Loading...
HomeMy WebLinkAboutNCS000489_Hendersonville 2020 Annual Report Narrative_20201019McCoy, Suzanne From: Lucas, Annette Sent: Monday, October 19, 2020 12:53 PM To: Powell, Jeanette Cc: McCoy, Suzanne Subject: FW: [External] NCS 000489 City of Hendersonville Stormwater Management Plan FY19-20 Attachments: FY 19-20 Hendersonville Stormwater Management Plan .pdf JP, FYI Suz, Can you please file this email and the plan in LF? Thanks, A From: Huffman, Mike <mhuff man@hvinc.gov> Sent: Wednesday, October 14, 2020 1:13 PM To: Lucas, Annette <annette.lucas@ncdenr.gov> Subject: [External] NCS 000489 City of Hendersonville Stormwater Management Plan FY19-20 External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Good afternoon Annette, Attached is the FY19-20 Stormwater Management Plan for the City of Hendersonville, NC. Permit NCS000489. I'm submitting this in conjunction with our annual SWMPA that I just completed. For FY20-21 I am planning to convert this plan to the new "Interim SWMP Template" provided on the MS4 Program website. Please let me know if you have any questions. Thanks and have a great day! Michael Huffman, CPMSM Stormwater Administrator City of Hendersonville, NC Office: 828-697-3013 Cell: 828-458-5693 mhuffman@hvinc.gov ',e t' ° E: 4L ■ r ■ r 18 1 S-STORMWATER, MANAGEMENT PLAN City of Hendersonville Engineering Department 305 Williams Street Hendersonville, NC 28792 NPDES PERMIT No.: NCS000489 Reporting Year: July 1, 2019 — June 30, 2020 Table of Contents Stormwater Management Plan Overview....................................................3 Status Of Implementation...........................................................................3 WaterQuality..............................................................................................3 Current FY 19-20 Adopted Budget..............................................................5 Organizational Chart...................................................................................6 Capital Improvement Projects.....................................................................8 Yearly Maintenance Activities.....................................................................9 Minimum Control Measures......................................................................10 Public Education and Outreach.............................................................................................10 Public Involvement and Participation.....................................................................................17 Illicit Discharge Detection and Elimination (IDDE).................................................................19 Construction Site Runoff Controls..........................................................................................25 Post -Construction Site Runoff Control...................................................................................26 Pollution Prevention And Good Housekeeping......................................................................34 Total Maximum Daily Loads (TMDL's)......................................................40 z Stormwater Management Plan Overview The City of Hendersonville is a federally designated National Pollutant Discharge Elimination System (NPDES) Phase II community and operates under the authority of the Stormwater Management Program which operates as a division of the Engineering Department. The North Carolina Division of Water Quality renewed NPDES Phase II Permit NCS000489 to the City of Hendersonville November 30, 2016 — November 10, 2022. The Stormwater Management Plan is the City of Hendersonville's program to comply with NDPES Permit NCS000489 authorization to discharge Stormwater from the Municipal Separate Storm Sewer System (MS4s) located within the City of Hendersonville Jurisdictional Area. The plan is a guidance document used by City staff and the general public. Status of Implementation The City of Hendersonville is pleased to report progress for year 12 compliance with requirements of NPDES Phase II permit in the following six minimum control measures in the plan: • Public Education and Outreach • Public Participation and Involvement • Illicit Discharge Detection and Elimination • Construction Site Runoff Control • Post -Construction Site Runoff Control • Pollution Prevention and Good Housekeeping for Municipal Operations On April 7, 2011 the City of Hendersonville Council approved Stormwater Ordinance No. 11-0419 Article 111. Water Quality The City of Hendersonville is delegated by the state to enforce the Stormwater and Illicit Discharge regulations within our jurisdictional area. The city has adopted and enforces a stormwater ordinance. (Chapter 24 Article III of the Code of Ordinances) The City reviews and approves all development plans associated with grading, stormwater, and erosion control. For projects that cumulatively disturb more than one acre a formal plan is required. All formal plans are required to be prepared by a qualified registered NC professional engineer or landscape architect. For projects that disturb less than an acre and are not part of a larger development are exempt from the stormwater ordinance. For all other projects, stormwater controls must 3 be designed by a licensed professional and installed. The city requires 85% removal of Total Suspended Solids and also requires that the post construction discharge not exceed pre -development discharge for the 2-year and 10-year storm event with the ability to pass the 25-year event. Additionally, the Zoning ordinance regulates a 30' undisturbed vegetated stream buffer with an additional 20' transitional buffer where no impervious surfaces are allowed. All projects have a buffer unless exempt by a variance or have been previously disturbed. 4 Budget Current FY 19-20 Adopted Budget Stormwater Fund Budgeted Revenues $(326,760) Charges for Services (325,000) Other Taxes & Licenses Unrestricted Intergovernmental Restricted Intergovernmental Permits & Fees (1,040) Sales & Services Investment Earnings (750) Miscellaneous Budgeted Expenditures 538,152 Stormwater 538,152 Other Financing Sources (211,362) Proceeds of Debt (226,000) Transfer (In) Transfers out 30,000 Fund Balance Appropriated (15,362) Sub -Total Appropriations $568,152 *Note: There is 1 Full -Time Equivalent (FTE) employee in the Stormwater Fund; however, a portion of wages for other City employees is accounted for via the Stormwater Fund 5 Organization Chart for Engineering Department (17/18 FY) Organizational Chart L Works ws Summary of Responsible Parties SWMP Component Responsible Position Staff Name Department/Division Stormwater Program Stormwater Michael Huffman Stormwater Administration Administrator SWMP Management Stormwater Michael Huffman Stormwater Administrator Public Education & Stormwater Michael Huffman Stormwater Outreach Administrator Public Involvement & Stormwater Michael Huffman Stormwater Participation Administrator Illicit Discharge Stormwater Michael Huffman, Tom Stormwater, Water Detection & Administrator, Public Wooten, Chad Freeman, Sewer, Public Works Elimination Works & Water/Sewer All PW and W/S Field crews Crews Construction Site Henderson County Natalie Berry Engineering Runoff Control Organization Chart for Engineering Department (17/18 FY) Post -Construction Stormwater Michael Huffman, Stormwater, Stormwater Administrator, City Brendan Shanahan Engineering Management Engineering Department Pollution Stormwater Michael Huffman, Tom Stormwater, Public Prevention/Good Administrator, Public Wooten, Chad Freeman, Works, Water and Housekeeping for Works & Water/Sewer All PW and W/S Field Sewer Municipal Operations Crews Crews Municipal Facilities Stormwater Michael Huffman, Tom Stormwater, Public Operation & Administrator, Public Wooten, Chad Freeman Works Maintenance Program Works Director, Assistant Public Works Director Spill Response Program Stormwater All Public Works and All Public Works and Administrator, Fleet Water Sewer Staff Water Sewer Staff Maintenance Manager MS4 Operation & Stormwater Michael S. Huffman, Stormwater, Public Maintenance Program Administrator, Public Tom Wooten, Chad Works Works Director, Freeman Assistant Public Works Director Municipal SCM Stormwater Michael S. Huffman Stormwater Operation & Administrator Maintenance Program Pesticide, Herbicide & Public Works Director, Tom Wooten, Chad Public Works Fertilizer Management Assistant Public Works Freeman Program Director Vehicle & Equipment All Public Works Staff All Public Works Staff Public Works Cleaning Program Pavement Management Public Works Director, Tom Wooten, Chad Public Works/ Program Assistant Public Works Freeman, Stacey Stormwater Director, Street sweeper Total Maximum Daily N/A N/A N/A Load (TMDL) Requirements Capital Improvement Projects Capital Improvement Projects New Street sweeper $226,000 Stormwater Utility Rate Study $99,000 Operation and Maintenance Yearly Maintenance Activities Maintenance activities include pipe repair, storm drain cleaning, grate replacement, catch basin repair, culvert repair, shoulder repair and ditching. These activities are conducted by the PW Streets and Parks crews. Stormwater Work Orders FY19-20 Blocked Storm Drain 9 Repair Storm Drain 4 Ditching 4 Curbing/Runoff 4 Sinkhole 2 Total 23 Yearly Operation Activities Total Number Inspections (7/1/19 — 6/30/20) Stormwater 110 Notice of Violations 30 Plan Reviews (7/1/19 — 6/30/20) Total Number Received 7 Reviewed 8 Approved 7 0 Public Education and Outreach Minimum Control Measures Public Education and Outreach 1. Objectives for Public Education and Outreach Distribute educational materials to the community or conduct equivalent outreach activities about the impacts of stormwater discharges on water bodies and the steps the public can take to reduce pollutants in stormwater runoff. 2. BMPs for Public Education and Outreach The permittee shall implement the following BMPs to meet the objectives of the Public Education and Outreach Program and shall notify the Division prior to modification of any goals. BMP a. Goals and Objectives 19-20 Accomplishment .Wm� Measurable Goals Defined goals and objectives of the Local Public Education and Outreach Program based on community wide issues The City of Hendersonville performs a public education and outreach program currently through community meetings, local schools, local news, and events. Currently the program includes providing lessons on general stormwater, watershed management, clean water and the steps people can take to reduce polluted stormwater runoff. 20-21 Objectives The City will continue to develop public education and outreach opportunities with our target audiences. City stormwater staff will continue participating in existing education events and partnering with community organizations in order to educate the public about the stormwater program. BMP b. Describe target pollutants and/or stressors 10 Measurable Goals SARl The permittee shall maintain a description of the target pollutants and/or likely stressors and likely sources. Public Education and Outreach 19-20 Accomplishment The City of Hendersonville participates in chemical and biological stream monitoring with Mountain True for the testing of five stream sites within the city. Mountain True has been developing an on -going water quality database of Western North Carolina watersheds. The purpose of this research is to continue and expand the long-term monitoring of stream sites within Henderson County. The cost was being shared by the Henderson County Board of Commissioners and MountainTrue. The major focus of the monitoring is to identify problem areas as well as areas with high water quality that need to be maintained and to monitor areas where water quality improvement projects will be taking place. (The Mountain True contract with EQI offers technical assistance through laboratory analysis of samples and statistical data analysis of monitoring results.) The overall goal of the proposed research is to assess the present water quality of representative streams and rivers within the City of Hendersonville. Specific objectives include: • Analyze water samples from five sites in Hendersonville for eight chemical parameters monthly, with this contract it brings the total number of monitoring sites in Henderson County to 37. • Analyze data statistically for trends between sites (spatial) and trends within sites overtime (temporal); and • Use the results of the analyses to assess the ability of the streams to support their various current, intended, and potential uses. EQI laboratory analyzes all samples for the following parameters: pH, ammonia -nitrogen, nitrate -nitrogen, orthophosphate, total suspended solids, alkalinity, turbidity, and conductivity. Based on results from the VWIN and SMIE programs, NCDEQ 303 (d) Impaired Waterbodies list, and local water quality issues the City has developed the following list of target pollutants and likely sources: Target Pollutant Likely Source Sediment Erosion from active construction, streambank instability Biological Contaminants Pet waste, SSO, sewer leaks, failing septic sstems Gross waste Leaking dumpsters/trash compactors, improperly managed dum sters/ Littering Oil/Grease/Heavy Metal Restaurants/ Car washes and road runoff 11 Public Education and Outreach Nutrients Over application of lawn and garden products These pollutants were selected because they can harm fish and wildlife population, foul drinking water supplies, kill native vegetation, and make recreational areas unsafe. 20-21 Objectives The City will continue to assist Mountain True in their VWIN and SMIE monitoring programs. City Stormwater staff will continue to monitor target pollutants in the MS4 c. Describe target audiences 19-20 Accomplishment Measurable Goals The permittee shall identify, assess annually and update the description of the target audiences likely to have significant stormwater impacts and why they were selected. The City of Hendersonville target audiences are youth groups, residential property owners /homeowner's associations, restaurants/food stores. Youth groups were chosen in order to educate children early as they can help educate their parents. Property owners and homeowner's associations were selected because of the large impact they can have on the stormwater in the community. Restaurants and food stores were chosen in order to reduce contaminated stormwater runoff general kitchen cleaning operations. 20-21 Objectives Continue our educational outreach to youth groups, community members, and commercial stakeholders. BMP Measurable Goals d. Describe residential and The permittee shall describe issues, such industrial/commercial issues as pollutants, the likely sources of those pollutants, potential impacts, and the 12 Public Education and Outreach physical attributes of stormwater runoff, in their education/outreach program. 19-20 Accomplishment The city's education/outreach program for residential property owners, contractors, auto shops, restaurants and food stores has focused on the following pollutants: Target Pollutant Likely Source Sediment Erosion from active construction, streambank instability Biological Contaminants Pet waste, SSO, sewer leaks, failing septic sstems Gross waste Leaking dumpsters/trash compactors, improperly managed dum sters/ Littering Oil/Grease/Heavy Metal Restaurants/ Car washes and road runoff Nutrients Over application of lawn and garden products 20-21 Objectives Continue to educate target audiences on the impacts of these pollutants and how they can better manage their impact on water quality. mmmdaama e. Informational Website 19-20 Accomplishments Measurable Goals MM& The permittee shall promote and maintain an internet website designed to convey the program's message. The Engineering Department continues to maintain an educational stormwater website: http://www.hendersonvillenc.gov/stormwater-management. The website provides information about the stormwater program and the importance of clean water to the citizens of Hendersonville. It provides links to regional and national stormwater resources and contact information for the City's stormwater hotline number. 13 Public Education and Outreach 20-21 Objectives Continue to maintain and update our current website with stormwater projects and activities. Addition of maps that detail the city's stormwater outfalls and infrastructure. BMP f. Distribute public education materials to identified target audiences and user groups. 19-20 Accomplishment Measurable Goals The permittee shall distribute stormwater educational material to appropriate target groups. Instead of developing its own material the permittee may rely on Public Education and Outreach materials supplied by state, and/or other entities through a cooperative agreement, as available, when implementing its own program. The City distributed stormwater education materials via email, direct mail, educational events and news media. Materials included: Material Number Distributed Water Protection Guide for Restaurant Owners/Employees 5 General Stormwater information 23500 Benefits of rain barrels and rain gardens 530 20-21 Obiectives Continue distributing stormwater educational material to target audiences. g. Maintain Hotline/Help line 14 Measurable Goals The permittee shall promote and maintain a stormwater hotline/helpline for the purpose of public education and outreach Public Education and Outreach 19-20 Accomplishments The City provides a stormwater hotline 828-697-3013 for citizens to report illicit discharge, accidental discharge, spills, erosion/sediment problems, and other stormwater related issues. This number is promoted on the city website and flyers/brochures mailed to citizens. 20-21 Objectives Continue to maintain and promote the stormwater hotline/helpline. In 2019 a new streetsweeper was purchased by the Stormwater Division. A vinyl wrap was purchased for the sweeper that has educational information about Stormwater program and provides the stormwater hotline. RMP h. Implement a Public Education and Outreach Program 19-20 Accomplishments Measurable Goals "N The permittee outreach program, including those elements implemented locally or through a cooperative agreement, shall include a combination of approaches designed to reach the target audiences. For each media, event or activity, including those implemented locally or through a cooperative agreement the permittee shall estimate and record the extent of exposure. Event Exposure (approximate) Classroom/Outdoor Lessons 420 Students WLOS Cost of Growth report 100,000+ Rain Barrel Program 200 residents Council Conversations 100 residents Stream Repair Workshop 35 residents Stream Clean ups/ Trash Trout Events x 3 50 volunteers Live staking events 40 volunteers 15 Public Education and Outreach 20-21 Objectives Continue to: • Search for public education and outreach opportunities • Maintain and update website • Mail informational brochures to target audiences • Work with other City departments and local organizations to provide stormwater education and outreach. 16 Public Involvement and Participation Public Involvement and Participation 1. Objectives for Public Involvement and Participation Comply with State and Local public notice requirements when implementing a public involvement and participation program 2. BMP's for Public Involvement and Participation The permittee shall implement the following BMP's to meet the objectives of the Public Involvement and Participation program and shall notify the Division prior to any modifications of any goals BMP a. Volunteer community involvement program 19-20 Accomplishments Measurable Goals The permittee shall include and promote volunteer opportunities designed to promote ongoing citizen participation The City of Hendersonville partners with Mountain True to provide an Adopt -a -park program. Groups and organizers are encouraged to help reduce litter by participating in Hendersonville's Adopt -a -Park program. Participants agree to pick up litter from local parks and streams at least 4 times a year. The City provides groups with bags, vests, gloves, and grabbers. The City of Hendersonville provides garbage pickup and signs to recognize litter reduction efforts. The City of Hendersonville partnered with Asheville GreenWorks to install a litter reduction device named the "Trash Trout" in a local river. The device catches floating trash that is then collected by volunteers. The City stormwater specialist participates in clean ups and helps with trash pickup. The device collected over 5000 lbs. of trash from June 2017- June 2020. Additionally, over 100 volunteers have participated in maintaining the device and in water quality monitoring associated with the device. The City of Hendersonville created a drain stenciling program in which volunteers can stencil drains with a message that aims to prevent illegal dumping into storm drains. The City provides stencils, paints, gloves, and other necessary items for the events and the stormwater administrator participates in all drain stenciling events. The City of Hendersonville promotes and participates in NC Big Sweep river clean up every year. This event encourages community members to participate in a one -day river 17 Public Involvement and Participation cleanup project. In 2019 the City hosted a team of 18 people who cleaned a 1.5-mile section of Mud Creek and removed approximately 1000 lbs. of trash. Other teams throughout the City also participated but were organized by various community groups. The City of Hendersonville participates in a volunteer -based water quality monitoring program sponsored by local non-profit Mountain True. The project is monitoring 30 locations within the watershed for Fecal Coliform and E. Coli in order to prioritize streams where illicit connections or discharges may be occurring. The City of Hendersonville organized 2 live staking events with local non-profit Mountain True to educate residents about erosion prevention methods. 20-21 Objectives The City will continue to look for partnership opportunities to perform various stormwater activities IV Illicit Discharge Detection and Elimination (IDDE) 1. Objectives for Illicit Discharge Detection and Elimination a. Implement and enforce a program to detect and eliminate illicit discharges into the MS4; b. Maintain a storm sewer system map, showing the location of major outfalls and the names and locations of waters of the United States that receive discharges from those outfalls; c. Prohibit, through ordinance, or other regulatory mechanism, non-stormwater discharges except as allowed in this permit and implement appropriate enforcement procedures and actions; d. Implement a plan to detect and address non-stormwater discharges, including illegal dumping into the MS4; e. Inform public employees, businesses, and the general public of hazards associated with illegal discharges and improper disposal of waste; and f. Address the following categories of non-stormwater discharges or flows (i.e., illicit discharges) only if you identify them as significant contributors of pollutants to the MS4: waterline flushing, landscape irrigation, diverted stream flows, rising ground waters, uncontaminated ground water infiltration, uncontaminated pumped ground water, discharges from potable water sources, foundation drains, air conditioning condensation, irrigation water, springs, water from crawl space pumps, footing drains, lawn watering, individual residential car washing, flows from riparian habitat and wetlands, dechlorinated swimming pool discharges, and street wash water (discharges or flows from firefighting activities are excluded from the effective prohibition against non-stormwater and need only be addressed where they are identified as significant sources of pollutants to waters of the United States) 2. BMPs for Illicit Discharge Detection and Elimination The permittee shall implement the following BMPs to meet the objectives of the Illicit Discharge Detection and Elimination Program and shall notify the Division prior to modification of any goals. AM a. Maintain adequate legal authorities 19 Measurable Goals The permittee shall annually review the IDDE ordinances or other regulatory mechanisms, or adopt any new ordinances or other regulatory mechanisms that provide the permittee with adequate legal authority to prohibit illicit connections and discharges and enforce the approved IDDE Program 19-20 Accomplishment The City of Hendersonville Council approved and adopted ordinance No. 11-0419 Article III on April 7, 2011. This ordinance addresses stormwater and illicit discharge. 19-20 Objective Continue to follow the ordinance and update annually as necessary. BMP1W1jJJJJ& ,,,&Measurable Goals " b. Maintain a Storm Sewer System The permittee shall maintain a current Base Map of Major Outfalls map showing major outfalls and receiving waters. 19-20 Accomplishment The City maintains and updates maps of the stormwater system throughout the city in ArcGIS, a GIS based system. The maps are updated annually to show new storm drainage systems that have been installed. This mapping system shows locations of streams, rivers, ponds, lakes, SCM's, storm drains, outfalls, and drainage networks. 20-21 Objectives Continue to maintain and update maps of the stormwater system in ArcGIS. Publish stormwater system map online for general public to access. The City has contracted with an outside consultant to complete a Stormwater Asset inventory for all City Owned stormwater infrastructure. DRP c. Detect dry weather flows AMIL Measurable Goals The permittee shall develop and implement a program for conducting dry weather flow field observations in accordance with a written procedure for detecting and removing sources of illicit discharge. 20 19-20 Accomplishment City of Hendersonville stormwater staff conduct dry weather screening of major outfalls for dry weather flows with a goal of surveying 20% of all major outfalls annually. This ensures a complete survey of major outfalls is conducted each permit cycle. If a dry weather flow is detected a sample is collected and screened using the LaMotte MS4 stormwater screening kit to determine if the discharge contains pollutants. The stormwater administrator is familiar with the stormwater system and conducts annual inspection of publicly maintained storm drain systems throughout the city. If a suspected illicit discharge is discovered, or a resident of the city reports a questionable discharge, the stormwater administrator is notified and visits the site to investigate the report. In the event the City is unable to identify the discharge, the NC Division of Water Quality is contacted for testing purposes. Assuming there is evidence of an illicit discharge, the property owner is notified in person (if possible) or by letter about what has been found, the amount of time to take corrective action and enforcement procedures should they choose not to comply in accordance with section 24-163 of the stormwater ordinance which covers civil penalties. 20-21 Objectives Stormwater administrator will continue to perform routine inspections. Additionally, municipal staff will be trained in illicit discharge detection procedures. AM Measurable Goals d. Investigation into the sources of all The permittee shall maintain and evaluate identified illicit discharges. annually written procedures for conducting investigations of identified illicit discharges. 19-20 Accomplishment City of Hendersonville Stormwater Administrator responds to illicit discharge concerns which include identifying the source and working with the property owner to resolve the issue. Developed a formal written standard operating procedure (SOP) for identifying illicit discharges and connections. Developed a formal SOP for investigating, reporting and documenting IDDE reports from the community. Developed a formal SOP for dry weather screening 21 20-21 Objectives Continue to administer the City's IDDE Program and review/update the plan annually AM e. Track investigations and document illicit discharges Measurable Goals The permittee shall track all investigations and document the dates the illicit discharge was observed; the results of investigation; any follow-up of the investigation; and the date the investigation was close. 19-20 Accomplishment The City of Hendersonville investigates all discharge complaints. All complaints are documented with pictures and the date the investigation was closed, as well as any follow- up needed. 19-20 Objective Continue to track all illicit discharge complaints. AM Measurable Goals f. Employee Training The permittee shall implement and document a training program for appropriate municipal staff, which, as part of their normal jobs responsibilities, may come into contact with or otherwise observe an illicit discharge or illicit connection to the storm sewer system. 19-20 Accomplishment Conducted Municipal stormwater pollution prevention training for the following departments: Division Number of Employees Date of Training Water/Sewer and Public Works 59 2/20/20 22 20-21 Objectives Hold training for other departments within the organization that may come in contact with or otherwise observe and illicit discharge to the storm sewers system. JI&BMP g. Provide Public Education Measurable Goals The permittee shall inform public employees, businesses, and the general public of the hazards associated with illegal discharges and improper disposal of waste. 19-20 Accomplishment Educational brochures were included in combined utility bills sent to all Water/Sewer customers. The brochure included information associated with illicit discharges and improper disposal of waste. 20-21 Objectives Continue mailing brochures to businesses and the public informing them of the hazards associated with illicit discharges and improper disposal of waste. AM h. Public reporting mechanism Measurable Goals The permittee shall promote, publicize, and facilitate a reporting mechanism for the public and staff to report illicit discharges and establish and implement citizen request response procedures. 19-20 Accomplishment The City operates a telephone number in which residents or staff members can report issues related to illicit discharges, off -site sedimentation and other stormwater issues. This telephone number is located on the City of Hendersonville website and on educational brochures mailed annually to the public. 20-21 Objectives 23 Continue to provide a telephone hotline to report issues related to illicit discharge, off -site sedimentation and other stormwater issues. Develop an online reporting tool for Illicit discharges. Measurable Goals Enforcement The permittee shall implement a mechanism to track the issuance of notices of violation and enforcement actions administered by the permittee. This mechanism shall include the ability to identify chronic violators for initiation of actions to reduce noncompliance. 19-20 Accomplishment City of Hendersonville Stormwater ordinance No. 11-0419 allows the enforcement of notices of violations for illicit discharges. 20-21 Objectives Develop a database for NOV's and enforcement actions. Continue to enforce the City's stormwater ordinance. 24 CONSTRUCTION SITE RUNOFF CONTROLS Construction Site Runoff Controls The City of Hendersonville has delegated the Local Erosion and Sediment Control program to Henderson County 25 Post -Construction Site Runoff Control Objectives for Post -Construction Site Runoff Controls a. Implement and enforce a program to address stormwater runoff from new and redevelopment projects, including public transportation maintained by the permittee, that disturb greater than or equal to one acre, including projects less than one acre that are part of a larger common plan of development or sale, which would discharge into the small MS4. The program shall ensure that controls are in place that would prevent or minimize water quality impacts. The program shall apply to private development sites and sites developed by the permittee, including public transportation maintained by the permittee. b. Implement strategies which include a combination of structural and/or non- structural best management practices (BMPs) appropriate for the community. c. Enforce an ordinance to address post -construction runoff from new and redevelopment projects. d. Ensure adequate long-term operation and maintenance of BMPs through an inspection and maintenance program. 1. BMPs for Post -Construction Site Runoff Controls The permittee shall implement the following BMPs to meet the objectives of the Post -Construction Stormwater management program. To the extent there is any conflict between the permittee and post -construction ordinances adopted by the N.C. Division of Water Quality, the post -construction ordinances shall apply with regard to permit compliance. 8"M Measurable Goals a. Adequate legal authorities Maintain through ordinance, or other regulatory mechanism, adequate legal authorities to meet the objectives of the post -construction site runoff control stormwater management program. The permittee shall have the authority to review designs and proposals for new development and redevelopment to determine whether adequate stormwater control measures will be installed, implemented, and maintained. The permittee shall have the authority to request information such as stormwater plans, inspection reports, monitoring 26 results, and other information deemed necessary to evaluate compliance with the post -construction stormwater management program. The permittee shall have the authority to enter private property for the purpose of inspecting at reasonable times any facilities, equipment, practices, or operations related to stormwater discharges to determine whether there is compliance with the post -construction stormwater management program. 19-20 Accomolishment The primary regulatory mechanism for the City of Hendersonville is the Stormwater Ordinance. Specifically, Article III Section 24 deals with stormwater and illicit discharges and connections. Section 24-148(a) calls for all development and redevelopment to which this subsection applies shall comply with the standards herein. The design of facilities to comply with these standards shall be based on procedures contained in DEQ's Stormwater BMP Manual or as approved by the Stormwater Administrator guided by the purpose and intent of this section. Section 24-147 (b) (1) calls for all treatment measures to treat either the runoff from the disturbed area volume calculated utilizing the one-year, one -hour design storm rainfall depth; or the difference in stormwater runoff volume between the pre- and post - development conditions for the one-year, 24-hour storm; whichever is greater. Section 24-147 (c) calls for stormwater quality control that discharges stormwater at a rate equal to or less than the pre -development discharge rate for both the two-year, 24-hour storm and the ten-year, 24-hour storm with the ability to pass the 25-year, 24-hour storm. Section 24-147 (b) (2) calls for the Runoff volume drawdown time to be a minimum of 48 hours, but not more than 120 hours. Section 24-147 (b) (3) calls for all structural stormwater treatment systems used shall be designed to have a minimum of 85 percent average annual removal for total suspended solids (TSS). Section 24-147 (e) calls for approval of the stormwater permit to require an enforceable restriction on property usage that runs with the land, such as recorded deed restrictions or protective covenants, to ensure that future development and redevelopment maintains the site consistent with the approved project plans. Every structural BMP installed pursuant to this ordinance shall be made accessible for adequate maintenance and repair by a maintenance 27 easement. The easement shall be recorded, and its terms shall specify who may make use of the easement and for what purposes. 19-20 Objective Continue to operate our program. BMP Measurable Goals b. Strategies which include BMPs The permittee shall adopt the DWQ MDC appropriate for the MS4 for Stormwater Control Measures 19-20 Accomplishment The City of Hendersonville requires that all projects that involve a structural stormwater BMP have an Operation and Maintenance Agreement filed with the city and recorded in the Henderson County Register of Deeds office before a final plan approval and Certificate of Occupancy are granted. The agreement binds the owner and any future owners. The agreement requires the owner to maintain, repair and if necessary, reconstruct the structural BMP and shall state the terms, conditions, and schedule of maintenance for the structural BMP. It shall also grant the city a right of entry in the event that the Stormwater Administrator has reason to believe that it has become necessary to inspect, monitor, maintain, repair or reconstruct the structural BMP. The agreement shall state that if the Stormwater Administrator has deemed an order directing the correction, repair, replacement, or maintenance of the facility has not been satisfactorily compiled within a reasonable period of time the city may, after notice to the owner enter the land and perform any necessary work to place the facility in proper working condition. Section 24-154 (b) established special requirements for homeowner's and other associations within the City's jurisdiction. For all structural BMPs required pursuant to the article and that are to be or are owned and maintained by a homeowners' association, property owners' association, or similar entity establishment of an escrow account, which can be spent solely for sediment removal, structural, biological or vegetative replacement, major repair, or reconstruction of the structural BMPs. If structural BMPs are not performing adequately or as intended or are not properly maintained, the city, in its sole discretion, may remedy the situation, and in such instances the City of Hendersonville shall be fully reimbursed from the escrow account. Escrowed funds may be spent by the association for sediment removal, structural, biological or vegetative replacement, major repair, and reconstruction of the structural BMPs, provided that the city shall first consent to the expenditure. Allowing the city to recover from the association and its member's any and all costs the city expends to maintain or repair the structural BMPs or to correct any operational deficiencies. Failure to pay the city all of its expended costs, after 45 days' written notice, shall constitute a breach of the agreement. In case of a deficiency, the city shall thereafter be entitled to bring an action against the association and its members to pay, or foreclose upon the lien hereby authorized by the agreement against the m property, or both. Interest, collection costs, and attorney fees shall be added to the recovery. The City of Hendersonville Public Works Department operates a vacuum truck that cleans out storm drainage pipes and structures. The city operates the truck on a cycle and cleans drains on an as -needed basis. The city also operates a street sweeper to assist in preventing any materials from entering into the storm drainage system. The City of Hendersonville's Public Works staff will also respond to complaints on storm drains and other drainage structures as needed. 20-21 Objectives Continue to require that all projects that involve a stormwater BMP have an Operation and Maintenance Agreement filed with the city and recorded in the Henderson County Register of Deeds office before plan approval and Certificate of Occupancy are granted. A Un Measurable Goals c. Plan reviews The permittee shall conduct site plan reviews for all new development and redeveloped sites that disturb equal to or greater than one acre (including sites that disturb less than one acre that are part of a large common plan of development or sale). The site plan review shall address how the project applicant meets the performance standards and how the project will ensure long-term maintenance. 19-20 Accomplishment The Stormwater ordinance provides the mechanism for the City of Hendersonville to review plans. 20-21 Objectives Continue to enforce the stormwater ordinance. BMP &E& d. Inventory of projects with post - construction structural stormwater control measures 29 Measurable Goals The permittee shall maintain an inventory of projects with post -construction structural stormwater control measures installed and implemented at new development and redeveloped sites, including both public and private sector sites located within the permittee's jurisdiction that are covered by its post - construction ordinance requirements. 19-20 Accomplishment Every SCM constructed within the City of Hendersonville is required to have an operation and maintenance agreement written that describes the location of the structure, list the owner, describes the structure proper, and describes the function and required maintenance. The owner of the SCM is required to have the structure inspected by a certified professional every year and provide the results of the inspection to the City of Hendersonville Stormwater Administrator. The City of Hendersonville inspected all public and private sector SCM's that have filed Operation and Maintenance agreements and are located within the city's jurisdiction 20-21 Objectives The City of Hendersonville plans to continue the inspection of all public and private sector SCM's that have filed Operation and Maintenance agreements and are located within the city's jurisdiction. e. Deed Restrictions Protective Covenants Recorded Operation Maintenance Agreements 19-20 Accomplishment Measurable Goals and The permittee provides mechanism such as or recorded deed restrictions and protective and covenants or recorded operation and maintenance agreements that ensure development activities will maintain the project consistent with approved plans. The Operation and Maintenance Agreement is recorded with Henderson County Register of Deeds. The City also maintains a hard copy of the agreement and electronic listing of each BMP which included the location, owner and running list of inspection dates. 20-21 Objectives Continue to require a recorded Operation and Maintenance Agreement for BMPs. 30 : 11 f. Provide a mechanism to require long-term operation and maintenance of structural BMPs 19-20 Accomplishment Measurable Goal! The permittee shall implement or require an operation and maintenance plan for the long-term operation of the structural BMPs required by the program. The operation and maintenance plan shall require the owner of each structural BMP to perform and maintain a record of annual inspections of each structural BMP. Annual inspection of permitted structural BMPs shall be performed by qualified professional. City of Hendersonville ordinance requires that an annual inspection of permitted structural BMPs shall be performed by a qualified professional and a copy sent to the city. The City performs annual inspections of all public and privately owned SCM's within the city's ETJ 20-21 Objectives The City of Hendersonville's Stormwater Administrator will continue the annual inspections of all SCM's operated in the city ETJ :NAIN Measurable Goals g. Inspections To ensure that all stormwater control measures are being maintained pursuant to its maintenance agreement, the permittee shall conduct and document inspections of each project site covered under performance standards, at least one time during the permit term. Before issuing a certificate of occupancy or temporary certificate of occupancy, the permittee shall conduct a post - construction inspection to verify that the permittee's performance standards have been met or a bond is in place to guarantee completion. The permittee shall document and maintain records of inspection findings and enforcement 31 actions make them available for reviewing by the permitting authority. 19-20 Accomplishment To ensure that all stormwater control measures are being maintained pursuant to maintenance agreements, the City of Hendersonville conducts random inspections at each project site covered under the performance standards, at least one time during the permit term. Before issuing a certificate of occupancy or temporary certificate of occupancy a post -construction inspection is performed. 20-21 Objectives Continue inspections for all stormwater control measures within the city ETJ .. . h. Educational materials and training for developers 19-20 Accomplishments Measurable Goals The permittee shall make available through paper of electronic means, ordinances, post - construction requirements, design standards checklist, and other materials appropriate for developers. New materials may be developed by the permittee, or the permittee may use materials adopted from other programs and adapted to the permittee's new development and redevelopment program. Ordinances, post -construction requirements, design standards checklist, and other materials appropriate for developers are available electronically on our website (http://www.hendersonvillenc.gov/stormwater-management). All close out documents are given to developers during the pre -con meetings and are available upon request. 20-21 Objectives Continue to maintain the website and provide documents to developers during pre -con meetings. BMP Measurable Goals 32 i. Enforcement The permittee shall track all issuances of notices of violation and enforcement actions. This mechanism shall include the ability to identify chronic violators for initiation of actions to reduce noncompliance. 19-20 Accomolishment A digital file is created for all notices of violation that contains all information pertinent to the project including owner information, contractor information, project address, any permit numbers attached to the project, a copy of the written notice of violation and any photos that were taken. These digital files are broken down by year. Every time a new violation is discovered, the inspector reviews digital files containing previous notices of violation to discover if a pattern of repeat violations is beginning to occur with a particular contractor or owner prior to the new notice of violation being written. 20-21 Obiectives Continue to track the issuance of notices of violation and enforcement actions. 33 Pollution Prevention and Good Housekeeping 1. Objectives for Pollution Prevention and Good Housekeeping for Municipal Operations. a. Implement an operation and maintenance program that includes a training component and has the ultimate goal of preventing or reducing pollutant runoff from municipal operations. b. Provide employee training to prevent and reduce stormwater pollution from activities such as park and open space maintenance, fleet and building maintenance, new construction and land disturbances, and stormwater system maintenance. 2. BMPs for the Pollution Prevention and Good Housekeeping for Municipal Operations. 17IM The permittee shall implement the following BMPs to meet the objectives of the Pollution Prevention and Good Housekeeping Program and shall notify the Division prior to modification of any goals. Measurable Goals a. Inventory of municipally The permittee shall maintain current inventory of owned or operated facilities facilities and operations owned and operated by the permittee with the potential for generating polluted stormwater runoff. 19-20 Accomplishment The Stormwater Administrator maintains a current inventory of facilities and operations owned and operated by the City that have a General or Individual Stormwater Permit. 20-21 Objectives Update the current inventory of facilities to include Fire stations, parks, and other facilities with the potential for generating polluted runoff. BMP Measurable Goals 34 b. Operation and Maintenance The permittee shall maintain and implement, (O&M) for municipally evaluate, annually and update as necessary an owned or operated facilities. Operation and Maintenance (O&M) program for municipally owned and operated facilities with the potential for generating polluted stormwater runoff. The O&M program shall specify the frequency of inspections and routine maintenance requirements. 19-20 Accomplishment Stormwater staff is in the process of working with each individual facility within the City of Hendersonville to formalize and implement an Operation and Maintenance program for each facility. The O&M will specify the frequency of inspections and routine maintenance requirements. 20-21 Objectives Finalize the O&M program for each City of Hendersonville facility. Measurable Goals c. Spill Response Procedures The permittee shall have written spill response for municipally owned and procedures for municipal operations. operated facilities 19-20 Accomplishment As part of the O&M program for each City facility, a written spill response procedure will be included 20-21 Objectives Finalize spill response procedures for all City facilities as part of the O&M program. Supply Spill kits and Good Housekeeping posters to City facilities. BMP Measurable Goals d. Streets, road, and public The permittee shall evaluate BMPs to reduce parking lot maintenance polluted stormwater runoff from municipally owned streets, roads, and public parking lots within their corporate limits. Within 12 months the permittee must update the Stormwater Plan to include the BMPs selected. 35 19-20 Accomplishment The City of Hendersonville reduced polluted stormwater runoff from streets, road, and public parking lots within our corporate limits by street sweeping and the use of a vacuum truck. During this fiscal year the street sweeper covers approximately 80 miles of curb and gutter at least 5 times. 20-21 Objectives Continue our street sweeping program. Develop a written O&M plan for street, road, and parking lot maintenance. BM Measurable Goals e. Streets, road, and public Within 24 months, the permittee must implement parking lot maintenance BMPs selected to reduce polluted stormwater runoff from municipally -owned streets, road, and public parking lots. The permittee must evaluate the effectiveness of these BMPs based on the cost and the estimated quantity of pollutants removed. 19-20 Accomplishment The City's street sweeping program deposits its collected material at the waste water treatment facility and weight is not recorded. 20-21 Objectives Continue our street sweeping program BMP AM Measurable Goals f. Operation and Maintenance Within 12 months, the permittee shall develop, (O&M) for municipally- and implement, an O&M program for the owned or maintained catch stormwater sewer system including catch basin basins and conveyance and conveyance systems that it owns and systems maintains. 19-20 Accomplishments The City of Hendersonville's maintenance program consists of leaf and garbage pickup, yard waste and brush removal, street sweeping, and storm -drain cleaning and maintenance within the City's right of way. 36 The City of Hendersonville's Engineering Department currently maintains one full time equivalent position for operations. This position is responsible for inspections of the storm drain system maintained by the City. Public Works staff periodically cleans catch basins when necessary in our maintained system. Public Works Department upgrades or rehabilitates existing structures when warranted. Public Works staff also street sweeps approximately 80 miles of curb on an annual basis, our target is 4-6 times per year Public Works Department operates a vacuum truck that can clean out storm drainage infrastructure when necessary. Public Works operates a street sweeper to assist with preventing any material from entering into the storm drainage system. The Stormwater Administrator also responds to complaints on storm drains and other structures as needed. 20-21 Objectives Public Works and Stormwater staff will continue to clean and inspect all catch basins in our system. The goal is to continue to operate vacuum trucks cleaning out storm drainage pipes on a periodic basis, continue to remove blockages from the storm drainage system on an annual basis and the City of Hendersonville plans to continue to perform street sweeping operations. BMP g. Identify municipally owned and maintained structural stormwater controls Measurable Goals The permittee shall maintain a current inventory of municipally -owned or operated structural stormwater controls installed for compliance with the permittee's post -construction ordinance. 19-20 Accomplishments The City of Hendersonville began developing and inventory of municipally owned and operated stormwater control structures. 20-21 Objectives Continue to update and maintain the database. BM Measurable Goals h. (O&M) for municipally- The permittee shall maintain and implement an owned or maintained O&M program for municipally -owned or maintained structural stormwater controls 37 structural stormwater installed for compliance with the permittee's post - controls construction ordinance. The O&M program shall specify the frequency of inspections and routine maintenance requirements. The permittee shall inspect and maintain all municipally -owned or maintained structural stormwater controls in accordance with the schedule developed by permittee. The permittee shall document inspection and maintenance of all municipally -owned or maintained structural stormwater controls. 19-20 Accomplishments Maintenance takes place on an as needed basis, mainly with City crews or volunteers. Structural stormwater controls are inspected at least annually by the Stormwater Administrator. 20-21 Objectives Continue maintenance when needed. BMP Measurable Goals Pesticide, Herbicide and The permittee shall ensure municipal employees Fertilizer Application and contractors are properly trained and all Management permits, certifications, and other measures for applicators are followed. 19-20 Accomplishments The City of Hendersonville Public Works and Parks departments ensures that municipal employees and contractors are properly trained on application of pesticide, herbicide, and fertilizer. 20-21 Objectives Public Works and Parks departments will continue to require this training. BMP Measurable Goals j. Staff training The permittee shall implement an employee training program for employees involved in 38 implementing pollution prevention and good housekeeping practices 19-20 Accomplishments Stormwater staff conducted Municipal Stormwater Pollution Prevention training to the following divisions: Public Works/ Water and Sewer 20-21 Objectives Conduct Municipal Stormwater Pollution Prevention training for the remaining departments within the city. JIM k. Prevent or Minimize Contamination of Stormwater Runoff from all areas used for Vehicle and Equipment Cleaning Measurable Goals The permittee shall describe measures that prevent or minimize contamination of the stormwater runoff from all areas used for vehicle and equipment cleaning. 19-20 Accomplishments The City has a wash bay with an oil water separator where vehicles and equipment are cleaned. 20-21 Objectives Continue to require vehicles and equipment be washed at the city's wash bay. 39 TOTAL MAXIMUM DAILY LOADS (TMDL's) Total Maximum Daily Loads (TMDL's) NO TOTAL MAXIMUM DAILY LOADS HAVE BEEN ESTABLISHED IN THE MS4 40