HomeMy WebLinkAboutWI0100106_Complete File - Historical_20141222IBLE BUNNELL-LAMMONS ENGINEERING, INC. GEOTECHNICAL, ENVIRONMENTAL AND CONSTRUCTION MATERIALS CONSULTANTS December 22, 2014 Underground Injection Control Program Division of Water Resources 1636 Mail Service Center Raleigh, NC 27699-1636 Attention: Mr. Mike Rogers Subject: Injection Plan for the 2015 Calendar Year UIC Permit No. WI0100106 Former Andrex Industries Facility 180 Deaverview Road Asheville, North Carolina BLE Project Number J14-1022-38 Groundwater Incident Number 6586 Brownfields Project Number 07022-03-11 Dear Mr. Rogers: Bunnell-Lammons Engineering, Inc. (BLE) is pleased to submit this injection plan for the 2015 calendar year. This document is prepared in response to an email request dated December 17, 2014 from the NCDENR. The requirements for the contents of this document were discussed in several emails between Mr. Andrew Alexander of BLE and Mr. Rogers, Mr. Landon Davidson, and Mr. Andrew Moore of the NCDENR. As discussed in our emails, BLE has completed the final sampling event (150 day) for the 2014 injection project at Andrex and have recently received the lab data. Recall that we installed one injection well (IW-2) in 2014 and injected and monitored in the IW-2 area per the approved monitoring matrix. BLE is preparing an interim evaluation report and an annual monitoring report for 2014 which will be issued in the 1 st quarter of 2015. Milkco and BLE are currently planning for injection in the 2015 calendar year. We are planning to install injection wells IW-1 and IW-3 in 2015 based on the 2014 results. However, the injection wells need to be moved from their permitted locations (about 100 lateral feet for IW-1 and 125 lateral feet for IW-3). Additionally, these wells need to be installed to shallower depths (60 feet bgs vs 85 feet bgs) to remediate the upper groundwater. Please note that we are not proposing a change to the approved injection well construction specifications. The monitoring matrix must be modified so that remediation in these areas can be adequately monitored based on the new injection well locations. No change is planned to the previously approved 30, 90, and 150-day monitoring frequency. It was agreed in the aforementioned emails that BLE would prepare revised tables, map, profiles, and proposed construction diagrams which illustrate the changes for the 2015 calendar year. 6004 PONDERS COURT PHONE (864) 288-1265 GREENVILLE, SOUTH CAROLINA 29615 FAX (864) 288-4430 Injection Plan for the 2015 Calendar Year December 22, 2014 Former Andrex Industries, Asheville, North Carolina BLE Project Number J14-1022-38 Injection Zone Illustrations The Proposed Injection Well Plan (Figure 2) has been modified to include an illustration of the actual installation location of injection well IW-2 and monitoring well MW-44 (both installed in 2014). The figure also shows the planned relocation of injection well IW-1 and IW-3 in 2015. This figure has been modified to include the results of the 2014 annual groundwater sampling event (report pending). The Hydrogeologic Profiles of the Affected Area (Figure 3) has been modified to include an illustration of the actual installation location and depth of injection well IW-2 (installed in 2014). The figure also shows the planned relocation and depths of injection well IW-1 and IW-3 in 2015. Please note that these injection wells now target the contaminated upper groundwater in the source area. Please note that the actual locations and depths of the proposed injection wells will be determined in the field based on site access and observed hydrogeology (water bearing fractures, depth to bedrock and groundwater, etc.). This figure has also been modified to include the results of the 2014 annual groundwater sampling event (report pending). Well Installation Plan The Well Installation Plan (Table 2) has been modified to document installation of IW-2 and MW- 44 in the 2014 calendar year and to show planned installation of in IW-1 and IW-3 in the 2015 calendar year. Additionally, the installation schedule for 2016 through 2018 has been cleared since we now anticipate adjusting the future installation schedule based on results from the prior year and on available project budget. Injection Schedule The Injection Schedule (Table 3) has been modified to document injection in IW-2 in the 2014 calendar year and to show planned injection in IW-1 and IW-3 in the 2015 calendar year. Additionally, injection schedule for 2016 through 2018 has been cleared since we now anticipate adjusting the future injection schedule based on results from the prior year and on available project budget. Injection Monitoring Plan Matrix The Injection Monitoring Plan Matrix (Table 4) has been modified to designate injection in IW-1 and IW-3 and to include the associated monitoring in those specific injection areas during the 2015 calendar year. Those wells are demarcated on the table with bold red text. Please note that monitoring is not performed in areas where injection is not occurring. Monitoring will occur on an annual basis for all wells and surface water points as required. The table has also been modified to include the requirement for semi-annual surface water monitoring of BC-1 and JW-1 as specified in the UIC permit. 2 Injection Plan for the 2015 Calendar Year Former Andrex Industries, Asheville, North Carolina Injection Well Construction Diagrams December 22, 2014 BLE Project Number J14-1022-38 Injection well construction diagrams for IW-1 and IW-3 (Appendix A) have been prepared based on anticipated subsurface conditions. Please note that the actual depths of the injection wells will be determined in the field based on observed hydrogeology (water bearing fractures, depth to bedrock and groundwater, etc.). The proposed construction is in accordance with the previously approved construction specifications in the permit. Closing We appreciate the opportunity to work with you at the subject site. We look forward to receiving NCDENR approval of the injection plan for the 2015 calendar year. If you have any questions, please do not hesitate contacting us at (864) 288-1265. Sincerely, BUNNELL-LAMMONs ENGINEERING, INC. &&/ A"W4--t- Andrew W. Alex nder, P.G., RSM Senior Hydrogeologist Registered, NC No. 1475 Attachments: Revised Figure 2 & Figure 3 Revised Tables 2, 3, & 4 Well Construction Diagrams for IW-1 and IW-3 Trevor J. Bento P.G. Project Hydrogeologist Registered, NC No. 2025 e:• awa projectslandrex milkcolphase38 injection & monitoring 20Minjection & monitoring plan 201512015 injection plan andrex 1022- 38.doc eeis ie eQ NSF'tis-9 '; � • =y 1 5 �; „�� 2025 s� 5 OLOG �ftist,��`` TABLES Table 2 Well Installation Plan (Revised for the 2015 Calendar Year) Andrex Industries Asheville, North Carolina NCDENR Groundwater Incident Number 6586 BLE Project No. J14-1022-38 3 0 ° o00 a MW-3R MW-8R MW-25R MW-44 X IW-1 X IW-2 X IW-3 X IW-4 IW-5 IW-6 IW-7 IW-8 IW-9 IW-10 IW-11 IW-12 Notes: X - Well Scheduled for Installation. Installations beyond 2015 will be determined based on 2015 results. Well installation schedule may be altered based on operational budget. Well installation schedule may be altered based on monitoring results. Prepared by: AWA Table 2 Inst Schedule of 1022-38 Andrex Injection Permit Tables 2015 Plan.xlsx Checked by: TJB Table 3 Injection Schedule (Revised for the 2015 Calendar Year) Andrex Industries Asheville, North Carolina NCDENR Groundwater Incident Number 6586 BLE Project No. J14-1022-38 Well Year One (2014) Year Two (2015) Year Three (2016) Year Four (2017) Year Five (2018) RW-3 XB IW-1 X IW-2 XB IW-3 X IW-4 IW-5 IW-6 IW-7 IW-8 IW-9 IW-10 IW-11 IW-12 Notes: X = Injection scheduled XB = Injection may be performed based on monitoring results. Injections beyond 2015 will be based on 2015 results. An injection volume of up to 25,000 gallons per well per event is assumed. Actual injection schedule will be adjusted based on monitoring results. Actual injection schedule & volumes injected will be adjusted based on available milk solution. Prepared by: AWA Table 3 Injection Schedule of 1022-38 Andrex Injection Permit Tables 2015 Plan.xlsx Checked by: TJB Table 4 (Revised for the 2015 Calendar Year) Injection Monitoring Plan Matrix Andrex Industries Asheville, North Carolina NCDENR Groundwater Incident Number 6586 BLE Project No. J14-1022-38 y a 0 U W 0 Q 0 U W 00 o � o U v F T FO y O ti Q O b UO CIO Groundwater RW-3 and/or *IW-1* *RW-3* X X X X *MW-5* X X X X *MW-12* X X X X IW-2 and/or *IW-3* *IW-2* X X X X *RW-1* X X X X *MW-6* X X X X *MW-44* X X X X None MW-3R IW-4 MW-7 X X X X IW-5 MW-8R X X X X MW-9 X X X X IW-6 None IW-7 RW-5 X X X X MW-10 X X X X MW-13 X X MW-14 X X IW-8 RW-6 X X X X IW-9 RW-7 X X X X MW-11 X X X X IW-10 MW-23 X X IW-11 MW-24 X X X X IW-12 MW-25R X X X X None MW-15 X MW-16 X MW-17 X MW-18 X MW-20 X MW-21 X MW-22 X MW-26 X Surface Water None Smith Mill Creek 1 X Smith Mill Creek 2 X Smith Mill Creek 3 X Smith Mill Creek 4 X Smith Mill Creek 5 X Smith Mill Creek 6 X Bear Creek 1 X X Bear Creek 2 X Bear Creek 3 X Bear Creek 4 X Bear Creek 5 X Jehovah Witness 1 X X Cecil's Spring 1 X Cecil's Spring 2 X Notes: Wells located outside of the Injection Zone. EMME VOC analyses performed by EPA Method 8260 MSV Low Level. TOC analyses performed by SM Method 5310B. It may not be possible to obtain samples at exact milestones (30, 90, and 150 days, etc) due to weekends, holidays, inclement weather, or other delays beyond our control. Samples will be collected as near the milestone dates as the schedule allows. * Injection / monitoring in the 2015 calendar year.* Prepared by: AWA Table 4 Monitoring Plan of 1022-38 Andrex Injection Permit Tables 2015 Plan.xlsx Checked by: TJB FIGURES CS-2 - 3.6 \ \ RESIDENTIAL RESIDENTIAL 0000 _ � swoop � � I � HQ � MW-26 � XFER CECICS EEGE RESIDENTIAE IND �CS-1 EOCS SPRING 12MW-16� MW-15*r0139 89 MW-18 �� / 100 \ HAYNES CORP. J� NO '�' MIEKC HAYNES CORP TH STREET - MW-24_2 TWEN rO o 276 AB ` y 0 CPA224 4.,E P IC SERVIC _ MW-12 ---- - - MW 1 / CO. NC RESIDE AE 2,685 39 AB is IW-12 IW-2 yo ��� oR� I� M 7 56* 68 IW-1 IW-4 cR MW-25R MW-25 gEP NP RW-1 \� \ 2,882 C 7 YNE\ CORP. MIEKCO, M MW 3 1 MW-44 �oP N G . 5,445 li j0 "Q ) - RW-2 ' M 0 4 SO ` �• _ - - AB AB j \ 8R\ I ,919 MW88 ` RESIDENTIAL r I _ tr ' MW - - SM-1 PEREE ON GEAR, INC. 0 ORW-4�[W-6 A 1 ----� 1 ND 'HAMILTON I AB ANDRE ; 4] M _ �� s o PROPERTY \� III— DUSTRIES, INll ,, D MW-23 SMD � 2 z s - RW-5 IW-8 - — — — -124_ ND - ' , - I MW-17 M I )0 IW-9� 21 vQ RASH ROAD --------------------- R O Y D. FA ER �A R I SM -3 BLOOMING - R= MW� 11�� I \ I ND MW-21 ARDENS MW 13 - 1,186 - 1,637 I ND ICE ��� RW-7 —� RV ORE i , -- — 698 I J _ _•\� MW �22 w 0000 � RESIDENTIAE i � X 0000 IBC-2 RESIDENT] z ��� 17 _ � STREET � � McDADE swoop 40050 SWOOP% i •. swoop swoop swoop swoop000100 swoop swoop MALVERN HIEES P BC-3 -� 5.3 _ J BC-4 IND TENNIS _Np COURTS I — _J sow 0 swoop gooso RUMBOUGH PLACE w BC-5 Li � RESIDENTIAE INS / ' Q LLJ z Q CL Q MIDDLEM)NT AVENUE RESIDENTIAL JV44 / FORMER JEHOVA\-,i� SILVERS Soo 5o WITNESS PROPERTY\.`BIESTERFEDLT E BOWLING PROPPROPERTYM MW2 14* SEXT op10o RTY oosj 19 NORFO so — \PERTY Np �K pry SM 4 eE PROPERTY -" n., 1.4 \:\ osss BC-1 M I p FORMER oqo SM_.0 L- 19 RESIDENTIAE \ SATTERFIELD _ WATER WELL - _ _ CRYDERMAN SI 40070 mom swoop s PRE R� _ HOUSE - - PROPERTY P \swoop Oho 0 RESIDENTIAL MW-20 r Q GR NO a �VENHOF n RESIDENTIAE RESIDENTIAL DRIVE LEGEND I z v NOTES: PROPOSED INJECTION WELL (IW-1 AND IW-3 THROUGH IW-12) 1. LABORATORY ANALYSIS BY EPA METHOD 8260. z 2. WELLS AND SURFACE WATER WAS SAMPLED ON SEPTEMBER 2-5, 2014. �� PROPOSED MONITORING WELL (MW-3R, MW-8R, AND MW-25R) 3. CONCENTRATIONS DETECTED IN MW-21 ARE PRIMARILY CHLOROFORM, PROBABLY RELATED TO LEAKING WATER SUPPLY LINES IN CLOSE APPROXIMATE LOCATION OF EXISTING (SAPROLITE OR SHALLOW PROXIMITY TO THE WELLS. BEDROCK) GROUNDWATER MONITORING WELL 4. SAMPLES FROM STREAMS DESIGNATED AS FOLLOWS: SM = SMITH MILL CREEK TRIBUTARY 0 APPROXIMATE LOCATION OF EXISTING (TYPE III -BEDROCK) CS = CECIL'S SPRING GROUNDWATER MONITORING WELL BC = BEAR CREEK JW = FORMER JEHOVAH WITNESS PROPERTY 0 RECOVERY WELL 5. NP = NOT PRESENT, WELL WAS NOT PRESENT AT TIME OF SAMPLING. APPROXIMATE LOCATION OF SURFACE WATER SAMPLES (SEE NOTE 4) GAR'rr�rr��' �bfi 6. �k�k SKY LANES BOWLING CENTER WATER SAMPLES COLLECTED 9-5-14 . ( ) .` Q� `• ' �= NCDEH - PUBLIC WATER SYSTEM ID #10-11-025 WELL NAME: WELL #1 JGENS ? AS OF 5-19-2009, MR. MARC FOWLER OF BUNCOMBE COUNTY HAS STATED O WATER SUPPLY WELL s S = "...THE ESTABLISHMENT HAS BEEN RESTORED TO CITY WATER." 1475 ¢ 162 CONCENTRATION OF TOTAL DETECTED CHLORINATED VOLATILE ORGANIC FOLOd�•'�'�'�� 7. * THE WELLS MAY INTERCEPT FRACTURE SETS OR MAY BE SCREENED AT COMPOUNDS IN PARTS PER BILLION (ppb). ':d ELEVATIONS AT WHICH GROUNDWATER CONTAMINANT CONCENTRATIONS ARE INCONSISTENT WITH THE ESTABLISHED PLUME. THE VALUES WERE IGNORED FOR BELOW GROUND STREAM SHOWING FLOW DIRECTION 'rrrrrr,�m,`'� CONTOURING PURPOSES. 8. THE FORMER WATER SUPPLY WELL ON THE CRYDERMAN PROPERTY APPEARED ABOVE GROUND STREAM SHOWING FLOW DIRECTION TO BE ABANDONED AND COULD NOT BE SAMPLED AS OF OCTOBER 2005. 9. MW-19 WAS NOT PRESENT IN OCTOBER 2003 AND WAS PRESUMED TO BE PROPERTY LINE DESTROYED BY GRADING PERFORMED BY THE CITY OF ASHEVILLE. MW-25 WAS NOT PRESENT IN OCTOBER 2003 AND WAS PRESUMED TO BE DESTROYED BY APPROXIMATE LOCATION OF SANITARY SEWER MANHOLE WITH SEWER LINE GRADING PERFORMED BY MILKO, INC. 10. RECOVERY WELLS WERE NOT OPERATIONAL AT THE TIME OF SAMPLING. 100 TOTAL CHLORINATED CONCENTRATION CONTOUR IN PARTS PER BILLION REFERENCE: ORTHOPHOTO MAP OF BUNCOMBE COUNTY, N.C. PREPARED BY L. ROBERT KIMBALL & ASSOCIATES, EBENSBURG, PENNSYLVANIA 200 100 0 200 400 FROM PHOTOGRAPHY DATED MARCH-APRIL 1985 IN ACCORDANCE WITH NATIONAL MAP ACCURACY STANDARDS. 11. AB =WELL ABANDONED IN 2008 PER APPROVED BROWNFIELD REDEVELOPMENT PLAN. — Np ESTIMATED LIMIT OF VOC'S APPROXIMATE SCALE IN FEET REVISIONS No. DESCRIPTION BY DRAWN: ACE CHECKED: AWA APPROVED: DATE: 12-19-14 CAD FILE: ANDREX38-INJECTPLAN JOB NO: J14-1022-38 BUNNELL-LAMMONS ENGINEERING, INC. 6004 PONDERS COURT INC. PHONE: (64I)288 1 65 FAX: (864)28854430 PROPOSED INJECTION WELL PLAN FOR 2015 WITH CONTOUR MAP OF TOTAL CHLORINATED VOLATILE ORGANIC COMPOUND ISOCONCENTRATIONS - SEPTEMBER 2-5, 2014 ANDREX INDUSTRIES ASHEVILLE, NORTH CAROLINA FIGURE NO. 2 2245 - 2235 2225 - 2215 2205 - 2195 2185 - J Cf� 2175 ~ 2165 - LL Z 2155 2145 - W w 2135 2125 - 2115 2105 - 2095 2085 - 2075 2065 - 2055 - 2225 - 2215 2205 - 2195 2185 - 2175 2165 - 2155 C%) 2145 - 2135 z 2125 - 0 ~ 2115 Q W 2105 - W 2095 2085 - 2075 2065 - 2055 2045 - 2035 2025 - MW AB ml nji II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I r-7-7-7 I I 0 200 400 600 800 1000 1200 1400 1600 1800 DISTANCE, FT. GEOLOGIC PROFILE A -A' 1 SOUT 2245 2235 2225 2215 2205 2195 2185 C/) 2175 2165 ~ LL 2155 z 0 2145 W 2135 LLJ 2125 2115 2105 2095 2085 2075 2065 2055 LEGEND APPROXIMATE POTENTIOMETRIC SURFACE ON 9-2-2014 GROUND SURFACE APPROXIMATE LOCATION OF BEDROCK ENCOUNTERED IN BORINGS GROUNDWATER FLOW DIRECTION 76 SCREENED OR OPEN BEDROCK INTERVAL WITH CONCENTRATION OF TOTAL CHLORINATED VOLATILE ORGANICS IN ug/I ON 9/2-4/2014 AB WELL WAS ABANDONED 0 _ VERTICAL EXAGGERATION = 10X N SCALE 11nch 200 Feet INJECTION ZONE ,'`,`t111#111#,,1 .�` CAAp�r oNS 't S = 1475 [r z NOTE: 7 A�� INJECTION WELLS IW-1, IW-3, IW-4, IW-5, IW-7, AND IW-11 ARE PROPOSED. ACTUAL CONSTRUCTION TO ;y0 Ctc�t�(��;;•'.10; BE DETERMINED IN THE FIELD. too, it INJECTION WELLS IW-1 AND IW-3 ARE PROPOSED FOR INSTALLATION IN 2015 2225 2215 2205 2195 2185 2175 - 2165 2155 - 2145 C� 2135 Li - 2125 Z O 2115 ~ Q I - 2105 W 2095 2085 2075 2065 2055 - 2045 2035 2025 0 0 200 400 600 800 1000 1200 1400 1600 1800 2000 2200 2400 2600 2800 3000 3200 3400 3600 3800 PROFILE LOCATI ON PLAN DISTANCE, FT. GEOLOGIC PROFILE 13-13' REVISIONS DRAWN: ACE DATE: 12-19-14 BUNNELL-LAMMONS ENGINEERING, INC. GREEMALLE SOUTDHERCAROLINA 29615 IRLIEINC. PHONE: (864)288-1265 FAX: (864)288-4430 HYDROGEOLOGIC PROFILES OF THE AFFECTED AREA FOR THE 2015 INJECTION PLAN ANDREX INDUSTRIES DEAVERVIEW ROAD ASHEVILLE, NORTH CAROLINA FIGURE NO. No. DESCRIPTION BY CHECKED: AWA CAD FILE: PROFILE FOR 2015 PLAN 3 APPROVED: TLL JOB NO: J13-1022-38 APPENDIX A INJECTION WELL CONSTRUCTION DIAGRAMS PROPOSED IW-1 BEDROCK INJECTION WELL CONSTRUCTION DIAGRAM 4-INCH THICK 3' X 3' CONCRETE PAD GROUND SURFACE 2-FEET CEMENT GROUT TOP OF BEDROCK (ESTIMATED 40 FEET) 2-FEET OF PEA GRAVEL #3 STONE (ESTIMATED 17.5 FEET) GROUNDWATER LEVEL JOB NO.: J14-1022-38 DATE: 12-18-14 SCALE: NOT TO SCALE 10-INCH AIR -HAMMERED BOREHOLE IRLEINC. BUNNELL-LAMMONS ENGINEERING, INC. 6004 PONDERS COURT GREENVILLE, SOUTH CAROLINA 29615 PHONE: (864)288-1265 FAX: (864)288-4430 FLUSH MOUNT STEEL WELL COVER COMPRESSION WELL CAP BENTONITE SEAL (38.5 FEET) 6-INCH ID PVC RISER TOP OF BEDROCK TOTAL DEPTH OF BORING (ESTIMATED 60 FEET) PROPOSED IW-1 BEDROCK INJECTION WELL DIAGRAM FORMER ANDREX INDUSTRIES ASHEVILLE, NORTH CAROLINA FIGURE PROPOSED IW-3 ABOVE BEDROCK INJECTION WELL CONSTRUCTION DIAGRAM 4-INCH THICK 3' X 3' CONCRETE PAD GROUND SURFACE FLUSH MOUNT STEEL WELL COVER COMPRESSION WELL CAP 2-FEET CEMENT GROUT ° as 3-FEET BENTONITE SEAL TO GROUNDWATER SURFACE (ESTIMATED 45 FEET) (ESTIMATED 40 FEET) GRAVEL 6-INCH ID PVC RISER GROUNDWATER LEVEL � o 0 TOTAL DEPTH #3 STONE o OF BORING (ESTIMATED 15 FEET) (ESTIMATED 60 FEET) 0 0 �o 0 10-INCH AIR -HAMMERED BOREHOLE BORING TERMINATED AT TOP OF BEDROCK (ESTIMATED 60 FEET) JOB NO.: J14-1022-38 INC.IGURE NIL�PROPOSED IW-3 DATE: ABOVE BEDROCK INJECTION WELL DIAGRAM 12-18-14 BUNNELL-LAMMONS ENGINEERING, INC. FORMER ANDREX INDUSTRIES '��� SCALE: 6004 PONDERS COURT ASHEVILLE, NORTH CAROLINA NOT TO SCALE GREENVILLE, SOUTH CAROLINA 29615 PHONE: (864)288-1265 FAX: (864)288-4430