Loading...
HomeMy WebLinkAbout20091021 Ver 2_More Info Received_20100317LCCS, Inc. 1156 Perth Road Troutman, NC 28166 Phone 704-528-7400 Fax: 704-528-3400 Contact Information: Steve Davis sdavisCairlancasterdock.com E MAIL ADDRESS LCCS 1156 Perth Road Troutman, NC 28166 704-528-7400 Phone 704-528-3400 Fax www.lancasterdock.com WEB SITE r ? ND-ERR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary March 2, 2010 CERTIFIED MAIL: RETURN RECEIPT REQUESTED Mr. Kerry Murphy 8891 Beach Bluff Court Sherrills Ford, NC 28763 DWQ Project # 2009-1021v2 Catawba County Subject Property: Boardwalk for Lot 117, Northview Harbour, Sherrills Ford, NC Lake Norman [030832,11-(75), WSIV, B. Ca] REQUEST FOR MORE INFORMATION Dear Mr. Murphy: On February 23, 2010, the Division of Water Quality (DWQ) received your application dated February 15, 2010 to impact an unknown amount of Zone 1 and Zone 2 protected riparian buffers to construct the proposed boardwalk at the subject property. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive three copies of the additional information requested below, we will place this project on hold as incomplete until we receive this additional information. If we do not receive the requested information, your project will be formally returned as incomplete. Please provide the following information so that we may continue to review your project. Additional Information Requested: Please re-submit your site plans on full plan sheets at a scale of no smaller than 1 "=50'. 2. Please enumerate all riparian buffer impacts on the site plan and clearly label impacts (Buffer Impact 1, etc.). 3. Please locate all of the protected riparian buffers as overlays on the site plan, clearly showing Zone 1 and Zone 2 4. Please provide an agent authorization letter for the application signature. 5. Please complete Section(s) C(1)(a), C(6) and D(1)(a) and D(1)(b) on the application. 6. One (1) data CD of full size plans in TIFF Group 4 format (black and white, not grayscale or color). If the plans are too large to store in TIFF format, they can be stored in PDF format. Please respond in writing within 30 calendar days of the date of this letter by sending a copy of this information to me. If you will not be able to provide the requested information within that timeframe, please provide written confirmation that you intend to provide the requested information, and include a specific timetable delineating when the requested materials will be provided. If we do not hear from you in 30 calendar days, we will assume that you no longer want to pursue this project and we will consider the project as returned. 401 Oversight/Express Review Permitting Unit One 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 NorthCarolina Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 y+ // Phone: 919-733-1786 l FAX: 919-733-6893 Internet: http://h2o.enr,state,nc.us/ncwetlands/ An Equal Opportunity 1 Affirmative Action Employer Vj 1 q. LEI] Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification PCN Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: E] Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ? Yes No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: '8 Yes ? No For the record only for Corps Permit: [Yes ? No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes No 2. Project Information 2a. Name of project: l4ORAD UM LW-- -C00 T 2b. County: C w 2c. Nearest municipality / town: F 11 2d. Subdivision name: lYdkrw ACA/ Q 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information ' 3a. Name(s) on Recorded Deed: y fK V4 DEw-WATEROUAUTY 3b. Deed Book and Page No. '12. It 7 4306 3c. Responsible Party (for LLC if applicable): 3d. Street address: 8 BAACH C 3e. City, state, zip: ,SN,£!zA ar 54y/ NG Z86 73 3f. Telephone no.: 70 210 3g. Fax no.: 3h. Email address: PALU $ 2- Fi A . LO/'LL Page I of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: 99 Agent ? Other, specify: 4b. Name: .STWV Q4vjf 4c. Business name (if applicable): nn LP#"Gas?, CWTOe- UIG,Ic+ j 4d. Street address: I I S-b e. 0, &0 AW 4e. City, state, zip: Ovfrw?v Al.. 2-171104 4f. Telephone no.: 7D 71600 4g. Fax no.: W Y 5'7-6 - 3 /O 4h. Email address: •5'0*vcs LR wL4She-[ Rog 4.01- 1 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1 a. Property identification no. (tax PIN or parcel ID): (, / 90 ?e xo 9 1 b. Site coordinates (in decimal degrees): Latitude: j s. G 3038 Longitude: - 80.4SYS3 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: ?, 96 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: 4A KE NO RA,%?F Al 2b. Water Quality Classification of nearest receiving water: 2c. River basin: 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: 0111-1, a,111--le- I"A-0 b«rol ? 1 k H*i / / 1 ld ?,. A-fX A c o vim. 3b. List the total estimated acreage of all existing wetlands on the property: 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3d. Explain the purpose of the proposed project: ?^0 V 1?'e 14L- &;6w, ^ --I-- ilk -tp 01-ao d?Sll? ?tal M•p-?"tiy??.?. !ate '7`b (?+?a?k A 1/i? ?/'a/? 3e. Describe the overall project in detail, including the type of equipment to be used: wi it °L I 0 ` i WA 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: El Yes No ? Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? ? Preliminary ? Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes ? No F1 Unknown 5b. If yes, explain in detail according to "help file" instructions. .0aer 4 A-C Is 6. Future Project Plans 6a. Is this a phased project? ? Yes No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your projec eck all tha pply): ? Wetlands ? Streams - tributaries f LBuffers ? Open Waters ? Pond Construc 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - Permanent (P) or (PER) or int rmitt t (Corps - 404, 10 stream length li Temporary (T) e en (INT)? DWQ - non-4041 other) width (feet) near ( feet) S1 ? P ? T ? PER ? Corps ? INT ? DWQ S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER El Corps ? INT ? DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts 'V'/A- If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction ?l If pond or lake construction proposed. then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5E Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ® Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? 61 ;4P ? T tte,.? ?e? El Yes ? - B2 ? P ? T ? Yes ? No E?3 ?P?T ?Yes ? No 6h. Total buffer impacts 6i. Comments: '7 `Id 'K -5 °? ..:_ i e, Page 5 of 10 PCN Form - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. er r ® ?G E? - p -a,?? be % ?4'_ 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through const uctio- techniques. 14 / 2. Compensatory Mitigation for Impacts to Waters of he U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes -R?No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank N 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program VIA- 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes N0 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ithi f ? Yes ?,No w n one o the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. _ El Yes [ 1 No Comments: 2. Stormwater Management Plan Al h- 2a. What is the overall percent imperviousness of this project? D % 2b. Does this project require a Stormwater Management Plan? ? Yes ?INo 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. if this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review A 3a. In which local government's jurisdiction is this project? CA r4ws,4 coevie rli N e- ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review fit/ ? Coastal counties 4a. Which of the following state-implemented stormwater management programs apply ? HQW ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 8 of 10 PCN Form - Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the f bli f d l/ ? Yes No use o pu c ( e era state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes WNO 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes XN 0 additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. I? Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes PdNo habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act im acts? ? Yes gNo p ,,\\ 5c. If yes, indicate the USFWS Field Office you have contacted. ? Raleigh El ? Asheville ?' 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Al h 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes] No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? ,411t? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ?No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes No 8b. If yes, explain how project meets FEMA requirements: AI41 8c. What source(s) did you use to make the floodplain determination? ?? 4 54"e- DAVII Z/Irl/o Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 PCN Form - Version 1.3 December 10, 2008 Version u Q 1 1 w CD CL3 s 'D / ? no Fr- i G, •t c1V `D r7 i-- LJ w a' W. z t E --?s 3„CZ,L'C.E0 NN LOT #111A I LOT #108A I NORTHVIEW HARBOUR NORTHVIEW HARBOUR Q OWNERS ASSOC. INC. I OWNERS ASSOC. INC. 8 I 2705-1512 2705-1512 S 01'43'39"E 187.89' 1 LOT #119 JOSHUA C. BYRD 2948-379 L2 - - - - - - - - - - - -- - 15' SIDE SETBACK l \ I \? 1 \? 1 J 1 `CD I? I Iz + I ? o KL O j F4 ° I m rn V) I O M 6 'o o CC) \ 1_ I z Q co w 1 U Ld f' C a =rr U I C) 0 Is, og z ry? I ? ? ??6 ?ub I ® YO r mac,' \ ?\ W a z W N s7 (L 0) 0 w 0 000 _Z W W lJJ S (O d JWOW1j IW- p^ `?1 O J ?? V Z ?Za1=1- O W c u ZWJOJO Z Y J?< Dz W Q (nZ?Wa :2 )- UooaoZ? z Q ? J CJ W of F- ZW W(YW h- W ?ZI-0W01-Z Z W ocaZ>Z ' ¢W 0 .?c > mU1ZO0oLi a Q W a W -i Ld 0 W Z Q- 0 WLd? w o?w n o s U D ? u II II u u T Ucl? WU>J as a n W J fMf°iP z ' O 4 f o ? v d (r" N n k I.1_I O co o0 o 51 5 J Z N J 4 a? o? w C44 0 CQ .4 .? a N O W U CID 0 \ J lull \ lllllll ? llll?w.ll \ 0 ltl??oZl.l W s l l° F- O J 1 LJ Lid W NJ 00 w'oal a l??jav,x 1 1 1 l1b-'?A N, l c, J> r- f O Z G O O / lltl°mrlI l l i l ?a l ®M M 0 r? wo3,Ms9pn3oP•AvAW/:d44 OW30 -1a%!JM 30d Sl d4dIsOP qpm PGIMO dad Z \\, 1 I 1O ?% v?'aus?"' a A?1VC q^IDO ? ? ? \ ?\ O N ?N•-- Nh \ \ ro tea} i-) tj ,?v i °o ,\\\\N1111e[rrl? L S yt W NZom[ ? ? "?' _•? ? ' •I ?? € W =O pN r1 ran a G4 Z B 3 Z'o pw x z=dig a+ w z p &w°zan I 1 LOT #111A I NORTHV?EW1HOA?RBOUR I LOT #119 1 ` NORTHVIEW HARBOUR f OWNERS ASSOC. WC• I OWNERS ASSOC. INC. ? I JOSHUA C. BYRD 1 \ ? I + dY 2705-1512 2705-1512 2946-379 LY •4 ' 1 t): L2 ww 1y J & `?\ I !? 2 nN 1 'C13 O \\ I 6 ZZ ya I / I ?Y u I a $ CD N I 41- I 0 I I? . W I 9 °N ? I \ t, / ao I o 5 gg i °' „I 0W? •; \, O I n N a n LLJ 0 OD .\y \„z II t 0 zN ?t7 i >k W WW WW;333 ?, \ \ \ "t p p: 10? ??.P n W ?. \ U n C ?N?'f?N 17 ? v 'c n m to t() pi 0 O oD g n??n ?'i• nQi g' x _ ? d n?tn' btbtn ho = 10 o <-w m? ?yW1 ?pWy. _ np , ZVIZZZznn j 1TF. ?p U 0 JJJJJ?JJJ ?[7rrR ? ? - z Z J O `? KK Z ix {? ? v°v Ley{ Z? 3 j w O u?C 9? 111 II ?' ? `- 691-I9 8d NO 03 SlB N1bON 'Ilk 1;11111 \ I111 }¢1l \ ? .1111 I Ills I I 1 p' lttzi 1 y? c °o ,111>E t ? itl> O Ti Pagel of 2 'teve Davis ' =rom: Lancaster's Custom Dock & Lift Systems, Inc. [docks@lancasterdock.com] Sent: Wednesday, February 03, 2010 10:42 AM ro: Steve Davis Subject: FW: Riparian planting approval request :rom: Burkhard, Michael W [mailto: Michael. Burkhard@ncdenr.gov] rent: Tuesday, February 02, 2010 4:09 PM 'o: DSMurphy@aol.com :c: jenrightgardens@yahoo.com; docks@lancasterdock.com subject: RE: Riparian planting approval request hat is correct, if you keep the board walk 4 feet (or less) and do not remove any trees in the process of onstruction you DO NOT need to apply for the 401 Buffer Authorization. Should you decide to go this ray (4' or less) we will need to have a revised plan from Jan reflecting this change, hope this helps. hank you Aichael Burkhard rom: DSMurphy@aol.com [mailto:DSMurphy@aol.com] gent: Tuesday, February 02, 2010 3:57 PM 'o: Burkhard, Michael W ;c: jenrightgardens@yahoo.com; docks@lancasterdock.com ;ubject: Re: Riparian planting approval request 1r. Burkhard, ,re you saying that if the boardwalk were 4' instead of 5' that you could approve it at your level and this dditional form for NCDWC in Raleigh would not be required? )enise Murphy i a message dated 2/2/2010 2:15:35 P.M. Eastern Standard Time, Michael. Burkhard@ncdenr.gov rites: Jan, thank you for sending me your riparian buffer planting plan for review and approval. As we discussed earlier today the 5' board walk you are showing on your plan will require a buffer authorization from NCDWQ since it exceeds the 4' allowable width. I have attached the 401 Buffer Authorization Form for your client to fill out and send to Raleigh. Should you have any questions, please feel free to call me. One question, this lot, according to the photos provided for the shoreline stabilization permit along with the aerial photo show this lot to be heavily wooded can I assume that the new plantings you are proposing are to "enhance" the existing vegetation and that no trees are to he removed? Thank you Michael W. Burkhard - rnichael.burkhard@ncdenr.gov N C Department of Environment & Natural Resources ,/3/2010 March 8, 2010 North Carolina Department of Enviromental and Natural Resources Raleigh, North Carolina Dear Sir or Madam: SUBJECT: LANCSTER DOCK AS OUR AGENT FOR REQUESTING PERMIT I have selected Lancaster Dock as our agent to request permits related to shoreline stabilization and associated landscaping projects for my lot (#117) located in North View Harbor. The address is 8891 Beach Bluff Court, Sherrills Ford, NC 28673. Sincerely, vI4 Kerry Murphy 164 MARINER POINTE LANE MOORESVILLE, NC 28117 Page 1 of 1 Reve Davis =rom: Steve Davis [sdavis@lancasterdock.com] Sent: Friday, February 19, 2010 11:05 AM fo: 'Steve Davis' subject: RE: Information )ivision of Water Quality ancaster Dock is working as my agent on this boardwalk project. Steve asked me to provide you with iy mother-in-law's name. She is handicapped and will be living with us. Steve needs this information dated to our bridge permit at the lot on Beach Bluff Court. Her name is Agnes Sessamen and she is 89 ears old. Please let me know if you need any additional information. hanks, .erry .erry Murphy tome: 704-660-0064 :ell: 704-564-4710 .mail: kmluvs2fish@aol.com ;/19/2010 Joogle Maps g maps Get Goggle Maps on your phone Text the word "GMAPS" to 466453 ?7 --,- I F! I,_ ?. s, tr1 Q " fC75 r+,`5t - uy Ste' SQL 02010 Goggle - Map data 02010 Google - 1156 Perth Rd, Troutman, NC 28166 Page 1 of 1 Iti)://ma-ps.2ooRle.com/mans?t=h&hl=en&ie=UTF8&hQ=&hnear=l 156+Perth+Rd,+Troutman,+Iredell,+Nor... 3/15/2010 fro, a 2 a .? Q f ? i ?" 3 Y= LL) w Ile D i o0 -??. P Duke Duke Energy Lake Services DrEnergy. PO Box 1006 / EC12Q Charlotte, NC 28201 November 24, 2009 Kerry Murphy 8891 Beach Bluff Sherrills Ford, NC 28673 RE: Permit Application Approval Norman - Shoreline Stabilization- 8891 Beach Bluff Dear Sir/Madame: This office has reviewed your application to stabilize the shoreline within the Project Boundary of a Duke Energy lake. Duke Energy can authorize the proposed construction/activity, provided it is completed in accordance with the conditions required by the Corps of Engineers and the Division of Water Quality, and as described in the approved application(s). The work must be completed within twelve (12) months from the date of this letter of approval. Please post the enclosed notice(s) at the shoreline so that it will be visible from the lake, and notify us upon completion of the project so that a final inspection may be made. Rip rap use should be limited to only that necessary to adequately maintain the existing eroded bank as described in the application. Rip rap must be confined to the area between 6' below the full pond elevation not to exceed 1' above full pond elevation. NOTE: APPLICANTS MUST IMMEDIATELY NOTIFY DUKE AND STOP ALL WORK IF HISTORICAL OR ARCHEOLOGICAL RESOURCES ARE DISCOVERED DURING THE IMPLEMENTATION OF ANA UTHORIZED PROJECT. Thank you for your cooperation with this program. If you propose to build any additions, make any modifications, including maintenance, or have any further questions, please contact me at 704-382-7506 or you may call 1-800-443-5193 and select the appropriate option. Sincerely, Joseph R. Kluttz, III Lake Services Representative Duke Energy Lake Services Enclosure(s) JRK/jcb www. duke-energy. corn NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Governor Coleen H. Sullins Director Dee Freeman Secretary October 2, 2009 DWQ# 09-1021 Catawba County Mr. Kerry Murphy 8891 Beach Bluff Sherrills Ford, NC 28673 Subject Property: Lot 117, North View Harbor, Lake Norman Approval Of 401 Water Quality Certification And Authorization Certificate per the Catawba Riparian Buffer Rule (15A NCAC 2B .0243) with Additional Conditions Dear Mr. Murphy: You have our approval; in accordance with the general certification and those conditions listed below, to place fill in or to otherwise impact/stabilize the following as described in your application dated September 24, 2009: Amount Approved Units Plan Location or Reference Shoreline 184 feet 404/CAMA Wetlands (acres) Waters 0.016 acres Buffers - Zone 1 184 (square ft. Buffers- Zone 2 (square ft.) After reviewing your application, we have determined that N.C. Division of Water Quality (DWQ) General Water Quality Certification Number 3693 covers the impacts (a copy can be found at: http://h2o.enr.state.nc.us/ncwetlands. This Certification allows you to use Regional General Permit No. 198200030 when issued to you by the US Army Corps of Engineers (USACOE). This letter shall also serve as your approved Authorization Certificate for impacts to the protected riparian buffers per 15A NCAC 2B .0243. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you proceed with your project, including (but not limited to) those required by Erosion and Sediment Control, Non-Discharge, Duke Power, and Water Supply Watershed regulations. The above noted Certification will expire when the associated USACOE's 404 permit expires unless otherwise specified in the General Certification. This approval is for the purpose and design that you described in your application. If you change your project, you must notify this office and you may be required to submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. This approval requires you to follow the conditions listed in the attached Certification and any additional conditions listed below. Mooresville Regional Office One Location: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 NorthCarohna Phone: (704) 663-1699\Fax: (704) 663-6040\ Customer Service: 1-877-623-6748 Naturally Internet: www.ncwaterguality.org 1. The Mooresville Regional Office shall be notified in writing once construction at the approved impact areas has commenced. 2. No impacts shall occur in the buffer from top of bank, including the removal of trees and soil disturbance, except along the immediate shoreline. 3. The access corridor shall be restored to its original state. 4. Staging shall occur, and any spoil shall be stockpiled, outside of Zone 1. 5. All storm water shall be directed as diffuse flow at non-erosive velocities through the protected lake/stream buffer and will not re-concentrate before discharging into the. lake/stream as identified within 15A NCAC 2B .0243(5). 6. Upon completion of all work approved by this 401 Water Quality Certification, and any subsequent approved modifications, the applicant is required to return the attached Certificate of Completion form to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes, to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This Certification and its conditions are final and binding unless you ask for a hearing. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act and the Catawba Riparian Buffer Rule as described within 15A NCAC 2B .0243. If you have any questions, please telephone Cyndi Karoly at 919-733-1786 or Alan Johnson at 704-663-1699. Sincerely, - _? v? for Coleen H. Sullins Enclosure cc: Ian McMillan, Wetlands Unit Duke Energy Lake Services, PO Box 1006, Charlotte, NC 28201-1006 Lancaster Dock/Dredge