Loading...
HomeMy WebLinkAboutSW8121018_CURRENT PERMIT_20121102STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW Ala DOC TYPE � CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE O�J` YYYYMMDD K-3 RUNERR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E. Dee Freeman Governor Director Secretary November 2, 2012 James Griffith, Vice President AutoZone Development Corporation 123 South Front Street, 311 Floor Memphis, TN 38103 Subject: State Stormwater Management Permit No. SW8121018 AutoZone — Cedar Point High Density Commercial Wet Detention Pond Project Carteret County Dear Mr. Griffith: The Wilmington Regional Office received a complete Stormwater Management Permit Application for AutoZone — Cedar Point on November 1, 2012. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000 and Session Law 2008- 211. We are forwarding Permit No. SW8 121018 dated November 2, 2012, for the construction, operation and maintenance of the BMP's and built -upon areas associated with the subject project. This permit shall be effective from the date of issuance until November 2, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, certification of the BMP's, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to certify the BMP's, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 1508 of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit, You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Chris Baker, at (910) 796-7215. Sincerely, For Charles Wa il�dj, E., Director Division of Water Quality GDS/csb: S:=&Stormwater\Permits & Projects120121120018 HD12012 11 permit 121018 cc: Matthew Lowder, P. E., Triangle Site Design, PLLC Carteret County Building Inspections Wilmington Regional Office Stormwater File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796.72151 FAX: 910-350-20041 Customer Service. /-877-623-6748 NorthCarolina Intemet: www.ncwaterquality.org ;Vatuyra & State Stormwater Management Systems Permit No. SW8 121018 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO AutoZone Development Corporation AutoZone — Cedar Point Cedar Point Boulevard, Cedar Point, Carteret County FOR THE construction, operation and maintenance of an infiltration basin in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter collectively and separately referred to as the "stormwater rules`) and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until November 2, 2020, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 33,778 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in Section 1.8 on page 3 of this permit, and as shown on the approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2of7 State Stormwater Management Systems Permit No. SW8 121018 6. The project shall provide a 50' wide vegetated buffer adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers, and the mean high water line of tidal waters. 7. The following design criteria have been permitted for the infiltration basin and must be provided and maintained at design condition: a. Drainage Area, Acres: Onsite, ft: Offsite, ft2: b. Total Impervious Surfaces, ft2: Onsite, ft : Offsite, ft2: C. Design Storm, inches: d. Basin Depth, feet: e. Bottom Elevation, FMSL: f. Bottom Surface Area, ft2: g. Bypass Weir Elevation, FMS�: h. Permitted Storage Volume, ft : i. Predevelopment 1 yr 24 hr peak flow, cfs: j. Post -development 1 yr 24 hr peak flow, cfs k. Type of Soil: I. Expected Infiltration Rate, in/hr: M. Seasonal High Water Table, FMSL: n. Time to Draw Down, fours: o. Receiving Stream/River Basin: p. Stream Index Number: q. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 1.05 45,740 NIA 33,778 33,778 NIA 3.66 2.5 22.0 2,665 24.5 9,482 817 9,964 Wando Sand 5 19.5 8.4 Boathouse Creek I White Oak 20-31 "SA; HQW" 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum .efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 4. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 121018 5. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 6. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 7. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. This permit is not transferable to any person or entity except after notice to and approval by the Director. At least 30 days prior to a change of ownership, or a name change of the project or of the permittee or a mailing address change, the permittee shall submit a completed and signed Name/Ownership Change form to the Division of Water Quality, accompanied by the appropriate documentation as listed on the form. The approval of this request will be considered on its merits and may or may not be approved. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 121018 2. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 3. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project in whole or in part, nor the conveyance of common area to a third party shall constitute an approved transfer request. 4. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 5. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 6. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 7. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 8. The permit issued shall continue in force and effect until revolted or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 9. Unless specified elsewhere, permanent seeding requirements for the stormwater controls must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revolting and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008- 211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et. al. 11. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 2nd day of November, 2012. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION w-iznaries. vaKua, r. t., uirector Division ofVVater Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 121018 AutoZone Cedar Point Stormwater Permit No. SW8 121018 Carteret County Designer's Certification 1, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 0 State Stormwater Management Systems Permit No. SW8 121018 Certification Requirements: .1. The,drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. .3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system .5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Carteret County Building Inspections Page 7 of 7 ►I) State'7water Management Systems Permit No. SW8 121018 AutoZone Cedar Point Stormwater Permit No. SW8 121018 Carteret County Designer's Certification I, z . y,,,,..) �oln1�P„i , as a duly registered f 2 %4 FN ,urr� in the State of North Carolina, having been authorized to observe eriodi atly weekly/ full time) the construction of.the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature _ W,�w a Registration Number ,V4V Date ¢ -18-13 Sgi SAE. a 1 24434 rM ECEIVE .R APR 19 200 M- r_ ,r-7 State Stormwater Management Systems.' Permit No. SW8 121018 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. ✓ 2. The drainage area to the system contains no more than the permitted amount of built -upon area. ✓ 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. ✓ 4. All roof drains are located such that the runoff is directed into the system. ,✓ 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. ,✓ 8. All slopes are grassed with permanent vegetation. ✓ 9. Vegetated slopes are no steeper than 3:1. ✓ 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. ✓ 12. All required design depths are provided. ✓ 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Carteret County Building Inspections Dom, ^ 7nf7 DWQ USE ONLY Date Feceived Fee Paid Pqmit Number Applic ble Rules: ❑ Coastal SW - 1 5 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters []Universal Storm water Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM 'Phis fonn may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): AutoZone - Cedar Point, NC 2. Location of Project (street address): NC Highway 24 (Cedar Point Boulevard) City:Cedar Point County:Carteret Zip:28584 3. Directions to project (from nearest major intersection): Project located 280 feet West of the intersection of NC Highway 24 (Cedar Point Blvd) and Sherwood Avenue 4. Latitude:34° 41' 07" N Longitude:77° 04' 44" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System []Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑NPDES Industrial Stormwater ®Sedimentation/Erosion Control: 1.6 ac of Disturbed Area ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: Form SWU-101 Version 07Jun2010 Page 1 of 6 DECEIVED OCT 3 0 201Z �.� Y. Ill. CONTACT INFORMATION I. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:AutoZone Development Corp. Signing Official & TitleJames Griffith - Vice -President b.Contact information for person listed in item 1a above: Street Address:123 South Front Street 3rd Floor City:Mem his State:TN Zip:38103 Mailing Address (if applicable): City: State: Zip: Phone: (901 ) 495-870"1 _ Fax: 901 495-8969 Email:wade.davis@autozone.com Please check the appropriate box. The applicant listed above is: ❑ The property owner (Skip to Contact Information, item 3a) ® Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser" (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization:Sound Banking Company Signing Official & Title:Andrea M. Benton - Senior Vice -President _ b.Contact information for person listed in item 2a above: Street Address:5039 Executive Drive City:Morehead City State:NC Zip:28557 Mailing Address (if applicable): City: State: Zip: Phone: (252 ) 247-1938 Fax: Email:abenton©soundbanking.com 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/ Organ ization:Wade Davis - AutoZone Development Corporation Signing Official & Title: b.Contact information for person listed in item 3,1 above: Mailing Address:]23 South Front Street City:Memphis _ State:TN Zip:38'103 Phone: 901 495-8701 Fax: (901 495-8969 l?niail:wade.davis©au tozone.com 4. Local jurisdiction for building permits: Town of Cedar Point Point of Contact -.Chris Seaberg Phone #: 252 393-2753 t -CECEI VED OCT 302012 Form SWU-101 Version 07Jun2010 Page 2 of gY L IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater from the site will be treated within a sand infiltration basin at the rear of the proposed AutoZone store. Runoff from the impervious areas of the site associated with the AutoZone development will drain into the or000sed sand infiltration basin. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid. Building Permit Issued Date: ❑ Other: Date- b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph Il - Post Construction 3. Storm water runoff from this project drains to the White Oak River basin. 4. Total Property Area: 2.66 acres 5. Total Coastal Wetlands Area: 0.0 acres 6. Total Surface Water Area: 0 acres Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:2.66 acres Total project area shall be calculated to exclude the following tine normal pool of innporunded strrrctrrres, the area between the banks of streants and rivers, the area below the Nornnal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landivard front the NNW (or MHW) line. The resultant pproject area is used to calculate overall percent built upon area (B UA). Not -coastal wetlands landward of the NHW (or MHW) line 7nay be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 29.2 % 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area _ Receiving Stream Name Boathouse Creek Stream Class * SA; HQW Stream Index Number * 20-31 Total Drainage Area (so 45,740 On -site Drainage Area (so 45,740 Off -site Drainage Area (so 0 Proposed Impervious Area** (so 33,778 % Impervious Area** total 73.8 Impervious** Surface Area Drainage Area 1 Drainage Area Drainage Area _ Drainage Area On -site Buildings/Lots (so 7,315 On -site Streets (so 0 On -site Parking (so 24,569 On -site Sidewalks (so 1,894 Other on -site (so 0 Future (so 0 Off -site (SO 0 Existing BUA*** (so 0 Total (so: 33,778 * Streann Class and Index Nutuber call be determined at: littl7://portal.nrcdetir.ot,gweb/i{) 7,,;Zc., lass [cations " Imppervious area is defined as the built upon area including, but not limited to, buildings, roads, prirkitTg�areas, sirleioalks, gravel areas, etc. A�+-S� "EI EI OCT 3 0 Z01Z Font SWU-101 Version 07Jun2010 Page 3 of 6 P,Y: *** Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. NIA Projects in Union County: Contact DIYQ Central Offtce staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from htt//portal.ncdenr.org/�ti_ebLi��/�s[su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package in all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://L)ortal.iicdenr.org/web/wgJi�,s/su/states%,/fortns_docs. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office maybe found by locating project on the interactive online map at http://portal.ncden.r.,org/iveb/wgjws/su/maw.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from bttp://pot-tal.ncdeiii-.org/web/wq/ws/su/statesw/foi-ms does. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. ► V- 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants PJIA Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M 411L _ agreements) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to +MStL http://www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor Ma the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as,class SA or the WIJL receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations. ►MIL & Two sets of plans folded to 8.5" x-14" (sealed, signed, & dated), including: iY11L a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MFIW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a RECRivF� qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. O C l 3 0 z012 Form SWU-101 Version 07Jun2010 Page 4 of 6 BY: Copy of any applicable soils report with the associated SHWT elevations (Please identify IM1 L elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area dearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 1388 Page No: 111 MgL- 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC rXii- Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. h ttp: / /www.secretary.st-,ite.nc.us/Cori2orations/CSearcii.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the ailowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://i2ortal.ncdenr.org/web/wn/ws/su/statesw/forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming tinder them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting EngineenMattlew Lowder, PE Consulting Firm: Triangle Site Design, PLLC Mailing Address:4006 Barrett Drive, Suite 203 City:Raleigh _ State:NC Zip:27609 Phone: (919 ) 553-6570 Fax: Eiiiail:mlowder@trianglesitedesign.com trianglesitedesign.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) 1, (print or type name of person listed in Contact Information, item 2a) Sc-,LldRxXn G4t.0 certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) lames Griffith with (print or type name of organization listed in Contact Information, item 1a) AutoZone Development Corp to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. F3RVOCT I�TED 02012Force SWU-101 Version 07Jun2010 Page 5 of 6 its the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: (i��(� �' Yli ri�l J V t' _ Date: I, ZC061-�k- --,Dlfi'1t E' l a Notary Public for the State of N01- l N� It 4 County of C-o ` s�±� do hereby certify that ?%Ld l' FA k personally appeared before me this L,,kL day of �—{:�—��c-� ��.�__,_a.nd acknowledge the due execution of the application for a storwater mi,6,Witness my hand and official seal, SEAL My commission expires r X. APPLICANT'S CERTIFICATION I, (print or type name of person fisted in Contact Information, item 7a) lames Gri{fr_'fh certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000, SL 2006-246 (Ph. II — Post Construction) or SL 2008-211. Signature: Date: 1, , a Notary Public for the State of , County of do hereby certify that before me this _ day of personally appeared _ and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expire Fonn SWU-101 Version 073un2010 Page 6 of 6 E C EIV ED OCT 302012 BY: As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: games D. Anderson I, , a Notary Public for the State of }rS,�.lN�Si�� ,County of do hereby certify that Ta-" Gs C. (ter•. •t- —,-(n personally appeared before me this. day of ttGTak.^... I 2VIX and acknowledge the�due �ecu of the application for a stormwater permit. Witness my hand and official seal, `� �`' Atlr •'L. 1EtAol PO4 s'yFtBY.G�J���?��, X. APPLICANT'S CERTIFICATION SEAL My commission expires Lr La i0 ;x I, (print or hjpe mire of person lister[ in Contact Information, item 1 a) amen Gri th certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, an at the proposed project complies with the requirements of the applicable stormwater rules CAC 2H .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. Signature: I JiM491D. Ande Date: o a Notary Public for the State of q%rNC.stEE County of 5t ")i do hereby certify that Z.MWS C. 6r."(4,74 personally appeared before me this 01-0day of ceTn)w. , OV1,7, , and acknowledge the due_;ecution of the application for a stormwater permit. Witness my hand and official seal, Fonn SWU-101 Version 07Jun2010 NN- SEAL ..� STATE �. OF TENNESSEE` - NOTARY', PUBLICkk LP My commission' y� Ova ��- ����l��fll11411111�\ r3� D E--��' CT•302052 Page 6 of 6 bnproc �4 VIAD ''d+lsuYllll o,, '13waa D' tiugar.; ou JE111+gf��A GF EF,