HomeMy WebLinkAboutSW8121018_COMPLIANCE_20121030STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW r7l�B�,P�
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
�iCOMPLIANCE EVALUATION INSPECTION
DOC DATE
YYYYMMDD
Permit Number: _ � �4 /�j�2/<
(to he provided by DIVQ)
Drainage Area Number:
Infiltration Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
— The drainage area will be carefully managed to reduce the sediment load to the
infiltration basin.
— Immediately after the infiltration basin is established, the vegetation will be
watered twice weekly if needed until the plants become established (commonly
six weeks).
— No portion of the infiltration basin will be fertilized after the initial fertilization
that is required to establish the vegetation.
— The vegetation in and around the basin will be maintained at a height of
approximately six inches.
After the infiltration basin is established, it will be inspected once a quarter and within
24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal
County). Records of operation and maintenance will be kept in a known set location
and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire BMP
'Trash/debris is present.
Remove the trash/debris.
The perimeter of the
Areas of bare soil and/or
Regrade the soil if necessary to
infiltration basin
erosive gullies have formed.
remove the gully, and then plant
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application,
The inlet device: pipe or
The pipe is clogged (if
Unclog the pipe. Dispose of the
swale
applicable).
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged (if
applicable).
Erosion is occurring in the
Regrade the swale if necessary to
swale (if applicable).
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problenis with erosion.
Form SW40I-Infiltration Basin O&M-Rev.3 OCT 3 0 2012 Page 1 oC3
BY:
BMP element:
The forebay
The main treatment area
The embankment
The outlet device
The receiving water
Potentialproblem;
Sediment has accumulated
and reduced the depth to 75%
of the original design depth.
Erosion has occurred or
riprap is displaced.
Weeds are present
A visible layer of sediment
has accumulated.
Water is standing more than
5 days after a storm event.
Weeds and noxious plants are
growing in the main
treatment area.
Shrubs or trees have started
to grow on the embankment._
An annual inspection by an
appropriate professional
shows that the embankment
needs repair.
Clogging has occurred.
The outlet device is damaged
Erosion or other signs of
damage have occurred at the
outlet.
form SW40 I -Infiltration Basin O&M-Rev.3
How I will remediate the problem:
Search for the source of the
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Remove the weeds, preferably by
hand. If pesticides are used, wipe
them on the plants rather, than
Search for the source of the
sedimentand remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP. Replace any media that
was removed in the process.
Revegetate disturbed areas
immediately.
Replace the top fear inches of filter
media and see if this corrects the
standing water problem. If so,
revegetate immediately. If not,
consult an appropriate professional
for a more extensive repair.
Remove the plants by hand or by
wiping them with pesticide (do not
svraO.
Remove shrubs or trees
immediately.
Make all needed repairs.
Clean out the outlet device. Dispose
of the sediment off -site.
_Repair or replace the outlet device.
Contact the NC Division of Water
Quality 401 Oversight Unit at 919-
733-1786.
OCT 3 0 Z01Z
BY:
Page 2 of 3
L
Permit Number:
{to be provided by DIVA)
I r �
to
SO
0
pe r
m
ao a
�Cr
0c
0
0
�(D
0
0
0
0
I acknowledge and agree by my signature below that I ant responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project nanie:AutoZone - Ceder Point
BMP drainage area number:
Print name:James G
Title:Vice-President
Address:123 S. Front Street Memphis, TN 38103 ^
Phone:901-495-8701
Signature:
Date: 11
Note: The legally responsible party should not be a hornmvners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I l .Jay.•U
a Notary Public for the State of
County of _ k.tt!,L , do hereby certify that
personally appeared before me this L
day of 2o, z , and acknowledge the due execution of the
forgoing bioretention maintenance requirements. Witness my liand and official seal,
yyD R. H �i
4• SATE • l
OF
T9*0$EE
n : t4O'DkW : .i.
0'• PLUJC •` ��
!rr ttt��
SEAL
My commission expires 2 •11"-
Form SW401-Infiltration Basin O&M-Rev.3
",r•
ti' Lo .
OCT 3 0 2G1z
BY:
Page 3 of 3
Permit No,
(to be provided by DWQ)
Nip
D=�4 W ArFgQG
STORMWATER MANAGEMENT PERMIT APPLICATION FORM p
NCGENR 401 CERTIFICATION APPLICATION FORM
INFILTRATION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Requlned Items Checklist (Part ftl) must be printed, filled out and submitted along with all of the required information.
Project Name Auto
Contact Person Matt
Phone Number 919
Date
Drainage Area Number i
Site Characteristics
Drainage area
Impervious area
33 77$ OQ'.?'_ : f?
Percent impervious
73.80 %
Design rainfall depth
1;5Q,`•L in
Peale Flow Calculations
1-yr, 24-hr rainfall depth
1-yr, 24-hr intensity
°< 4:66 : =`:. irVhr
Pre -development 1-yr, 24-hr discharge
:;:':1:477.7 ; "a f Isec
Post -development 1-yr, 24-hr discharge
fflsec
Pre/Post 1-yr, 24-hr peak flow control
3,50 f'/sec
Storage Volume: Non -SA Waters
Minimum design volume required=
ft3
Design volume provided
ff3
%�����
Storm a Volume: SA Waters
g
1.5' runoff volume
Q
Pre -development 1-yr, 24-hrruftoffvolume
837a16';'.=ift3
_
SEAL
Post -development 1-yr, 24-hr runoff volume
:: 3;964.001 ' ft3
_ #
a1
Minimum required volume
Volume provided
P
91� 47. f?
:° 9'482.OQ:::::; a OK
ft
� 3i 11
9 F jJ� ¢:`
�GI
Soils Report Summary
a°
'• �° O`��
tiii
E.Soil
'��'vrrvrl
type
1llfando Sarid
r
Infiltration rate
;'S:flO`::._ _ _:; ;:: inlll r
SHWT elevation-
fmsl
Basin Design Parameters
d?b
Drawdown time
_ 00_ :: _: days 0K
Basin side slopes
3�UQ :1 OK
Basin bottom elevation
:''=2200i:: fmsl OK
Storage elevation
`=24`.5l)° ;' = hnsl
Storage Surface Area
4;990,00 -'i?i ft
Top elevation
'.=':`25.00 -:;::- I fmsl
Basin Bottom Dimensions
Basin length
Basin width
Bottom Surface Area
Form SW401-IrAtreti3n Basin-Rev.5 11Apr2011 Parts L & II. Design Summary, Page 1 of 2
Permit
(to be provided by DWQ)
Additional Information
Maximum runoff to each inlet to the basin?
0,05
ac-in
OK
Length of vegetative filter for overflow
N/A
ft
OK
Distance to structure
N/A
ft
OK
Distance from surface waters
100.00
ft
OK
Distance from water supply well(s)
100.00
ft
OK
Separation from impervious soil layer
200
It
OK
Naturaily occuring soil above shwt
2.00
It
OK
Bottom covered with 4-in of clean sand?
Y
(Y or N)
OK
Proposed drainage easement provided?
Y
(Y or N)
OK
Capures all runoff at ultimate build -out?
Y
(Y or N)
OK
Bypass provided for larger storms?
Y
(Y or N)
OK
Pretreatment device provided
RIP -RAP
Form SW401-Infiltration Basin-Rev.5 11Apr2011 0 C T 3 0 2012 Parts I. & li. Design Summary, Page 2 of 2
BY:
Permit No.
(to be provided by DwQ)
Ill: REQUIRED]TEMS CHECKLIST
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent'may initial below. If a
requirement has not been met, attach justification.
Page/ Plan
Initials Sheet No.
All L
I1l�L C/___� C'I• S
Plans (1" - 50' or larger) of the entire site showing:
Design at ultimate build -out,
Off -site drainage (if applicable),
Delineated drainage basins (include Rational C coefficient per basin),
Basin dimensions,
Pretreatment system,
High flow bypass system,
Maintenance access,
Proposed drainage easement and public right of way (ROW),
Overflow device, and
Boundaries of drainage easement.
2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing:
Bypass structure,
Maintenance access,
Basin bottom dimensions,
Basin cross-section with benchmark for sediment cleanout,
Flow distribution detail for inflow,
Vegetated filter, and
Pretreatment device.
3. Section view of the infiltration basin (V = 20' or larger) showing:
Pretreatment and treatment areas, and
Inlet and outlet structures.
ML 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided.
01iL tic 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The
results of the soils report must be verified in the field by DWQ, by completing & submitting the soils
investigation request form. County soil maps are not an acceptable source of soils information.
�IfL Cl.3 6. A construction sequence that shows how the infiflration basin will be protected from sediment until the
entire drainage area is stabilized.
M1 7. The supporting calculations.
MIf 8. A copy of the signed and notarized operation and maintenance (0&M) agreement.
A 9. A copy of the deed restrictions (if required).
OCT 3 0 z012
Form SW401-Infiltration Basin-Rev,4
Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1
IF . ;
NCDENR
North Carolina Department of Environment and
Natural Resources
Request for Express Permit Review
For DENR Use ONLY
Reviewer.
SUbmil: O -f3 0 7�u,'�
.o
Time: �
Confirm: _��( 4-
FILL-IN all the information below and CHECK the Permit{s) you are requesting for express review. FAX or Email the completed form to Express
Coordinator along with a completed DETAILED narrative, site plan ii file) and vicinity map (same items expected in the application package
of the project location�Please include this form in the application package.
• Asheville Region -Alison Davidson 828-296-4698;alison.davidson
ncdenr.gov
• Fayetteville or Raleigh Region -David Lee 919-791-4203; david.ie
ncdenr. ov
• Mooresville & -Patrick Grogan 704-663-3772 or patrick.orogan@ncdenr.gov
• Washington Region -Lyn Hardison 252-946-9215 orlyn.hardison
ncdenr.gov
• Wilmington Region -Janet Russell 910-350-2004 or JanetrussellAncderinctov
NOTE: Project application received after 12 noon will be stamped in the following work day.
OCT ZS t 2(o
ocz o s "
_11_%
(5e
nub 1A-1
Project Name: AUTOZONE Bounty: CARTERET
Applicant: WADE DAVIS Company: AUTOZONE
Address: 123 SOUTH FRONT STREET, 3RO FLOOR City: MEMPHIS, State: TN Zip: 38103-_
Phone: 901-495-8701, Fax: 901-495-8969, Email: Aade.davis@autozone.com
Physical Location:NC HIGHWAY 24 (CEDAR POINT BOULEVARDIAT SHERWOOD AVENUE
Project Drains into BOATHOUSE CK waters — Water classification SA;HQW (for classification see-hftp:tth2o.enr.state,nc.uslbimsireports/reportsWB.html)
Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? Y , within''/2 mile and draining to class SA waters Y or within 1 mile
and draining to class HQW waters? Y
Engineer/Consultant: MATT LOWDER Company: TRIANGLE SITE DESIGN, PLLC
Address: 4006 BARRETT DRIVE, SUITE_203 City: RALEIGH, State: NC Zip: 271
Phone: 919-553-6570, Fax: _-_-_, Email: mlowder@t6angtesitedesign.com
SECTION ONE: REQUESTING A SCOPING MEETING ONLY
SW
SW
SW
SW
SW
❑ Scoping Meeting 9RLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER:
SECTION TWO: CHECK ONLY THE PROGRAM (5) YOU ARE REQUESTING FOR EXPRESS PERMITTING
❑ 401 Unit ❑ Stream Origin Determination: — # of stream calls - Please attach TOPO map marking the areas in questions
❑ Intermittent/Perennial Determination: _ # of stream calls - Please attach TOPO map marking the areas in questions
❑ 401 Water Quality Certification ❑ Isolated Wetland (___ linear ft or _acres)
❑ Riparian Buffer Authorization El Minor Variance ❑ Major General Variance
® State Stormwater ❑ General ❑ SFR, ❑ SFR < 1 ac. ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Other
❑ Low Density ❑ Low Density -Curb & Gutter — # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)]
❑ High Density -Detention Pond 1 # Treatment Systems '® High Density -Infiltration 1 #Treatment Systems
❑ High Density -Bio-Retention _ # Treatment Systems [IHigh Density -SW Wetlands _ # Treatment Systems
❑ High Density -Other _ # Treatment Systems / ❑ MOD:❑ Major ❑ Minor ❑ Plan Revision ❑ Redev. Exclusion SW (Provide permit 4)
❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information
❑ Upland Development ❑ Marina Development ❑ Urban Waterfront
® Land Quality ® Erosion and Sedimentation Control Plan with 1_6 acres to be disturbed.(CK #, (for DENR use))
SECTION THREE — PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scopinp and express meeting request),
Wetlands on Site ❑ Yes ® No
Wetlands Delineation has been completed: ❑ Yes ® No
US ACOE Approval of Delineation completed: ❑ Yes ® No
Received from US ACOE ❑ Yes ® No
Buffer Impacts: ® No ❑ YES: _acre(s)
Isolated wetland on Property ❑ Yes ® No
404 Application in Process wl US ACOE: ❑ Yes ® No Permit
For DF.NPR use only
Fee Split for multiple permits: [Check # i Tataf Fee Amount
SUBMITTAL DATES
Fee
SUBMITTAL DATES
Fee
CAMA
$
Variance (❑ Maj; ❑ Min)
1
$
SW ( HD, EFLD, El Gen)
1
$
401:
$
LQS
$
Stream Deter—
$
NCDENR EXPRESS March 2009
FC El T 1 2 2012
I. WE
Stormwater Narrative
AutoZone
Cedar Point Boulevard (NC Highway 24) & Sherwood Avenue
Cedar Point, NC
Tax Parcel ID: 537411764068000 & 537411762196000
At the intersection of NC Highway 24 (Cedar Point Boulevard & Sherwood A venue)
Site Information:
Total Site Area = 2.66ac
Disturbed Area = 1.6ac
Wetland No wetland or stream features on the site
Developer = AutoZone, Inc.
Wade Davis
123 South Front Street, 3`d Floor
Memphis, NC 38103
901-495-8701
Owner = Current Property Owner Property Owner at Time of Construction
Sound Banking Company Kirkland Assets, LLC
Andrea M. Benton Ralph H. Falls, III
Morehead City, NC 28557 1310 South Tryon Street, Suite 104
252-247-1938 Charlotte, NC 28203
704-333-4244
Engineer = Triangle Site Design, PLLC
Matt Lowder, PE
4006 Barrett Drive, Suite 203
Raleigh, NC 27609
919-553-6570
mlowder@trianglesitedesign.com
Development Plan: The proposed development will consists of an AutoZone retail store. A
stormwater infiltration basin will be constructed to treat stormwater
runoff from the AutoZone for water quality & water quantity control.
The stormwater infiltration system is designed to treat runoff from the
impervious areas of the site.
The existing site condition for the site is open space with trees spaced
throughout the site.
Phasing: All of the site construction will be developed in one phase of
construction.
Utility Systems: Domestic water supply will be provided via a new service line from the
West Carteret water system. Sanitary sewer will be provided via a new
on -site septic system to be reviewed and approved by the Carteret
County Health Department.
Historic/Public Money: The property does not contain any historic sites and is not being funded
with public monies.
NCDENR: There are no known non-compliance issues with DENR Agencies.
1�
Stormwater Information:
River Basin: White Oak
Stream Classification: SA, HQW
Stream: Drains to Boathouse Creek
Stormwater Design: State Stormwater (Coastal County)
Density Option: High Density
Development Type: Commercial
Impervious Area:
Total Site Area:
Impervious Area:
Open Area:
115,855sfsf (2.66ac)
33,778sf (29.2% of site)
82,077sf (70.8% of site)
Proposed Treatment Measures: Infiltration Basin
Will all built -upon areas be collected: The proposed buildings and parking lots will drain to the
BMP infiltration basin.
Buffer Requirements: Municipality required landscape buffers required at property perimeter,
no development within buffers
On-site/off-site runoff: No off -site runoff will drain into the proposed stormwater management
system.
Road Construction Requirements: The NCDOT is not requiring turn lanes in association
with this project.
Soils Evaluation:
Infiltration Rate: 5"/hr-10"/hr
SHWT: 55-60" Below Surface (existing surface elevation = 22.0±;
therefore SHWT = 17.4±)
Site Evaluation Date: 8/30/12
EJVED
OCT 1 2 2012
a�Y�=
r it
AMM
N 'ilm "m
n ITMIE NH 8
�ef 0101
R ORD :Hzamm 8HOIS
r
all
iy!y'Iiilot
i
I
i• .�11f
=!e' `.�
i
Ij�il
!I l�=r1'!I
�.rl=lllj�li�lfl:i
r rr
..
ra=o= rlr
11H I
r r r r r r
r a �
il! 151.=
r � • .
r
ilink
• • • • • •
5
. .
a
y ■■
ee
ii yy ,
,
�a
5
I
I
I
1
l
1
I
I
1
III
gg9�
Page 2 of 2
DIVISION OF WATER QUALITY
INFILTRATION SYSTEM INVESTIGATION
Complete and email this form to iVincent.Lewis(cDncagrr.gov . (Note new email address for Vince Lewis). If
there are more than 7 areas to be tested, attach a second sheet.
pl4g1IL
State Soil Scientist Confirmation Visit dateltime:
Project Name: AUTOZONE County: CARTERET
Street Address: NC Highway 24 A- Sherwood Drive
Directions from the nearest intersection of two major roads: FROM ONSLOW
COUNTY SITE IS BESIDE MARSH HARBOR SALES OFFICE
>1 acre being disturbed? ®YES [:]NO CAMA Major required? DYES ONO
Consultant Name: HAYWOOD PITTMAN Phone: 910-330-2784
Consultant Firm Name: Pittman Soil Consulting
Bore Number
1
2
3
4
5
7�7 „
A Existing Ground Elevation
21
21.5
22
21
23
1 KX�.,
b) Proposed Bottom Elevation
22
22
22
22
22
:,. y
c Difference a minus b
0
0
0
0
1 1
1 ;
d Add 2 ft. Min. Bore De th
2
2
2
2
1 3
e Hardpan Depth?
NA
NA
NA
NA
NA
Approx. Elev. Of SHWT
18
18.5
17
18
20
Max. lowest bottom elev.
20
20.5
19
20
22
';.
h Infiltration Rate OK? *
'Vm
M- k
i Confirmation of SHWT *
For projects requiring more than 5 hand borings, manpower or equipment to
conduct the excavation must be provided by the consultant.
*State Soil Scientist Use ONLY
Comments
Required Attachments: ,
1. Legible vicinity map.
2. Complete Soils Report.
3. PDF formatted site plan with the boring locations to be tested. Site plans should
be emailed or hand -delivered only. Illegible faxed maps will not be accepted.
All proposed infiltration areas and existing, active utility lines located within the proposed
basin/trench must be marked and flagged. If these areas are not flagged, the Soils Scientist
reserves the right to decline to do the investigation, If the proposed infiltration system will be
located in an area of existing pavement and there is no open area nearby, equipment capable of
breaking through the impervious layer must be provided. The soils investigation does not take
the place of a soils report prepared by an appropriate professional. The Soils Scientist will only
verify the soil conditions that are reported in the Soils Report, and make a determination as to
the suitability of the site to meet the infiltration design requirements under NCAC 2H.1000, and
assumes no liability should the system fail.
SAWQSIStormWater\Forms & TemplateslApplication Formslinfiltration site visit Revised 3/12
k
I
Mi-iii
-2
d k ON
3
I. " -
I
1001
ji
if
iu!
IF
STORE NMMER: 4980
CAA@ POW BOULUM by
IT IUGHWIY 24
CEDAR PDIXT, NC
CAM= cowm
a
I
pi
• 30RI
ISORIN
2
7..Vl&r
J
PROPOSED AUTOZONE
LEGEND
THIS SOIL SKETCH WAS PREPARED USING FIELD DATA
p
OOp •ITl
_
HWY 24
CEDAR POINT
CARTERET COUNTY
PITTMAN SOIL CONSULTING
• /UGER eoRp+lo
AND AERIAL MAPS. THIS IS A PRELIMINARY SOIL
SKETCH, AND ALL LOCATIONS SHOULD BE CONSIDERED
APPROXIMATE- ADDITIONAL SOIL AREAS MAY BE
LOCATED WkTHIN PROJECT. THIS IMAGE WAS TAKEN
fl4
t NORM
STORM WATER
SOIL EVALUATION
IOR01 GRE30RY FORK RD,
C�x.R m"
RroRE-9 �0.)10.i�6�
F-smaza.3180
FHOM A TRIANGLE SITE DESIGN CAD FILE. IT IS NOT
SURVEY QUALITY AND SHOULD NOT BE USED AS SUCH-
DATE 9-12-12 SCALE I---
�i
- tPlA ra92
PO Box 1387
Richlands, NC 28574
Phone: 910-330-2784
pi ttmansoil @yahoo. com
...................................................................
August 30, 2612
Matt Lowder
Triangle Site. Design
4006 Barrett Drive -
Raleigh, NCB .27609
Dear Mr. Lowder -
The following is a,summary of the soil profiles taken at -the proposed Autozone site located on
Hwy.24 in the Cedar.Point,afca of Carteret County. The purpose of this evaluation-was'to
determine estimated. Seasonal.High NA"ater Table�(SHWI) and to determine the infiltration.rate of
the soil. A hand auger was used to obtain the soil profiles and"to determine the SHWT. Field
techniques outlined in the North Carolina .Lm4,s crud Rules.for Seii,age Treatmel7i-and Disposal
Systems were used to determine soil texture. structure. consistency and soilwetness condition.
Findings
BORING,1 SHWT 36"
KSAT
DEPTH
TEXTURE
STRUCTURE
MINERALOGY
MATRIX
MOTTLES MOTTLES "HR.
0-20"
LS
GR
NS. NE
10Y/R 311
5-10"
2030"
LS '
GR
NS. NE
10YR 313.
5-10"
30-36"
LS,
GR
NS. NE
2.5Y 514
1OYR 3/3 5-10"
36-60"
LS
GR
NS. NE
2.5Y:514
2.5Y 3/1 5-10"
S
BORING 2
SHWT 55"
KSAT
DEPTH TEXTURE'
STRUCTURE
MINERALOGY
MATRIX
MOTTLES MOTTLES "HR.
0-6'" LS
GR
NS. NE
10Y/R.311
5-10,
6-12" LS
GR'
NS' NE
10YR 414
12-55" LS
GR
NS: NE
2.5Y 614
5-10"
55-" LS
GR
NS: NE
2 5Y 6/4
2.5Y 7/2 10YR 518 5-10
PO Box 1387
Richlul7ds„ NC 28574
Phone: I10-330-?784
pittn7ansoil @yahoo. cony
August 30, 2012.
Matt Lowder
"Triangle Site, Design
4006 Barrett Drive `
Raleigh, NC 27609
Dear Mr. Lowder:
The following is a•summary of the.soil. profiles taken at the proposed.Autozone site located on
Hwy24 in the Cedar Point,area of Carteret County. The purpose of this evaluatioh,was to
determine estimated,Scasonal .High Water Table-(SHWT) and to determine the infiltration rate of
the soil. A hand auger'was used to obtain the soil profiles and to determine the SHVVT. Field
techniques outlined in the North Carolina Laws and Rules..for 8,1 ge Treatment and Disposal
Systems were used to determine soil texture, structure, consistency and soil wetness condition:
Findings
BORING'1 SHWT 36"
KSAT
DEPTH TEXTURE STRUCTURE MINERALOGY MATRIX MOTTLES MOTTLES Ili-(R.
0-20" LS GR NS. NE 10Y1R'311 5-10"
20-30" LS GR NS. NE 1 OYR 313 5-10"
30-36" LS GR NS, NE 2.5Y 5/41OYR 313' 5-10"
36-60" LS GR NS. NE 2.5Y 514 2:5Y 311 5-10
S
BORING 2 SHWT 55"
DEPTH TEXTURE STRUCTURE MINERALOGY- MATRIX
0-6'" LS GR 'NS. NE 10Y1R'311
6-12" LS GR` N5. NE 10YR 414
12-55" LS GR NS. NE 2.5Y 614
55-" LS GR NS. NE 2.5Y 614
KSAT
MOTTLES MOTTLES "HR.
5-10"
5-10"
5-16"
2.5Y 712 IOYR 518 5-10"
SATURATED
BORING.3 SHVVT >60" AT 40"
KSAT
DEPTH
TEXTURE
STRUCTURE
MINERALOGY
MATRIX
MOTTLES MOTTLES "HR.
0 6"
LS
GR
NS..NE'
10YIR 413
6-12"
LS
GR
NS: NE
10YR 5!6
5-10"
12-66"
LS
GR
NS. NE
2.5Y 614:
5-10"
BORING SHVVT 36"
KSAT
,DEPTH TEXTURE STRUCTURE MINERALOGY MATRIX MOTTLES' MOTTLES
'"HR.
LS GR NS-NE 10Y/R 4l3
5.10"
6-12" LS GR NS. NE ,10YR,516
'5-10"
't2-36" LS GR NS.NE 2:5Y614
5-10
NS. NE
36• CS GR 2:5Y 6I4 2.5Y 7!2 10YR5I8.
5-4.
BOG5 SHVV RINT>60"
•
KSAT.
DEPTH TEXTURE STRUCTURE MINERALOGY MATRIX MOTTLES. MOTTLES
"HR.
0-12" LS GR NS. NE i0Y1R 413
5-10""
NS: NE
�12-18". LS GR 10YR 5/6'
5-10"
18-30" LS GR. W. NE '2.5Y &4
5-10"
30-60+ LS GR NS. NE 2.5Y 6P
5-10''
SHWT was determined by the'indication.of colors of'chroma 2 or -'less utilizing.a Munsell.Soil
,color'Chart at >2% off,soil,volume in mottles.or matrix of a horizon or horizon
subdivision-.
If you have any questions, please feel free to.contact me.at.(91.0).330-2784. Thaiik you.
Respectfully,
SO!(
�S�p
SC'
G� �..
R. IIaywood Pittman, LSS
t4 `,c�T75 ' !!
I
a
INFILTRATION BASIN ANALYSIS FOR PHASE It AND 2008 PROJECTS
Formula
FILENAME: S:IWQSlexcel Sp readsheets\INBASIN1121018 User in ut
PROJECT NUMBER: SW8
121018 Current Date 02-Nov-12
PROJECT NAME:
AutoZone - Cedar Point Original Run Date: 10/31/2012
DRAINAGE BASIN:
White Oak I REVIEWER: icsb
RECEIVING STREAM:
Boathouse Creek CLASS: SA;HQW
Index No.:
20-31 If ORW, is site within the 575' AEC? Y N
RULES ("2008" or "Ph2") 2008 (Use a comma {') before entering 2006)
PROJECT AREA
2.66 acres Overall DA 45740 sf
=
1.05
acres
as7ao
sf (reduce overall DA by -previously -permitted BUA amount)
DA for Proposed BUA
o
DA for Prev.Permitted BUA
sf (assume DA = previously permitted BUA)
IMPERVIOUS AREA CALCULATION
Previously
BUILDINGS
PARKING/ASPHALT
CONCRETE
OrFSITE
OTHER/FUTURE
I Total
Overall % IMPERVIOUS, 1=
New BUA % impervious =
Ex, BUA % impervious =
VOLUME CALCULATION
Previously permitted BUA Design Storm
Previously permitted BUA volume
1 yr. 24 hour precipitation depth (inches)
Predevelopment C value from consultant
1 yr. 24 hr. Pre -development volume _
1 yr, 24 hr. Post -development volume
1.5" volume for New BUA
2008 Design Volume
Phase 2 Design Volume
SURFACE AREAS / ELEVATIONS! VOLUMES
BOTTOM
TOP/BYPASS
VOLUME PROVIDED 956s.75
SOILS INFORMATION
ELEVATION OF SEASONAL
SOIL TYPE
REPORTED INFILTRATION
Time to Draw Down
10 YEAR STORM (WAIVE BYPASS & VFS)
Runoff depth for 10 yr 24 hr storm, inches
Volume of 10 yr. 24 hr storm =
Volume infiltrated in 24 hours =
Remaining volume to store =
BUA
BUA at dill. DS
C value
7315
1
24569
0.98
1894
0.95
0.95
0.95
33778
0
Cc=
33778
Pre Rv
73.8%
0.05
73.8%
0.05
0.00
inches
0
cf
3.66
698
cubicfeet
9970
cubic feet
4086
cubic feet
9272
cubic feet
4086
cubic feet
Elev. (ft)
Area, s ft
Inc. Volume
Acc. Volume
22.00
2,665
-29315
-29315
#VALUEI
#VALUEI
24.50
4,990
#VALUEI
#VALUE!
cf
Est Rv
0.71
I' or 1.5'
from NOAA chart
does not include exis
HIGH WATER TABLE
195
fmsl
Wando Sand
RATE
5
in/hr
8A
hours
3.66 from NOAA chart
J
9970 CF
13325 CF, at T=1 day, V= (2 x k x AI