Loading...
HomeMy WebLinkAboutSW8120913_CURRENT PERMIT_20121030STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE � CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD A P15% MC®NR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E. Governor Director October 30, 2012 Natural Resources Mr. Charles A. Thomas, President Eastern Pride, Inc. 2405-F Nash Street Wilson, NC 27896 Subject: Stormwater Management Permit No. SW8120913 Burgaw— Family Dollar High Density Commercial Constructed Wetlands Project Pender County Dear Mr. Thomas: Dee Freeman Secretary The Wilmington Regional Office received a complete Stormwater Management Permit Application for Burgaw — Family Dollar on October 26, 2012, Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8120913, dated October 30, 2012, for the construction, operation and maintenance of the BMP's and built -upon area associated with the subject project. This permit shall be effective from the date of issuance until October 30, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150E of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 67,14 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Kelly Johnson, at (910) 796-7215. Sincerely, `-For hones �akild, P.E., Director Division of Water Quality GDSlkpj: &: WQS1StormwatehPermits & Projects120121120913 HD1201210 permit 120913 cc: Marie Peedin, PE Inspector, Pender County Inspections Division of Coastal Management Wilmington Regional Office Stormwater File Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: 910-796-72151 FAX: 910-350-20041 DEN Assistance: 1-877-623-6748 fntemet: www.ncwalerquality.org Nne orthCarolina Aaturallrf An Equal Opportunity 1 Affirmative Action Employer State Stormwater Management Systems Permit No. SW8120913 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Eastern Pride, Inc. Burgaw — Family Dollar US Hwy 117, just South of NC 53, Burgaw, Pender County FOR THE construction, operation and maintenance of one (1) constructed wetland in compliance with Session Law 2008-211 and the provisions of 15A NCAC 2H .1000 (hereafter collectively referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until October 30, 2020 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. 3. The application form, supplement forms, approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The project shall maintain a 50' wide vegetated buffer adjacent all surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of each side of rivers and streams and the mean high water line of tidal waters. 6. All runoff being directed into wetlands shall flow into and through those wetlands at a non -erosive velocity of 2 fps or less. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 120913 The following design elements have been approved for this constructed wetlands stormwater facility, and must be provided in the system at all times: DA1 sa a. Drainage Area, acres: 1.17 Onsite, 112: 50,965 Offsite, ft2: 0 b, Total Impervious Surfaces, ft2: 28,818 Buildings, ft2: 8,320 Roads/Parking, ft2: 18,649 Sidewalks, ft2; 1,849 Offsite, ft2: 0 c. Plant Depth, feet: 0.8 d. TSS removal eff., %: 85 e. Design Storm, inches: 1.5 f. Permanent Pool Elevation, FMSL; 43.75 g. Permitted Wetland Surface Area, ft2: 4,280 h. Shallow Land Area, ft2: 1,566 L Shallow Water Area, ft2: 1,684 _L Deep Pool Area, ft2; 1,030 k. Permitted Temporary Storage Volume, ft3: 3,560 I. Temporary Storage Elevation, FMSL: 44.59 m. Controlling Orifice 0": 1 n. Trees 0 o. Shrubs 64 Herbaceous Plants 900 Receiving Stream I River Basin Trib to Burgaw Creek r. Stream Index Number: 18-74-39 s. Classification of Water Body: C; SW II. SCHEDULE OF COMPLIANCE 1, No person or other legal entity shall alter the approved stormwater management system, or fill in, alter, or pipe any drainage feature, including swales, shown on the approved plans as part of the stormwater management system, unless and until the permittee submits a modification to the permit and receives approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire project does not exceed the allowable built -upon area. 3. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 3 of 7 State Stormwater Management Systems Permit No. SW8120913 The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Infiltration systems should not be used as erosion control devices, due to the potential clogging. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 7. The Director may determine that other revisions to the project should require a modification to the permit. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 9. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Maintenance of the wetlands plants and replacement of dead plants. e. Immediate repair of eroded areas. f. Maintenance of side slopes in accordance with approved plans and specifications. g. Trash and debris removal and unclogging of the wetlands, outlet structure, orifice, catch basins and piping. h. Access to all components of the system must be available at ail times. 10. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 11. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual, 12. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 13. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the application, approved plans and specifications, and other supporting data. Page 4 of 7 State Stormwater Management Systems Permit No. SW8120913 14. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. Ill. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. At least 30 days prior to a change of ownership, or a name change of the Permittee or of the project, or a mailing address change, the permittee shall submit a completed and signed "Name/Ownership Change Form" to the Division of Water Quality, accompanied by the appropriate documentation as listed on the form. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. Neither the sale of the project area in whole or in part, nor the conveyance of common area to a third party, constitutes an approved permit transfer. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143- 215.6A to 143-215.6C. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition, Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. The permittee shall submit a permit renewal application and processing fee at least 180 days prior to the expiration date of this permit. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. Permit issued this the 30sh day of October 2012. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION forC aries WaOld, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 120913 Burgaw — Family Dollar Stormwater Permit No. SW8120913 Pender County Designer's Certification Page 1 of 2 I, , as a duly registered in the State of North Carolina, having been authorized to observe (pedodicallylweeklylfull time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8120913 Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage, 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system, 4. All roof drains are located such that the runoff is directed into the system. 5. The wetland zone elevations are per the approved plan. 6. The wetland is located per the approved plans. 7. A trash rack is provided on the outlet structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of wetland zone surface area and volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans, 13. All required design depths are provided. 14. All required parts of the system are provided. 15. The required number of wetlands plantings have been provided. cc: NCDENR-DWQ Regional Office Inspector, Pender County Building Inspections Page 7 of 7 DWQ USE ONLY Date Recpive4 Fee Paid Permit Number �z' �j �J r" --'eel2 Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Constr ction (select all thaf apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: ..e State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Burgaw - Family Dollar 2. Location of Project (street address): US Hwy 117 just south of NC 53 intersection City:Bur aw County:Pender Zip:28425 3. Directions to project (from nearest major intersection): Approximately 450 If south along US 117 from the intersection of US 117 and NC 53 located on the east 4. Latitude:34° 33' 34" N Longitude:77° 55' 15.8" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification ❑ Renewal w/ Modificationt tRenewals with modifications also requires SWU-102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: []Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density []Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control:1.17 ac of Disturbed Area ❑NPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/ Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a;public airport? ®No ❑Yes If yes, see S.L. 2012-200, Part VI; htti2://j2ortai.ncdenr.org/weblwqlws/­­su/statesw I wo SEP 2 5 202 I:orm SWU-101 Version 06Aug2012 Page I of pV: a IM CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer; properly owner, lessee, designated government official, individual, etc. who owns the vroiectl: Applicant/Organization; fagern Pride. lnc. SigningOificial&rTide: Charles A. Thomas, President b.Conlact information for person listed in item la above: Street Address: F Ngh Street City:Wilson Statet& - ,,,,,_ Zip:278% Mailing Address (if applicable): City: State: Zip Phone: L252--- -) 230-0P2 -- - - -- - Fax: Email: c. Please check the appropriate box. The applicant listed above is: ❑ The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ® Purchaser* (Attach a copy of the pending sales agreement and complete Contact information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization Geo S chuk Si ;nmg Official & Title:t,eo= ghm chuk, Owner _ b. Contact information for person listed in item 2a above. Street Address:l Glenbrook Court City: NftLmn, State:k - - Zip:0T981 Mailing Address (if applicabk): City Stag: Zip: Phone: ( ) Fax: L ) ._ 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the projects Other Contact Person/Organization Signing Official & Title: b.Contact information for person listed in item 3a above: Mailing Address: City Site Zip: Phone. f 1 Fax: Email: 4. Local jurisdkction for building permits: Pender Co. Point of Contact:Tommy Garria Phone #: f910 _ . 259-1201 CEIV Form SWU-101 Version 06Aug2012 Page 2 of SEP 2 5 2012 BY: w 1„ _! _t ^c.- .I k ,' .'•�, !R .!�x?". f�• -r, s�.yr�f�w ..r 1!A .1 .A } r:t ,�%-' ':,a4 io-, •r.-,ri -. ff tt tt • �', .. ` i � ra,•.li f�C;iZ".: 3i' • ..i.i41 • ���.. �� if � F. °1f kY r'� �?r,. _ i. ]� f fr ;v'r�:i•�*-' _ . , u= ''•:'� . � _, .. �•i: Mf.,,.•E.';:`C a j; ., r+:.. .i:f r...f.. �f i •� �a .. `�• - r °'' � ,_ : • _.� ri C .. ' So « _ , k� 'c..-6 W r+]2.S f]1 .'. •, _...sr,�,ak J'Ly :.4 '.:t ' .t `-iz'`. �.�•t;.?j7� ,',:i P`1 `r i]i:: a,. :..:.:: ''1-. +l'�a ei.•jr t1;?:t`'. J.._ 1i_ " •. �, k.�.;ir+T' _.`'� i.�i . 'k3i r•.7'..tFv� iJi A`I L.i _ •^- - - _. ...._ .. __ 'Y`-1 `-1' ,•'c �_-• _ _ -»�. _....-.....�' l.iy 7 .j ...... .... _. *»...._� . -... .... ._ � _... _ -... _ .. '1 .1lTM1 y M1 ._ t i .... �7 � r " ;:.}'!i-r•i.. 4_i�. .•�. <t ,�-s, ;1 . . _ r',njt „�>� .;'.� ..i,:.a•` f*'_ i. i:i:ic}!� •r,;f;_ �'a' :-.r JLfi.. .. . •!". . .� '3,� `e.•.ft. tit,:'Wol •:r::1�. {.,r , •t, ft; g�K.3��! _ . •i•..�3 y,�i 1Tr i:ffr?�"��'. f r•;r.'=f'. __ � ___..- �_-�-�- _ ._ �_ _ .. _. »_�_ •._.___. __.___.._..may_. - __.. .-T—. .�. - .. of .d E IV: PROJECT INFORMATION 1. In the space provided below, briefiy summarize how the stormwater runoff will be treated. Stormwater runoff from teh development sahll be treated through a created wetland prior to overflowing into an existing side ditch which is a tributary to Burgaw Creek 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: Approval of a Site Specific Development Plan or PUD Approval Date: Fj Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear _ _ River basin. 4. Total Property Area:1.17 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:1.17 acres + Total project area shall be calculated to exclude thefollowing: the normal ool of imp�'ounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHWJ line or Mean High Water (MHW) line, and coastal wetlands landward front the NHW (orA4HM line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 56.5 % 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low densihj and other projects, use I for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Draina a Area 1 Drainage Area _ Drainage Area Drainage Area Receiving Stream Name Trib to Burgaw Ck Stream Class QSW Stream index Number * 18-74-39 Total Drainage Area (so 50965 On -site Drainage Area (sf) 50965 Off -site Drainage Area (so 0 Pro used Impervious Area'* (s_0 28818 % Im ervious Area** total 56.5 Impervious** Surface Area Drainage Area 1 Drainage Area Drainage Area Drainage Area On -site Buildings/Lots (so 8320 On -site Streets (so 0 On -site Parkin (so 18649 On -site Sidewalks (so 1949 Other on -site (so 0 Future (so 0 Off -site (sf) 0 Existing BUA*** (sf) 0 s� Total (sf): 28818 * Stream Class and Index Number can be determined at: liLtp.Ilportal.ticdetir.orgzwebABdpslcstilclassijicaticws linpervious area is defined as the built upon area including, but not Iimited to, buildin roskqp199xs, sidewalks, gravel areas, etc. BY: Form 5WU-101 Version 06Aug2012 Page 3 of 6 • � - • � \ � � �.• . _ •' " . ' . - , -! t, � .fir , ., � ., , r ' r . r ' . :,� � � - - +, r � :[7' ,r , - • .. .� �. � � , .. �. • � .r r � •, , . � � , ,. , • .. ,t ., r - - ._. _ .. _ - r', Sr - -..., r, - -- - - - .. _ _ - _ - _ .. .� r r -- _ - � � �.r • r . _ � _ _ � �rF�i a -- � - � r. � I . � ,. r 'Report only that amount of existing BUA that will remain after development. Do not report any existing .BETA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. n/a Proiects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15,4 NC,4C 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://12ortal.ncdenr.org/web/wgjws/suLbmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from htty://portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/webjwq/­ws/su/mal2s.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http:/ /portal.ncdennorg/web/wq/.ws/su/statesw/forms . docs. T Is 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (f required as per Part VIl below) 3. Original of the applicable Supplement Form(s) (sealed, sinned and dated) and O&M n2 el agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/paees/ones topexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, -include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of'tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. I. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must'be delineated 4 s� qualified person. Provide documentation of qualifications and identify the perso ` C E N Imo.. made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calc tioo 2012 o. Drainage areas delineated (included in the main set of plans, not as a separate do ent . p. Vegetated buffers (where required). BY: Form S WU-101 Version 06A ug2012 Page 4 of 6 �. _ � - r, •1 t -� � - .. �. '- �. � r i ,. - _ _ - � � � a T t - � Y 9. Copy of any applicable soils report with the associated SHWI' elevations (Please identify elev bons ' a dditi iA--ell of th bo ' 1 th the m a on depths) as w as a map a rag ocatnons wi exrstn6 elevations and boring logs. Include an 8.5"xil" copy of the MRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book 835 Page No. 861 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC - Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per 15A NCAC 211.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. hM I L www. secretax'_y. state.tic.usl CoraorationssiCSearch.aspx VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outpareels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from hgg:/ Iporta-mcdenr.org/web/wq/ws/su/statesw/fornts does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holders) certify that the recorded property restrictions and protective covenants for this project, V required, shall include all the items required In the permit and listed on the forms available on the wrebsite, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VUL CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting F.ngineer:Marie U. Peedin Consulting Firm: Pamlico Engineer U Services. PLLC Mailing Address•128 Abbey Lane _ City -Was State -.NC Zip Fax: (252 ) 974-7618 DL PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has beenfidled out, complete tlos section) I, (print or type now of person listed ire Contact Information, item 2a) GeoW ShrudWk , certify that I own the property identified in this licatian d thus give permission to (print or type recmu of person Gated in Contact Information, item ia)�r l� 5 A 'f'hon s with (fit or type name of organization listed in Contact Information, item Ia) Eastern Pride. Inc _ to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the styormwater system. ra EC;EB VE. SEP 2 5 2012 Form SWU-101 Version WAuO012 Page 5 oft BY: S3;q 1.4i't OR, T q -klfi M, Qs I V. f--f .rt. 3il c 1 N i-C 11. J U-� t's- 44iI-gm '7'r .)tr 1, k1 'Flrt�j:;j *10 V, If. J; 9.111' .1 '1 L rip "-4 N f;., ca r, (7- ur v Wil ail ,-I- -jj-ciz .1 jj"- ["—It qjrj 1'% L 10.f t.,L C. ­12 J'`, :1a L "j."f Ll I k'2 4, 1-(, j.j rr,r 1;, jl'I IN( --A ij I% 'I. ) - ' ' " , ' " k�" I JA -F It !'.k" Etf I ir r) 7p ill "plij, L.I. v %jqi r 'I JA 4 A Z 4;. Ll liq 1 '1 rye,r. 57% t4 C -i' X I. - 4 I t 4i' 1. err._ r.- p i r-v- i -1ir Isa ft VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/ or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer.Marie U. Peedin PE Consulting Firm: Pamlico Engineering Services, PLLC _ ^ Mailing Address:128 Abby Lane-- City:Washington - _ State:NC Zip:27889 Phone: (252 ) 945-2983_ Email-.pffRllc@embargmail.com Fax: (252_ _ ) 974-7618 _ IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type natne of person listed in Contact hrforntation, item 2a). George Shevchuk , certify that I own 2-te property identified in this permit appl cation, and thus give perpiission to (print or type trarne oflxrson listed in Contact Information, item 1a) Am7rtrB i+:Okr riC-5 with (print or type name of organization Iisted in Contact Information, item 1b) Eastern Pride Inc. to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit -a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a -valid permit is a violation of C General Statue 3-225.1 and may result in appropriate enforcement action including the assessment of civil RC of up to $ `',9W per dad, pur-4ant to NCGS-143-215.6. Date: V-1 r %Z 1 Lpa a //�� Notary Public for the State of ounty of 6'ry Ido hereby certify that l� Sh h personally appeared before me this day of ,.and c owledge the du execution of the application for a stormwater permit. Witness my hand and official seal, SEAL Michelle A Read Notary Public New Jersey My Commission Expires 3-1-17 My commission expires nEGEWE)l SEP252012 BY: Form SMM-101 Version 07July2009 Page 6 of 7 I pr im 'X. APPLICANT'S CERTIFICATION I, (print or hjpe name of person listed in Contact Information, item 2) Charles Thomas certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable �s}tormwater rules under 15A NCAC 21-1.1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. Signature: l -��� j p - Date: 4/oZOA6 Z I, �iie��S54 5 �oneg a Notary Public for the State of 90ek eamUfs*. County of do hereby certify that C AAE'S A • Aor+tuf S personally appeared before me this 10 day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, s�5• __ 5 � f SEAL My commission expires EGEN,c- SEP 2 5 2012 BY: Form SWU-101 Version 07July2009 Page 7 of 7 o'zOt NN n Z9QG a NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WETLAND SUPPLEMENT This,form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all the required information. I. PROJECT INFORMATION Project name 'BURGAW FAMILY DOLLAR Contact name MARIE U PEEDIN Phone number Date Drainage area number II. DESIGN INFORMATION Site Characteristics 252-945-2983 Revised 10/23/12 1 Drainage area 50,965.00 -Je impervious area 28,818.00 ft2 Percent impervious 56.5% % Design rainfall depth 1.50 inch Peak Flow Calculations 1-yr, 24-hr rainfall depth 3.43 in 1-yr, 24-hr intensity 0.14 inlhr Pre -development 1-yr, 24-hr runoff 0.07 ft3lsec Post -development 1-yr, 24-hr runoff 0.11 ft3/sec PrelPost 1-yr, 24-hr peak control 0.04 fi3lsec Storage Volume: Non -SA Waters Minimum required volume 3,558.00 ft3 Volume provided (temporary pool volume) 3,621.00 ft3 Storage Volume: SA Waters Parameters 1.5' runoff volume ff3 Pre -development 1-yr, 24-hr runoff volume ft1 Post -development 1-yr, 24-hr runoff volume ft3 Minimum volume required fe Volume provided It, Outlet Design Depth of temporary pool/ponding depth (Dpbrie) 12.00 in Drawdown time 2.00 days Diameter of orifice 1.00 in Coefficient of discharge (Ca) used in orifice diameter D.60 (unitless) calculation Driving head (Hp) used in the orifice diameter calculation 1.50 ft 0 OK OK CA SEAL �r + L, i 20212 Z� ��rfr!HL rarra�`� fly Drawdown orifice diameter may be insufficient. Please provide adequate supporting calculations. er-'b OK'- t { Form SW401-Wetland-Rev.6-11116/09 Pans I and il. Project Design Summary, Page 1 of 3 r [. r' r .. .. r ,, �t-r'.Ir�...-. apt;/..a;' A's .� • r .'r�r c,g�mr" =�r zti u% :ry It r i_ I� r 'r . - 0 Surface Areas of Wetland Zones Surface Area of Entire Wetland 4,514.00 fe OK Shallow Land 1,566.00 fe OK The shallow land percentage is: 35% % Shallow Water 1,880.00 ft, OK The shallow water percentage is: 42% % Deep Pool Forebay portion of deep. pool (pretreatment) 538.00 ftz OK The forebay surface area percentage is: 12% % Non-forebay portion of deep pool 530.00 fe OK The non-forebay deep pool surface area percentage is: 12% % Total of wetland zone areas 4,514.00 fe OK Add or subtract the following area from the zones 0.00 ft2 Topographic Zone Elevations Temporary Pool Elev Wn.(TPE) Shallow Land (top) 44.00 ft amsl Permanent Pool Elevation (PPE) Shallow Water/Deep Pool (top). 43.00 ft amsl Shallow Water bottom 42.50 ft amsl Most shallow point of deep pool's bottom 41.00 it amsl Deepest point of deep pool's bottom 40.00 ft amsl Design must meet one of the following two options: This design meets Option #1, y or N) Top of PPE is within 6" of SHWT, If yes: SHWT (Seasonally High Water Table) 42.50 ft amsl OK This design meets Option #2, n (Y or N) Wetland has liner with permeability < 0.01 inlhr, If yes: Depth of topsoil above impermeable liner in Topographic Zone Depths Temporary Pool Shallow Land 12.00 in OK Permanent Pool Shallow Water 6.00 in OK Deep Pool (shallowest) 24.00 in OK Deep Pool (deepest) 36.00 in OK Planting Plan Are cattails included in the planting plan? n (Y or N) OK Number 2f.Plants recommended in Shalom Water Area: Herbaceous (4'cubic-inch container) 500 re Number of Plants recommended in Shallow Land Area: Herbaceous f4'cubic-inch er1� 400 Shrubs (1 gation or larger tR — 64 OCT 2 6 2012 Trees (3 gallon or larger) and Herbaceous (4+ cubic -inch) 8 and 320 Number of Plants Rrovided in Shallow Water Area: BY: Herbaceous (4'cubic-inch container) 500 OK Number of Plants A oMv ded in Shallow Land Area: Herbaceous Woubic-inch container) OP, 400 OK Shrubs (1 gallon or larger) O R 64 OK Trees (3 gallon or larger) and 0 More required if not planting herb. arbor shrubs. Grasslike Herbaceous (4+ cubic -inch) 0 More recommended if planting trees. Form SW401-Wedand-Rev,6-11/16/09 Parts I and 11. Project Design Summary, Page 2 of 3 .+C a, 4' L n' Additional Infoir ration Can the design volume be contained? y —(Y (Y or N) OK Does project drain to SA waters? If yes, n (Y or N) Excess volume must pass through filter. What is the length of the vegetated filter? ft Are calculations for supporting the design volume provided in the y (Y or N) OK application? Is BMP-sized to handle all runoff from ultimate build -out? y (Y or N) OK Is the BMP located in a recorded drainage easement with a y (Y or N) OK recorded access easement to a public Right of Way (ROW)? The length to width ratio is: 11.00 :1 OK Approximate wetland length 220.00 ft Approximate wetland width 20.00 ft This approx. surface area is within this number of square feet Approximate surface area using length and width provided 4,400.00 it z of Be entire wetland surface area reported above: Will the wetland be stabilized within 14 days of construction? y —(Y or N) OK ' OCT 26 4312 BY' Form SW401-Wetiand-Rev.5-11118109 Parts r and ir. Project Design Summary. Page 3 of 3 'j' e Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Page/ Plan Sheet No. C4 ° z 1. Plans (Y - 5lY or larger} of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), --- N l /� - Delineated drainage basins (include Rational C coefficient per basin), - Wetland dimensions (and length to width ratio), -Pretreatment system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and 'DO k&-A st-e —4 C° d L' 2. Plan details (1' = 50' orlarger)for the wetland showing: - Wetland dimensions (and length to width ratio) - - Pretreatment system, - Maintenance access, + - Design at ultimate build -out, - Overflow device, and - E3aun ades_QLdrAnaUA easement ° 3. Section view of the wetland (1' = 20' or larger) showing: - Side slopes, 3:1 or lower1 S�� wT - Wetland layers D Ai! wetlands: Shallow land depth, shallow water depth, deep pool depth Option 1, no day liner: SLWT depth Option 2, day liner: Depth of topsoil on top of liner, liner specifications o Y > 4. A detailed planting plan (1' = 29 or larger) prepared by a qualified individual showing: ; - A variety of several suitable species (not including cattails), . Q - Sizes, spacing and locations of plantings, .00 C, � TISA - Total quantity of each type of plant specified, ✓ - A planting detail, ✓ Off, - The source nursery for the plants, and ✓ / - Fertilizer and watering requirements to establish vegetation✓ 5. A construction sequence that shows how the wetland will be protected from sediment until the entire drainage area is stabilized. f (k' 6. The supporting calculations {including drawdown calculations}. ✓ 7. A copy of the signed and notarized operation and maintenance (O&M) agreement. V VV 8. > b 9. A soils report that is based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. SW401-Wetland-Rev.6-11116109 Part ill, page 1 of 1 .44 WAY sop w Permit Number:µJ������� (to be provided by DWQ) Drainage Area Number: ' Stormwater Wetland Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — Immediately following construction of the stormwater wetland, bi-weekly inspections will be conducted and wetland plants will be watered bi-weekly until vegetation becomes established (commonly six weeks). — No portion of the stormwater wetland will be fertilized after the first initial fertilization that is required to establish the wetland plants. — Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wetland. — Once a year, a dam safety expert should inspect the embankment. After the stormwater wetland is established, I will inspect it monthly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential roblem: How I will remediate theproblem: Entire BMP Trash/debris is present. Remove the trash/debris. Perimeter of wetland Areas of bare soil and/or erosive Regrade the soil if necessary to remove the gullies have formed. gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too long. Maintain vegetation at an appropriate height. Inlet device: pipe or The pipe is clogged (if applicable). Unclog the pipe. Dispose of the sediment swale offsite. The pipe is cracked or otherwise Replace the pipe. damaged if applicable). Erosion is occurring in the swale (if Regrade the swale if necessary to smooth applicable). it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. E G E I SEP 2 5 2012 Form SW401-Wetland O&M-Rev.4 BY: Page 1 of 3 Permit Number: (to be provided by DWQ) BMP element: Potentialproblem: Forebay Sediment has accumulated in the forebay to a depth that inhibits the forebay from functioning weII. Deep pool, shallow water and shallow land areas Embankment Erosion has occurred. Weeds are present. Algal growth covers over 50% of the deep pool and shallow water areas. Cattails, phragmites or other invasive plants cover 50% of the deep pool and shallow water areas. Shallow land remains flooded more than 5 days after a storm event. Plants are dead, diseased or dying. Best professional practices show that pruning is needed to maintain optimal plant health. Sediment has accumulated and reduced the depth to 75% of the original design depth of the deep pools. A tree has started to grow on the embankment. An annual inspection by appropriate professional shows that the embankment needs repair. Evidence of muskrat or beaver activity is present. Micropool Sediment has accumulated and reduced the depth to 75% of the original design depth. Outlet device ! Clogging has occurred. The outlet device is damaged Receiving water Erosion or other signs of damage have occurred at the outlet. How I will remediate the problem: Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. _ Consult a professional to remove and control the algal growth. Remove invasives by physical removal or by wiping them with pesticide (do not sorav) - consult a professional. Unclog the outlet device immediately. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the eround cover if necessarv. Prune according to best professional practices. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Consult a dam safety specialist to remove the tree. Make all needed repairs. Consult a professional to remove muskrats or beavers. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Clean out the outlet device. Dispose of the sediment off -site. Repair or replace the outlet device. Contact the NC Division of Water Quality 401 Oversight Unit at 919-733-1786. SEP252012 Form SW401-Wetland O&M-Rev.4 Rge 2 of 3 BY: Permit Number: {Po he provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project nameTamily Dollar Burgaw _ ^ BMP drainage area number: Print name:Charles Thomas Title: President Address:2405-F Nash Street Wilson, NC 27896 Phone:252-230-0632 Signature: Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, ffio'mpi S. T a Notary Public for the State of NOA Nfbti na , County of GASor1 , do hereby certify that �prt�s 1 1f►om&g 44 personally appeared before me this ad- day of 15�!: rhba.r 2O1 a , and acknowledge the due execution of the forgoing stormwater wetland maintenance requirements. Witness my hand and official seal, +s•`i° ws SEAL My commission expires 5(t� to, aao(3_ _ F9V"E SEP 2 5 2012 0. Form SW401-Wetiand O&M-Rev.4 Page 3 of 3 i Fr„ . State Stormwater Management Systems Permit No. SW8 120913 Burgaw — Family Dollar Stormwater Permit No. SW8120913 PenderCoun Designer's Certification Page 1 of 2 1� I, u, ����� as a duly registeredi'^e-e r in the State of North Carolina, having been authorized to observe ( eriadicall 1 eklylfull time) the construction of the project, (Project) for ?(, D E- (Project Owner) hereby state that, to the best of my'abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number :20 i Z- Date"".,f i �`�y412Pot 1:dd1J!! o Q` � OFE551O,jjgC'•y �� :-.SEAL" 1 •. G E N, JUN 03 2013 _.. — Paae 6 of 7 State Stormwater Management Systems Permit No. SW$ 120913 Certification Requirements: Page 2 of 2 1. Thedrainage area to the system contains approximately the ermined acreage. ag Y PP Y P 9 -vL4 ✓3 The drainage area to the system contains no more than the permitted amount of built -upon area. All the built -upon area associated with the project is graded such that the runoff drains to the system. All roof drains are located such that the runoff is directed into the system. The wetland zone elevations are per the approved plan. The wetland is located per the approved plans. A trash rack is provided on the outlet structure. All slopes are grassed with permanent vegetation. Vegetated slopes are no steeper than 3:1. The inlets are located per the approved plans and do not cause short-circuiting of the system. The permitted amounts of wetland zone surface area and volume have.been provided. Required drawdown devices are correctly sized and located per the approved,plans. All required design depths are provided. All required parts of the system are provided. 5. The required number of wetlands plantings have been provided cc: NCDENR-DWQ Regional Office Inspector, Pender County Building Inspections 0 Page 7 of 7