HomeMy WebLinkAboutSW8120902_CURRENT PERMIT_20121009STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW�lol(%���
DOC TYPECURRENT
PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
a&k?/O/i°f
YYYYMMDD
r
t NC®ENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Charles Wakild, P. E. Dee Freeman
Governor Director Secretary
October 9, 2012
Daniel Cook, President
The Sanctuary of Wilmington, Inc.
Post Office Box 2374
Carolina Beach, NC 28428
Subject: State Stormwater Management Permit No. SW8 120902
The Sanctuary of Wilmington
High Density Commercial Infiltration System
New Hanover County
Dear Mr. Cook:
The Wilmington Regional Office received a complete State Stormwater Management Permit
Application for The Sanctuary of Wilmington on October 1, 2012. Staff review of the plans and
specifications has determined that the project, as proposed, will comply with the Stormwater
Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are
forwarding Permit No. SW8 120902 dated October 9, 2012, for the construction, operation, and
maintenance of the BMP's and built -upon area associated with the subject project.
This permit shall be effective from the date of issuance until October 9, 2020, and shall be
subject to the conditions and limitations as specified therein. Please pay special attention to the
conditions listed in this permit regarding the Operation and Maintenance of the BMP(s),
recordation of deed restrictions, certification of the BMP's, procedures for changes of
ownership, transferring the permit, and renewing the permit. Failure to establish an adequate
system for operation and maintenance of the stormwater management system, to record deed
restrictions, to certify the BMP's, to transfer the permit, or to renew the permit, will result in
future compliance problems.
If any parts, requirements; or limitations contained in this permit are unacceptable, you have the
right to request an adjudicatory hearing by filing a written petition with the Office of
Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North
Carolina General Statutes, and must be filed with the OAH within thirty (30).days of receipt of
this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee
is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC
27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com.
Unless such demands are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please contact
Chris Baker, at (910) 796-7215.
eSinely,
a rles akild, P.E, Director
n of Water Quality
GDS/csb: S:IWQSIStormwater\Permits & Projects120121120902 HD12012 10 permit 120902
cc: Amy Drucker, P. E., Carolina Site Design, Inc.
New Hanover County Building Inspections
Wilmington Regional Office Stormwater File
Wilmington Regiona3 Office
127 Cardinal 0« ve Extension, Wilmington, North Carolina 28405 One
Phone: 910-796-72151 FAX: 910-350-20041 Customer Service: 1-877-623-6748 NorthCarolina
Internet: www.ncwaterquafity.org �/ '�'atuinlfn y
An Equal Opportunity 1Affirmative Action EmplDyer �i "
State Stormwater Management Systems
Permit No. SW8 120902
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
:I[t1:��7�a:-'���'��I�h'ill'il�:Zy1,�>l�I��I���IJ►'il���
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
The Sanctuary of Wilmington, Inc.
The Sanctuary of Wilmington
Carolina Beach Road, Carolina Beach, New Hanover County
FOR THE
construction, operation and maintenance of an infiltration trench and two (2) infiltration
swales in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H
.1000 (hereafter collectively and separately referred to as the "stormwater rules') and
the approved stormwater management plans and specifications and other supporting
data as attached and on file with and approved by the Division of Water Quality and
considered a part of this permit.
This permit shall be effective from the date of issuance until October 9, 2020, and shall
be subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.8 of this permit. The stormwater control has been
designed to handle the runoff from 124,744 square feet of impervious area.
3. The tract will be limited to the amount of built -upon area indicated in Section 1.7
on page 3 of this permit, and as shown on the approved plans.
4. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
5. The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system.
6. The project shall provide a 50' wide vegetated buffer adjacent surface waters,
measured horizontally from and perpendicular to the normal pool of impounded
structures, the top of bank of streams and rivers, and the mean high water line of
tidal waters:
Page 2 of 7
State Stormwater Management Systems
Permit No. SW8 120902
7. The following design criteria have been permitted for the infiltration system and
must be provided and maintained at design condition:
Trench 1
Basin 2A
Basin 2B
a.
Drainage Area, acres:
Onsite, ft2:
Offsite ft2
3.57
155,410
None
0.16
6,843
None
0.13
5,741
None
b.
Total Impervious Surfaces, ft :
Onsite, ft2:
Offsite ft2
118,817
118,817
None
3,029
3,029
none
2,898
2,898
None
C.
Design Storm, inches:
1.5
1.5
1.5
d.
Trench Length, feet:
1,563
NIA
NIA
e.
Trench Width feet:
7
NIA
NIA
f.
Trench Depth, feet:
3
NIA
NIA
q.
Basin Depth, feet:
NIA
3
3
h.
Bottom Elevation FMSL:
NIA
25
25
i.
Bottom Surface Area, ft:
NIA
74
68
Bypass Weir Elevation, FMLS:
27.25
25.9
25.9
k.
Permitted Storage Volume, ft:
14 598
2,075
1,660
I.
Pre-dev, 1 r-24 hr. discharge rate cfs:
3.7
0.31
0.25
M.
Past-dev. 1 r-24 hr. dischar a rate, cfs:
17.8
0.55
0.5
n.
Type of Soil:
Lakeland
& Leon
Wakulla
Wakulla
o.
Expected Infiltration rate:
20
4
4
p.
Seasonal High Water Table FMSL:
22.17
22
22
Time to Draw Down, hours
5.0
8.4
9.4
S.
ReceWng Stream/River Basin:
UT to Myrtle Grove Sound
t.
Stream Index Number:
18-87-27
U.
Classification of Water Body:
SA-ORW
II. SCHEDULE OF COMPLIANCE
1. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance
necessary to assure the permitted stormwater system functions at optimum
efficiency. The approved Operation and Maintenance Plan must be followed in its
entirety and maintenance must occur at the scheduled intervals including, but not
limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowin.9 and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of bypass structure, infiltration media, flow
spreader, catch basins, piping and vegetated filter.
g. A clear access path to the bypass structure must be available at all times.
Page 3 of 7
State Stormwater Management Systems
Permit No. SW8 120902
4. The facilities shall be constructed as shown on the approved plans. This permit
shall become voidable unless the facilities are constructed in accordance with the
conditions of this permit, the approved plans and specifications, and other
supporting data.
5. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
6. A copy of the approved plans and specifications shall be maintained on file by
the Permittee for a minimum of ten years from the date of the completion of
construction.
7. Records of maintenance activities must be kept for each permitted BMP. The
reports will indicate the date, activity, name of person performing the work and
what actions were taken.
8. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A
modification may be required for those deviations.
9. Access to the stormwater facilities shall be maintained via appropriate
easements at all times.
10. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc.
b. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
C. Further development, subdivision, acquisition, lease or sale of any, all or
part of the project area. The project area is defined as all property owned
by the permittee, for which Sedimentation and Erosion Control Plan
approval or a CAMA Major permit was sought.
d. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
11. The permittee shall submit final site layout and grading plans for any areas noted
as future development on -the approved plans, prior to construction.
12. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
III. GENERAL CONDITIONS
Approved plans, application, supplement forms, Operation and Maintenance
agreements, design calculations and specifications for this project are
incorporated by reference and are enforceable parts of the permit.
Page 4 of 7
State Stormwater Management Systems
Permit No. SW8 120902
2. This permit is not transferable to any person or entity except after notice to and
approval by the Director. At least 30 days prior to a change of ownership, or a
name change of the permittee or project, or a mailing address change, the
permittee must submit a completed and signed Name/Ownership Change form to
the Division of Water Quality, accompanied by the appropriate documentation as
listed on the form. The approval of this request will be considered on its merits
and may or may not be approved.
3. The permittee is responsible for compliance with all permit conditions until such
time as the Division approves the transfer request. Neither the sale of the project
area in whole or in park, nor the conveyance of common area to a third party
constitutes an approved transfer request.
4. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division of Water Quality, in
accordance with North Carolina General Statute 143-215.6A to 143-215.6C.
5. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
6. In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
7. The permittee grants DENR Staff permission to enter the.property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
8. The permit issued shall continue in force and effect until revoked or terminated.
The permit may, be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and reissuance or
termination does not stay any permit condition.
9. Unless specified elsewhere, permanent seeding requirements for the stormwater
controls must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
10. The issuance of this permit does not prohibit the Director from reopening and
modifying the permit, revoking and reissuing the permit, or terminating the permit
as allowed by the laws, rules and regulations contained in Session Law 2008-
211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et. al.
11. The permittee shall submit a permit renewal application at least 180 days prior to
the expiration date of this permit. The renewal request must include the
appropriate documentation and the processing fee.
Permit issued this the 9th day of October, 2012.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
Division of Water Quality
By Authority of the Environmental Management Commission
Page 5 of 7
State Stormwater Management Systems
Permit No. SW8 120902
The Sanctuary of Wilmington
Stormwater Permit No. SW8 120902
New Hanover Countv
Designer's Certification
I, , as a duly registered in the
State of North Carolina, having been authorized to observe (periodically/ weekly/ full
time) the construction of the project,
(Project)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL
Page 6 of 7
State Stormwater Management Systems
Permit No. SW8 120902
Certification Requirements:
1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
5. The bypass structure weir elevation is per the approved plan.
6. The bypass structure is located per the approved plans.
7. A Trash Rack is provided on the bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than. 3:1.
10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
.12. All required design depths are provided.
.13. All required parts of the system are provided.
.14.. The required system dimensions are provided per the approved plans. .
cc: NCDENR-DWQ Regional Office
New Hanover County Building Inspections
Page 7 of 7
i
DWQ USE ONLY
Date Received
Fee Paid
Permit Number
- 1-1 - ! a-
000 31, -7
U �6 l }-a of v 2
Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction
(select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan
❑ Other WQ M mt Plan:
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This form may be photocopied for use as an original
I. GENERAL INFORMATION
1. Project [Name (subdivision, facility, or establishment name - should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
The Sanctuary of Wilmington
2. Location of Project (street address):
6687 Carolina
City: Carolina Beach County: New Hanover Zip: 28428
3. Directions to project (from nearest major intersection):
Project is located on Carolina Beach Road approximately 2 000` north of Myrtle Grove Road
4. Latitude:34° 05' 41" N Longit7ude:77° 53' 44" W of the main entrance to the project.
1L PERMIT INFORMATION:
1. a. Specify whether project is (check one): ®New ❑Modification
b.If this application is being submitted as the result of a modification to an existing permit, list the existing
permit number , its issue date (if known) _ , and the status of
construction: ❑Not Started ❑Partially Completed* ❑ Completed* provide a designer's certification
2. Specify the type of project (check one):
❑Low Density ®High Density ❑Drains to an Offsite Stormwater System []Other
3. If this application is being submitted as the result of a previously returned application or a letter from DWQ
requesting a state stormwater management permit application, list the Stormwater project number, if
assigned, SW8120210 and the previous name of the project, if different than currently
( proposed, The SanctuaEy
4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be
obtained by contacting the Customer Service Center at 1-877-623-6748):
❑CAMA Major ❑Sedimentation/Erosion Control: ac of Disturbed Area
❑NPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts
I
b.If any of these permits have already been acquired please provide the Project Name, Project/ Permit Number,
issue date and the type of each permit: NjA „
EC"O"EIVE [
O C T 0 12012
BY:
I N
III. CONTACT INFORMATION
I. a. Print Applicant.%rSigning Official's name and title (specifically the.developer, property owner, lessee,. -'-
designated government official, individual, etc. who owns the project):
Applicant/Organization: The Sanctuary of Wilmington, Inc. (property owner) ^_
Signing Official & Title:— Daniel Cook, President_
b. Contact information for person listed in item I above:
Street Address: PO Box 2374
City: Carolina Beach State: NC Zip: 28428
Mailing Address (if applicable): PO Box 2374
City: Carolina Beach State: NC ' Zip: 28428
Phone: ( 910 ) 397-0656 Fax: ( l le5 ) — i <� /
Email:
c. PIease check the appropriate box. The applicant listed above is:
® The property owner (Skip to Contact Information, item 3a)
❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below)
❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and
2b below)
❑ Developer* (Complete Contact Information, item 2a and 2b below.)
2. a. Print Property Owner's name and title below, if you are the lessee, purchaser oudeveloper. (This is the
person who owns the property that the project is located on): , ,
Property Owner/Organization: Same As Above
Signing Official & Title:
b.Contact information for person listed in item 2a above:
Street Address:
City:
State: . Zip:
Mailing Address (if applicable):
City: State: Zip:
Phone: Fax:
Email:
3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other
person who can answer questions about the project:
Other Contact Person/Organization: N/A
Signing Official &
b.Contact information for person listed in item 3a above:
Mailing Address:
City: State:
Phone: ( 1 Fax:
Email:
4. Local jurisdiction for building permits: New Hanover County
Point of Contact: Chris O'Keefe
Phone #: ( 910 ) 798-7165
1V. PROJECT INFORMATION
1. In the -space provided below, briefly summarize how the storinwater runoff.rvill be treated:
The proposed runoff will sheet flow into grassed swales which drain into an infiltration system
2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved:
❑ ApprovaI of a Site Specific Development Plan or PUD Approval Date:
❑ Valid Building Permit Issued Date:
❑ Other: Date:
b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with:
❑ Coastal SW -1995 ❑ Ph 11 - Post Construction
3. Stormwater runoff from this project drains to the Cape Fear River basin.
4. Total Property Area: 8.15 acres 5. Total Coastal Wetlands Area: 0.00 acres
6. Total Surface Water Area: 0.00 acres
7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project
Area+: 8.15 acres
+ Total project area shall be calculated to exclude the following the normal pool of impounded structures, the area
between the banks of streams and rivers, the area below the Nonnal High Water (NUM line or Mean High Water
(MHW) line, and coastal wetlands landward from the NHW (or MHW) line. Tile resultant project area is used to
calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NNW (or MHW) line may
be included in the totalproject area.
8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 35 %
9. How many drainage areas does the project have?3 (For high density, count 1 for each proposed engineered
stonnwater BMP. For law density and other projects, use 1 for the whole property area)
10. Complete the following information for each drainage area identified in Project information item 9. If there
are more than four drainage areas in the project, attach an additional sheet with the information for each area
provided in the same format as below.
ECEIWE'
OCT Q 1 2012
BY:_
Basin Information
Drainage Area 1
Drainage Area
Drainage Area 2B
—
Drainage Area 3
—
-
2A
Receiving Stream Name
Unnamed Trib
Unnamed Trib
Unnamed Trib
Unnamed Trib
to Myrtle
to Myrtle
to Myrtle
to Myrtle
Grove
Grove
Grove
Grove
Sound
Sound
Sound
Sound
Stream CIass
SA-ORW
SA-ORW
SA-ORW
SA-ORW
Stream Index Number *
18-87-27
18-87-27
18-87-27
18-87-27
Total Drainage Area (sf)
155,410
6,843
5,741
186,955
On -site Drainage Area (sf)
155,410
6,843
5,741
186,955
Off -site Drainage Area (so
0
0
0
0
Proposed Impervious Area** (so
118,817
3,029
2,898
0
Impervious Area** total
76
44
50
0
Impervious' Surface Area
Drainage Area 1
Drainage Area
2A
Drainage Area 2B
Drainage Area 3
On -site Buildings/Lots (so
21,000
0
0
0
On -site Streets (so
0
3,029
2,898
0
On -site Parkin (sf)
97,817
0
0
0
On -site Sidewalks (so
0
0
0
0
Other on -site (sf)
0
0
0
0
Future (so
0
0
0
0
Off -site (so
0
0
0
0
Existing BUA*** (so
0
0
1 0
0
Total (so:
118,817
3,029
1 2,898
0
* Stream Class and Index Number can be determined at: littp://portal.ncdetir.orzii7ebhiuiLIpslcsit/classf cations
`* Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas,
sidewalks, gravel areas, etc.
*** Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that
is to be removed and which will be replaced Inj new B UA.
11. How was the off -site impervious area listed above determined? Provide documentation. -N/A
Projects in Union County: Contact DWQ Central Office staff io check if the project is located within a Threatened &
Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600.
V. SUPPLEMENT AND O&M FORMS
The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms
must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded
from http://portal.ncdenr.org/web/wg/ws/su/bmp-manual.
V1. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. A detailed application instruction sheet and BMP
checklists are available from hU:/Z]2ortal.ncdenr.org/web/wq/ws/su/statesw/fornis dots. The complete
application package should be submitted to the appropriate DWQ Office. (The appropriate office may be
found by locating project on the interactive online map at;http://portal.ncdenr.org/web/wq/`ws/su/"maps.)
Please indicate that the following required information have been provided by initialing in the space provided
for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions
for each submitted application package from http://portaI.ncdenr.org/web/`wq/`ws/`su/statesw/forms does.
Initials
1. Original and one copy of the Storm water Management Permit Application Form.
2. Original and one copy of the signed and notarized Deed Restric���en nts N R
Form. (if required as per Part Vil below)
rTocT
Q1 2012
BY:
3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M G,f}
agreement(s) for each BMP.
4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to _T
http://www.envhetp.org/pages/onestopexpress.html for information on the Express program
and the associated fees. Contact the appropriate regional office Express Permit Coordinator for
additional information and to schedule the required application meeting.)
5. A detailed narrative (one to two pages) describing the stormwater treatment/management for
6. A USGS map identifying the site location. If the receiving stream'is reported as class SA or the C-9
receiving stream drains to class SA waters within lh mile of the site boundary, include the
mile radius on the map.
7. Sealed, signed and dated calculations. _ u�
S. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including:
a. Development/ Project name.
b. Engineer and firm.
c. Location map with named streets and NCSR numbers.
d. Legend.
e. North arrow.
f. Scale.
g. Revision number and dates.
h. identify all surface waters on the plans by delineating the normal pool elevation of
impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal
waters, and any coastal wetlands landward of the MHW or NHW lines.
• Delineate the vegetated buffer landward from the normal pool elevation of impounded
structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters.
i. Dimensioned property/ project boundary with bearings & distances.
j. Site Layout with all BUA identified and dimensioned.
k. Existing contours, proposed contours, spot elevations, finished floor elevations.
1. -Details of roads, drainage features, collection systems, and stormwater control measures.
m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a
qualified person. Provide documentation of qualifications and identify the person who
made the determination on the plans.
n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations.
o. Drainage areas delineated (included in the main set of plans, not as a separate document).
p. Vegetated buffers (where required).
9. Copy of any applicable soils report with the associated SHWT elevations (Please identify c24
elevations in addition to depths) as well as a map of the boring locations with the existing
elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the
project area clearly delineated. For projects with infiltration BMPs, the report should also
include the soil type, expected infiltration rate, and the method of determining the infiltration rate.
(Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior
to submittal, (910) 796-7378.)
-10. A copy of the most current property deed. Deed book: 5472 Page No: 865-869
11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Cn�
Secretary of State or other official documentation, which supports the titles and positions held—T
by the persons listed in Contact Information, item la, 2a, and/or 3a'per NCAC 2H.1003(e). The
corporation or LLC must be listed as an active corporation in good standing with the NC
Secretary of State, otherwise the application will be returned.
http://www.secretaly.state.nc.us/CorporationslCSearch.aspx,
I Y.
VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective
covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed
BUA allocations vary, a table listing each lot number,'lot size, and the allowable built -upon area must be
provided as an attachment to the completed and notarized deed restriction form. The appropriate deed
restrictions and protective covenants forms can be downloaded from
htlp://portal.ncdenr.org/web/wq/ws/su/st,itesw/forms_docs..Download the latest versions for each
submittal.
In the instances where the applicant is different than the property owner, it is the responsibility of the property
owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring
that the deed restrictions are recorded.
By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and
protective covenants for this project, if required, shall include all the items required in the permit and listed
on the forms available on the website, that the covenants will be binding on all parties and persons claiming
under them, that they will run with the land, that the required covenants cannot be changed or deleted
without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot.
VIII. CONSULTANT INFORMATION AND AUTHORIZATION
Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a
consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as
addressing requests for additional information).
Consulting Engineer: Arnie S. Drucker, PE
Consulting Firm: Carolina Site Desi", Inc.
Mailing Address: PO Sox 538
City: North Myrtle Beach .,,__..,.,_.. State: SC Zip: 29597
Phone: ( 843 ) 280-5870 _ Fax: ( 843 ) 280-5870
Email: csd@sc.rr.com
IX. PROPERTY OWNER AUTHORIZATION (if Contact Infonnation, item 2 has been filled out, complete this
section)
1, (print or type name of person listed in Contact Information, item 2a) _ certify that I
own the property identified in this permit application, and thus give permission to (print or type name of person
listed in Contact Information, item 1a) with (print or type name of organization listed in
Contact Information, item 1a) to develop the project as currently proposed. A copy of
the lease agreement or pending property sales contract has been provided with the submittal, which indicates the
party responsible for the operation and maintenance of the stormwater system.
OCTCEDVE
o 12012
dY:
Permit No. S'w% iI0 Rod
(to be provided by DWQ)
ATA
I r
} ti
k4CDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM Y
401 CERTIFICATION APPLICATION FORM
INFILTRATION TRENCH SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information.
I. PROJECT INFORMATION -•'r
a "
Project name
The Sanctuary
Contact person
Amie Drucker, PE
Phone number
843-280-5870
Date
9/28/2012
Drainage area number
DA-1
Ill.- DESIGN INFORMATION;x 3 ,.. - ." ;.:,, ..�• y= k �, �,,:
Site Characteristics
Drainage area 155,410.00 ft2
Impervious area 118,817.00 ft2
Percent impervious 76.5% %
Design rainfall depth 1.50 in
Peak Ftow Calculations
1-yr, 24-hr rainfall depth
1-yr, 24-hr intensity
Pre -development 1-yr, 24-hr discharge
Post -development 1-yr, 24-hr discharge
Pre/Post 1-yr, 24-hr peak flow control
Storage Volume: Non -SA Waters
Minimum volume required
Volume provided
Storage Volume: SA Waters
1.5" runoff volume
Pre -development 1-yr, 24-hr runoff volume
Post -development 1-yr, 24-hr runoff volume
Minimum volume required
Volume provided
Soils Report Summary
Soil type
Infiltration rate
SHWT elevation
Trench Design Parameters
Drawdown time
Perforated pipe diameter
Perforated pipe length
Number of laterals
Stone type (If used)
Stone void ratio
Stone is free of fines?
4.04 in
6.49 inlhr
3.70 ft31sec
17.80 ft3lsec
14.10 ft3/sec
14,190.00 ft3
14,598,00 ft3 OK for non -SR waters
ft3
ft3
ft3
ft3
ft3
Lakeland & Leon
20.00 inlhr
22.17 fmsl
0.21 days OK
12.00 in
1,563.00 ft
9
#5
0A ECEIVE
Y (Y or N) OK
OCT Q 12012
BY:
Form SW401-Infiltration Trench-Rev.4 Parts I. & II. Design Summary, Page 1 of 2
U
Trench Elevations
Bottom elevation
Storageloverflow elevation
Top elevation
Trench Dimensions
Length (long dimension)
Width (short dimension)
Height (depth)
Additional information
Maximum volume to each inlet into the trench?
Length of vegetative filter for overflow
Number of observation wells
Distance to structure
Distance from surface waters
Distance from water supply well(s)
Separation from impervious soil layer
Depth of naturally occuring soil above SHWT
Bottom covered with 4-in of clean sand?
Proposed drainage easement provided?
Capures all runoff at ultimate build -out?
Bypass provided for larger storms?
Trench wrapped with geotextile fabric?
Pretreatment device provided
24.25
fmsl
OK
27.25
fmsl
28.00
fmsl
1,563.00
ft
7.00
ft
3.00
ft
OK
1.27
ac-in
OK
NIA
ft
OK
5
OK
67.00
ft
OK
NIA
ft
OK
130.00
ft
OK
2.00
ft
OK
2.00
ft
OK
Y
(Y or N)
,OK
Y
(Y or N)
OK
Y
(Y or N)
OK
Y
(Y or N)
OK
Y
(Y or N)
OK
Y 6" Sumo in CB's
'
Permit No
(to be provided by DWO)
Form SW401-Infiltration Trench-Rev.4
Farts I. & rl. Design Summary, Page 2 of 2
-
Permit No.
(ro be provided by 01 )
o �Zi
AG"Ar
9
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
KDENR 401 CERTIFICATION APPLICATION FORM 7
INFILTRATION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information.
I. PROJECT INFORMATION '
Project Name The Sanctuary of Wilmington
Contact Person Arnie Drucker, PE
Phone Number W-280-5870
Date 8127I2012
Drainage Area Number DA-2A
IIr DESIGN INFORMATION'
Site Characteristics
Drainage area
6,843.00
ft2
Impervious area
3,029.00
ft2
Percent impervious
44.26
%
Design rainfall depth
1,50
in
Peak Flow Calculations
1-yr, 24-hr rainfall depth
4.04
in
1-yr, 24-hr intensity
0.17
inlhr
Pre -development 1-yr, 24-hr discharge
0,31
ft3/sec
Post -development 1-yr, 24-hr discharge
0.55
ft3lsec
Pre/Post 1-yr, 24-hr peak flow control
0.24
ft3lsec
Storage Volume: Nan -SA Waters
Minimum design volume required
392.00
ft3
Design volume provided
2,075.00
ft3 OK for non -SA waters
Storage Volume: SA Waters
1.5" runoff volume ft3
Pre -development 1-yr, 24-hr runoff volume ft3
Post -development 1-yr, 24-hr runoff volume ft3
Minimum required volume ft3
Volume provided ft3
Soils Report Summary
Soil type
Infiltration rate
SHWT elevation
Basin Design Parameters
Drawdown time
Basin side slopes
Basin bottom elevation
Storage elevation
Storage Surface Area
Top elevation
Basin Bottom Dimensions
Basin length
Basin width
Bottom Surface Area
Wakulla
4.00 inlhr
22.00 fmsl
0.35 days OK
3.00 :1 OK
25.00 fmsl OK
25.90 fmsl
733.00 ft2
28,00 fmsl
260,00 ft
10,00 ft -RECEIVED
74.00 ft2
SEP 1 7 201Z
Form SW401-infiltration Basin-Rev.5 11Apr2011 Parts I. & Ir. Design Summary, Page 1 or 2
a
11
Permit No.
(to be provided by DWQ)
Additional Information
Maximum runoff to each inlet to the basin?
0.26
ac-in
OK
Length of vegetative filter for overflow
45.00
ft
OK
Distance to structure
180.00
ft
OK
Distance from surface waters
WA
fi
OK
Distance from water supply well(s)
272.00
ft
OK
Separation from impervious soil layer
3.00
ft
OK
Naturally oocuring soil above shwt
3.00
ft
OK
Bottom covered with 4-in of clean sand?
Y
(Y or N)
OK
Proposed drainage easement provided?
NIA
(Y or N)
OK
Capures all runoff at ultimate build -out?
Y
(Y or N)
OK
Bypass provided for larger storms?
Y
(Y or N)
OK
Pretreatment device provided
Grass Shoulder
Form SW401-Infiltration Basin-Rev.5 11Ap2011 Parts I. & II. Design Summary, Page 2 of 2
Permit No
III.-REQUIRED'ITEMS CHECKLIST
(to be provided by DWQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional Information. This will delay final review and approval of the project.lnitial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below.lf a
requirement has not been met, attach justification.
Pagel Plan
Initials Sheet No.
6' C-3 1. Plans (1" - 50' or larger) of the entire site showing:
Design at ultimate build -out,
Off -site drainage (if applicable),
Delineated drainage basins (include Rational C coefficient per basin),
- Basin dimensions,
Pretreatment system,
High flow bypass system,
- Maintenance access,
Proposed drainage easement and public right of way (ROW),
Overflow device, and
Boundaries of drainage easement.
_ C-6 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing:
Bypass structure,
Maintenance access,
Basin bottom dimensions,
Basin cross-section with benchmark for sediment cleanout,
Flow distribution detail for inflow,
- Vegetated filter, and
Pretreatment device.
_ C-6 3. Section view of the infiltration basin (1" = 20' or larger) showing:
Pretreatment and treatment areas, and
- Inlet and outlet structures,
SWM REPORT 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided.
C-J�)— SWM REPORI 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The
results of the soils report must be verified in the field by DWQ, by completing & submitting the soils
investigation request form. County soil maps are not an acceptable source of soils information.
— C-5 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the
entire drainage area is stabilized.
SWM REPORT 7. The supporting calculations.
Attached 8. A copy of the signed and notarized operation and maintenance (O&M) agreement.
NIA 9. A copy of the deed restrictions (if required).
RECEIVED
SEP 1 7 Z01Z
Farm SW401-Infiltration Basin-Rev.4 Page 1 of t Part III. Required Items Checklist, Page 1 of 1
[BY: I
Permit No.
�-
(to be provided by DWI)
Op a:.a rER
A&7A
J STORMWATER MANAGEMENT PERMIT APPLICATION FORM
WDENR 401 CERTIFICATION APPLICATION FORM —
INFILTRATION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information.
1. PROJECT INFORMATION
Project Name The Sanctuary of Wilmington
Contact Person Amie Drucker, PE
Phone Number 843-280-5870
Date 8127I2012
Drainage Area Number DA-213
II. DESIGN INFORMATION
Site Characteristics
Drainage area
5,741.00
ft'
Impervious area
2,898.00
ft2
Percent impervious
50.48
%
Design rainfall depth
1.50
in
Peak Flow Calculations
1-yr, 24-hr rainfall depth
4.04
in
1-yr, 24-hr intensity
0.17
inthr
Pre -development 1-yr, 24-hr discharge
0.25
ft lsec
Post -development 1-yr, 24-hr discharge
0,50
ft3lsec
Pre/Post 1-yr, 24-hr peak flow control
0.25
—ft'/sec
Storage Volume: Non -SA Waters
Minimum design volume required
354.00
ft3
Design volume provided
1,660.00
ft3 - •••- ••.••• •• ••,-•••,•,.
Storage Volume: SA Waters
1.5" runoff volume
n3
Pre -development 1-yr. 24-hr runoff volume
ft3
Post -development 1-yr, 24-hr runoff volume
ft3
Minimum required volume
ft3
Volume provided
ft3
Soils Report Summary
Soil type
Wakulla
Infiltration rate
4.00
inlhr
SHWT elevation
22,00
fmsl
Basin Design Parameters
Drawdown time
0.39
days
Basin side slopes
3.00
:1
Basin bottom elevation
25.00
fmsl
Storage elevation
25.90
fmsl
Storage Surface Area
695,00
ft7
Top elevation
28.00
fmsl
Basin Bottom Dimensions
Basin length
200.00
ft
Basin width
10.00
ft
Bottom Surface Area
68.00
ft2
Form SW401-Infiltration Basin-Rev.5 11Apr2011
CRIVIE�
SEP 1 7 2012
BY:
Parts I. & II. Design Summary, Page 1 of 2
Permit No.
(to be provided by DtNc?)
Additional Information
Maximum runoff to each inlet to the basin?
0.20
ac-in
Length of vegetative filter for overflow
45.00
ft
Distance to structure
240.00
ft
Distance from surface waters
N/A
ft
"
Distance from water supply well(s)
292.00
ft
Separation from impervious soil layer
3.00
ft
Naturally occuring soil above shwt
3.00
it
Bottom covered with 4-in of dean sand?
Y
(Y or N)
'
Proposed drainage easement provided?
N/A
(Y or N)
,
Capures all runoff at ultimate build -out?
Y
(Y or N)
"
Bypass provided for larger storms?
Y
(Y or N)
r�
Pretreatment device provided
Grass Shoulder
Form SW401-inflttration Basin-Rev.5 11Apr2011 I Parts I. & II, Design Summary, Page 2 of 2
k�
Permit No.
(to be provided by DWQ)
Ill. REQUIRED ITEMS CHECKLIST
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional Information. This will delay final review and approval of the project initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below.lf a
requirement has not been met, attach justification.
Pagel Plan
Initials Sheet No.
C-3 1. Plans (1" - 50' or larger) of the entire site showing:
Design at ultimate build -out,
Off -site drainage (if applicable),
Delineated drainage basins (include Rational C coefficient per basin),
Basin dimensions,
Pretreatment system,
High flow bypass system,
Maintenance access,
Proposed drainage easement and public right of way (ROW),
Overflow device, and
Boundaries of drainage easement.
4• C-6 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing:
Bypass structure,
Maintenance access,
- Basin bottom dimensions,
Basin cross-section with benchmark for sediment cleanout,
- Flow distribution detail for inflow,
- Vegetated filter, and
- Pretreatment device.
G i C-6 3. Section view of the infiltration basin (1" = 20' or larger) showing:
Pretreatment and treatment areas, and
Inlet and outlet structures.
6C7 SWM REPORT 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided.
SWM REPORT 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The
results of the soils report must be verified in the field by DWQ, by completing & submitting the soils
investigation request form. County soil maps are not an acceptable source of soils information.
_ C-5 6. A construction sequence that shows how the infibration basin will be protected from sediment until the
entire drainage area is stabilized.
oj�SWM REPORT
_1514 Attached
NIA
7. The supporting calculations.
8. A copy of the signed and notarized operation and maintenance (0&M) agreement.
9. A copy of the deed restrictions (if required).
Form SW401-Infiltration Basin-Rev.4
Page 1 of 1
Part III. Required Items Checklist, Page 1 of 1
Permit Number: J�L'J���
(to be provided by UW
Drainage Area Number: VA I -k A Z
infiltration Trench Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
— The drainage area of the infiltration trench will be carefully managed to reduce
the sediment load to the sand filter.
— The water level in the monitoring wells will be recorded once a month and after
every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County).
The infiltration trench will be inspected once a quarter and within 24 hours after every
storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of
operation and maintenance will be kept in a known set location and will be available
upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The grass filter strip or
Areas of bare soil and/or
Regrade the soil if necessary to
other pretreatment area
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
Sediment has accumulated to
Search for the source of the
a depth of greater than six
sediment and remedy the problem if
inches.
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
The flow diversion
The structure is clogged.
Unclog the conveyance and dispose
structure (if applicable)
of an sediment off -site.
The structure is damaged.
Make any necessary repairs or
replace if damage is too large for
repair.
SEZ012j
BY:
Form SW401-infiltration Trench O&M-Rev.3 Page 1 of 3
BMP element:
Potentialproblem:
How I will remediate the roblem:
The trench
Water is ponding on the
Remove the accumulated sediment
surface for more than 24
from the infiltration system and
hours after a storm.
dispose in a location that will not
impact a stream or the BMP.
The depth in the trench is
Remove the accumulated sediment
reduced to 75% of the original
from the infiltration system and
design depth.
dispose in a location that will not
impact a stream or the 13M P.
Grass or other plants are
Remove the plants, preferably by
growing on the surface of the
hand. If pesticide is used, wipe it on
trench.
the plants rather than spraying.
The observation well(s)
The water table is within one
Contact the DWQ Stormwater Unit
foot of the bottom of the
immediately at 919-733-5083.
system for a period of three
consecutive months.
The outflow pipe is clogged.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
The outflow pipe is damaged.
Repair or replace the pipe.
The emergency overflow
Erosion or other signs of
The emergency overflow berm will
berm
damage have occurred at the
be repaired or replaced if beyond
outlet.
repair.
The receiving water
Erosion or other signs of
Contact the NC Division of Water
damage have occurred at the
Quality 401 Oversight Unit at 919-
ou tlet.
733-1786.
Dorm SW401-Infiltration Trench O&M-Rev.3 Page 2 of a
Permit Number:
(to be provided by DWQ)
i acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name: The Sanctuary -of Wil_mngton
BMP drainage area number:DA 1 ,- 7 A -.�_
Print name: Daniel Cook
Title: Registered Agent _
Address: PO Box 2374. Carolina Beach, NC 28428
Phone: 91 0-397S?.656
Signature: C( C..-= - -&_
y/ Date: 2// 2.
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, _Z o 11oll-7- of 1J1d,-,xYc1a1 , a Notary Public for the State of
County of c do hereby certify that
viJ �-t� C dad personally appeared before me this "'/7
day of per, and acknowledge the due execution of the
forgoing infiltration trench maintenance requirements. Witness my hand and official
seal.`-
v
Pubft
New°`
` 1�lorth C��
SEAL
• ZILD
My commission expires l� SEP 1 7 2012
Form SW40 I -Infiltration Trench O&M-Rev.3 Page 3 of 3
Permit Dumber:
(to be provided by DI11Q)
Drainage Area Number:_PA-7 A t l)A- 3 6
Infiltration Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set Iocation. Any deficient BMP elements noted'in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
The drainage area will be carefully managed to reduce the sediment load to the
infiltration basin.
— Immediately after the infiltration basin is established, the vegetation will be
watered twice weekly if needed until the plants become established (commonly
six weeks).
— No portion of the infiltration basin will be fertilized after the initial fertilization
that is required to establish the vegetation.
— The vegetation in and around the basin will be maintained at a height of
approximately six inches.
After the infiltration basin is established, it will be inspected once a quarter and within
24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal
County). Records of operation and maintenance will be kept in a known set location
and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How 1 will remediate theproblem:
The entire BMP
Trash/debris is Eresent.
Remove the trash/debris.
The perimeter of the
Areas of bare soil and/or
Regrade the soil if necessary to
infiltration basin
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application..
The inlet device: pipe or
The pipe is clogged (if
Unclog the pipe. Dispose of the
swale
applicable).
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged (if
applicable).
Erosion is occurring in the
Regrade the swale if necessary to
Swale (if applicable).
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
D
SEP 112D12
Form SW401-Infiltration Basin O&M-Rev.3 Page 1 of 3
r-,�r.
t
BMP element:
The forebay
The main treatment area
The embankment
The outlet device
The receiving water
Potentialproblem:
Sediment has accumulated
and reduced the depth to 75%
of the original design depth.
Erosion has occurred or
riprap is displaced.
Weeds are present.
A visible layer of sediment
has accumulated.
Water is standing more than
5 days after a storm event.
Weeds and noxious plants are
growing in the main
treatment area.
Shrubs or trees have started
to grow on the embankment,
An annual inspection by an
appropriate professional
shores that the embankment
needs repair.
Clogging has occurred.
The outlet device is damaged
Erosion or other signs of
damage have occurred at the
outlet.
Form SW401-Infiltration Basin O&M-Rev.3
How I will remediate the problem:
Search for the source of the
sedimentand remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Remove the weeds, preferably by
hand. If pesticides are used, wipe
them on the plants rather than
spraying.
Search for the source of the
sedimentand remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP. Replace any media that
was removed in the process.
Revegetate disturbed areas
immediately.
Replace the top few inches of filter
media and see if this corrects the
standing water problem. If so,
revegetate immediately. If not,
consult an appropriate professional
for a more extensive repair.
Remove the plants by hand or by
wiping them with pesticide (do not
spray). _
Remove shrubs or treesT
immediately.
Make all needed repairs.
Clean out the outlet device. Dispose
of the sediment off -site.
Repair or replace the outlet device.
Contact the NC Division of Water
Quality 401 Oversight Unit at 919-
733-1786.
SEP 1 7 2612
BY:
Page 2 of.")
Permit Number:
(to be provided b}, DYVQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Projecl name: The Sanctuary of Wilmington
BMP drainage area number: 11 & 12
Print name: Daniel Cook
Title:_ Roistered Agent
Address: PO Box 2374. Carolina Beach NC 28428
Phone: 910-397,0656
Signature: re
Date: 11
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
7t(J-yG+�t1l
�da.. a Notary Public for the State of
County of /l 1_eZ.r/,i,1cJ` , do hereby certify that
personally appeared before me this z
day of 1-and acknowledge the due execution of the
forgoing infiltration basin maintenance requirements. Witness my hand and official seal,
WPec
Hid J. VW EOIO'�
merm CarORM
SEAL
My commission expires.�i��� 7
('. F'VE
Form SW401-Infiltration Basin O&M-Rev.3 SEP 1 7 2j Page 3 of 3