HomeMy WebLinkAboutSW8120607_COMPLIANCE_20120719STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW ez��gz 7 DOC TYPE El CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE fD COMPLIANCE EVALUATION INSPECTION DOC DATE a2��D7/g YYYYMMDD WET DETENTION POND ANALYSIS -ALL RULES FILE NAME 81WQ818tormwateriiPermits & Projects12012020607 HD%2012 07 excel WP 120607 PROJECT # SW8 1120607 REVIEWER IS Pusey Initial Run Date 7I19112 PROJECT NAME Friendly Mart Hwy 258 Last modified 19-Jul-12 Receiving Stream JUT of New River Drainage Basin White Oak Class IC NSW I Within 1/2 mile? �Y or N Index No 119-0) 1 Site Area 241 acres ODrainage Are; Is new DA being added? N Y or N New Added DA Rules- "2008" or "Ph2" 2008 Total DA IMPERVIOUS AREAS - BUA Runoff C Buildings 1136000 square feet 1 Street square feet 098 Parking 4475700 square feet 095 Sidewalks 65500 square feet 0 95 Future 720600 square feet 0 95 Other square feet �? BUA at Old IDS square feet ?7 TOTAL 63972 00 Iscivare feet SURFACE AREA CALCULATION (Including old and new DA and BUA) Overall % Impervious 89 87% QAverage Design Depth 3 09 feet TSS, 85 or 90 90 % Old D: ODra;nage Area 0 BUA 000 Post development Rv= 0 001 Old BUA Design Storm Old BUA Design Volume 0 1 5" New BUA Design Storm Volume 1 yr 24 hour precipitation depth (inches) from NOAA chart Predevelopment Rv value (0 05 if no existing BUA) 1 yr 24 hr Pre -development volume 1 yr 24 hr Post -development volume 2008 Design Volume 7642 cubic feet Phase 2 Design Volume 7642 - 400 Required Volume Top of Sediment Bottom of Shelf Permanent Pool Top of Shelf Temporary Pool Volume met at elev **Vol Prov at TPE 7642 cf msl msl msl msl msl msl 3900 4600 4650 4700 4740 4747 1cf 7877 "" only works if TPE ? top of shelf elevation user input req formula Breakdown of BUA C old DS Buildings/Lots Street Parking / SW Other SAIDA Ratio 10 68% - 10 1% Req SA 1 7387 isf ' " Different due Prov SA 7573 Isf interpolation en OK 6397200 sf 0 859 unitless inches 7642 37 0 05 Note do not include previously approved BUA as existir 1097 cubic feet 18850 cubic feet Area sf Inc volume 12200 000 Forebay 140800 497250 Area, sf Inc volume Acc volume 23000 000 000 428900 1581650 1581650 616500 261350 1843000 801100 354400 2197400 948800 349980 2547380 FOREBAY Perm Pool Volume= 23403 Req Forebay Volume= Provided Volume= WNIA Percent= Max Pumo HP ORIFICE CALCULATION Average Head Flow 02, cfs Flow Q5, cfs No of Orifices Diameter, inches ❑rawdown = 1 yr 24 hr intensity, in/hr Runoff Coefficient 1 yr 24 hr peak Q Onfrce flow<ty24hr 7 feet cfs cfs or weir H x W days NOAA chart a unitless cfs 02 Area z 250 05 Area z 100 Orifice Area = 177 Ava Flow Q= 0 031 in x # of end contractions, N =_ discharge coefficient, C Effective weir length, L sq inches sq inches sq inches cfs in 1331 1000 028 0 044 0 018 1 150 28 750 089 1087 YES -OK Crystal Coast Enaineenna. PA 205-3 Ward Road Swansboro NC 28584 910-325-0006 Business License C•2553 PROJECT Friendly Mart tc=5mcns 110= 75 PIPE Ccum INCR AREA INCR Q10 A 090 034 230 B 090 012 081 C 090 019 128 D 090 Oil 074 E 090 0 17 115 F 090 012 081 G 090 015 101 H 090 000 000 1 065 010 049 J 065 010 049 K 065 020 098 a TOTAL TOTAL AREA Q10 " 11L1111,�r r� _ t '•.,, K. Nam;.•• !l11//11 j1 OUTLET DIAMETER LENGTH GRADE VELOCITY ZONE LENGTH WIDTH 12" 151 0 38% 15" 69 0 38% 18" 127 0 38% 12" 65 0 50% 12" 134 0 50% 15" 60 0 50% 24" 18 0 50% 60 18" 26 1 00% 70 15" 114 0 20% 30 15" 93 0 48% 40 15" 117 0 25% 30 TYPE 2 12 6 Cl"B" 2 9 5 CI"B" 1 8 4 CI"B" 1 8 4 CI"B" 1 8 4 CI"B" S 1WQSISTORMWATERIFORMSICHECKLIST STORMWATER SUBMITTAL REQUIREMENTS WET DETENTION POND Objective ✓A_ Collect all runoff from all BUA (proposed and/or existing and/or offsite) as the case may be, by any means including piping or swales, and direct it to the pond B Check the proposed pond design to make sure it meets or exceeds the minimum design criteria for surface area, volume and drawdown II Wbat makes up a complete wet detention pond application package? ✓/ Two sets of sealed, signed & dated layout & grading plans with appropriate details ,/ Completed & signed application (SWU-101) with supplement(s), SW-401-Wet Detention Basin, SW-401-Level Spreader, and signed & notarized inspection and maintenance agreements Deed restriction document, if applicable (for subdivisions & projects with outparcels) �Dp Sealed, signed & dated calculations Estimated seasonal high water table elevation at all pond locations For Phase II projects only - Chlorides test results if the project is within'/z mile of SA waters and a wet pond is proposed Chlorides testing must be accomplished by averaging the chloride concentration of five (5) water samples taken'/2 mile downstream from the project site, that are taken on separate days, within one hour of high tide, and not within 48 hours following a rain event The samples must be analyzed by a State certified laboratory III BIMS entry (for DWQ use only) Enter & track application acknowledged date, review date, add info requested/received dates, permit issue dates, permit expiration date, and drainage area and streamlwaterbody info Best done after the add info letter is written and before sending permit up for signature IV Shell documents (for DWQ use only) Permit shells sIwgslstormwateAshellslhighcompond sIwgslstormwaterlshellslhighsubpond s IwgslstormwaterlshelIs\HDhybrid Calculations s Iwgslstormwaterlexcel spreads heetslpond or s IwgslstormwateAexcel spreads heetslmultipie pond V Review Procedure A APPLICATION An original signature is required Photocopied signatures cannot be accepted A completed wet detention pond supplement and a signed, dated and notarized wet detention pond Inspection and Maintenance Agreement with an original signature The numbers on the supplement match up to the numbers used in the calculations and /shown on the plan details kBuilt -upon areas are reported in square feet in Section III 9 Receiving stream name and classification This is important because in the non -Phase II counties, a wet pond cannot be used on a project that is within'/ mile of and draining to / SA waters For Phase 11, a wet pond is allowed within '/2 mile of SA waters ✓6 Section 1119 is filled in-cannot_be left blank One column must be filled in for each proposed wet pond ✓ ( 7 j If the applicant is a corporation, partnership or LLC, look it up on the Secretary of State Corporations Database Make sure corporation is spelled correctly (capitalization and punctuation matter) and that the person signing the application is at least a vice- president in the corporation, a General Partner in the partnership, a member in a member -managed LLC, or the manager of a manager -managed LLC Need documentation to support if the Articles of Incorporation do not list the members or managers of the LLC If an agent signs, then a letter of authorization is needed from the president, vice president, general partner, member or manager �u- For subdivided projects, a signed and notarized deed restriction statement must be -� provided Page 4 of 12 Wet Detention Pond, cont B CALCULATIONS The orifice is sized based on drawing down the calculated minimum volume in 25 days The average head to use in the orifice equation is approximately onethird of the distance between the permanent pool elevation (PPE) and the elevation of the next available outlet above the permanent pool The elevation of the next available outlet must be either the elevation where the minimum volume is provided, or it can be higher The temporary pool elevation (TPE) b report on the supplement will be the elevation of the next available outlet above the PPE The temporary pool volume (TPV) to report on the supplement is the volume between the specified PPE and the TPE For Phase II protects that are within'/ mile of ard draining to SR waters, the difference in runoff volume from the predevelopment and postclevelopment / conditions for the 1 year 24 hour storm must be controlled and treated �?l Required volume calculation based on 1 5" storm for Phase I I projects (non -SR waters) and 1" storm for all other classes of receiving stream For Phase II projects, discharge the storage volume at a rate equal to or less than the pre -development discharge rate for the 1 year 24 hour storm For Phase II projects draining to SA waters, no discharge to surface waters may occur from wet ponds The discharge leaving the orifice must be directed to a natural area capable of providing effective infiltrated for the 1 year 24 hour storm prior to reaching surface waters The average pond depth can be determined by dividing the permanent pool volume by the permanent pool surface area, or by using the approved formula in the BMP Manual The result must be rounded to the nearest 0 5 foot, so that it is between 3 ft and 7 5 ft Parts of the pond can be deeper than 7 5 ft , but in no case can any part of the pond be less than 3 ft deep Note that the sediment storage is not considered part of the permanent pool ,9� If the 85% TSS chart is used a 30' vegetated filter must be provided at the outlet of the pond If the 90% TSS chart is used, no filter is required V%8 Use the correct SAIDA TSS chart from the BMP Manual noting that there are different / charts for different areas of the State ✓9 Required surface area at permanent pool Provided surface area at permanent pool (Based on pond dimensions) 1 Table of elevations, areas, incremental volumes and accumulated volumes for overall pond and for forebay, to verify volumes provided Forebay designed to hold 20% of the permanent pool volume (Range of 18%-22% OK ) Non -erosive flow for 10 yr storm in the vegetated filter, if using 85% TSS The seasonal high watertable must be no lowerthan 6" belowthe proposed permanent pool elevation to assure that the necessary temporary storage volume will be available above the permanent pool Otherwise, the consultant must provide a detailed soils analysis report which takes into account the soil type, transmissivity, groundwater volume flowing into the pond and the orifice size to demonstrate that the required storage volume will be available above the proposed permanent pool elevation 5 Rounding numbers off during the calculation process can result in deficiencies Do not ,.,,'round the numbers until you get to the final result An additional one foot must be excavated below the bottom elevation of the pond The 1 foot sediment accumulation depth is not included in either the permanent pool volume calculation or the average depth calculation Page 5 of 12 Wet Detention Pond, cont C. PLANS- Due to storage space constraints, plan sheets should be kept to a minimum and must be folded to no more than 8 5" x 14" For small commercial single wet pond projects, the plan set could consist of only 2 or 3 sheets, layout, grading and details For larger projects, show as much information as possible on as few sheets as possible, without cluttering them up r/1 Development/Project Name Engineer name and firm Legend North Arrow Location Map with nearest intersection of two major roads shown Major road is any 1, 2, 6-15�or 3 digit NC, US or interstate highway / Scale- standard engineering scale, no off-the-wall stuff .•i Date Revision number and date, if applicable Original contours, proposed contours, spot elevations, finished floor elevations, pipe inverts, swale inverts, etc Existing drainage (piping, swales, ditches, ponds, etc ), including off -site Include a map delineating the offsite drainage areas Property/Project boundary lines, bearing & distances > ' Mean High Water Line or Normal High Water Line, if applicable The permanent pool elevation must beat or above the SHWT If adjacent a wetland, the permanent pool level must be set such that the wetland is not drained through the pond Drainage easement widths, pipe sizes and swale inverts are provided Wetlands delineated, or a note on the plans that none exist Get a copy of the wetlands delineation map signed by the Corps of Engineers, or contact the appropriate field rep for the Corps to see if they can email a statement regarding the status of the delineation &Air Details for the roads, parking, cul-de-sacs, including sidewalk width, radii, dimensions & slopes ,4T— Apartment / Condo development- Provide a typical building footprint with dimensions rid note all concrete and wood deck areas _,,and drainage area for each wet pond is clearly delineated and numbered to match up to he calculations and supplement Drainage area delineation is best done as a separate plan sheet / / A pond section detail to inc! de the forebay, a�.0 foot wide vege�ted shelf, pertin t elevatio for the bottom,-ediment cleanout, permanent pool,"tempora pool,"and SHWTf3 1 slopes above the permanent pool, 10 1�pes on the shelf and the weir elevation between the main pond and the forebay 0' The 10' vegetated shelf extends 6" below and 6" above the permanent pool elevation An outlet structure detail showing a trash rack with 56" square openings, the necessary orifice invert elevation (i e , the permanent pool), orifice size and temporary pool elevation Dimensions for each line and arc formed by the permanent pool contour :2 - Where the 85% TSS chart was used, a 30 ft filter strip is required to be shown on the plans & detailed (elevations, inverts, slopes, and flow spreader mechanism) Please note that the filter strip is not a ditch 4 A forebay is provided for each inlet and located so as to pre%ent short-circuiting ,,25— The pond must have a minimum 1 5 1 length to width ratio and a minimum 3 1 flow path length Artificial "baffles" of timber, vinyl, or earth can be used to create a longer flow path The top elevation of the baffle should be set at the temporary pool elevation or higher llz26 A Vegetation plan is specified for the pond, including slopes Wetlands species are listed for planting on the 10 1 shelf Weeping Love Grass is not suitable as a permanent , � vegetated cover for pond slopes Vl/ All roof drainage must be directed to the pond Show the roof drain collection lines on the plan This is necessary for projects where the buildings back up the propertylines where roof drainage may leave the site prior to going through the pond Page 6 of 12