HomeMy WebLinkAboutSW8120511_COMPLIANCE_20120605STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW SIZ241) SI I
Z
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
COMPLIANCE EVALUATION INSPECTION
DOC DATE
4�26/o'1U(LDS
WYYMMDD
General Data Impervious, Drainage Area and Volume
PROJECT NUMBER SWB
120511
Reviewer
K Johnson
DRAINAGE BASIN
Cape Fear
Current Date
5-Jun-12
Original Run Date
5-Jun-12
DA Number
1
2
3
4
6
6
7
8
9
10
BMP Type
Wet Pond
No BMP In
DA
No BMP In
DA
No BMP In
DA
No BMP In
DA
No BMP In
DA
No BMP In
DA
No BMP In
DA
No BMP In
DA
No BMP In
DA
Receiving Stream
UT NE Cape
Fear River
Stream Index
to 74 (47 5)
Class
Impervious Area
Prot2osed ImperviousIMPERVIOUS). Total,
B, SW
39,500
0
0
0
0
0
0
0
0
0
Onsite Buildin s
Onsite Streets
Onsite Parking
38,903
Onsite Sidewalks
Onsite Other
Future
597
Offsite
Existin
D
0
0
0
0
0
0
0
0
0
Onsite Buildin s
Onsite Streets
Onsite Parkin
Onslte Sidewalks
Onsite Other
Future
Offsite
Exislin
39 500
65 773
0
0
0
0
0
0
0
0
0
Draina a Area
Drainage Area, Total
Onsite.
65,773
Off i
0
Onsite,
0
0
0
0
0
0
0
0
0
0
0
Offsi e
0
Proposed DA (Being Added By Mod) , f?
65,773
Drairiane Area, SubleCto Old Rule ft
0
0
0
0
0
D
0
0
0
0
Qrainga2 6rea. Sublect to New Rule
65 773
Percent Impervious Overall, per DA
Volume Required
Volume Re fired Old Rule a
60 06%
Rvpow Dmid"nt Old Rule
Desi n Storm Old Rule in
Volume Re uired New Rule a
4,855
RvR& Dawjopmant New Rule
005
005
005
005
005
005
005
005
005
005
Rvp�mD �Iop .m, New Rule
059
Design Storm, 5 In
1 5
15,
1 5
1 5
15
15
1 5
1 5
1 5
1 5
Design Storm,yrUhr, in
Sub ect to SA? Y or N
N
Volume Required, 5, ft
4,855
Volume Required lyr24hr, ft
0
Volume Re uired Total Old +New Rule R3
4,855
Wet Ponds
PROJECT NUMBER SW8
120511
Reviewer
K Johnson
DRAINAGE BASIN
Cape Fear
Current Date
5-Jun-12
Original Run Date
5-Jun-12
DA Number
1
2
3
4
5
6
7
B
9
10
BMP Type
Wet Pand
No BMP In
DA
No BMA in
DA
No BMP In
DA
No aW in
DA
No BMP In
DA
No BMP In
VA
No BMP in
DA
No BMP in
DA
No BMP In
DA
Minimum Surface Area
%impervious
601%
Lower Impervious
600%
#VALUEI
#VALUE!
#VALUE]
#VALUE!
#VALUE!
#VALUEI
#VALUEI
WtVALUEI
#VALUE!
Urlmpervilous
700%
#VALUEI
WOVALUEI
#VALUE!
#VALUE!
XVALUEi
#VALUEI
WCVALUEI
#VALUE!
#VALUEI
TSS 85 or 90
90
Lower SAIDA
70
#VALUEI
#VALUE!
NVALUE11
#VALUE!
OVALUE11
#VALUE!
NVALUEII
#VALUEI
#VALUE!
Upper SAIDA
81
#VALUElj
#VALUE!
NVALUE11
#VALUEI
#VALUE!
#VALUE!
#VALUE!
NVALUEI
NALUEI
SAIDA rate
70
#VALUE[
#VALUE!
11VALUEI
#VALUE!
#VALUEI
#VALUE!
#VALUEI
#VALUEI
#VALUE!
PP Surface Area req
Storage Calculations
4 608
#VALUE[
#VALUE!
#VALUE]
#VALUEI
#VALUEI
#VALUE!
#VALUEI
#VALUE!
#VALUE!
Elevation Top of Sediment bottom pond),fmsl
1800
Elevation Bottom of shelf. fmsl
2415
ElevaBon Permanent Pool fmsl
2465
Elevation, Top of Shelf, fmsl
2515
ElevaBon Tam Pool fmsl
2520.
Area Top of Sediment bottompond),
805
Area Bottom of Shelf, 02
4,212
Area Perm Pool
7,660
Area Top of Shelf.
10669
Area Tamp Pool
10,811
Volume Provided (Tamp Pool),DWO Calculated R
5,119
0
0
0
0
0
0
0
0
0
Volume Provided (Tamp Pool Provided perconsultant
5119
Volume Required (Tamp Pool Dw9 Deicuieted ft
4,855
Consultant Provded Enou h Volume?
Y
Average De th O tlon 1 or Option 2 Enter 1 or 2)?
Avere a De 1h Provided R
30
Average De 1h OPTION 1 DWO Calculated R
291
#DIVroI
#DIV101
#DIVI01
#DIV/01
#DIV/01
#DlVI01
#DIV101
#DIV/01
#DIVl01
Average Depth OPTION 2 DWO Calculated It
Foreba Volume
40
#DIV101
#DIV101
#DIVIDI
#DIV101
0DIV101
#DIV/01
#DIV/01
#DIV/01
#DIV101
Permanent Pool Volume ft
22,297
0
0
0
0
0
0
0
0
0
Foreba Volume Required, ft
4,459
0
0
0
O
0
0
0
0
0
Foreba Volume Provided ft
4,266
Percent of Permanent Pool 18 22% Is Target)
Drowdown
19%
#DIV101
0DIV101
#DIVIDI
9DIV/01
#DIV/01
#DIV/01
#DIVIOI
0DIV101
#DIV/01
Avre ea Head R
016
000
000
000
0 00
000
0 DO
000
000
000
Average Flow O= lsec
0 028
#VALUE]
#VALUEI
#VALUEI
#VALUEI
#VALUE!
ItVALUEI
#VALUE!
#VALUE!
#VALUEI
Average Flow Os R /see
0 011
#VALUE!
#VALUE!
#VALUEI
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
02 Area In
2084
#VALUE!
#VALUE!
#VALUEI
#VALUE!
#VALUE!
#VALUE!
NVALUEI
#VALUE!
#VALUE!
Os Area In
0 834
#VALUE!
#VALUE!
*VALUE!
#VALUE]
#VALUEI
#VALUEI
#VALUE!
IIVALUEI
#VALUE!
No of Orifices
1
Onflee Diameter In
1 50
Orifice Area in
1 767
0 000
0 000
0 000
0 000
0 000
0 000
0 000
0 ODD
0 DDO
Weir Haight In
Weir Length in
Weir
#DIV/01
#DIV101
10IVI01
#DIV/01
#OW101
#DIV/0l
#DfV101
#DIWOt
0DIV101
WIV101
Weir L Effective Length ft
-0 033
0 DOO 1
0 000
00001
0 000
0 000
0 000
0 000
0 0W
0 000
Average Orifice Flowrate DWO Calc (QmQ) ft Isec
0 024
0 000
O 000
0 000
0 000
0 000
0 000
0 000
0 000
0 Ot10
Average Orifice Flovxate Reported (OR ) R !sec
0 020
Average Orifice Flowrate is Adequate? set Rwpe in cak
Y
Runoff Coefficient Cc
0 250
0 250
0 250
0 250
0 250
0 250
0 250
0 250
0 250
0 250
1 yr 24 hr rainfall de th in
1 24 hr Intensi 1 inlhr
0 000
0 000
0 ODO
0 000
0 000
0000,
0 000
0 000
0 000
0 000
1 yr 24 hr PmDeveioant (0) lsec
0 000
Ava Orifice Row<Pre 07
N
Drewdown days
236
Solis Report Data
Ground Elevation at Boring in Soils Re ortfmsl
2820
Distance Ground to SHWT per Soils Ree2rt, In
4800
Distance Ground to SHWT per Soils Report, ft
400
000
000
000
0 DO
000
000
0 00
000
000
SHWT Elevation DWO Calculated fmsl
2420
000
000
000
0 DO
0 OM
000
000
0 00
000
SHWT Elevation Reported by Consultant fmsl
2420
Distance SHWT toPIP fl
00sign OK of O<= Value <m 0 5
045
000
000
000
000
000
000
000
000
000
Permanent Pool Elevation fmal
Pump
1 2465
000
0001
0001
000
000
0001
0001
0001
000
Max HP
N/A
NIA
NIA I
N/A IWA
NIA I
NIA IWA
INIA
I
N/A
Bot Pond
Bot/Top Sed Rem
Bot Veg Shelf
PP
Wet Pond
Use to Find Areas/Volumes if the Engineer Reports the Main Pond and Forebay Separately
(This is not linked to other worksheets in this Ole )
Basin
Forebay Bot
Forebay Sed Rem
PP
Forebay
Contour El
(ft)
SA
(so
Inc Vol
(cf)
Cum Vol
(d)
Contour El
(ft)
SA
(sfl
Inc Vol
(d)
Cum Vol
(d)
1600
0
01
0
0
18001
8051
0
0
1800
1 01
0
24151
4,212
15,427
15,427
2000
375
0
0
24 65
6,200
2,603
18,030
24 65
1,460
4,266
4,266
Permanent Pool 22,297 ft3