Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8120501_CURRENT PERMIT_20120511
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW q"N DJ � DOC TYPE � CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD A. NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor May 11, 2012 Brian Clodfelter, Member Manager Par 5 Development Group, LLC 2860-B NC 5 Highway Aberdeen, NC 28315 Division of Water Quality Charles Wakild, P. E. Director Subject: State Stormwater Management Permit No. SW8120501 Dollar General — Mt. Misery Road High Density Commercial infiltration Basin Project Brunswick County Dear Mr. Clodfelter: Dee Freeman Secretary The Wilmington Regional Office received a complete State Stormwater Management Permit Application for Dollar General — Mt. Misery Road on May 2, 2012. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8120501 dated May 11, 2012, for the construction, operation and maintenance of the BMP's and built -upon area associated with the subject project. This permit shall be effective from the date of issuance until May 11, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, certification of the BMP's, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to certify the BMP's, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. Unless such demands are made this permit shall be final and binding. You should contact the OAH with all questions regarding the filing fee and/or the details of the filing process. The mailing address, telephone and fax numbers for the Office of Administrative Hearings are: 6714 Mail Service Center, Raleigh, NC 27699-6714. Telephone 919-431-3000 or visit their website at www.ncoah.com. If you have any questions, or need additional information concerning this matter, please contact Chris Baker, at (910) 796-7215. 4Sinc rely, \ For Charles Wakild, P. E., Director Division of Water Quality GDS/csb: S:1WQS1StormwaterlPermits & Projectsl20121120501 HD Q012 05 permit 120501 cc: ,tames B. Reed, P. E., Call Sign Engineers Brunswick County Building Inspections Brunswick County Engineering Wilmington Regional Office Stormwater File Wilmington Regionaf Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 One Phone: 910-796-72151 FAX: 910.350-20041 Customer Service: 1-877-623.6748 North Caro 1 i n a Internet: w%w.ncwaterquality.org "]fj " atum ly An Equal Opportunity 1 Affirmative Action Employer �/ State Stormwater Management Systems Permit No. SW8 120501 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Par 5 Development Group, LLC Dollar General Store — Mt Misery Road Mt. Misery Road, Leland Brunswick County FOR THE construction, operation and maintenance of a infiltration basin in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter collectively and separately referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until May 11, 2020, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 33,541 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in Section 1.8 on page 3 of this permit, and as shown on the approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The project shall provide a 50' wide vegetated buffer adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers, and the mean high water line of tidal waters. Page 2of7 State Stormwater Management Systems Permit No. SW8 120501 R VA The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. The following design criteria have been permitted for the infiltration basin and must be provided and maintained at design condition: a. Drainage Area, acres: 0.98 Onsite, ft : 42,689 Offsite, ft2: NIA b. Total Impervious Surfaces, ft2: 33,541 Onsite, ft : 33,541 Offsite, ft2: NIA C. Design Storm, inches: 1.5 d. Basin Depth, feet: 1.6 e. Bottom Elevation, FMSI : 30.5 f. Bottom Surface Area, ft : 3,880 g. Bypass Weir Elevation, FMSL: 32.1 h. Permitted Storage Volume, ft3: 8,690 i. Predevelopment 1 yr 24 hr peak flow, cfs: 0.45 j. Post -development 1 yr 24 hr peak flow, cfs: 0.19 k. Type of Soil: Loamy Sand I. Expected Infiltration Rate, in/hr: 1 M. Seasonal High Water Table, FMSL: 28.5 n. Time to Draw Down, hours: 24 a. Receiving Stream/River Basin: Baton Branch 1 Cape Fear P. Stream Index Number: 18-77-1-1-2 q. Classification of Water Body: "C;Sw" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including,,but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 4. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 5. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 120501 6. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 7. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further development, subdivision, acquisition, lease or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 2. This permit is not transferable to any person or entity except after notice to and approval by the Director. At least 30 days prior to a change of ownership, or a name change of the project or of the permittee or a mailing address change, the permittee shall submit a completed and signed Name/Ownership Change form to the Division of Water Quality, accompanied by the appropriate documentation as listed on the form. The approval of this request will be considered on its merits and may or may not be approved. Page 4of7 State Stormwater Management Systems Permit No. SW8 120501 3. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project in whole or in part, nor the conveyance of common area to a third party shall constitute an approved transfer request. 4. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 5. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 6. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 7. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 8. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 9. Unless specified elsewhere, permanent seeding requirements for the stormwater controls must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revolting and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008- 211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et. al. 11. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 11 th day of May, 2012. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 120501 Dollar General Story — Mt. Misery Roak Stormwater Permit No. SW8 120501 Brunswick County Designer's Certification 1, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW8 120501 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Brunswick County Building Inspections Page 7 of 7 DWQ USE ONLY Date Received Fee Paid Permit Dumber Applicab e Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Dollar General Store - Mt. Miser- Road 2. Location of Project (street address): Mt. Misery Road City:Leland County:Brunswick Zip:28451 3. Directions to project (from nearest major intersection): The eroiect site is located on _Mt. Misery_ Road (SR 1426) near its intersection with SR 1479 and SR 1480. 4. Latitude:34° 15' 36" N Longitude:78° 03' 19.08" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®Ne,,,, ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed' ❑ Completed' *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other If this application is being submitted as the result of a previously returned application or a Ietter from DWQ requesting a state Stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permit`s can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ®Sedimentation/Erosion Control: 2 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.lf any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: ECEIVE" MAY 0 2 2012 BY: — Form SWU-101 Version 07Jun2010 Page I of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Par 5 Development Group, LLC Signing Official & Title:Brian Clocifelter, Member Manager b.Contact information for person listed in item 1a above: Street Address:2860-B NC 5 Highway City:Aberdeen State:NC Zip:28315 Mailing Address (if applicable):2860-13 NC 5 Highway City:Aberdeen State:NC Zip:28315 Phone: (910 } 944-0881 Fax: (910 ) 944-0881 Email: briar©rhetsoncompanies.com Please check the appropriate box. The applicant listed above is: []The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ® Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ® Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. ("Phis is the person who owns the property that the project is located on): Property Owner/Organization:Charlie M. Skipper Signing Official & TitIe:Charlie M. Skipper, Owner b.Contact information for person listed in item 2a above: Street Address:4924 Woodcrest Drive City:Caslte Flayne State:NC Zip:28429 Mailing Address (if applicable):4924 Woodcrest Drive City:Caslte Ha Phone: ( } Email: State:NC Zip:28429 Fax: ( } 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b.Contact information for person listed in item 3a above: Mailing Address: City: Phone: ( ) Email: State: 1 ! Zip: BY: — Fax: ( } 4. Local jurisdiction for building permits: Brunswick County Point of Contact:Helen Bunch Phone #: (910 ) 253-2050 Form S WU-10l Version 07.1un2010 Page 2 of 6 E OE IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. The proposed parking lot and building will be designed so that runoff discharges into and is treated by an infiltration basin. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the CaRe Fear River basin. 4. Total Property Area: 1.28 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) -Total Coastal Wetlands Area (5) -Total Surface Water Area (6) = Total Project Area+:1.28 acres Total project area shall be calculated to exclude the follawin the normal pool of impounded structures, the area between the batiks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landzoard front the NHW (or MHW) litre. The resultant project area is used to calculate overall percent built upon area (B UA). Nau-coastal wetlands landzvard of tlue NHW (or MHM lifie ttiay be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 60 9. How many drainage areas does the project have?l (For high density, count I for each proposed engineered stormwater BMP. For tow density and other projects, use I for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin information Drainage Areal Draina e Area _ Drainage Area _ Draina >e Area _ Receiving Stream Name Banton Branch Stream Class * QSW Stream Index Number * 18-77-1-1-2 Total Drainage Area (so 42,689 On -site Drainage Area (so 42,689 Off -site Drainage Area (so 0 Proposed Impervious Area** (so 33,541 Impervious Area** (total) 79% Impervious— Surface Area Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area _ On -site Buildings/Lots (so 9,100 On -site Streets (so 0 On -site Parking (so 24,225 On -site Sidewalks (so 0 W_- Other on -site (so 216 _ ,t Future (so 0 IVIH1 U 4 LV L Off -site (sf) 0 i Existing 13UA*** (so 0 Total (so: 33,541 Stream Class and Index Number can be detertuiued at: littp.aortal.ucdertr.org ebAtpq&s/csu/classifications * lux pervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, si ewalks, gravel areas, etc. Norm SWU-101 Version 07Jun2010 Page 3 of 6 'Report only that aniount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which zoill be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. N/A Projects in Union County: Contact DIVQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements cis per NCAC 028 .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from httl2:ZZ2ortal.ncdenr.org/wet/",gLws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portil.ncdenr.org/web/wq/ws/su/statesw/forms_docs. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at htt://_portal.ncdeiir.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to _http://www.envhelp.org/pages/onestopex press. htmI for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the storm water treatment/management 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the'/2 mile radius on the map. 7. Sealed, signed and dated calculations. for Gam/ `� 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including:��C/ a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of.tidal, waters, and any coastal wetlands landward of the MHW or NI-1W lines. `� E C E IVE • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal wae�s. MAY 0 2 2012 i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. BY:-- 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). Form SWU-101 Versicm 07Jun2010 Page 4 of 6 9. Copy of any applicable soils report with the associated SHWT elevations (Please identifyj,/ _ elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SI WT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 1095 Page No: 0545 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC L✓ Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1 a, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. htt2://www.secretary.state.tic.uslCorpor-,itioiis/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:C. Heath Wadsworth, PE Consulting Firm: Call Sip_n Engineers, PA Mailing Address:104 Gillespie Street City:Fayetteville Phone: (9-10 ) 486-0700 Email:heath.wadsworth©cailsignengineers.com State:NC Zip:2830"1 Fax: (91.0 ) 486-8900 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) Charlie M. Skipper , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) Brian Clodfel ter with (print or type In7me of organization listen in Contact Information, item 1a) Par 5 Development CrouL) LLC _ to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. ECEN . MAY 4 2 2012 BY: Form SWU-101 Version 07Jun2010 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity fisted in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties "of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: (_. ifs/.L-�� Date:/,/, ,�_3 - 2 1 L�1•e�I �,►' t I� ✓ ', a Notary Public for the State of �c?` C �rUlrl^0. , County of NfQW 4CLr"0yf-+r do hereby certify that �-ha-rU e. rn - S k4prx✓ personally appeared before me this day of ZOI� , and acknowledgethedue execution of the application for a stormwater permit, Witness my hand and official seal, i( '�t, � r�oTARy � PUBLIC : �tl111�� X. APPLICANT'S CERTIFICATION SEAL, My commission expires S�GLk� 2-015 1, (print or type narne of person listen in Contact Information, item 7a) Brian Clod{elter certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwatoellles undX 15A NCB 2I-1 .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. Signature: Date:_` ff— ra11 1, �VbAca- - a Notary Public for _the (State of County of do hereby certify that tC.I1 V, personally appeared before me this I'S day of h I and J ledge th e cution of the application for a stormwater permit. Witness my hand and official seal, P1 441 Notary Publlc ir,_ Moore county ^ �My comm4sston ExpIres- Ob11912fl 1 bT ni SEAL My commission expires to -- � 9- au I L FIECEIVE MAY 0 2 2012 l Form SWU-101 Version 073Un2010 Page 6 of 6 4., Permit No: ' ` U / ZA__52_2/ (to be waded by DM) � of wnrF9 G ATA STORMWATER MANAGEMENT PERMIT APPLICATION FORM o HCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be Rkd out, printed and sub =Wed. The Required Hems Chockfist (Part 110 most be printed, Trtlod out and s1bnfffed along with ap of fire required information. Projed Name Contact Person Ptmarre Number Date Drainage Area Number Site Chamderistics Dravrape area Impervious area Pemant impervious Design mnla0 depth peal Flow Calculations 1-1fr. 244u rainfall depth 1-yr. 244mr intensity Pro -development 1-yr. 244u discharge Post -development 1-yr, 244u discharge PrelPos11-yr, 244rr peak flow control Storage Volume: Non -SA Waters Mirmnwn design volume required Design volume Provided Storage Vohrme: SA Waters 1.5 runoff volume Pre -development 1-yr. 24-tu rumoff volume Post4evelopment 1-yr. 24-hr runoff volume Minimum requaed vokmm Volune provided SoiTs Report Summary Sad type Infiltration rate SHWT ckra5or Basin Design Parmrrueters Orawdorr time Baser side slopes Bashi bottom elevation Storage elevation Storage Surface Area Top elevation Basin Bottom Dimensions Basin lerrpth Basin width Bottom Surface Area Dollar General Stare - M1. Misery Road C. Heath Wads*VrUX PE 910486-0700 4I1912012 DA 1 42.689.00 tlz 33.541.00 78.57 % 1.50 in 3.83 m NIA inlhr 045 f1llsec 0.19 llrtsec -0.26 t lsee 4,WA0 fly 8,6W.00 to il f? to fe fe Loamy Sand 1.00 h1hr 28.50 hsl OK for non -SA waters 1.00 days OK 3.00 :1 OK 30.50 fmsl OK 32.10 fmsl 6,110.00 f? 32.75 fmsl 96.00 f1 35.00 ft 3 eeo.00 f? PEG Form $W4014 riftation 8asln4;ev.5 1 tApM11 Parts L d It Design Swomry. Pape I of 2 ti Permit No. fto bepoviaadbr nwnl Additional Information Maximum runoff to each inlet to the basin? 2.00 ac-in OK Length of vegetaWe filler for overflow ft Distance to structure ft Distance tarn surface waters 30.00 ft OK for non -SA waters Distance firm water supply well(s) >100 a OK Separation from impervious sod layer 200 H OK Naturally ooanaug sod above shw1 1.50 it OK Bottom covered with 4-in of dean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storrLs? Y lY or N) OK Pretreatment device provided Y Rip Rap basin with 10 fl wide sodded strip CEf ` MAY 02 Form SW4014r&Qratim B*�-Aer.S 11AprMl l Parts L & li. Design Surnrruuy, Pepe 2 of 2 Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below, If a requirement has not been met, attach justification. Page! Plan Initials Sheet No. _ZP41 6,1T,-O i 1. Plans (1" 50' or larger) of the entire site showing: - Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. �r� Z& -O 1 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing: - Bypass structure, Maintenance access, - Basin bottom dimensions, Basin cross-section with benchmark for sediment cleanout, Flow distribution detail for inflow, Vegetated filter, and Pretreatment device. 4& -3. Section view of the infiltration basin 0" = 20' or larger) showing: - Pretreatment and treatment areas, and Inlet and outlet structures. 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. * <" 'D Wo PA4c v- pwr w ?-MbVr Ai'PfA41p► Y. (p 6 U, a r 296 !L '1✓ 4` �► 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. /� / r x /," AR'r*41D1 x OF �¢b 9:T z k *A 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the entire drainage area is stabilized. 4 * 4 S-SE N aTIE, i pN -VF-A►^v ► J G- 114 0 - G !r — 01 KEPotr'r 7. The supporting calculations. GHN AT —MA wD 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. .zl�v .� 9. A copy of the deed restrictions (if required). MAY 0 2 2012 Form SW401-Infiltration Basin-Rev.4 Page 1 of 1 Part Ili. Required Items Checklist, Page 1 of 1 - 7 ip Permit Numbcr45 IZDZ5�/ (to be proi4ded by DIVQ) Drainage Area Number: Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set Ioccation. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will rernediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale ae2liLable . sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). l,rosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. -EGEIV MAY 0 2 2012 Form 5W401-Infiltration Basin O&M-Rev.3 Page I of 3 H' - BMP element: The forebay The main treatment area The embankment The outlet device The receiving water Potential problem: Sediment has accumulated and reduced the depth to 75% of the original design depth. Erosion has occurred or riprap is displaced. Weeds are present. A visible layer of sediment has accumulated. Water is standing more than 5 days after a storm event. Weeds and noxious plants are growing in the main treatment area. Shrubs or trees have started to grow on the embankment. An annual inspection by an appropriate professional shows that the embankment needs ret)air. Clogging has occurred. The outlet device is damages Erosion or other signs of damage have occurred at the outlet. Form SW401-Infiltration Basin O&M-Rev.3 How I will remediate the problem: Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. if pesticides are used, wipe them on the plants rather than spraying. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMI'. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Replace the top few inches of filter media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Remove the plants by hand or by wiping them with pesticide (do not spray). Remove shrubs or trees immediately. Make all needed repairs. Clean out the outlet device. Dispose of the sediment off -site. Repair or replace the outlet device. Contact the NC Division of Water Quality 40"1 Oversight Unit at 919- 733-1786. EC;E VE MAY 0 2 2012 BY:—_ pagi; 2 Of 3 e Permit Number: (to be provided by DIVQ) I acknowledge and agree by my signature below that 1 am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Doliar General Store - Mt. Misery Road BMP drainage area number: l Print narne:Brian Clodfelter Title:Member Manager (Par 5 Development Group, LLC) Address:2860-B NC 5 Highway; Aberdeen, NC 28315 Phone Signa Date: Note: The legally responsible Party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, - Pwc — P1 11Y1't,e , a Notary Public for the State of County of do hereby certify that F2- a*— personally appeared before me this 17 day of &nvi 1 1 �—, and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, GGA4PIrTM���'% Notary PubliC Moore Cauniy ;idly Commission Explres= 06/ 1912016 �O SEAL My commission expires Form SW401-Infiltration Basin O&M-Rev.3 1,'Iq - --O [ L GE D V Ewa,") i k` MAY 422012 Y:--Paa- 3 oT 3 05-11-' 12 14:34 rR0t9-DENR Lilaim.ingzim 910-350-2004 'l'-332 P00,97/0008 r-H2 I Dollar General Story — Mt. Misery Roak Stormwater Permit No. SW8 120501 Brunswick County Designer's Certification State 5tcraiwater Management Systems Permit No.�,Q 8 12g5Ct1 E I, C. j4fPerki INft'Ds a Vf , as a duly registered _Fkopfr4Sto�� j„ , ►GI N�€.Z in the State of North Carolina, having been authorized to observe (periodicallyl weekly/ full time) the construction of the project, 3�01•�-�'iz __Ci �.N �.i�A"t-, sTD�E - Mr M tS t~i�-Y g-D.�r.-L D Nc (Project) for FAg- 5 �Ev9.oer► et4-r �i?wr? 4�-G - _(Project Owner) hereby state that, to the best of my abilities, clue care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature _ 0 8p ZrsSrp� Registration Number 26 LtZ_ I - S - / 28421 Date JD/ZW ZO�L N� �a M, ECE O qY E OCT 2 9 2012 BY: _t, 05-11-'12 14:35 FROM-PENE Wilmingtim 9ZC�-35�i-2f7f-�4 T-332 P0008/0008 F-282 Certification Requirements: State Stormwater Management Systems Permit No. SW8 120501 _ ✓ 1. The drainage area to the system contains approximately the permitted acreage. ✓2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. ✓ 4. All roof drains are located such that the runoff is directed into the System. ✓_ 5. The bypass structure weir elevation is per the approved plan. ,_✓ 6_ The bypass structure is located per the approved plans. M44 7. A Trash Rack is provided on the bypass structure. ✓ S. All slopes are grassed with permanent vegetation. T 9: Vegetated slopes are no steoper than 3:1. ✓^10, The inlets are located per the approved plans and do not cause short- circuiting of the system, ✓ _11. The permitted amounts of surface area and/or volume have been provided. ✓ -12. All required design depths are provided. ✓ 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans, cc: NCDENR-DWQ Regional Office Brunswick County Building Inspections r-, - - - -r _'C