Loading...
HomeMy WebLinkAboutSW8111203_COMPLIANCE_20120202STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW$""��O-3 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD WET DETENTION POND ANALYSIS - ALL RULES FILE NAME: S:IWQSISTORMWATERIEXCELSPREADSHEETSIPOND1111203 PROJECT #: SW8 1111203 1 REVIEWER: c. baker Initial Run Date fe, b. 2, 2012 PROJECT NAME: State Employees Credit Union Last modified 02-Feb-12 Receiving Stream; lGibbs Creek Class: ISA Drainage Basin: LWhite Oak Within 112 mile SA? Site Area ODrainage Area Rules- "2008" or "Ph2" IMPERVIOUS AREAS - BUA Buildings Street SW Future Offsite Other TOTAL Index No. 121-35-1-10 I 2.87 JaCres 86965.00 Isquare feet DA Area 2.00 acres 6701.00 square feet 1 46616.00 square feet 0.98 3634.00 square feet 0,95 3200.00 square feet 0.95 square feet o.95 square feet 0-95 square feet 0.95 60151.00 square feet 0 SURFACE AREA CALCULATION (with added DA and BUA at different design storm) Overall % Impervious 69.17% SA/DA Ratio 6.92% Average Design Depth 3.5 1 feet Req. SA 6015 sf TSS, 85 or 90: 90 % Prov. SA 6823 sf TEMPORARY POOL AND FOREBAY VOLUME CALCULATIONS New BUA Old BUA Drainage Area® 86965.00 sf BUA 60151.00 0.00 sf Post development Rv= 0.673 #DIV/0! unitless Old BUA Design Storm inches Old BUA Design Volume 0 1.5" New BUA Design Storm Volume 7311 1 yr. 24 hour precipitation depth (inches) 3.70 from NOAA chart Predevelopment Rv value 0.05 Use 0.05 if no existing BUA 1 yr. 24 hr. Pre -development volume 1341 cubic feet 1 yr. 24 hr. Post -development volume 18033 cubic feet 2008 Design Volume 16692 cubic feet Phase 2 Design Volume 16692 cubic feet Required Volume 16692 of Area, sf Inc. volume Acc. volume Top of Sediment 1.50 msl ......... 658.00 0.00 0.00 Bottom of Sheff 6.50 msl.......... 4683.00 13352.50 13352.50 Permanent Pool 7.00 msl......... 6823.00 2876.50 16229.00 Top of Shelf 7.50 msl.......... 8872.00 3923.75 20152.75 Temporary Pool 8.94 IMS1......... 10954.00 1 13878.20 34030.95 Volume met at elev 9.29 msl FOREBAY Vol. Prov. at TP 17801,95 cf Perm. Pool Volume= 16229 Req. Forebay Volume= 3246 Provided Volume= Percent= 0.0% Calculated Averacte Depth, feet 13.27 Max Pumo HP NIA ORIFICE CALCULATION Average Head Flow 02, cfs Flow 05, cfs No. of Orifices Diameter, inches Drawdown = 1 yr 24 hr intensity, in/hr Runoff Coefficient 1 yr 24 hr peak Q Orifice flow< 1yr24hr ? feet Q2 Area = 3.71 cfs Q5 Area = 1 A8 cfs Orifice Area = 3.14 Avg. Flow Q= 0.082 or weir H x W in x days '# of end contractions, N = NOAA chart @t discharge coefficient, C = unitiess Effective weir length, L cfs sq. inches sq. inches sq. inches cfs 0.61 0.097 0,039 1 2.00 2.4 0.15 3.34 o.75 10.00 0.23 YES -OK