HomeMy WebLinkAboutSW8060826_HISTORICAL FILE_20061113STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SWTaplPblrl
DOC TYPE
El CURRENT PERMIT
❑ APPROVED PLANS
HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
�!�((/l
YYYYMMDD
State Stormwater Management Systems
Permit No SW8 permit#
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Michael T Macomson
Red Fish Grille
2550 Holden Beach Road, Supply, Brunswick County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with
the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules')
and the approved stormwater mans ement plans and specifications and other
supporting data as attached and on file with and approved by the Division of Water
Quality and considered a part of this permit
This permit shall be effective from the date of issuance until November 13, 2016, and
shall be subject to the following specified conditions and limitations
I. DESIGN STANDARDS
1 This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data
2 This stormwater system has been approved for the management of stormwater
runoff as described in Section 16 on page 3 of this permit The stormwater
control has been designed to handle the runoff from 37,788 square feet of
impervious area
3 The tract will be limited to the amount of built -upon area indicated on page 3 of
this permit, and per approved plans This permit makes no allocation for any
future built -upon area
4 All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans
5 The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system
Page 2 of 7
State Stormwater Management Systems
Permit No SW8 permit#
6 The following design criteria have been provided in the wet detention pond and
must be maintained at design condition
a
DrainaArea, 9cres
gnsite,
1 62
ft
70,377
Offsite, ft2
0
b
Total Impervious Surfaces, ft2
37,788
c
Design Storm, inches
1
d
Pond Depth, feet
350
e
TSS removal efficiency
90%
f
Permanent Pool Elevation, FM! I,
1150
g
Permanent Pool Surface Ares, ft
3,910
h
Permitted Storage Volume, ft
4,340
i
Temporary Storage Elevation, FMSL
1160
t
Controlling Orifice
0 75"0 pipe
k
Permitted Forebay Volume, ft3
1,067
I
Max Fountain Horsepower
118
1
Receiving Stream/River Basin
Bell Branch 1 LBR59
m
Stream Index Number
15-25-2-15-4
n
Classification of Water Body
"C Sw HQW"
II. SCHEDULE OF COMPLIANCE
1 The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface
2 During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately
3 The permittee shall at all times provide the operation and maintenance
necessary to assure the permitted stormwater system functions at optimum
efficiency The approved Operation and Maintenance Plan must be followed in
its entirety and maintenance must occur at the scheduled intervals including, but
not limited to
a Semiannual scheduled inspections (every 6 months)
b Sediment removal
c Mowing and revegetation of slopes and the vegetated filter
d Immediate repair of eroded areas
e Maintenance of all slopes in accordance with approved plans and
specifications
f Debris removal and unclogging of outlet structure, orifice device, flow
spreader, catch basins and piping
g Access to the outlet structure must be available at all times
4 Records of maintenance activities must be kept and made available upon
request to authorized personnel of DWQ The records will indicate the date,
activity, name of person performing the work and what actions were taken
5 The facilities shall be constructed as shown on the approved plans This permit
shall become void unless the facilities are constructed in accordance with the
conditions of this permit, the approved plans and specifications, and other
supporting data
6 If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility
Page 3 of 7
State Stormwater Management Systems
Permit No SW8 permit#
7 Decorative spray fountains will be allowed in the stormwater treatment system,
subject to the following criteria
a The fountain must draw its water from less than 2' below the permanent
pool surface
b Separated units where the nozzle, pump and intake are connected by
tubing, may be used only if they draw water from the surface in the
deepest part of the pond
c The falling water from the fountain must be centered in the pond, away
from the shoreline
d The maximum horsepower for a fountain in this pond is listed in Section
16 (1) of this permit
8 Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation Any deviations from the
approved plans and specifications must be noted on the Certification A
modification may be required for those deviations
9 Access to the stormwater facilities shall be maintained via appropriate
easements at all times
10 The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below
a Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc
b Project name change
c Transfer of ownership
d Redesign or addition to the approved amount of built -upon area or to the
drainage area
e Further subdivision, acquisition, lease or sale of all or part of the project
area The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMA
Ma)or permit was sought
f Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan
11 The permittee shall submit final site layout and grading plans for any permitted
future areas shown on the approved plans, prior to construction
12 A copy of the approved plans and specifications shall be maintained on file by
the Permittee for a minimum of ten years from the date of the completion of
construction
13 The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made
Page 4 of 7
State Stormwater Management Systems
Permit No SW8 permit#
III. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director
In the event of a change of ownership, or a name change, the permittee must
submit a formal permit transfer request to the Division of Water Quality,
accompanied by a completed name/ownership change form, documentation
from the parties involved, and other supporting materials as may be appropriate
The approval of this request will be considered on its merits and may or may not
be approved The permittee is responsible for compliance with all permit
conditions until such time as the Division approves the transfer request
2 Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division of Water Quality, in
accordance with North Carolina General Statute 143-215 6A to 143-215 6C
3 The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction
4 In the event that the facilities fail to perform satisfactorily, including the creation
of nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems
5 The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility
6 The permit may be modified, revoked and reissued or terminated for cause The
filing of a request for a permit modification, revocation and reissuance or
termination does not stay any permit condition
7 Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual
8 Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit
9 The permittee shall notify the Division any name, ownership or mailing address
changes within 30 days
Permit issued this the 13th day of November 2006
NORmTH ROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
for n ie ,Director
Division of Water Quality
By Authority of the Environmental Management Commission
Page 5 of 7
East Coast
v Engineering Company, P.A.
Consulting Engineers 4918 Main Street
Telephone 910 754 8029 �� Post Office Box 2469
Fax 910 754 8049 �Shallotte North Carolina 29459
TO Ms Linda Lewis
NCDENR - Stormwater
Wilmington. NC
SUBJECT: Red Fish Grille SW8 060826
We are sending you [X ] Attached or Enclosed
Via US Mail , the following items
DATE __ 10/30/06______
PROJECT: Red Fish Grille
_ _EC1EYV�]D
OCT 3 1 2006
[ ] Under Separate Cover
[ X ] Plans [ ] Contract Documents [ ] Specifications
[ ] Samples [ ] Copy of Letter [ ] Reproducibles
[X] Other Response to Stormwater Comments
Sheet No (s) No Copies Date
These are Transmitted as Checked Below
[X] As Requested [ ] For Your Use [ X ] For Approval
[ ] Approved as Noted [ ] Comments [ ] For Your Information
[ ] Shop Drawings
[ ] Computer Disk
Sheet or Item Description
[ ] Approved as Submitted
[ ] Rejected
[ ] Submit Additional Copies [ ] Resubmit For Approval
REMARKS. Linda,
Per your e-mail we have added a revision note and note to the plans identifying the Stormwater Outlet structure
If you have any further questions, please contact our office
IJ Christian Russell
East Coast Engineering Company, PA
pc File 06-0703 — Red Fish Grille
Red Fish Grille SW8 060826
Subject: Red Fish Gnlle SW8 060826
From: Linda Lewis <Iznda lewis@ncmail net>
Date: Wed, 25 Oct 2006 14 29 11 -0400
To: Elizabeth Nelson <enelson@ececpa com>
Elizabeth
Good news[ I only need one small thing added to these plans in order to issue a
permit Please label the small square in the pond as the outlet structure on sheet
C3 and submit 2 copies of the revised plans You may also want to reference it to
the detail on that same sheet
Linda
I of 1 10/27/2006 10 33 AM
V
4918 Main Street PO Box 2469 East Coast 324 Village Road, Suite C
Shallotte, North Carolina 28459 Engineering Company, P.A. Leland North Carolina 28451
Office 910 754 8029 Consulting Engineers Office 910 371 3526
Fax 910 754 8049 Fax 910 371 3448
August 14, 2006
Ms. Linda Lewis
Water Quality Section
NC Department of Environment and Natural Resources
127 Cardinal Drive Extension
Wilmington, North Carolina 28405-3845
Subject Red Fish Grille
Holden Beach, NC
High Density Submittal
Dear Ms. Lewis:
On behalf of our client, enclosed is a submittal package for Red Fish Grille located in
Holden Beach, NC The project is a high -density restaurant project, and runoff will be
directed to catch basins then to an onsite stormwater pond via underground storm drains
The following presents the various components of the enclosed submittal package
1 One original and one copy of the Stormwater Management Permit Application
Form
2 One original and one copy of the Wet Detention Basin Supplement to the
Stormwater Plan
3 Two sets of plans, sheets C 1, C2 and C3
4 A Project Narrative, sheet t of 1
5 Calculations pages 1 thru 5
If you have any questions or require any additional information, please contact our
Shallotte office
Sincerely,
J Christian Russell
Enclosures
copy: Mr Brian Garrett (Johnson & Garrett Architects)
File 0703 (Red Fish Grille)
lrr
-1q-
AU G 1 5 Z006
East Coast
Engineering Company, P.A. 4918 Main Street
Fax 910 754 8049 Consulting Engineers Post Office Box 2469
Office 910 754 8029 q Shallotte, NC 28459
Red Fish Grille
Brunswick County, North Carolina
STORMWATER AND EROSION CONTROL NARRATIVE
Red Fish Grille is located in Brunswick County on NC 130 between Shallotte and Holden Beach
The project proposes to build a restaurant and associated parking The developer proposes to
construct parking, construct a stormwater collection system including a stormwater pond and install
water and sewer utilities to serve the site The total project area is 162 acres The developer
proposes to disturb 1 5 acres
Stormwater will sheet flow from all impervious areas to catch basins then to an onsite stormwater
pond The developer proposes to install paved parking lots and driveways to serve the new site
The overall impervious area of the project will be high -density The project will be approximately
54 percent impervious
Temporary silt fence will be installed on the south side of the project between the disturbed area and
existing ditch, block and gravel inlet protection will be installed around the catch basins and a
graveled construction entrance will be used to prevent any significant amounts of sediment from
leaving the site The proposed stormwater pond may be utilized for sediment storage during rough
grading of the site The block and gravel inlet protection may be used for sediment storage during
final grading of the site These measures shall be inspected regularly, and the accumulated sednnent
removed to prevent the conveyance of sediment to any off -site areas
The primary permanent erosion control measures that will remain after the temporary measures are
removed will be permanent grassing