Loading...
HomeMy WebLinkAboutSW8060742_APPROVED PLANS_20061024STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW eo('o()-l%�aj DOC TYPE ❑ CURRENT PERMIT C� APPROVED PLANS c ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE -aJr�'nT YYYYMMDD a.!_ _L_. . _ 11k' _--._.;iI i_ -"-I "-le,.,_ 11 Al i _.I _.1 1" �'u_ - -__ L-L. I. AREA 24000 SQFT = .55 ACRES 2. TOTAL IMPERVIOUS AREA 14051 SQFT, THEREFORE 56.97. IMPERVIOUS SYSTEM DES€GN PARAMETERS: GONI'"AIN FIRST I" OF RAINFALL (STATE REQUIREMENT) CONTAIN FIRST 15' OF RAINFALL (LOCAL ORDINANCE) CONTAIN FIRST 3" OF RAINFALL (MAINTAIN NO OVERFLOW) VOLUME FOR I" _ (1/12)(14051) = 1,170 CU FT VOLUME FOR 1.5' _ (1.5/12X14051) = 1,756 GU FT VOLUME FOR 3" _ (3/12)(14051) = 3,512 CU FT 3. FLOW RATES: LINAGE AREA 19Z PRE -DEVELOPMENT CN = 35 T c = .293 5 = .176 qI = 5ZI GFS ql0 = .957 (AS POST DEVELOPMENT (NO CONTROLS) GN = 73 Tc = .219 5 = .131 ql = .945 6F5 q10 = 1.79 GFs POST DEVELOPMENT (WITH CONTROLS) CN = 73 T c = .219 S = .131 ql = O CFS qI0=0CFS 4. THE STORMWATER SYSTEM WILL COMPRISE OF 44 STORMTEGEI 56-740 CHAMMRS. (SEE ATTACHED DETAILS) 5. TRENCH I IN DRAINAGE AREA OZ, STORMTECH 66 -740 SYSTEM SPECIFICATIONS: OVERALL TRENCH DIMEN510N5: 156" q' X 11' 45.9 CU f=T OF STORMWATER STORAGE PER 56,- 740 GHAMMR WITHOUT STONE WITH THE ADDITION OF I2" OF STONE f ELOW CHAMMR ROVVS AND CHAMBERS INSTALLED TO MR4YACTURER6 SPECIFICATIONS 516 64J FT OF STORAGE IS OTAINE P TOTAL STORAGE VOLUME 51-6(44) = 3590 CU FT 6. WATER TABLE WAS DETERMINED TO M APROX. 14.5" MSL SEE DRAWING 040 FOR TEST SITE 7. INFILTRATION RATES WERE DETERMINED TO PE APROX. 14.5"/HR 5. SUMMARY WITH THIS SYSTEM, THE FIRST 1" ,15' AND 3" OF EACH EVENT 15 CONTAINED AND INFILTRATED, THERE IS NO OTHER DISCHARGE. THE I YEAR AND 10 YEAR EVENTS ARE CONTAINED AND INFILTRATED WITH NO OTHER DISCHARGE. IN THE EVENT THAT THE EVENT EXCEEDS THE DESIGN EVENT, INDIVIDUAL i5YPASSES ARE GONSTREX,FD ON EACH GUTTER 60LWTION POINT (SEE ATTACHED DETAILS) THEREFORE, FOR THE! I YEAR AND 10 YEAR 24 HOUR 66511 EVENTS, RAINFALL FROM THE PERVIOUS AREAS WILL M CONTAINED AND INFILTRATED 15Y THE INFILTRATION TRENOIE5. THERE WILL W- NO INCREASE IN VOLUMES OR FLOWRATE5 OF THIS DRAINAGE AREA. _T FA I NACRE SEE )e vj IN(/ IF-,. (1-ump (l-U I I C/ V1'Gf111N r /-\mr\IIN4u LOT INTO PROF INLETS K;_il .i...i_ ►� JWH ENGINEERING DOES NOT ASSUME ANY LIARILTTY FOR THE CONSTRUCTION METHODS, OR ANY DEVIATION FROM THESE PLANS. ALL INFORMATION ON THESE PLANS IS TO BE VERIFIED PRIOR TO START OF CONSTRUCTION. SHOULD ANY DISCREPANCIES OCCUR, CONTACT JWH CUSTOM DESIGN INC. PRIOR TO ANY DEVIATION FROM THIS PLAN. FOR CONSTRUCTION PURPOSES, DO NOT SCALE THESE PLANS. REFER TO DIMENSIONS INDICATED ON THESE PLANS. CODES GOVERN OVER THESE DRAWINGS. PROJECT INFO: OWNER: r l V DRAINAGE AREA 01: z 1. AREA 7(000 SQFT = 1.74 ACRES Q Q^ 2. TOTAL IMPERVIOUS AREA 76000 SOFT, THEREFORE^j 1007 IMPERVIOUS M H 3. SYSTEM DE51GN PARAMETERS: ~� CONTAIN FIRST I" OF RAINFALL (STATE REQ)IREMENT) r � CONTAIN FIRST 15 OF RAINFALL. (LOCAL ORDINANCE) m Z CONTAIN FIRST 3" OF RAINFALL (MAINTAIN NO OVERFLOW) ^ }� VOLUME FOR I" = (1 /12)(76000) = 6,333 0 FT h� VOLUME FOR 1.5" _ (1.5/12)(76000) = 9,500 GU FT VOLUME FOR V' _ (3/I2)(76000) = 19,000 CU Fr O 4. FLOW RATES: DRAINAGE ffiLA Q1 PRE -DEVELOPMENT T n CN= 35 V 1 T c= 509 5= .3 6 l J qj q10= 3.12 GFS POST DEVELOPMENT (NO CONTROLS) TcCN 9 0 T c = .352 ql = 3.73 CFS q10=7.07CF5 P05T DEVELOPMENT (WITH CONTROLS) CN=95 r� T q10=OOPS 5. THE STORMWATER SYSTEM WILL COMPRISE OF 235 SC-740 [� STORMTFGH CHAMBERS (SEE ATTACHED DETAILS) � r 6. TRENCH I IN DRAINAGE AREA 01, STORMTEGH 96-740 SYSTEM SPECIFICATIONS: uj OVERALL TRENCH DIMENSIONS: 334'-6" X 25-3" 45.9 CU FT OF STORMWATER STORAGE PER S6 -740 GHAMMR WITHOUT STONE � z WITH THE ADDITION OF 12" OF STONE I5ELOW CHAMBER ROWS .� rr..� AND GHAMMRS INSTALLED TO MANIJFAGTURERS SPECIFICATIONS � V 51.6 CU FT OF 5TORAGE IS OBTAINED TOTAL STORAGE VOLUME 51.6(235) = 19176 CU FT %Lu STORAGE VOLUME OF 51.6 CU FT PER CHAMBER FOR A TOTAL OF SI.6(233)= Roll CU FT 5. WATER TAi31-E WAS DETERMINED TO 13E APROX. 14.5' MSL SEE goof O'QUINN BLVD. DRAWING 04V FOR TEST 51TE UNIT IF 6. INFILTRATION RATES WERE DETERMINED TO M APROX. 148"/HR SOICI'7[ HP'OR'T, NC 28461 7. SUMMARYPHONE: (910) 278-1226 WITH THIS SYSTEM, THE FIRST 1" ,15' AND 3" OF EACH EVENT 15 ]FAX: (866) 597-482o CONTAINED AND INfILTRATED, THERE 16 NO OTHER DISCHARGE. THE I ``,1y111111f11f!!!I YEAR AND 10 YEAR EVENTS ARE CONTAINED AND INFILTRATED WITH NO ��``��H CARQ� �''1i, OTHER DISCHARGE. SS �'y-:- FE IO'. THEREFORE, FOR THE I YEAR AND IO YEAR 24 HOUR SOS€ I � p ;p EVENTS, RAINFALL FROM THE PERVIOUS AREAS WILL M CONTAINEDAL AND INFILTRATED 15Y THE INFILTRATION TRENCHES. _ _4 025E573 �= THERE WILL M NO IN6REA5E IN VOLUMES OR FLOWRATES OF THIS DRAINAGE AREA. %�9'-FN •�'�.'�'F' W. 0 ! !'!llrrnnl � L Tn �i 31wf `TC m$� ` r -9 t.g1 ; m I. GdMpINES LOT SIZE I5 IOO UO SF/ 2.3 ACRES 2. ALL STORMWATER IS TO M CONTAINED ON SITE. 3, THERE ARE NO WETL}ND5 ON THIS SITE. 4. THE 51.6 M516 FT OT STORAGE PER SG-740 GHAMMR VALUE IS 015TAINEP WITH THE �TL 12" OF STONE BELOW AND 6" OF STONE APOVE IN ADDITION TO THE /.HAMI3ER5 STORAGE. 5, ALL ROOF GUTTERS TO HAVE DOWNSPOUTS AND ROCK BOXES TIED TO SW 5Y51i'M. 6. SYSTEM DESIGN PARAMETERS: CONTAIN FIRST I" OF RAINFALL (STATE REQUIREMENT) CONTAIN FIRST 15" OF RAINFALL (LOCAL ORDINANCE) CONTAIN FIRST 3" OF RAINFALL. (NO OVERFLOW REOLFZI=JMENT5) 7. THE SYSTEM CONTAIi15 AND CONTROLS THE FIRST 3" OF RAINFALL. ALL STORMWATER IS RETedNED ON SITE, RECEIVED SEP 2 0 2006 DWQ OROJ # 5W 9' 0Coo-742 02 09.19.06 RE.gWSTED PEW GHANGE5 NO, DATE DESCRIIPTION REVISIONS DRAWN: CIHIECKED: AA JWH SCALE: SHEET SIZE: 1" = 30' 1 D Ii3�1 08.07.06 DRAWING TITLE. STORM WATER PROJECT NO. 01-06-0180 DRAWING NO.: 01,00 r? r 71 1 T� t I 'tlili. � ,•'i `1'. =+i �. r. r �„ t�.. .. . -F' f__i�e. �._ If �! S'� � .. - � 1 ��' y!.�.p, '+�1� �j 1! --,-w-UT -07 FT JWH ENGINEERING DOES NOT ASSUME ANY LIABILITY FOR THE CONSTRUCTION METHODS, OR ANY DEVIATION FROM THESE PLANS, ALL INFORMATION ON THESE PLANS IS TO BE VERIFIED PRIOR TO START OF CONSTRUCTION. SHOULD ANY DISCREPANCIES OCCUR, CONTACT JWH CUSTOM DESIGN INC PRIOR TO ANY DEVIATION FROM THIS PLAN. FOR CONSTRUCTION PURPOSES, DO NOT SCALE THESE PLANS. REFER TO DIMENSIONS INDICATED ON THESE PLANS. CODES GOVERN OVER THESE DRAWINGS. MATERIAL LOCATION DESCRIPTION AASHTO M43 AASHTO MI45 COMPA6,TION/PENSITY PE5IGNATION DESIGNATION REQUIREMENT FILL MATERIAL FROM IS" ANY SOIL/ROCK MATERIALS, NATIVE SOIL5 OR N/A N/A PREPARE PER ENGINEER'S PLANS. PAVED INSTALLATIONS MAY TO GRADE ABOVE CHAMBERS PER ENGINEER'S PLANS. CHECK PLANS FOR HAVE STRINGENT MATERIAL AND PREPARATION REQUIREMENTS. PAVEMENT SUBGRAPE REQUIREMENTS. Ga FILL MATERIAL FOR 6" TO 18" GRANLL.AR WELL-L--C�RAaEP 3, 357, 4, 4(0, A 1 COMPACT IN 6" LIFTS TO A MINIMUM 957. STANPARD ELEVATION ABOVE UTAMBERS SOIL/A[�GREeATE MIXTURES, <557- 5, 56, 57, 6, 67, 68, 7, 75, S, A_2 PROCTOR DENSITY. ROLLER eRO56 VEHICLE WEIC�I-ICNOT TO {24" FOR UNPAVI*D INSTALLATIONS} FINES. M, 9, 10 q-3 EXCEED 11,000 L.BS. DYNAMIC FORCE NOT TO EXCEED 20 00 LVS. © EMBEDMENT STONE SURROUNDING AND TO A WASHED ANW-AR STONE WITH THE MAJORITY 3, 357, 4, 467, 5, N/A NO COMPACTION REQUIREb 6" ELEVATION ABOVE CHAMBERS OF PARTICLES BETWEEN 3/4 -- 2 INCH 56, 57 AO FOUNDATION STONE BELOW CHAMBERS WASHED ANGULAR STONE WITH THE 3, 357, 4, 467, N/A PLATE COMPACT OR ROLL TO ACHIEVE A 95% MAJORITY OF PARTICLES BETWEEN 3/4 - 'Z 5, 56, 57 STANDARD PROCTOR DENSITY INCH PLEASE NOTE: THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE WASHED CRUS-EP ANGUAR. FOR EXAMPLE, THE STONE MUST BE SPECIFIED AS WASHED, CRUSHED, ANC I, NO. 4 STONE. SCALE. J/Vy = 1—O go l6w OEM ApS 41 PIPE IS SMOOTH 1145VE AND AVAILABLE IN 4"-iW' DIAMETERS IN NOMINAL 2d LPNOTH5. PIPE CAN M 66LIP OR PERFORATED/sLonw. 66111716URATION IS N-12 (6ORRE6ATED OUTSIDE AND SMOOT-H IN51DE). �IGAYION 6tNIERAL GRAVITY DRAINAGE. STORM WATER CONTROL, 515-'17RAINAC;E, A;.P/OR SEWER. qm(.IFLGATLONS PIPE AND FITTINGS MEET THE REQUIREMENTS OF AASHTO M 252 (3"-Ids. M-294 (12" AND LARGER) TYPE S (6VRRL0ATFJ7 OUTSIPlff- IvI00iH IN151DE, 4"- 'a), AND MP7 (6d' JOINT OPTIONS AND PFRFORMANCE: I. NON-0A5KETED JOINTS ARE INTERNAL OR EXTERNAL COIFLERS COVERING A MINIMLM OF TWO CORRLrvATIONS AT EACH END. 2, 6ASKETED NON -WATER T16HT JOINTS (SOIL TIGHT PER AASHTO SECTION U)} 6A5KET5 MAY BE ARG111TECURAL. WEATHER-STRIPPING MATERIAL PER ASTM D-1056, OR RLWR PER ASTM F-4T. --5 INTEGRAL pmL/S'IeOr WITH A RU6bER BASKET MEETING A5r`M r-AFT! INSTALLED ON THE LW, 4. 6A5KETFD, LAB TEST CERTimp IO.S PSI JOINT: NDL/SPI60T WITH A RUBBER 6A5KET MEETINI6 ASTM F-477 INSTAL I EP ON THE 5PI60T END. 5. REPAIR OR ADAPTER COIlLER, 5.0 PSI TESTED HDPE WRAP-ARaW SLEEVE WITH SELF --CONTAINED T160TENIN6 STRAPS, FURNISHED PY THE PIPE MANLFACTIFER. INSTALLATION: INSTALLATION SHALL DE PER FOCAL A6ENCY REQUIREMENTS OR MAIFA(,TL)RER'S RV-151-1E1? REGLOMEWATIONS WITH A MINIMLM COVER FOR 11-25 LOAPIN6 SHALL BE ONE FOOT THRaK-)h 40, AND TWO FEET FOR DIAMETERS 6RL=ATR THAN 60'. 1+VI ATHpE 5� N spEGHIcATI N MANUAL. ��H CHAM13ERs SHALL M IN ACCORDANCE 7. THE INSTALLATION OF STORMTECH CHAMMRS SHALL BE IN ACCORDANCE WITH THE LATEsT sTORMTFCH INSTALLATION IN5TRWTIONs. 3, THE CONTRACTOR IS ADIVISEP TO REVIEW AND UWERSTANP THE INSTALLATION INSTRUCTIONS PRIOR TO BEGINNING SYSTEM INSTALLATION. GALL I-SSS-592-U94 OR VISIT WWW.STORMTECH.C.GM TO RECEIVE A COPY OF THE LATEST STORMTECII INSTALLATION INSTRUCTIONS. 4. CHAMBERs SHALL MEET THE DESIGN REQUIREMENTS ANP SAFETY FACTORS SPECIFIED IN SECTION 12.12 OF THE LATEST EDITION OF THE AASHTO LRM 15RIPC-E DE510N SPE(IFICATIONS. THE INSTALLED 641AMf5ER SYSTEM SHALL PROVIDE THE SAFETY FACTORS SPECIFIED IN THE AASIITO LRFD 15RIPOE DESIGN SPECIFICATIONS SECTION 12.12 FOR EARTH AND LIVE LOADS, WITH CONSIDERATION FOR IMPACT AND MULTIPLE VEHICLE PRESENCES. S6-740 6HAMf5ER 3/4 - 2 INCH WASHED, CRUSHED, ANGULAR STONE ADS 601 GEOTEXTILE OR EgUAL DE51GN ENGINEER IS RE51`01\161ft-E FOR ENSURING SUITABILITY OF SU15GRADE SOILS AA ii GHAMERS SHALL MEET ASTM F 2� 18-05 "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS"_ GRANULAR WELL GRADED 501L/A0GREATE MIXTURES, <35% FINES. COMPACT IN ( IN LIFTS TO 95% PROCTOR DENSITY. SEE THE TAf5LE OF A6CEPTAf5LE FILL MATERIALS . 56-740 END GAP PAVEMENT TH15 6R055 SECTION DETAILS THE REgUIREMENT5 NECESSARY TO SATISFY THE SAFETY FACTORS SPECIFIED IN THE AA5HTO LRFD BRIDGE DESIGN SPECIFICATIONS SECTION 12.j2 FOR EARTH AND LIVE LOADS USING STORMTECH CHAMBERS STEM TTYP I OL_ 6R05�SEOT I ON SCALE: 1/21 / = I1-0„ ACCEPTS 4" SCH 40 PIPE FOR OR INGPFCTION PORT -- 90.7" ACTUAL LENGTH 85.4" INSTALLED STORMTEUI 56-740 OHAM NOMINAL. CHAMBER SPECIFICATIONS 51ZE (W x H x INSTALLED LENOT H) 51 j;P" x 30.d' x P,5.A}' CHAMBER STORK-E 45.9 CUBIC FAT MININW INSTALLED STORAGE 74.9 CUBIC FEET WEIGHT 75 LBS. FOR STORMTECH INFORMATION GALL 1-550--"—U94 5 ►:11M 0 I2"o ADS PIPE FOR STORMTECH IWORMATICN CALL I-e09-9192-2694 SCALE: 1/2" = 1,-0 22.5•• t Is" A�pRpyc. c <<rlrl s 24" o ADS PIPE NO, I DATE DESCRIPTION REVISIONS PROJECT INFO: OWNER: 5oo1 O'QUINN BLVD. UNIT 1F SOU THPOR'T, NC 28461 PHONE: (910) 278-1226 FAX: (866) 597-4820 \gyp 1{ 14111,1I l Ip! l � J�'/ SSI�,9''% Q� SF�L - 025573 = DRAWN: CHECKED: AA JWH SCALE: SHEET SIZE: I AS NOTED D DATE. 08.07.06 DRAWING TITLE: DETAILS PROJECT NO. 01-06-0180 DRAWING NO.: 02,00 A +I !,i + i �' a I'litr � , I i � r r �, ,�,, , } , t �' r ° r •�� l �r , � � •S,r r'��' Ids .S �.. 1; 1�._ . �F.. ;L'- _.l..±2. _....� •L' , — - -- .I ,. .. ,. , " 12" MIN STOM AT END OF (HAMMR ROY 6" MIN STONE BETWEEN GHAMMR ROWS A-H' W f If L_ 5TO EMT EG11 5Y5TEM W P OP INLET- Tofu VIEW OZ SCALE: 1 /4„ == [,_d, �� SroRMr 5Y5TEM YX. 740 SYSTEM I/ATION VIEW STORMTEO"i 66-740 GHAMMR ROW (TYP) STORMTEGH 56-740 GHAMMR ISOLATOR ROW NOTE 6TORMTEG�f1 5Y5TEM NOT TURNED FOR CLARITY off-- sr MT 3'X3' ID. PRECAST DRY' INLET 1 1 - - f- .7 I I IYI IST .5 ET M 5 S 5 5 SHWT 6d' PELeN EXISTING GRADE 145 FT MSL 5Y5T STORM ; I WITECH 56-7,40 C HAMMR ROW (rYP) 6" MIN STONE BETWEEN GHAMMR ROWS 12" MIN STONE AT END OF GHAMMR ROWS W PROP INLET To' VIEW SCALE: 1/4,. _ 1,_6y„ 5Y5TEM lv' o PIPE (TYP) PAVEMENT i APPFOX. il STORMTFLht 5G-740 5Y5TEM E1/AT1 VIEW SCALE: 1/4" = 11`o„ NO. I DATE DESCRIPTION REVISIONS JWH ENGINEERING DOES NOT ASSUME ANY LIABILITY FOR THE CONSTRUCTION METHODS, OR ANY DEVIATION FROM THESE PLANS. ALL INFORMATION ON THESE PLANS IS TO BE VERIFIED PRIOR TO START OF CONSTRUCTION. SHOULD ANY DISCREPANCIES OCCUR, CONTACT JWH CUSTOM DESIGN INC. PRIOR TO ANY DEVIATION FROM THIS PLAN. FOR CONSTRUCTION PURPOSES, DO NOT SCALE THESE PLANS, REFER TO DIMENSIONS INDICATED ON THESE PLANS. CODES GOVERN OVER THESE DRAWINGS. PROJECT INFO: OWNER: gooi 010,UINN BLVD. UNIT ]F SOU` HPORT, NC 28461 PHONE: (qxo) 278-1226 FAX: (866) 597-482o N1111 ItuInlli'll ��� CARa(�'�i.,�. SEAL 025573 = - W. DRAWN: CHECKED: AA JWH SCALE: SHEET SIZE: AS NOTED D DATE 08.07.06 DRAWING TITLE: DETAILS PROJECT[' NO. 01-06-0180 DRAWING NO.: 0201 '! •t ,! j• 1 I r t s P I, 1 - - -,q -, - - 1. 7-- Alls Sys, A L A Win 0 -1 � if L-1 L. -F-' L