Loading...
HomeMy WebLinkAboutSW8060703_COMPLIANCE_20061003STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW qZl'&97o 3 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE INCOMPLIANCE EVALUATION INSPECTION L DOC DATE YYYYMMDD INFILTRATION TRENCH ANALYSIS Filename: S:IWPDATAIWQSIINTRENCH1060703 Project# SW8 060703 Project Name Flywheel Office Park Recvng Stream Bradley Creek Drainage Basin Cape Fear Site Area 3.06 acres Impervious Area Calculation Buildings Streets/pkg OS SW Offsite Total Volume/Storage Calculation 26000 45507 6101 0 77608 If Rational Method is used, place a 1 in this box 0 Required Provided Design Storm RV Volume to Store Pipe Diameter (equivalent) Length Of a Single run of Pipe Number of Pipe Runs in Trench Storage In Piping Total Storage in Piping Date 03-Oct-06 Reviewer P.Bartlett Classification SC; HQW Index # 18-87-24-4-(1) Drainage Area 133,294ISF 3.06 JAcres Rational Cc (list C after each BUA) 1 1 1 1 % Impervious: Cc: 0.67 1 lin 0.57 6376 CF Pipe Size 1 Pipe Size 2 4.4 53 6447 0 58.2% Feet Feet each Cubic Feet Cubic Feet Cross -Sectional Area Of Pipe Runs 121.642 0.000 SF Length Of Trench Width Of Trench Height Of Trench Cross -Sectional Area Of Trench Voids Volume, 40% Total Voids Volume Total Volume Provided Feet Feet Feet SF CF CF Cubic Feet (StormChamber: 15.17 cf/ft * 56 units * 7.587unit = 6,440 cf) Elevation Of Bottom Of Trench 22.5 Mean Sea Level Elevation Of SHWT 20.5 Mean Sea Level Overflow Elevation 25.8 Mean Sea Level Exfiltration Rate / Drawdown Reported Hydraulic Conductivity Bottom Surface Area Drawdown Time 25 YEAR 24 HOUR STORM N/A Intensity, i = .33 inches / hour Qr=CiA= Qp through the bottom of the basin= 10 YEAR 10 MIN HIGH INTENSITY EVENT Intensity, i = 6.3 inches / hour Volume for 10 yr. 10 min. event = 53 48 3.3 158.40 0.00 779 0 779 7226 0.67 CFS 1.3660 CFS 7701:03 CF < 1.9331 Cubic Feet Per Hour Per Sq Ft 2544.0 Square Feet 1.30 1 hours Must be > Qr 7226 CF