Loading...
HomeMy WebLinkAboutSW8060660_COMPLIANCE_20060908 (2)STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW �l0(ND DOC TYPE ❑CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE 11 COMPLIANCE EVALUATION INSPECTION DOC DATEi2/771/o(9gl2g' WYYMMDD 'i Permit No. (to be proviried 6y D4VQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This forrrt may be photocopsd far use as art original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name: � ,c��5 C1r\5e Ck.J6Vv se. c-4 (&,n-koxvice Fc2tt;-�d Contact Person: e"-&\0A C-emvo� Phone Number: (LIM Z8"7- 1g63 For projects with multiple basins, specify which basin this worksheet applies to: SLj Pond 4r 2- elevations Basin Bottom Elevation 43.5 ft. (floor of the basin.) Permanent Pool Elevation 4F9.5 ft. (elevation of the orifice) Temporary Pool Elevation SO.O ft. (elevation of the discharge structure overflow) areas Permanent Pool Surface Area S!o 4S5 sq. ft. (water sinface area at the orifice elevation) Drainage Area .79B4 ac. (on -site and off=site drainage to the basin.) Impervious Area yil z ac. (on -,site and off -site drainage to the basin.) volitrnes Permanent Pool Volume Z35,a37- cu. ft. (combined volume of main basin crud forebay) Temporary Pool Volume ZO, 941 cu. ft. (volunne detained above the permanent pool) Forebay Volume 5�,3`i4i cu. ft. (appraeimotely 20% of total volume) Other parameters SA/DA] l .7-304 (surface area to drainage arect ratio from DWQ table) Diameter of Orifice i.s in. (2 to S clay temporary pool drab, -down required) Design Rainfall 1 in. Design TSS Removal 2 % (mininunn 85% required) Form SWU-tot Rev 3.99 Page 1 of 4 Footnotes: t When using the Division SAIDA tables, the correct SAIDA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 In (lie 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines desiun requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an ,tgc:zt in the Stortnwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). b. The forebay volume is approximately equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws down in 2 to .5 days. e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) f. The basin length to width ratio is greater than 3:1. a. The basin side slopes above the permanent pool are no steeper than 3:1. h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right- of-way. I. If the basin is used for sediment and erosion control during construction, clean out of the A�,-&p basin is specified prior to use as a vet detention basin. AW10 m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION 13ASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does tr loe not incorporate a vegetated filter at the outlet. This system (check one) 0 does toes not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 = - � - � , •; , C' .i � _ •""� ,� - - r� .. � � Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping,'swales, riprap, etc.).quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 46 feet in the main pond, the sediment shall be removed. When the permanent pool depth roads 'i.s feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in rhe blanks) Permanent Pool Elevation 149.5' Sediment Ren oval El. 4 1 75 n -----H -`------ Sediment Removal Elevation US 7�% Bottom Ele anon35 0�0--------------------------------------------- - Bottom Elevation 43.5 2 5% FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when the), cover 50% of the basin surface. These plants shall be encouraged to ¢row along the vegetated shelf and forebay berm. b. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-102 Rev 3.99 Page 3 of 4 V 7. All components of the wet detention basin system shall be maintained in Qood working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: ' 'Nc t &A C.-CrMUOI Title: 11 tce PregAcnt o f C�c�S{-�a` Cor�Mun 1C.s� +��clG� Piwti t�bn .one Address: $L J Ci-ea.n -(-s(c $�,,h_ r_ NG_ ZIP-,{(a4 Phone: !�l 0 - Z67 Signature_ Date: S- 22.-bCP Note: 'the legally- responsible party should not be a homeowners association unless more than 500/a of the lots have been sold and a resident of the subdivision has been named the president. Aar4L.` '�a fan_ a Notary Public for the State of �08-41 County of Zh".Swec�-- do hereby certify that :6 �C- -c� &,�t�va� personally appeared before me this ,Z'XKA day of `hrl4ud aock, , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements, Witness my hand and official seal, -� ' 0 `y� SEAL My commission expires a069 Form SWU-102 Rev 3.99 Page 4 of 4 4 Permit No. (to be provided fir 0WQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal inclun des aapplication form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. 4 I. PROJECT INFORMATION Project Name: Leopn,c S Chase coA MolMenance Fai- l-ht Contact Person: Q:c1 e5 _ac-&Jod Phone Number: ( q10 } 7,61- 1903 For projects with multiple basins, specify which basin this work -sheet applies to: elevations Basin Bottom Elevation Z. 5 ft. (floor of the basin)"": Permanent Pool Elevation 48,5 fit. (elevation of the orifice) `r Temporary Pool Elevation ( f g fl ) 49.5 ft. elevation o the discharge .structure of er ow areas Permanent Poo] Surface Arca z3239 sq. ft. (water si.nface areo at the orifice elevation) Drainage Area 10. (ola4 ac. (on -site and off -site drainage to the basin.) Impervious Area S. Z6'3 I ac. (on -site and off -site drainage to the basin) volumes Permanent Pool Volume ri�7 9Z - cu. ft. (combined volume of maid basin and forebay) Temporary Pool Volume 2-4,'7(0 cu. ft. (volume detained above the permanent pool) Forebay Volume 16, It cu. ft. (approximately 20% of total volume) Other parameters SAlDA1 Z.((,LfG (sarrface area to drainage area ratio from. DWQ table:) Diameter of Orifice Zo in. (2 to 5 day ieniporory pool draw -down required) Design Rainfall in. Design TSS Removal 2 q0 % (minirrrurn 85% required) Form SWU-102 Rev 3.99 Page 1 of 4 Footnotes: l When using the Division SAIDA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management 1'ermit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). b. The forebay volume is approximately equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) f. The basin length to width ratio is greater than 3:1. g. The basin side slopes above the permanent pool are no steeper than 3:1. h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right- of-way. 1. If the basin is used for sediment and erosion control during construction, clean out of the Po�i74 basin is specified prior to use as a wet detention basin. Ak P m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check ogre) 0 does Vdp;4s not incorporate a vegetated filter at the outlet. This system (check ogre) 0 does does not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75110 of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4..5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 4•5 feet in the forebay, the sediment shall be removed. Sediment Ren oval El. 4 7 Bottom EA" 2.5_-__� 2 FOREBAY BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 4 S Sediment Removal Elevation 44 75% Bottom Elevation 4Z.5 25% NIAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Y Form SWU-102 Rev 199 Page 3 of 7. All components of the wet detention basin system shall be maintained in good working order. 1 acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: fQ �GCe%Otj& Title: UiCe Pre,S,Le+ ,t Cco8�C--Omrr,uni ieC @. CUIG- + ?44 C rla(\AAioA . 11kc Address: 35l 5L) ; mar -Ule 9mck tVC Z-Wq(A Phone: -nio- ZY7- L1d3,' Signature: Date: .S- 1. 2 - Dlv Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, AOL&-- Ql�SiDr._ a Notary Public for the State of C V-OL110. County of 1L, �v�� .►etc , do hereby certify that :At9bg-4— "V0. personally appeared before me this XvuA day of ` ioA1 ,�.J ata�lo , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, � Y�o TA SEAL My commission expires to - I "�— ':V qQ9 Form SWU-102 Rev 3.99 Page 4 of 4 WET DETENTION POND ANALYSIS FILE NAME: S:kWQS\POND1060660 Pond 1.WK1 PROJECT#: SW8':013M0:::R 'Kd::l REVIEWER:R _Hail PROJECT NAME: 0 ep-0 DATE: 08 ................... .......... Receiving Stream:j a W. j�j- Class: Drainage Basin: dihbic, Index No. -'�:�� Site Area ' 363Z acres Drainage Area Fl--�-.- square feet Area in Acres 10.66 IMPERVIOUS AREAS Buildings Parking SW TOTAL SURFACE AREA CALCULATION % IMPERVIOUS Des. Depth TSS, 85 or 90: 49.42% ............ VOLUME CALCULATION Rational ?* ..... ... .. Des. Storm Anches Rv= 0,495 Bottom 1'msl Perm. Pool msl Design Pool .. ....................... .. MSI Storage met @elev 49.27 ms] Req. Volume 19149 1cf Vol. Prov. at DP 24710 jcf ORIFICE CALCULATION Rational C square feet square feet square feet square feet square feet square feet square feet square feet Rational Cc= 0.10 SA/DA Ratio 2.67% Req. SA 12378 sf Prov. SA sf * place a "I" in the box if Rational is used . :....... Perm. Pool Volume= 77322.. Req. Forebay Volume= 15464.4 Provided Volume= Percent= 23.4% Elevation Area Inc. Vol. Acc. Vol. A 8.: 5 0 7: X.- 32 ..',2 X" 0.00 4950 8.100`71' 24710.00 24710.00 Avg. Head = 0.46 ft Q2 Area 4.90 sq. inches Flow Q2, cfs 0.111 cfs Q5 Area = 1.96 sq. inches Flow Q5, cfs 0.044 cfs Orifice Area 3.14 sq. inches No. of Orifices...... ...... .. - Q= 0.071 cfs Diameter, inches .. weir H x W in x in .. ......... Drawdown = 3.1 days Surface Area @DP = 26181 sq. ft. Falling Head Drawdown = 5.4 days C: 3,300555556 Lz -0.092 COMMENTS Surface Area , Volume and Orifice are within Design Guidelines WET DETENTION POND ANALYSIS FILE NAME: S:kWQS\POND1060660 Pond2.WK1 ::: PROJECT#: SW H REVIEWERJ 4� PROJECT NAME: ed-pa �s.. t Chase Clubhouse & Maint DATE: 08-Sep-06 Receiving Stream: i S a'- W" �": P 1 t 9 W 6M ... ..... ....... Class: Drainage Basin: tU... M .... .'25 Index No. 1 5 .................... Site Area ....... .. .. ... .. ...... 36­32::'% acres Drainage Area 2961fs04Q square feet Area in Acres 6.80 IMPERVIOUS AREAS .. Rational C ... . ... . Buildings 0 1`0 .`....-square feet ............................ Parking square feet SW . ... xx 0.1... ....... ......... ... ................ square feet .. ..... .. .. .. square feet .......... . ....... ......... . square feet .............. .............. xxx... ...... . ................. square feet square feet TOTAL 1 6147-2-00-1 square feet Rational Cc= 0.16 SURFACE AREA CALCULATION % IMPERVIOUS Des. Depth TSS, 85 or 90: 20.76% ........... .. .......... ............................ .. ........... .. .......... ................................. SA/DA Ratio 1.23% Req. SA 3644 sf Prov. SA -:71 sf VOLUME CALCULATION * place a "'I" in the box if Rational is used Rational ?* . . . . . . . . . . .............................. . . .. . ... . . Des. Storm . ..t=a0 ...... inches Rv= 0.237 Bottom MSI Perm. Pool msi Design Pool .. .. .. .. ...... .. ..... .. ..................... ...... .. .. .. .. .. .. .. .. ' 5.0. MSI Storage met @eleV 49.60 msl Req. Volume 5844 cf Vol. Prov. at DP 28849 cf ORIFICE CALCULATION FOREBAY Perm. Pool Volume= Req. Forebay Volume= Provided Volume= Percent= Elevation 4716&4 23.9% Inc. Vol. Acc. Vol. 0.00 28849.25 28849.25 Avg. Head = 0.22 ft Q2 Area = 216 sq. inches Flow Q2, cfs 0.034 cfs Q5 Area = 0.87 sq. inches Flow Q5, cfs 0.014 cfs Orifice Area 1.77 sq, inches No. of Orifices ........ .......... .. ........... ......... .. ... Q= 0.028 cfs .. ........... . ........... ........... ....... in x Diameter, inches 50' weir H x W in ......................... .. . .... .. ..... . . . . ...... Drawdown = 2.4 days Surface Area @DP = 58942 sq. ft. Falling Head Drawdown = 16,0 days C: 3.284583333 L= -0.044 COMMENTS Surface Area , Volume and Orifice are within Design Guidelines