Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8060302_COMPLIANCE_20060420
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW SW&(1�� DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD INFILTRATION TRENCH ANALYSIS Filename: S:IWPDATAIWQSIINTRENCH1060302 Project # SW8 060302 Date 20-Apr-06 Project Name Southeastern Nephrology Reviewer P.Bartlett Recvng Stream UT to Greenfield Lake Classification C; Sw Drainage Basin Cape Fear River Index # 18-76-1 Site Area 1.273 acres Drainage Area 55,452 SF 1.27 Acres Impervious Area. Calculation Buildings 6197 Rational Cc (list C after each BUA) 0.95 Streets... 0 0.95 OS Prkg . 30672. 0.95 OS sidewalks 2292 0.95/�� Total €391C1 % Impervious: 70.6% Volume/Storage Calculation If Rational Method is used, place a 1 in this box 0 Cc: 0.69 Required Design Storm RV Volume to Store Provided Pipe Diameter Length Of a Single run of Pipe Number of Pipe Runs in Trench Storage In Piping Total Storage in Piping Cross -Sectional Area Of Pipe Runs Length Of Trench Width Of Trench Height Of Trench Cross -Sectional Area Of Trench Voids Volume, 40% Total Voids Volume Total Volume Provided Elevation Of Bottom Of Trench Elevation Of SHWT Overflow Elevation Exfiltration Rate/Drawdown Reported Hydraulic Conductivity Bottom Surface Area Drawdown Time 25 YEAR 24 HOUR STORM NIA Intensity, i = .33 inches / hour Qr=CiA= Qp through the bottom of the basin= 10 YEAR 10 MIN HIGH INTENSITY EVENT Intensity, i = 6.3 inches / hour Volume for 10 yr. 10 min. event = 1 in 0.69 €�!R CF Pipe Size 9 Pipe Size 2 1 0.5 Feet 112 125 Feet 1 1 each 88 25 Cubic Feet 113: Cubic Feet 0.785 0.196 SF 169.5 85 Feet 25 34.5 Feet 1.17 1.17 Feet 29.25 40.37 SF 7275 21f}$ CF CF Cubic Feet °3284 339fi 0.29 CFS 9.9583 CFS 3322.14 CF < 46.75 Mean Sea Level 44.75 Mean Sea Level 47.92 Mean Sea Level d V P.v- 5 Cubic Feet Per Hour Per Sq Ft 7170.0 Square Feet i€p09 hours Must be > Qr 3396 CF qk 7) (7, 0 2-�s ` 2 cr 1.1/14/2005 MOil 16.10 FAX 910 343 9604 Norris. Kuske, Tunstall g 002/003 Y1-t ED NKT Project No. 05183 INFILTRATION SITE`.' ISIT;REQ EU ST Name of the Project: Southeastern Nephrology Location (attach a clear vicinity map): Comer of Medical Center Drive & Yaupon Drive Q- 1302 Medical Center Drive - Street address, SR number, community, etc. Directions from the nearest major intersection: From intersection of 17th Street & Medical Center Drive. turn onto Medical Center Drive. Site is at the comer of Medical Center Drive and Yau on Drive. Owner/Applicant Name: 1302 Properties, PLLC / John M_ Herion, Partner Consultant Name: Norris Kuske & Tunstall Consulting Engineers, Inc. / Dale Thomflson Consultant Contact Information: 343--9653 (El 343-9604 (F) dthompson(a-)nkteng com Phone, fax, email, etc. #1 #2 #3 #4 #5 #6 #7 #8 Existing ground elev. @basin/trench= Bottom Elev. of infiltration basin/trench= Existing ground minus bottom elev.= Add 2' (max. bottom elevation)= Datefrime of Soils Investigation : _ 1,6 %O d _ Summary/Comments: � ', / f ti� '617 , All proposed infiltration areas and existing, active utility lines located within the proposed basin/trench must be marked and flagged. If these areas are not flagged, the Soils Scientist reserves the right to, decline to do the investigation. If the proposed infiltration system will be located in an area of existing pavement and there is no open area nearby, equipment capable of breaking through the impervious layer must be provided The soils investigation does not take the place of a soils report prepared by an appropriate professional_ The Soils Scientist will only verify the soil conditions that are reported in the Soils Report, and make a determination as to the suitability of the site to meet the infiltration design requirements under NCAC 21-1.1000, and assumes no liability should the system fail. 11/14/2005 )ION 16:10 FAX 910 343 9604 Norris. 6uske, Tunstuil � 003/003 N W E 5 c-) y MECttla -o z o� Sf TE GLEN MEADE RD- LOCATION MAP NOT TO 5CALE a 1' ' f�� S`j-F� . 4+ a4 �I►�f f •�'�'i+ � ' i �,y;+ff v'k1"t �;,; e i l . � � � G � � ' ' •' fir �.',Jfy' AL.'S". a'7 [ f"�; •. 1 Ac nt 0.4 7�� }y, ,��.., -r - a .aS��� r!:i r�� .►€�" 'R+ Ofi�i -� > ��1' _� ZF,- �riC. � E*,J _ � �, �• •�• ».�9«�"�,�r,��pnyr �•�.i d cad G .�. �'_fi F'�'�'Qs.r :T y.i' X1. '1.�: x,T!. ,� i (g �%• F... ,11.m "�°$. �,,��qqy �P .r:••li s( r _ J ° Ca 3"� ..`� _�*! r�$ y-i .�.� W ffTT t •� /!.: .!0 �" . � F J4 `{ V� R'i� � � her, l .�r"$� • _ '` �!;, �� h6 W:y Tz tq- I a [P.� ,2,U�5•Dig�talGfflo/). 3 127377;56ei: .EN�~?`_ 0�itointN�Wi� :>. NORR.IS, KUSKE & TUNSTALL John S. Tunstall, P.E. Kent P_ Harrell, P.E. CONSULTING ENGINEERS, INC. Jaynes T. Pyrtle, P.E. 902 Market Street • Wilmington, NC 28401A733 • Phone (910) 343-9653 • E-Mail: office@nkteng.com LETTER OF TRANSMITTAL J. Phillip Norris, P.E. John A. Kuske, III, P-E. I A Krickp P.E. (910) 343-9604 DEC 0 5 cUuo To: �G.. e Date: O Q 5 Job No. 5� L Subject: 12cpj6seo w WE ARE SENDING YOU VIA ❑ ATTACHED El UNDER SEPARATE COVER ❑ SFIOP DRAWINGS ❑ PRINTS ❑ TRACINGS ❑ D1SKS ❑ copY OF LETTERC�k�91 ❑ E=AX _TRANSMIT7TALK ¢s NUMBEWN Z: AGES S.d' .w-.i"'YaTYbi s bSRi INCtUD1NGTHIS-�URANSMITT{AL�ON " z f'y�." # A`7i%c�T-''?ON �SPECEF1CATiONS D 343 9653 IfQT1aVn Cflf�iCfl�ty ��CK � recelving��hls message�Y 1' ��y3�,�py��' i5` COPIES DATE NO. DESCRIPTI N r / l e e T c v ❑ S REQUESTED FOR YOUR USE ❑ FOR REVIEW AND COMMENT ❑ FOR APPROVAL ❑ FOR BIDS DUE ❑ YOUR PRINTS LOANED TO US REMARKS: CC:a<u;oSIGN % C: I if 64 CONFIDENTIAL AND PRIVILEGED: Information contained in this document is privileged and confidential, intended for the sole use of the addressee. If you are not the addressee or the person responsible for delivering it to the addressee you are hereby notified that any dissemination, distribution or copying of this document is strictly prohibited. If you have received this document in error please immediately notify the sender and return to the address above. I 1 I I I I I 4 JI";' I 1 •• P52 '202 q_ ,Y'`1PProxlmate's's 4952 11 I I I I i F9 \9 ju •E' I npV-T'..c.:; L,,7.9a°GS E�.20 CF 7y ° EPe -]jr� _Infiltrometer ®REPE / / (Y I+5 9 55 49 a0 42 )s IPC U yt I°SI.tl6 EP°9TR.PE Pv Test Location N e _ W "'Pv 956 4a.so -RPVC'- PDC EPBC °Pvp_io I'iOS 5W'S. ePY.a2 °PY26 DROP SNLET INLET tw~�I } o� "33 °52.D7 TOP= 49.10 A A of '4: JhNG Op= 47.9 E .I �- 479 47,7• t11- k GS - Y!' [t Dw CL G541 q INV.OUT= 45,92 °'' Bc'•9 • ,�'2 3 4: L NEFRVI, NR II [[]i. 49 9 n 46.7] a6C •. 0;ILDG I € 4f sW w �F ySCDIPC STRIP[P 5a P7 4914-LLPINC St.05 f EP9C 4999CN{ BI�C 51.53 RI2-CREPE C� 3" PE uT z.'�.2 a 3OSJORAGt 49.]0.T :.�J P Cy 5W �5 VAC °BC $4 Cr5t.395t 6D Cl r ? It• :tE . i -1 - , F `STOHACE iTG8WG Z ttwsDp_•46/4 ?0 CS IIr59.BV 17 '4 7C V 50 42 Si VIP EP 12 6 S3. B I-RCDOnN h 50.21 _W250I' RA K A P PE u GS ° N - LPI J 4� - ED - 7"R a" 19.7 n 476s IEi v34, Bc 5 AK - 5[ 51.64 :�s-nwooD 5U , NE h T° .1802 ECC CS PBC Pec5.r MASONRY 94•Dno 10 "BUILniWn3 CPF Q15.•1 O10 u 4].54 1 "CEDAR CL 127 10 iLPINC 41' I F.F.= 52.95 8�72 0 7-STORY BRI K & rwDA C7 rrnr 53• ,57.e! FRAME BUIL ANC FP`• $3 rs6 Ns .•,..,.,..,- .,,�, i DE Cs 1,51 B 4•CEDAR I, iP A- JI 1? rqa 2"Dd000 ♦964 556w4> CEDAF 3•Cf4AR 3•C OAR ]""CEDAR 5'.0" IPBC 14-LLPINC^-DWDW - q I 10' A 'PORCH _ s. I 12�2" EE 9 - pp�� 3-CREpPE 33 [CREPE �'�5q�[py�..'S9 9 I 1a' PC761 Uj H "w0 W S:e 0 W p � "H SW� 4990 11 � 313 CS C5 � !-CAEpE ]CREPE BF CS _I1G 17•LLRNE sift _ '"K J Ift 4987'4 EPA 5'46 SIDFWA K 50.a6 SIDE ALK +/ �P.97 Z °5 71 52.53 ' [[,�yy 50 ]2 4 DL G Sw S72 47 5215 5N4 W W F•."k 5�f. EP 01 {P.90 W 50.40 SM [P 4 SW 5 („ 55 SN .G2.25 M t'(ytrp 50 7 EE0,22 °P PO 9. 47-de 5 BC °G544 6 c ec FP 4994 ASPRAtaT ARKING s PE " 7'C"ERFT (] °49.64 49.I6 °5569 P °P�.69 Pv °PV :' PV *,a. , a. rs C]) .5.,j C V) DROP INLET IN e7a I 70P- 4 .15 TOP= 48.45 c« 51.89 7.96 cs ,s s4 b Io sG] 'A_ iiA :T P RKi INV. 46. Q . Ing 4 a INV.= 45.40 59 I ac 5034 4R 52 EPBC 96 19 .2 49.]7 49.19 Pa[ 6.29 cso; I s174 °s1. B °" _ rPQC EPec 9s6 EPec q U' ILITY za 'CS 51.35 GS Ep C EPB _50 T4i GS EPBC.' GS l9 •64064 C I© EPBC{PaC �•� P 4 49 9 •7L EPBC y V ULT 2•DNOM E BC' PSC ° EPBC EPBC 't FPBI P'. E� 4966 kn C� 3'P�L] !'CNCPC a9.y0 •9.46• Y -` ~8, A}/(' �- G5 BCOb .TUB 45 ° 49 7 ~- 3"CACP[ Y d-11 'UT 92.44� D rDr�DD� Nc�u L cs ec . b I CS 184.88 . Fat C Fan'09.Y 47,9] •0s is U BC94's:Gn `F " 4aSIGN i CONCRETE cs c6 ai:2 0 49.7; - - - - DR1 VE D4 +� .40 46 - w 4.69 4 8.52 49, 21 .�;8C 1 BC 49, EPB.B4 I, BC -- - _49;53-- CONCRETE CURB J - -- -- -- EP _- v - - -- 9.51 TO 171h STREET EP CF-4 EP6.9] SSMH SDM» E D I C A, L CENTER DRIVE roP-- 4a.4a Top- 48.47 Top s a zl INV.- 43.i2 INV.- 44.92 INV.= 4 .79 ° 5D.55 - - ..� r CL SQ.I1 4n m C•N.]3 a9.24 �- 48 ]B L •T-R 5l Note: Site plan drawing provided to S&ME by Clancy & Theys Construction Company personnel. LEGEND SCALE: NOT TO SCALE DOUBLE -RING INFILTROMETER TESTING FIGURE ® Approximate CHECKED BY: PAM SOUTHEAST NEPHROLOGY NUMBER Infiltrometer MEDICAL CENTER DRIVE Test Location DRAWN BY: JNS 4t . ENGINEERING TESTING WILMINGTON, NORTH CAROLINA DATE: 11-16-05 ENVIRONMENTAL SERVICES JOB NUMBER: 1061-05-576D