Loading...
HomeMy WebLinkAboutSW8060249_COMPLIANCE_20060516STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE WYYMMDD DETENTION POND ANALYSIS FILE NAME: G:\DATA\WPDATA\WQS\POND1060249.WK1 PROJECT#: SW8 060249 REVIEWER: P.Bartlett PROJECT NAME: Ness Commons, Lot#1-43 (Shop Ctr/WilcoHess) DATE: 16-May-06 Receiving Stream: Ness Creek Class: C; SW Drainage Basin: Cape Fear Index No. 18-74-62 Site Area 8.00 acres square feet 8.00 acres Drainage Area 048a Area = IMPERVIOUS AREAS Lot 1: Bldg 3500-00 square feet Lot 1: prkg 22661.00 square feet Lot 1: sidewalk 500.00 square feet Lot 1: other 539.00 square feet Lot 2: future 27200.00 square feet Lot 3- future 185180.00 square feet TOTAL square feet SURFACE AREA CALCULATION % IMPERVIOUS 68.75% Des. Depth 5 TSS: 90 Rational C 0.95 0.95 0.95 0.95 0.95 0.95 Rational Cc= 0.72 SA/DA Ratio 4.91% Req. SA 17119 sf Prov. SA ii18733 sf VOLUME CALCULATION place a "1" in the box if Rational is used Rational ?* FOREBAY Des. Storm 1:7:77:::777: 'T 00] inches Perm. Pool Volume= 43697 Rv= 0.67 Req. Forebay Volume= 8739.4 Bottom 24 msl Provided Volume= 8396.00 Perm. Pool 29.40i msl Percent= Design Pool 30 msl Design SA 22250 sf Req. Volume cf SA @ = 1651 18733 22250.00 Prov. Volume 20743 cf Elevation= 24 29 30-00 ORIFICE CALCULATION Avg. Head = 0.46 ft Q2 Area = 4.96 sq. in. Flow Q2, cfs 0.112 cfs Q5 Area = 1.99 sq. in. Flow Q5, cfs 0.045 cfs Orifice Area 3.14 sq. in. No. of Orifices '::' :A Q= 0.071 cfs Diameter, inches weir H x W in x in Drawdown days COMMENTS Surface Area , Volume and Orifice are within Design Guideline: REVISED RUNOFF and STORAGE CAL CULA TIONS AND WET DETENTION POND SIZING for WilcoHess C-Store Site Castle Hayne Road April 2006 By: RIGHT ANGLE ENGINEERING, P.C. 2 12 Prince55 Street Wlmincgton, North Carolina 28401 (91 O) 251-8544 (910) 251-2208 (fax) SEAL PE 0239, r A�G1NE�` P��= NE -owes$ forebay Forebay volumes #units=Elevation,ft,Area,ft2,volume,ft3,volume,ft3 # Elev Area Cumml Avg Cumml Conic # ft ft2 ft3 ft3 29.0000 3938.7395 8395.6836 8203.4120 27.0000 1684.7109 2772.2332 2737.1297 26.0000 1138.0756 1360.8399 1334.6421 25.0000 662.4773 460.5635 445.0236 24.0000 258.6496 0.0000 0.0000 Page 1 main main Section volumes #unitS=Elevation,ft,Area,ft2,volume,ft3,volume,ft3 # Elev area Cumml Avg Cumml Conic # ft ft2 ft3 ft3 29.0000 14794.4123 35301.2221 34744.7064 27.0000 7424.4724 13082.3374 12945.1221 26.0000 5342.2929 6698.9547 6590.2293 25.0000 3331.3667 2362.1249 2292.7877 24.0000 1392.8830 0.0000 0.0000 Page 1 R UNOFF and STORA GE CAL CULA TIONS AND WET DETENTION POND SIZING for WilcoHess C-Store Site Castle Layne Road April 2006 1 APR 1 2 Z006 By: RIGHT ANGLE ENGINEERING, P.C. 2 1 2 Prince5s Street Wilmington, North Carolina 28401 (910) 25 1-8544 (J 10) 251-2208 (fax) SEAL 1, Right Angle Engineering, P.C. DETENTION POND SIZING CALCULATIONS 4/12/2006 Drainage Area = 8.00 acres Impervious Area = 5.50 acres Percent Impervious = 68.8% Pond depth = 5 ft TSS removal = 90% M SA/DA = 5.00% (No vegetative filter required) Receiving Stream Class: sc Required Runoff Storage Depth = Minimum Required Surface Area at Permanent Pool: = 0.0500 8.00 ' Minimum Required Volume (Schueler Method, see calculations): Rv = 0.05 + 0.009 (68.75) = 0.67 Volume = (1"112") 0.67 8.00 ' 43560 = Surface Area Provided at PP = 18500 ✓ > 17424 @ Need at Least 19421 ft� of storage/ 18500 Therefore, use Elevation of Temporary Pool = 29 ✓ + 1.00 ft = Surface Area at 30 ,/ = 22250 sf Storage Volume Provided = 20375 ✓ f13 Calculate Forebay Volume Permanent Pool Total Volume = 41524 cf Forebay Volume Required = (.2' 41524 ) _ 8305 cf Forebay Volume Provided = 6905 CIF or E-9/. Orifice Sizing Qz = 19421 Q5 = 19421 1 Choose a 2" Circular Orifice, Average Head = 0.112 cfs > Choose a 1" Circular Orifice, Average Head = 0.112 cfs > Therefore, use a 2" Orifice 1 inch 43560 = 19421 ft' Elev. 29 ft 1.05 ft 1.00 ft 30 ft 17424 sf 172800 = 0.112 cfs (Flowrate required for a 2 day drawdown) 432000 = 0.045 cfs (Flowrate required for a 5 day drawdown) az = 0.03448 a5 = 0.013791 (1.00-(1I2)*(2in/12)12 = 0.458 ft dia (in) = 2 a = pi(r^2) 0.0218 sf Q = Ca(2gh)^.5 = 0.0711 cfs 0.0711 cfs > 0.045 cfs (1.00-(112)'(4in112)12 = 0,479 ft dia (in) = 1 a = pi(r^2) 0.00545 sf Q = Ca(2gh)6.5 = 0.01818 cfs 0.0182 cfs < 0.045 cfs Page 1 Right Angle Engineering, P.C. DETENTION POND SIZING CALCULATIONS 4/12/2006 Pre -Development 25 Year Storm Q=CIA = C = 0.2 1 = 7.14 Tc = 10.00 A = 8.0 Q = CIA = 11,43 cfs Post -Development 25 Year Storm Q = CIA = C = 0.681 1 = 7.14 Tc = 10.00 A = 8.0 Q = CIA = 38.93 cfs Size Outlet Pipe D = 16(Qnl(s1.5))1(318) S = 1.92% n = 0.013 D (theoretical) = 26.0 in D (actual) = 30.0 in Size Emergency Spillway impervious 0.00% pervious = 100.00% t (in/hr) = g/(h+T) for T=5 to 120 minutes impervious 68.8% pervious = 31.25% 1(ir1hr) = g/(h+T) for T=5 to 120 minutes Channel Lining: Grass Lined n= 0.010 34 ft. 1 S= 0.50% 3 Q Mannings (cis)= 9A9 �5.0 ft—� Length= 10 fi Velocity-- 4.54 ft/s Depth with Freeboard= 0.34 ft Page 2 Temporary Pool Volume #units=Elevation, # Elev # ft 30.0000 29.0000 ft,Area,ft2,vo Area 22250.3442 19287.1977 temppool lume,ft3,volume Cumml Avg / f_t 3 Y 20768)7709 0.0000 Page 1 , ft3 Cumml Conic f-t 20751)1334 0.0000 mai n Main Pond Volume #units=Elevation, ft,Area,ft2, Vol ume,ft3,Vol ume,ft3 # Elev Area Cumml Avg Cumml Conic # ft f�2 _ft3 ft3 29.0000 15075> 6398 L4619).7086 33882.8233 27.0000 6906.6828 12637.3859 12425.2407 26.0000 4817.1998 6775.4446 6594.5829 25.0000 2Z92,.2730 2970.7082 2835.5747 24.0000 (�1478 2522 835.4456 734.8428 23.0000 192.6389 0.0000 0.0000 Page 1 u7 415 /G.�% Forebay Volume #Units=Elevation # El ev # ft 29.0000 27.0000 26.0000 25.0000 24.0000 23,0000 ft,Area,ft2,Vo Area ,f 2 350_3).6939 12'82.3992 821.4375 431.9941 c212>. 2104 24,3600 forebay lume,ft3,Volume, Culilml Avg t3 6905).1146 21f9.0215 1067.1032 440.3874 118.2852 0.0000 Page 1 ft3 Cumml Conic ft3 6682.1211 2078.2581 1034.8599 418.4834 102.8230 0.0000 DESIGN NARRATIVE FOR HIGH DENSITY PROJECT AT CORE INVESTORS 8 AC. COMMERCIAL BUILDING SITE CASTLE HAYNE ROAD NEW HANOVER COUNTY, N.C. October 2005 TABLE OF CONTENTS 1.0 PROJECT DESCRIPTION 2.0 SITE DESCRIPTION ;:0 ADJACENT PRDrc 4.0 DRAINAGE CONSIDERATIONS 5.0 EROSION CONTROL CONSIDERATIONS 6.0 CONSTRUCTION SCHEDULE 7.0 VEGETATION PLAN 8.0 MAINTE^DANCE PLAN APPENDIX RUNOFF CALCULATIONS PIPE CALCULATIONS ww 9___j U231 lNE � Y P�+ I moo Core Investors Commercial Building Site Castle Hayne Road October 2005 1. Projcect Description: The Project is proposed to be construction of a 3500 SF gas station/convenience store with fuel islands, parking lot, asphalt entrance road, and storm water system for the entire 8 acre site. The land disturbing activity associated with the project will consist of clearing and grubbing of vegetation, preservation of existing trees, grading of the site, and sediment and erosion control measures such as a silt fence, gravel 'construction entrance, inlet protection, and wet detention pond. Also included in the project will be storm piping to collect the parking drainage and future areas and direct it to the wet detention pond. The total area which will be disturbed for this project is 3.5 acres. Total impervious area allowed for the entire site will be 239,580 SF for the proposed construction and also make a future allowable impervious for prospective development. 2. Site Description:, The project site is in New Hanover Co., NC, located on Castle Hayne Road approximately 2000 feet north of the intersection of Kerr Ave. The property on which the development will take place is currently owned by Core Investors of ,vl�' Winston-Salem, NC. On site soils consist mainly of Baymeade, and Leon. These soils are mainly loamy, fine sands. There are no existing wetlands onsite. Existing drainage ditches define the rear property line and the south property line and provide surface water runoff for the site. These ditches will be left intact. General slope of the site is from northeast to southwest towards the back of the site. Land use in the vicinity is residential, rural agricultural, and commercial. 3. Adjacent Property: The areas adjacent to the project site are residential and commercial areas. 4. Drainage Considerations:- There are two major drainage features existing on the site. The site is mostly flat with slight slope from northeast to southwest. A typical 18" driveway crossing pipe will be installed at the entrance on Castle Hayne Road and will only carry drainage along the road side ditch. The parking area will have one catch basin and an 18" outlet pipe to direct the runoff to the collection system. The collection system will -be sized for -future development and carry the flow to the wet detention -basin. I The basin is sized to provide sufficient runoff capacity for the entire allowable impervious area. The wet detention basin is to provide detention of the pre -construction and post - construction runoff difference and meet the 90% TSS water quality requirements. The amount of retention was based on the Type III rainfall distribution of the 25 year, 24-hour storm. Calculations are provided. 5. Erosion Control Considerations: The following erosion control measures are used on this project: 1. Temporary Gravel Construction Entrance/Exit Core Investors Commercial Building Site Castle Hayne Road October 2005 To prevent sediment from leaving the site, temporary gravel construction entrances should be installed where the access road enters the site and instersects with Castle Hayne road. For dimensions and specifications, see construction details. 2. Land Grading The existing slope of the site is from northeast to southwest towards the back of the lot. Most of the disturbed areas on the site will sheet flow to the existing drainage patterns on the site and to the catch basins. 3. Silt Fence Silt fence should be installed prior to clearing and grading activities. Silt fence should be checked routinely. If needed, silt fence should be cleaned and replaced if damaged. See Construction Detail for dimensions and specifications. 4. Wet Detention Basin A wet detention basin will be constructed for long term runoff pollutant control, and this area will be used as a sediment basin during construction. Outlet control structure with rip rap energy dissapator will be installed when basin is excavated and 30' sodded vegetated filter will be placed after the rip rap to provide additional filtering prior to discharge into the existing ditch. 6. Construction Schedule_ 1. Obtain plan approval and other applicable permits. 2. Hold pre -construction meeting at least one week prior to beginning construction. 3. Install temporary construction entrance/exits. 4. Before clearing and grading of the site, install silt fencing, detention basin with outlet structure, and clean and replace as necessary. 5. Begin clearing and grading of the site. 6. Install storm piping. 7. Install new roadway. 8. Sod/Seed, mulch, and tack immediately to establish proper vegetation. 9. All erosion and sediment control practices will be inspected weekly and after each rainfall event_ Needed repairs will be made immediately. 10. After the entire covered area is stabilized, all temporary measures will be removed and permanent vegetative repairs to be completed. 7. Vegetation Plan: 1. After complete stabilization of the entire covered area, top cover soils will be roughened by making 1 "-2 deep grooves perpendicular to the slope. Core Investors Commercial Building Site Castle Hayne Road October 2005 2. Spread lime (agricultural limestone) evenly over the area at a rate of 1.5 tons/acre; spread 10-10-10 fertilizer at a rate of 1000 lb/acre and incorporate into the top 6" of soil. 3. Loosen surface prior to applying seed. 4. Broadcast seed at recommended rates. 5. Rake seed into the soil and lightly pack to establish good contact. 6. Mulch with 4000 lb/acre grain straw or equivalent and anchor by weighted farm disc set nearly straight or other mulch anchoring tool. 7. Mow as needed and refertilize in late winter or early spring by topdressing with 10- 10-10 fertilizer. 8. Graded surfaces shall not be exposed without grass coverage for more than 15 days. If grades are not complete and exposure is more than 15 days, temporary seed with rye grain at 50 lb/acre. 8. Maintenance Plan: 1. Contractor shall maintain all sedimentation and erosion control devices during construction. 2. All devices shall be checked after each rain event and weekly. Repairs shall be made immediately when detected. 3. Any deficiencies shall be brought to the immediate attention of the Engineer. Seed Types and Application Rate ! Schedule Temporary Seeding Grass Type Amount/ 1000 SF Time of Seeding Initial Rye Grain 1-2 Ibs Nov. —Jan. 25 Ibs 10-10-10 Brown Top Millet 1-2 Ibs June —Au , 25 lbs 10-10-10 Core Investors Commercial Building Site Castle Hayne Road October 2005 Permanent Seeding Grass Type Amount Time of Initial Fertilization 1 Fertilization 1 Fertilization / /1000 Seeding 1000 sf 1000 sf 1000 sf sf Maintenance Maintenance maintenance Bermuda, 1-2 lbs Apr. — 25 lbs March -April Each 4-8 Aug. -Sept - Common June 10-10-10 12 lbs Weeks 12lbs 10-10-10 1-2 lbs N. 10-10-10 Fescue, Tall 5-7 lbs Sept. — 25 ibs Feb -March May & Dec. Sept. -Oct - (Kentucky Oct. 10-10-10 12 lbs '/2 to 1 lb. n. 12 lbs 31) Feb. — 10-10-10 10-10-10 Oct. Sericea 1-2 lbs March — 25 lbs Feb -March %to 1 lb. N. NIA Lespedeza Apr. 10-10-10 5lo es ** Bermuda Sod Where shown on the plans. END OF PLAN Core Investors Commercial Building Site Castle Hayne Road October 2005