Loading...
HomeMy WebLinkAboutSW8060211_APPROVED PLANS_20060222 (2)STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW d(.LQv�G DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE O YYYYMMDD LEGEND sym. BEARINGAND DISTANCE PROPERTY BOUNDARY PARKING LOT EXISTING TOPOGRAPHICAL LINE LANDSCAPED SIDEWALK SEDIMENT FENCE TEMPORARY DRIVE ENTRANCE TEMPORARY SEDIMENT TRAP SHEET FLOW CURBING POND FLOW PATH WALL PLAN CHECKLIST OWNER/SITE INFORMATION SEE TITLE BLOCK ENGINEER AND FIRM SEE TITLE BLOCK LEGEND NORTH ARROW AS SHOWN ON PLAN SCALE SEE TITLE BLOCK REVISION NCI AND DATE SEE TITLE BLOCK MEAN HIGH WATERLINE NA DrMFWMWD PROPERTY/PROJECT BOUNDARY VICINITY MAP, SHOWN ON PLAN PROPOSED AND EXISTING CONTOURS ROAD AND SCALE DETAILS WETLAND BOUNDARIES CALCULATIONS DRAINAGE AREA VEGETATED BUFFERS GENERAL PROJECT INFORMATION PROJECT NAME: TRI COAST PLAZA PROJECT OWNER: TRI COAST PROPERTIES, LLC 1508 MILITARY CUTOFF RD WILMINGTON. NC 28403 PROJECT ENGINEERING- MICHAEL C. GALLANT, P.E- 311 S. TOPSAIL DR. SURF CITY, NC. 28445 PROJECT SURVEYING: THE CLARK GROUP POST OFFICE BOX 10136 WILMINGTON. NC 28404 PROJECT ZONING: CITY ZONE B2 PROJECT SIZE: 1.87 ACRES NOTE: SLOPE ALL FILLED AREAS 0 3:1 ALONG PROPERTY LINES & STABILIZE WITH EXCELSIOUR MAT. NOTE: ALL RCP TO BE CLASS IV, NOTE: SEE SEEDING CHART FOR POND BANK STABILIZATION_ AVERAGEWIDTH CALCULATION (REQUIRED SA) 4154 SO. FT. (AVG FLOW LENGTH) 113.02 FT. =36.75 FT LENGTH TO WIDTH RATIO = 3:1 NOTE: NO USCOE WETLANDS ON SITE. 50' VEGETATED FILTER PROJECT 1. BOUNDARY/ DRAINAGE . • . . . . . . AREA C / Story Aluminum boldtng 20 0 20 40 60 PROJECT BOUNDARY/ DRAINAGE 20' AREA n1f Mills Refrigeration Inc CIO PHILLIP MILL5 E PO BOX 1043 DURGA W, NC 26425 ZONE.- B-2 DL9. 549, PG, 10 i-T all PROJECT T T I BOUNDARY/ 44 3E]UT 44 INV OL)T DRAINAGE -1 N V U 442 AREA 54, LF 46 2 L B4 4E 01" T 1=4 NV 0UT 44.3 A CB3 R T M 4' 3 INV III 44.4 T ;NV OIL-7 44 4 41 i? 4, 4 4Y.9 47 9 -A 5.Cy u 42-B 473 PROP05EO L3LDG 2 7, C5 55'X 60' d rvf Stacy H. cow/ 303 VANN CT F F DURCAW, NC 25425 40, 0 PROPERTY 628 L15 I 17 HWY ZONE., B-2 DL3. 842, PG. 154 !NV 01LIT 44.0 � T 5 PROJECT N 4 4 BOUNDARY/ 1 N nPATNAr.C' 'NV JT 44.0 AREA .7 Ljlr-- PROJECT iNV TIN 44,1 BOUNDARY/ ''NV V D Lj T 44,1 DRAINAGE ; : N V T AREA N '4 2- !NV DIJT 442 4-� 4LL 1. 465 -4 4 17-1 J 7 N'v1 N 4 4, -3 474 V, 4 - • D 44.4 47.3 I \ d?.5 J I �! A 4RI PROJECT BOUNDARY/ DRAINAGE AREA 46 j ari AR.1 O 1�4 7 n1f vF Norwood Covil 50/ HWY53 E 48.1 DURGAW, NC 28425 ZONE. B-2 476 47.3 05. 2162, PG. 246 481 j 47.0 a 4 �D /a 7 4 4, 71111 4U PROJECT 48.1 BOUNDARY/ DRAINAGE AREA 481 .11 479 AT3 L LI N T 48.4 4F 1! iag Vi s3 Y-135 48.3 4t'3 492 4S.1 [4� �7q 1 3,4+,-4-1 RIM 46,6 48.3 4R; INV IN 45.c---'47,2 INV U 4 4. r 4R.7 494 .74, _7 5.0' T. N E-11 U 4 t5.3 PRo 050 r F F BLDG L 47.5 4Y& 4e!� 484 60' X 54 6 4&4 16 PROJECT i RETAIL BOUNDARY/ IN j L IMI TE19 DRAINAGE 60' x 49"' PROJECT RE5 TA UP\14 N T BOUNDARY/ AREA A DRAINAGE "7j 60'x 35" AREA 47.4 485 4 -A ' =9 48.0 'W R �111 4 7 41 ICT j'V 7 A r:: N V '-AD A 7.3 4 B 49.5 PROJECT BOUNDARY/ 3�" �7c! Cf-f 48.1 DRAINAGE 7Q AREA R-Y. 47 C� INV CIUT45.7 � L= 48.5 49.1 �j PROJECT L BOUNDARY/ DRAINAGE AREA i2-11 47.1 N 2-04'E Tie 49. 495 47.4 , I 100-ca .. 'i-:� 1�a 4736 47.9 OJECT 450 �-Pk hall BOUNDARY/ 45-1 A36, DRAINAGE 4ti 0 --bc -fe, -,n 4 PROJECTAREA BOUNDARY/ DRAINAGE AREA MICHAEL C. TRI-COAST PLAZA BURGAW, NC STORM WATER N r X" �j PROPERTIES COASTAL RopfRTIE5 LLC 0111 E VICINITY MAP 5CALE.- 111 = 400' APPROVED NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DIVISION OF WATER QUALITY � ("; 6 c)-(o C9 2- ( I GALLANT PEPT MICHAEL C. GALLANT, PE,PA k P.O. BOX 4039 SURF CITY, NC 28445 PHONE: 910-328.2188 REVISIONS HEET: 1 OF -7 1 F ' �or �o '� � ) 3 , (y j I LII I , " I I I . LATE: I SCALE: DRAWN BY: 2/14/2005 1 JP=2C 1 FILENAME: .— _ . . . , . ._ _..._..._.. _. a .-..__. ._ ...._._._ _ _. _.....-. ..___ _.i. e.__ __�L. ' h _'t1 _—.1 _t...1: _.`. ,-3L.._..f._ O PO WET ND NOT DRAWN T05 L E POOLAlAL - IM ,All Q VEGETATED FILTER DETAIL N TS 10' 50' rRECIEMNG '4 WALE A OUTL IN41,707DISSIPATOR LEVE SPREADER PLAN il- i t i l i l _W w •�• wi W I_ _ W _ SECTION A- A i w w s w s W •Y s w s s s s s W W W W w W w •ti W S Y •L OUTLET STRUCTURE DETAIL NOT TO SCALE 6(500, TEMPORARY STORAGE ALE45` ------------- ---y--,- -- ----r------ PERIIi1A Mt Af T r---, r--- s--'� ! FO REBAY WIER DETAIL_ NOT TO SCALE E NOTES A. F❑REBAY WIER INV 43.50 Br PERMANENT POOL ELEV. 44,00 C, 6Y RIP RAP 9' THICK WITH 3" ABC STONE AND FILTER FABRIC UNDERLAY T❑ EXTEND TO TOE OF SLOPE BOTH SIDESr Dr APRON WIDTH 6 FT MIN, Er WIER WIDTH 5 FT. P\ CK WALLS EMENT PEAS -H-H SECTI❑N 'B-B' 5-1t}• MiN: 5'-4' PVMT, r CURB & GUTTER cr NOTE, PLAN 1. 4' DEEP X S' WIDE CONCRETE C❑PING ALL AROUND BASIN CASTING. 2. ALL CONCRETE TO BE CLASS 'A' 3. FOR CASTING DETAIL SEE SD 14-03 CATCH BASIN SD 2-0I NOT TO SCALE 5GU � 02-( I .r- k. l�L..._ �', .�iri�_-•- `-. .. �! isi._ nLL-e�1,•5.t!t4;,.t±� r11 l - 0, l2.8' So.Bf 413.6' � so 0 �O �c R 2' IVY � � o 45.9' �- ! 4.4' 9.0' /z 75.C' 4 i 65.6` i I 0r5' i 5.3' Rj O N ol �D O b 0 as � D j �"'��` w 19 1 55 # X 60# aZ d2ir Lf�� w � O � o � 5.3' , O � W t .p 6' 64, 0' �i 49.6' ac;q�q LANDSCAPED AREA y.5 Lo 59.0' # (5-2' o' PRO) ED 51, DG co x 54 Li1VifTEQ RETAIL RESTAURANT 60(X 49" O 60 X 3 5 " Q) (56.6' 7�t 55- 01 Inh G c*a N 4' -A C) 34.0Q 42.0' uaj ri w p � o b m _ 41.5 NOTE: l , ALL RADIUS AIDE V UNLE5.5 OTHER W13E ANNOTATED. 20 10 0 20 40 1:20 SCALE MICHAEL C e GALLANT, PE,PA MICHAEL C. GALLANT, PE,PA TR I — C OAST PLAZA P.O. PDX 4039 B U R GAW, NC SURF CITY, NC 28445 PHONE: 910.328.2188 f-- R EVI S I O N S: L C• DIMENSIONS A . s SHEET: 3 OF 4 ATE: SCALE: DRAWN BY: FILENAME: 12/ 1 4/2005 1 :20 : +1 i r • � � i � l j } 'A 11 1. �+ 1 ' ;• 1 t' � 1 ! r i h 1� 1'11 4t 1 1 3,� 1 (I rrl• Y t � lrr i i j 5 + � + 4� � �.+rf +r k� ki Pre -Development _ - Inflow Hydrograph, 10-yr storm Inflow Hydrograph, 50-yr storm Runoff Coefficient, C t < 1.25 Tc Q (t) = Qp/2*(1-cos(pi*t/Tp)) t < 1.25 Tc Q (t) = Qp12*(1-cos(pi*t/Tp)) Hydraulic Length, L ft t > 1.25 Tc Q = 4.34*Qp*exp(-1.3*(t(Tp)) t> 1.25 Tc Q = 4.34*Qp*exp(-1.3*(t/Tp)) Elevation Change, H ft Watershed Area, A acres Permanent Level 44.00 ft Permanent Level 44,00 It Time of Concentration, Tc 9.12 min Tc = iL'`/H)o"'/128 10-yr Intensity, i 6.44 in/hr l = 2521(30+Tc) Riser Length r ft Ctrl, Pipe Diameter in Peak Outflow 0.07 cfs Riser Length 3.00 ft Ctrl. Pipe Diameter 1.04 in Peak Outflow 2,59 cfs 50-yr Intensity, 1 8.02 in/hr I = 338/(33+Tc) Elevation ft Elevation 44.00 ft Peak Stage 44,29 ft Elevation 44.25 ft Elevation 44.00 ft Peak Stage 44.37 ft Weir Coef. 3.00 Orif. Coef. 0.52 Weir Coef. 3.00 Orif Coef. 0.52 10-yr Flow, Qa 6.59 cfs Q = CIA Orif. Coef. 0.60 Q Pre -Development 5.59 Orif. Coef. 0.60 Q Pre -Development 6.96 50-yr Flow, Qa 6.96 cis Q = CIA Peak Inflow 9,63 Pond Bank 45,00 Pond Bank Post -Development Riser 2 Length ft Barrel Orif. Coef 0.65 Sec Riser Length 0.00 ft Barrel Orif Coef 0.65 Impervious Area acres Top El. :. ft Diameter in Top El. 0,00 ft Diameter 8.00 in Runoff Coefficient, C 0.79 Bot. El. It Elevation ft Sot. El. 0.00 ft Elevation 42.00 ft Hydraulic Length, L 570 ft Weir Coef. 3.00 Number 1.00 Weir Coef. 3.00 Number 1.00 Elevation Change, H ft Orif. Coef. 0.60 Orif. Coef. 0.60 Area, A 1.87 acres Time of Concentration, Tc 9.12 min Tc = (l.21H)0"'/l28 int: 10-yr Intensity, 1 6.44 in/hr 1 = 252/(30+Tc) Tp = 35.79 Riser 2 Riser 2 Riser Riser Riser Structure Total Tp = 39.50 Riser 2 Riser 2 Riser 2 Riser Riser Riser Structure Total 50-yr Intensity, 1 8.02 in/hr I = 338/(33+Tc) Time t Qin Storage Stage Ctrl Pipe Weir Oriface Outflow Weir Oriface Outflow Total Barrel Outflow Time t Qin Storage Stage Ctrl pipe Weir Oriface Outflow Weir Oriface Outflow Total Barrel Outflow min cfs cu ft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs min cfs cu ft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 10-yr Flow, Qp 9.63 cfs Q = CIA 0 0.00 0.00 44.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.35 0.00 0.00 0.00 0.00 44.00 0 00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.35 0, 00 50-yr Flow, Qp 12.00 cfs Q = CIA 4 0,24 0.00 44.00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.35 0.00 3 95 0.29 0.00 44.00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.35 0.00 7 0.92 50.60 44.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 35 0.00 7.53 1.04 63.03 44.00 0 00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,35 O.CO dQ, 10 yr storm 4.04 cfs 11 1.98 248.05 44.00 O.00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 2.35 0.00 11 11 2.19 287,09 44.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.35 O.00 dQ, 50 yr storm 5.04 cfs 14 3.33 674.21 44.01 0.00 0.00 0.00 0,00 0.00 0.00 0,00 0.00 2 35 0.00 1469 3,65 757.75 44.01 0,00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 2.35 O.00 18 4.81 1388.56 44.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,36 0.00 1826 5.29 1540.75 44.02 000 0.00 0.00 0,00 0.00 0.00 0.00 0,00 2,36 0.00 10 yr Required Storage 1.21E+04 cu It S = dQ*Tc*1.39*60 21 6.30 2422.33 44.03 0.00 0.00 0.00 C.00 0,00 0.00 0.00 0.00 2.36 0.00 2184 6.99 2676,69 44,03 O.CO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.37 O.00 50 yr Required Storage 1.66E+04 cu ft S = dQ*Tc*1.39*60 25 7.65 3775.48 44.04 0,00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 2 37 0.00 25.42 8,61 4177.71 44.04 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.38 O.CO 29 8.71 5416.69 44,06 0.00 0.00 0.00 C.00 0.00 0.00 0.00 0.00 2.39 0.00 29 00 10.02 6026.60 44.06 0.00 0.00 0,00 0,00 0.00 0.00 0,00 0.00 2.39 O.00 Time to Peak 32 9.39 7286.38 44.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 240 0.00 32.58 11.11 8178.09 44.08 000 0.00 0.00 0,00 0.00 0.00 0,00 0.00 2,41 0.00 10-yr Storm Depth (P) 4.80 in 6 hr runoff 36 9.63 9302.61 44.10 0.01 0.00 0.00 C.00 0.00 0.00 0.00 0.01 2.41 0.01 36.16 11.79 10562.66 44,11 0.01 0.00 0.00 0,00 0.00 0.00 0.00 0.01 Z42 O.C1 50-yr storm depth (P) 640 in 6 hr runoff 39 9,39 11369.16 44.12 0.01 0.00 O.00 0.00 0.00 0.00 0.00 0.01 243 0,01 39.74 12.00 13091.81 44.13 O.C1 0.00 0.00 0.00 0.00 0.00 0.00 0.01 2.44 0,01 Soil Curve Number (CN) 43 8.71 13384.91 44.14 0.01 0,00 0.00 C.00 0.00 0.00 0.00 0.01 2A4 0.01 4332 11.72 15665.90 44.16 O C1 0.00 0.00 0.00 0.00 0.00 0.00 0.01 2.46 0.01 SCS Curve Number (CN) 95 47 7,71 15253.65 44.16 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.01 2,45 0.01 46 89 10.99 18181.25 44.18 0.01 0,00 0.00 0,00 0.00 0.00 0.00 0.01 247 O.C1 Soil Storage Capacity (S) 0.51 S = 1 OOO/CN - 10 50 6,77 16907.84 44.17 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.01 2.47 0.01 5047 9,89 20538.98 44.21 0.01 0.00 0.00 0,00 0.00 0.00 0.00 0.01 2,49 0.01 10-yr Runoff Depth (Q*) 4.23 in Q* = [(P-O.2*S)]"2/(P + 0.8*S) 54 5.95 18360.06 44.19 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0,01 2.47 0.01 54.05 8.79 22660.36 44.23 0,01 0.00 0.00 0.00 0.00 0.00 0.00 0.01 2.50 0,01 10-yr Runoff Volume (V) 28741 cu ft V = Q*A 57 5.22 19634.93 44.20 0.01 0,00 0.00 0.00 0.00 0.00 0,00 0.01 248 0.01 57.63 7.81 24545.69 44.25 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.01 2.52 0.01 50-yr Runoff Depth (Q*) 5.82 in Q* = [(P-0.2*S)],,2/(P + 0.8*8) 61 4.58 20754.09 44.21 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.01 2.49 0.01 61 21 6,95 26221.23 44.26 0.01 0.00 0.00 0.00 0.02 1.75 0.02 0,03 2.53 0.03 50-yr Runoff Volume (V) 39521 cu ft V = Q*A 64 4,03 21736.52 44.22 0.01 0.00 O.00 0.00 0.00 0.00 0,00 0.01 2 50 0.01 64,79 6.17 27706.83 44.28 0.01 0.00 0.00 0,00 0.05 2.48 0.05 0.06 2.54 0.06 68 3.54 22598.88 44.23 0.01 0.00 0.00 0.00 O. DO 0.00 0.00 0.01 2.50 0.01 68.37 5.49 29020.37 44.29 0, 01 0.00 0.00 0.00 0.08 2.97 0.08 0.09 2.54 0.09 10-yr Time to Peak (Tp) 35.79 min Tp = V/1.39Qp 72 3.10 23355.81 44.24 0.01 0,00 O.DO 0.00 0.00 0.00 0.00 0,01 2.51 0.01 71 94 4,88 30179.44 44.30 0.01 0,00 0,00 0,00 0.11 3,35 0.11 0.12 2.55 0.12 50-yr Time to Peak (Tp) 39.50 min Tp = V11.39Qp 75 2,73 24020.17 44.24 0.01 0.00 O.DC 0.00 0.00 0.00 0.00 0.01 2.51 0.01 75.52 4.34 31200,27 44.31 0.01 0.00 0.00 0,00 0.15 3.65 0.15 0.16 2,56 0.16 79 2. 39 24603.25 44.25 0.01 0.00 0,00 0.00 0,00 0.00 0.00 0.01 2.52 0.01 79.10 3.85 32097.59 44.32 0,01 0.00 0.00 O.00 0.18 3.90 0.18 0.19 Z 56 0.19 Stage Storage Function 82 2,10 25114.94 44.25 0.01 0.00 000 0.00 0,00 0.89 0.00 0.01 2.52 0.01 82.68 3.43 32884.71 44.33 0.01 0.00 0.00 0,00 0.21 4.10 0.21 0.22 2,57 0.22 Permanent Pond Level " .: ft 86 1,85 25563.52 44.26 0.01 0.00 0.00 0.00 0.01 1.31 0.01 0.02 2.52 0.02 86.26 3.05 33573.63 44.34 0.01 0.00 0.00 0.00 0.23 4.27 0.23 0.24 2.57 0.24 S Z 89 1.62 25956.07 44,26 0.01 0,00 &OD 0.00 0.01 1.59 0.01 0.02 2.52 0.02 89.84 2.71 34175.08 44.34 0.01 0.00 0.00 0,00 0.26 4.41 0.26 0.27 2.58 0.27 CONTOUR INCR ACCUM 93 1.42 26299.16 44,27 0.01 0.00 0.00 0.00 0.02 1.80 0.02 0.03 2.53 0.03 9342 2.41 34698.70 44,35 0.01 0.00 0.00 0,00 0.28 4,53 0.28 0.29 2.58 0.29 CONTOUR AREA VOL VOL STAGE In S In Z Zest 97 1.25 26598.66 44.27 0.01 0.00 0.00 0.00 0.02 1.96 0.02 0.03 2.53 0.03 9699 2.14 35153.08 44.35 0.01 0.00 0.00 0,00 0.30 4.63 0,30 0.31 2.58 0.31 [sq ft] cu ft cu ft ft 100 1.10 2685978 44.27 0.01 0.00 0.00 0.00 0.03 2.10 0.03 0.04 2,53 0.04 10057 1.90 35545.92 44.36 0.01 0.00 0.00 0,00 0.31 4.72 0.31 0,33 2,59 0.33 104 0.96 27087,13 44.27 0,01 0.00 0.00 0.00 0.03 2.20 0.03 0.04 2.53 0.04 104.15 1.69 35884.09 44.36 0.01 0.00 0.00 0.00 0.33 4.79 0.33 0.34 2.59 0.34 44.00 0 0 0,00 0.0000 0.0000 0.0000 107 0.85 27284.78 4428 0.01 0.00 0.00 0,00 0.04 2.29 0,04 0.05 2.53 0.05 107.73 1.50 36173.71 44.36 0.01 0.00 0.00 0,00 0.34 4.85 0.34 0.35 2.59 0.35 45,00 4,627 4,627 1.00 8,4397 0.0000 0.0483 ill 0,74 27456.32 44.28 0.01 0.00 0.00 0.00 0.04 2,37 0.04 0.05 2.53 0.05 111 31 1.34 36420.24 44.37 0.01 0.00 0.00 0.00 0.35 4.91 0.35 0.37 2.59 0.37 4600 6,027 10,654 1.00 9.2737 0.0000 0.1095 115 0,65 27604.91 44.28 0.01 0.00 0.00 0.00 0.04 2.43 0.04 0.05 2.54 0.05 114.89 1.19 36628.54 44.37 0.01 0.00 0.00 0.00 0.36 4.95 0.36 0.37 2,59 0.37 47.00 7,037 17,690 3.00 9.7808 1.0986 0.1800 118 0.57 27733.35 44.28 0.01 0.00 0.00 0.00 0.05 2A9 0.05 0.06 2.54 0.06 11847 1.06 36802.95 44.37 0,01 0.00 0.00 0.00 0.37 4.98 0.37 0.38 2.59 0.38 48.00 3,544 21,235 4.00 9,9634 1.3863 0.2153 122 0.50 27844.07 4428 0.01 0.00 0.00 0.00 0.05 2.53 0.05 0.06 2.54 0.06 12205 0.94 35947.33 44.37 0.01 0.00 0.00 000 0.38 5.01 0.38 0.39 2.59 0.39 125 0.44 27939.25 44.28 0.01 0.00 0.00 0.00 0.05 2.57 0.05 0.06 2.54 0.06 b b = [In (S2/S,)]/[In (Z214)1 129 0,39 28020.77 44,28 0.01 Q00 0,00 0.00 0.05 2.60 0.05 0.06 2.54 0.06 Ks :: =: °: KS = Sz/Z2b 132 0.34 28090.32 44.28 0.01 0.00 0.00 0,00 0.05 2.63 0.05 007 2.54 0.07 136 0.30 28149.34 44.28 0.01 0.00 0.00 0,00 0,06 2.66 0.06 0.07 2.54 0.07 Peak Discharge (Wls) 140 0.26 28199.14 44.28 0.01 0.00 0.00 0.00 0.06 2.67 0.06 0.07 2.54 0.07 143 0.23 28240 85 44,28 0,01 0.00 0.00 0,00 0.06 2.69 0.06 0,07 2.54 0.07 Pre -Development Post -Development 147 020 2827546 44.29 0.01 0.00 0,00 0.00 0.06 2.70 0.06 0.07 2.54 0.07 City Consultant City Consultant 150 0.18 28303.85 44.29 0.01 0.00 0.00 0.00 0.06 2.71 0.06 0.07 2,54 0.07 10 yr 5,59 9.63 154 0.16 28326, 79 44.29 O. 01 0.00 0.00 0,00 0.06 2.72 0.06 0.07 2.54 0.07 50 yr 6.96 12,00 157 0,14 28344. 95 44.29 001 0.00 0.00 0.00 0,06 2.73 0.06 0.07 2.54 0.07 161 0.12 2835893 44.29 0.01 0.00 0.00 0.00 0.06 2.74 0.06 0.07 2,54 0.07 165 0.11 28369.24 44.29 0.01 0.00 0.00 0.00 0.06 2.74 0.06 0.07 2.54 0.07 168 0.09 28376.34 44.29 0.01 0.00 0.00 0.00 0.06 2.74 0.06 0.07 2.54 0,07 172 0.08 2838C,64 44.29 0,01 0.00 0.00 0.00 0.06 2.74 0.06 0.07 2.54 0.07 D CALCULATIONS DRAINAGE AREA PERCENT IMPERVIOUS 3 FOOT DEEP POND 85% TSS SA/DA MINIMUM REQUIRED SURFACE AREA AT PERM POOL =.0510 X 1.87 X 43560 SURFACE AREA PROVIDED AT PERMANENT POOL MINIMUM REQUIRED VOLUME SIMPLE METHOD Rv = .05 +_009(68.0) TEMP VOLUME REQUIRED = 0"/l2")X.662X1.87X4356O SURFACE AREA PROVIDED AT PP STORGE ELE ABOVE PP = 5068/4185 (USE V) SURFACE AREA AT 45 FT TEMP VOLUME PROVIDED =(5068+4185)/2 X (45-44) 1.87 ACRES 68 % 5.1 % 4154 SF 4185 SF 0,662 4494 CU FT 4185 SF 45 FT 5068 SF 4626.5 CU FT FORE BAY VOLUME PP VOLUME FOREBAY VOL REQUIRED=.2(6877) FORE BAY VOL PROVIDED (3' DEEP) ORIFICE SIZING Q2=4494/172800 Q5=4494/432000 CHOOSE A 1" CIRCULAR ORIFICE AVERAGE HEAD = (1'-(.5)(2`712)I/2 AREA Q=CdA(SQ RT(2gh) .010<. 022<.026 5099 CU FT 1019.8 CU FT 1227 CU FT 0,026 CFS 0.010 CFS 1" 0.729167 FT 0.005451 SF 0.022414 CFS PERMANENT POOL VOLUME (SUM OF THE VOLUMES OF THE FOREBAY AND POND BELOW THE PP LEVEL) ADDITION OF THE VOLUMES FOR THE FRUSTRUM OF TWO PYRAMIDS V=113H(B +SQRT(B*B'O +B') H= 3 FT FOR THE POND B= 2889 SQ FT B'= 208 SQ FT V= 3872 CU FT H= 3 FT FOR THE FOREBAY B= 9,51 SQ FT B'= 49 SQ FT V= PERMANENT POOL VOLUME= MICHAEL C GALLANT, PE, PA PO BOX 4039 SURF CITY, NC 28445 WET DETENTION CALCULATIONS ATLANTIC PLAZA 1227 CU FT 5099