Loading...
HomeMy WebLinkAboutSW8060118_APPROVED PLANS_20060515STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SWL/N��� DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD 0 C P IR L w >, v L See Suet I -A For Index of Sheets See Suet t-8 For Conventional Symbols BEGIN BRIDGE �r -tr STA. 53+0B.00 +� -Y � r {� -Y5- I Y4- \ -Y2-Y3- �CMA.t ptaN� OL DIVISION OF iH[lG iH W AYS BRUNSWICK COUAITY LOCATION: NEW ROUTE FROM SR 1104 OCEAN BEACH DRIVE) TO NC 211 (SECOND BRIDGE TO OAK ISLAND) TYPE OF WORK GRADING, PAVING DRAINAGE, CULVERT, STRUCTURES, SIGNING AND SIGNALS -AC2- END BRIDGE INTRACOASTAL —L— STA. 10 + 00.00 BEGIN TIP PROJECT R-2245 uIIIML14 ■11 -L-.ISR 1105) MIDDLETON AVENUE -Yl-, iSR 1104) OCEAN BEACH DRIVE -Y2-,00LPHhV DRIVE -Y.3 -, P£UCAN DRIVE -Y4-.wxrrE LANE -Y5-. (SR IM) OAK ISLAND OWE APPROVED WM CMUNA EMONMEM GEMEWCOMMWON V=DF WAM QWAW I's-p44 -2coo -r6-.YACHT DRIVE -Y7-, (NC Ott) SDUTHPORF-SUPPLY ROAD -Y6-. (54 1500) MIDWAY ROAD -A C1-.ACCE55 ROAD 'i -A0C2-,ACCESS ROAD '2 -ACC3-,ACC£55 ROAD '3 CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III . A PORTION OF THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF THE TOWN OF OAK ISLAND. ACCESS IS NOT CONTROLLED FROM OCEAN BEACH DRIVE TO 835' SOUTH OF YACHT DRIVE. ACCESS CONTROL IS LIMITED TO POINTS AS SHOWN ON THE PLANS FROM 835' SOUTH OF YACHT DRIVE TO NC 211. nan .ran r.u�-r �vuarc� wa s�i-r � a�isare •C• R-2245 1 34407.1.1 STP-1105(61 P.E. 34407.3.1 STP-1105M RW & UTIL. nECEIVED APR 1 ?� 2006 D O[oU((� -?Rod # S3 �� TO SUPPLY / � l I I � x I � —L— STA. 248+66.02 END TIP PROJECT R-2245 I TO 80t$via Ij TO SOUTHPORT PRELIMINARY PLANS M %,d um MR LQvS u=DN, GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared In the office of: DIVISION OF HIGHWAYS HYDRAULICS ENGIII�SR DIVISION OF HIGHWAYS STATE OF NORTH CAROL INA 50 25 0 50 100 ADT 2003 = 11600 ADT 2025 = 27400 LENGTH ROADWAY TIP PROJECT R-2245 = MI 1000 Birth Ridge Dr., RateiSh NC, 27610 2M sTX\MA" SPscmMnONS PLANS 50 25 0 50 100 L DHV = 8 % D = 55 % T = 3 % V = 40-60 MPH • TTST 1% + DUAL 2% FUNC CLASS = RURAL COLLECTOR LENGTH STRUCTURES TIP PROJECT R-2245 = MI TOTAL LENGTH OF TIP PROJECT R-2245 = 4.520 MI GLENN W. MUMFORD PE P.B PS srers DMIGN MMMAR RrGHT OF WAY DATE: PRIL 2 2005 PRGJSGT SYGQ1B81t LISA W. SHAPIRO, PE ROADWAY DESIGN ENGINEE74 Ps stG.urc�8: DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION PROFILE {HORIZONTAL} 1a 5 0 10 20 i[ )�_[ [_ LETTING DATE: AUPUST_ 15 2006 PRGJZC7' raaslax A'GWI3dR PROFILE (VERTICAL) amsrav .vzurti7srR.{roR a,srs f" Note: Not to Scale L *S. U.E. = Subsurface Utility Engineering STATE OF NORTH C:S\]f3O1LIN DIVISION OF HIGHWAYS CONVENTIONAL PLAN SHEET SYMBOLS BOUNDARIES AND PROPERTY State Line ------------------------------------ — - aunty Line --------------------------------------- ---- Township Line --------------------------------- -- -- CityLine ------------------------------------ Reservation Line ------------------------------ - — Prop" Line ---------------------------------- Existing Iron Pin ------------------------------ o Property Corner ------------------------------- Property Monument ---------------------------- 0 Parcel/Sequence Number --------------------- pa Existing Fence Line -----------------------------XXx•- Proposed Woven Wire Fence ----------------- a Proposed Chain Link Fence-----------------E Proposed Barbed Wire Fence ----------------- Existing Wetland Boundary ------------------ - ---- Proposed Wetland Boundary ----------------- Existing High Quality Wetland Boundary ------ rox° Existing Endangered Animal Boundary Existing Endangered Plant Boundary ---------- BUILDINGS AND OTHER CULTURE.• Gas Pump Vent or LPG Tank Cap ------------ o Sign------------------------------------------- o Well ------------------------------------------- ° w Small Mine ------------------------------------ 5Z Foundation ------------------------------------ 0 Area Outline --------------------------------- 0 Cemetery ------------------------------------ 0 Building--------------------------------------- School --------------------------------------- Church--------------------------------------- 161 Dam HYDROLOGY - Stream or Body of Water Hydra, Pool or Reservoir ---------------------- .--- River Basin Buffer --------------------------- ROB Flow Arrow ---------------------------------- < — Disappearing Stream -------------------------=-- — Spring---------------------------------------- or-.._ 1 Swamp Marsh ------------------------------- Proposed Lateral, Tail, Head Ditch ----------- False Sum ------------------- RAILROADS.• Standard Guage------------------------------ ' M. ; RR Signal Milepost ---------------------------- wr1�POSr ,75 Switch----------------------------------------- RR Abandoned --------------------------------- — --._ — RR Dismantled -------------------------------------- RIGHT OF WAY Baseline Control Point ---------------------- 0 Existing Right of Way Marker ---------------- A Existing Right of Way Line ---------------- - Proposed Right of Way Line ---------------- —`�— Proposed Right of Way Line with Iron Pin and Cap Marker Proposed Right of Way Line with Concrete or Granite Marker ------------- Existing Control of Access ------------------- — 5) — Proposed Control of Access ------------------- Existing Easement Line ------------------- --E-- Proposed Temporary Construction Easement - e Proposed Temporary Drainage Easement---- roe Proposed Permanent Drainage Easement ----- PDe Proposed Permanent Utility Easement -------- Pue ROADS AND RELAMD FEATURES: Existing Edge of Pavement ------------------- ----- Existing Curb -------------------------------- ----- Proposed Slope Stakes Cut ------------------ --- c --- Proposed Slope Stakes Fill ------------------- --- F___ Proposed Wheel Chair Ramp ----------------- (90 Curb Cut for Future Wheel Chair Ramp ------ 9 Existing Metal Guardrail ---------------------- — *— —- Proposed Guardrail -------------------------- T T T Existing Cable Guiderail--------------------- Proposed Cable Guiderail-------------------- ^ Equality Symbol ------------------------- Pavement Removal --------------------------- VEGETATION.• Single Tree ---------------------------------- { Single Shrub -------' - - - t� Hedge----------------------------------------��^ Woods Line --------------------------------- Orchard--------------------------------------- C? Q Q C? y"sY�a Vine ard------------------------------ --------- EXISTING STRUCTURES.• MAJOR: Bridge, Tunnel or Box Culvert ---------------- Bridge Wing Wall, Head Wall and End Wall COnC ww MINOR: Head and End Wall ------------------------ Pipe Culvert -------------------------------- ----- Fo*tbridge----------------------------------- r-------� Drainage Box: Catch Basin, DI or JB --------- ❑`B Paved Ditch Gutter-------------------------- ----- Storm Sewer Manhole ---------------------- O Stone Sewer ------------------------------- —- MIMES'. POWER: Existing Power Pole -------------------------- i Proposed Power Pole ------------------------- b Existing Joint Use Pole ----------------------- Proposed Joint Use Pole ---------------------- Power Manhole ------------------------------ Power Line Tower ---------------------------- Power Transformer --------------------------- B LPG Power Cable Hand Hole---------------- ED H-Frame Pole --------------------- Recorded LLG Power Line---------- DesignatedUeG Power Line (S.U.E.* TELEPHONE: Existing Telephone Pale --------------------- f Proposed Telephone Pole -------------------- -0- Telephone Manhole -------------------------- 6 Telephone Booth ----------------------------- W Telephone Pedestal -------------------------- IT] Telephone Cell Tower ------------------------ .il 1.1,13 Telephone Cable Hand hole ---------- - Ed Recorded USG Telephone Cable ------------- Designated UG Telephone Cable (S.U.E.*)------�---- Recorded LPG Telephone Conduit --------- r Designated WG Telephone Conduit (S.U.E.`)-- Recorded UrG Fiber Optics Cable ------------ ra Designated LPG Fiber Optics Cable (S.U.E.`) WATER: Water Manhole ------------------------------- Water Meter---------------------------------- o WaterValve ---------------------------------- Water Hydrant ------------------------------- .0 Recorded UAG Water Line ------------------- Designated WG Water Line - Above Ground Water Line ------------------- AEG w"t°r TV: TV Satellite Dish ----------------------------- CC TV Pedestal ---------------------------------- TV Tower ------------------------------------ LPG TV Coble Hand Hole ------------------- Recorded WG TV Cable -------------------- Desi nated LPG TV Cable S.U.E.' - - - -�•- - - - Recorded LPG Fiber Optic Cable ------------ nr: Designoted UG Fiber Optic Cable (S.U.E.`)-- -- --+•ram-- GAS: Gas Valve ----------------------------------- Q Gas Meter ----------------------------------- Recorded U4G Gas Line --------------------- Desi nated LkG Gas Line S.U.E.* - - - - - Above Ground Gas Line -------------------- .�G cos SANITARY SEWER: Sanitary Sewer Manhole -------------------- 6 Sanitary Sewer Cleanout-------------------- p WG Sanitary Sewer Line -------------------- ss Above Ground Sanitary Sewer -------------- - c sar,it-,. s..a, Recorded SS Forced Main Line-------------- rss Designated SS Forced Main Line (S.U.E.*) -- — — — —rss— — — - MISCELLANEOUS: Utility Pole ----------------------------------- • Utility Pole with Base ------------------------ 0 Utility Located Object ----------------------- D Utility Traffic Signal Box ---------------------- Utility Unknown UG Line -------------------. WG Tank; Water, Gas, Oil ------------------- A/0 Tank; Water, Gas, Oil ------------------- UPG Test Hole (S.U.E.*)---------------------- m Abandoned According to Utility Records ----- AATUR End of Information --------------------------- E.O.I. Ci � 1.5" fi9.S6 C2 3" S9.8B C3 VAR. S9.5B D1 4" I19.08 132 VAR. 119.00 El 4"B25.OB E 2 VAR. 826.0E �J B" ABC R1 1'-e" c a a R2 2`-e" c S 0 R3 2'-0" C a a S 4" CONC SIDEWALK u EXISTING PAVEMENT T EARTH MATERIAL W1 WEDGING DETAIL NO. 1 W2 WEDGING DETAIL NO. 5 s- VARIABLE SLOPES 6.1 VAR $, 11' W/GR 4' FDPS 6" O.Oa 0.02 b.� u f 8' VAR 12' TO 36' VAR. 16' TO 36' 4' I 20' . FDPS (c 2 GRADE 2 Cl i Por Cl C2 Dl 0�02 0.02 i 0.02 Di 15� I 15" El U TYPICAL SECTION NO. 3 —L-- STA. 27+20.00 TO STA. 32+00.00 LT. —L— STA. 27+ 44.00 TO STA. 32 +00.00 RT. f 1 Ll 30' 30' 24' VAR. 5.5' TO 12' 24' D1 C2 I GRADE C2 D1 POINT 0.02 ,I 0.02 I TYPICAL SECTION NO. 4 —L— STA. 32+00.00 TO STA. 53+08.00 +/— (BEGIN BRIDGE) —L— STA. 62+88.00 +/ (END BRIDGE) TO STA. 67+10.00 VAR. 5.5' TO 12' w VA.R.' 5.5' w ? TO 114. 5' a x x I GR411E I POINT TYPICAL SECTION NO. 4—A —L— STA. 52 + 00.00 TO STA. 67 +10.000 1 M02M URRCVCE N0. SHEET NO. R-2245 I 2-A IOADWAY DESIGN /Avwwr DESIGN ENGINEER 9JGINHR 4' W\G.R. 4' FDPS 0.02 0`01L t.02 _ 6:1 VARIABLE SLOPES - ' C1 i.a" s9.aB C2 3" BB.ae C3 VAR. 89.513 01 4' IlQ.OB 02 VAR. I19.05 E1 41825.03 E2 VAR, 825.08 i S' ASO R1 1'-e" c a G R2 2'-8" a a G R3 2'-B° C e 0 B 4" CONC SIDEWALK u EXISTING PAVEMENT T EARTH MATERIAL Wl WEDGING DETAIL NO. 1 W2 WEDGING DETAIL NO. 2 VARIABLE SLOPES _ucria 6:1 j VAR 8' I VAIL 26'9" TO 32'9" 24' UJI 4' 6 FDPS D1 C2 u F- 0.0a 0.02 0.02 t a VAR. 2' TO ' . AR. 0' TO 8'-- a LIA GRADE 9,. � ' i POINT l R3 T I T R1 TYPICAL SECTION NO. 5A & 6A -L- *STA. 98 + 34.60 TO - STA. 111 + 97.79 -L- " STA.155 + 18.97 TO * STA. 170+ 82.2 7 -L- " STA. 233 + 76.23 TO " STA. 240 + 54.44 REVERSE OF TYPICAL SECTION NO. 5A & 6A -L- STA. 86 + 00.00 TO ' STA. 89 + 84.04 -L- * STA. 130 + 2 9.43 TO ' STA. 145 + 14.53 -L- STA. 197+00.00 TO * STA. 204+85.97 -L- * STA. 222+75.67 TO ' STA.228+91.24 • 50' TRANSITIION FROM 1' 6" CURB TO 2' 9" CURS BETWEEN TYPICAL 5/6 AND 5A/6A �itcYtu VARI7ES LE `�'I a SLOP �It1� b:r VAR 3y 11' W/GR 6° FDPS a W z u VAR. 2' TO VAR. 2' TO 8' I " 9" GRADE 9 9" POINT " l R1 T I T R1 TYPICAL SECTION NO.! VAR. 26'9" TO 32'9" 8' a 24' z 4' = C2 Dl FD PS " J 0.02 +IIT 0.01_ .al -L- STA. 67 + 10.00 TO STA. 73 + 50.00 TYPICAL SECTION NO. 613 rl W x u 73 + 50.00 245 + 00.00 TRANSITION FROM 73+25.35 TO TYPICAL 6B 100' TRANSITION FROM 244 + 00.00 TO TYPICAL 6B REVERSE OF TYPICAL SECTION NO. 613 85+50.00 50' TRANSITION FROM THE REVERSE TYPICAL OF 6B AND 86+00.00 -L- 1 32'-9" i ._ 32'-9" 24' Q 8' 8' a 24' Dl C2 x 9" PO&INTE " = C2 Dl O.D2 6" I / 1 0.02 TYPICAL SECTION NO. 6 -L- STA. 90 + 34.04 TO STA. 97 + 84.60 -L- STA. 112 + 47.79 TO STA. 12 9 + 79.43 -L- STA. 145+64.53 TO STA. 154.68.97 -L- STA. 171 +32.27 TO STA. 182 +33.75 -L- STA. 205 + 35.97 TO STA. 222 + 25.67 -L- STA.229+41.24 TO STA. 233+26.23 -L- STA. 241 + 04.44 TO STA. 244 + 00.00 I I 4' 0.7 HIOJECT REFERhICE NO. SHEET NO. R-2245 2-8 ROADWAY DESIGN ►AYWNT bMGN ENGINM ENGINUI PAINT 4' CONC. MONOLITHIC ISLAND TYPICAL SECTION NO. 6C -L- STA. 80 + 18.21 TO STA. 85 + 50.00 -L- STA. 183 + 00.00 TO STA, 188 + 62.50* REVERSE OF TYPICAL SECTION NO. 6C -L- STA. 190+62.50 TO STA. 196+25.00 -L- STA. 245 + 00.00 TO STA.248 + 08.41 * 200' TRANSITIION BETWEEN TYPICAL 6C AND REVERSE OF TYPICAL 6C u1� f Iiw VARIABLE SLOPES 17 pw VARIABLE SLOPES ll p N C1cn C 2 3" 89,58 C 3 VAR. 89.55 131 4" I19.DB D 2 VAR. I19.00 E1 4"825.OB E 2 VAR. 828.08 .1 8" ABC R1 1'-8" C A G R2 2'-9" C a G R3 2'-0" C t G 8 4" CONC SIDEWALK u EXISTING PAVEMENT T EARTH MATERIAL W1 WEDGING DETAIL NO. 1 W2 IWEDGING DETAIL NO. 2 6:1 I I TYPICAL SECTION NO. 7 Yl — STA. 10 + 00.00 TO STA. 13+00.00 Y2-, -Y3-1 -Y4-1 -Y5-, Yb- I I I VAR 6' VAR 20' • O 48' 6' C2 Cl GRADE Cl C2 P GRADE 0.08 O.Oz 0.02. VAR 6' 1 li' I 11" Dl T El Dl L iJ El T TYPICAL SECTION NO. 8 —Y2— STA, 11+00.00 TO STA. 11+86.39 —Y2— STA. 12 + 09.39 TO STA. 12 + 80.00 —Y3— STA. 11+00.00 TO STA. 11+98.26 —Y4— STA. 10+50.00 TO STA. 11+63.54 —Y5— STA, 11 + 20.00 TO STA. 13 + 88.46 *—Y5— STA. 14+49.46 TO STA. 17+21.27 —Y6— STA. 10+90.00 TO STA. 12+90.00 R VA _ — as—�� VARIABLE SLOPES `—ter aa^.sss�. 1 VAR ` VARIABLE SLOPES PROJECT REFERENCE NO. I SHEET NO. R-2245 T 2—C ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER BEGIN TIP PRO ECT R-2245 -L- POT Sra..10 + 00.00 -Yl- POT Sra.11 + 99.95 BEGIN CONSTRUCTION I ,, ps ME III 9'Mill SBG 4�4' PS 5.5C+�U-350 25.1 PS TAPER 100' SIDEWALK10, CURB SIDEWALK 100' SIDEWALK TAPER TRANSITION 10, CURB TAPER 7RAN I ON 25.1 PS TAPER SKETCH SHOWING BRIDGE /PAVEMENT RELATIONSH�I� NOT TO SCALE PROJECT EEFERINCE NO. SHEIT NO. R -2245 4 RAV SHEET NO, AALWAY DESIGN HYDRMM1ICS ENOWEEt I ENGWEER PRELIMIN4RY PLANS DO NO USE Mg CDNsrRErE" l -Yl- STA.10+00.00 I aF--ir? -- _T- i I II L�J 1 dl I 11 + + B I MAINTAIN DRAINAGE I I I I FROM EAST SIDE W 1 END APPROACH SLAB 4 i C IIIIIII^ I I ; GARAGE TO NaxTH SIDS II I BOBBY A. LOMON I I I I II I O DS *93 PC !43 DP�4 SO 923 I I I I M8 2 '/2 P6 262 END BRIDGE PErERSC I f OGERALD [.GOUGER tl 1 HAND CLEARMG WME BE MUM= EB 6 PG 174 I D6 459 PG 6a O L4' AREAS nJ3,4IG.L'ATSD BY TJ98 P.BRMITS -L,-STA.22+31.50+A- l0 I E. LEE -Y� Par STA. 1a+00.00 I $8 DO +D9s PG 1O76 AND AS nrRsc7a0 BY li3E IE4rrtJ+ZER. - - DOMB 2 1/2 PG 262 1 141 I I 1Q -Y3- POT STA. 10+00.X �IIII I I BEGIN CONSTRUCTION j1 w 1 BEGIN CONSTRUCTIONGIN ,, 2p+6g S 8 EO +L E I I -Y2- STA H+00AV 7 �I S -Y3- STA.1I+00.00 5 2• aHGBOIEE.rIC. PA o �o T j ti 5 ' ' N9.T6' .. I I ' s1' . _ 1 w 1 gO De 872 PC g 9p sISa.Do' 44 R DB 872 PG FJ3 { Hm AI►fJT C. 25E _��- I _ �� Rsa�J o- i i I+•, °°�, , . vll� l g� 75=� BEGIN APPROACH s n41D5s EPQ r' ELT) 4 r - - - - - - -- -wL6- - - - - _ PL EV t- s I' S DO'. .12. 5 149.73" �, - r S 1' /5'rY • t90.o0' 2 .� iTRr a AY RAPREMOm + fr II' 41' 31' x 130.0' • _ _ q mL S . I ze.3D• +00.00 � 1� H II M1 06 �11. } �; g _ l �+ +b-rJSTA.14+32.44 W.6'RTreo-4-WOODS zsvD(LT)B8-BL- 51 PING 9+11.95 x 0.33• s 1. 1.EP 2'.D ,{ IL e E �4 r r _ I 29.I8' 12' . t: �_ �.. I I G' N9N DEED+-' • - +60. i 6 I� , x i xD +E .oa W o o f y� 3' 1 "+t'POT STA 12+10 I r avo IR9 E� * O�M� a PDE R Y�POT STA.11+ E ! P M1s <' ?WD N a E E�61.1�Riw Tom ` V7 A! 1'065'13ZE +oa I I - k •A2"48.4' -� �N'`2932'L'E--- - - --- - - - ~i ��-�-- EWs me N7 rQ._. AL.- +0000 �. It' 4' N 2. O1 43.5• 1DEW .fiLr�]7 I I +00.00 lE W.r vau _ LG$�E1�iSB ] TAPER zsrD SEPIK DRANAGE e'er 2 I ! MAINTAIN SURFACE ' r/.rrt ❑E NS E � T'1'P T I I J ! a �r M. f to, CU 1 Tua I'~ ON [� y ►'+ .00 s 1'Ir S'. N9.9+'_Ey i x xER * # �. A--.-� +00.00t !►1 \ , � I N 0' 41. 04.6' W/ aa.eus o a oo.00 �' IRTI # E E E � a 10' CURB 2srO - --�: '- 111 6s1 A +50.DO e.W+xrra p tp/ �• -I TON PUUCH P . �U TRANSITION Y.� FL 1 k I s s WOODS 41.16' O EP ! I ` DO 592 PC 494 mLI corlc� - - - BM200 ELEVATION 7.95.� - '� �~ - +00.00 --I SPECU:L AA1E DRC .. SEE DETAII I I f1 I _m_t22.65 ~� _,Q D8 188 PG 154 / H N 1'46'ST'E r5.ar L STATION 15r14.91 62.0 RIGHT I C0� II I I \ © II 1 FRB`2-l2_P� BS_ WOODS - BOLT IN LEFT FRONT LEG OF WATER TOWER W j I 1 I\ seLFD o sEPrc I I IrD CONBTTIU T x4 o ro r26•E 1 I I \E ❑ rare 2 3.2_Y2- STA.12+80.00 ,�.. ' I N r /8' 16• E H9.91' 2/.24- ON' _ I P S 2' " 02- w +e2.41s 15z.Oj• + - - N 1.46'46'E w III B If I-L-STA. 0+89.77 28.59' RT II �I J"CS A. FERRELL. ESTATEDO i I� + A. 14+0711 _U POT STA Zoe Pa 5u -BL- 50 PINC 6+68.981 POT ST _ I � O+EB 2 y PO 212 _ Jq I _ _ _ I - _IJ -Y3- POT . 12+10.2 he 2PG 186-189 'I T_ _ a��l II iC LJ OAK ISLAND ELKS LODGE •2769 W HA?w Cr.RJmw WIIl RE REQUIRRD 'L- STA. 20+38.93 B I I I I 1 I II I { DB 927 PG IOT LY AR94S DE31G.tiA77W BY TMIN PERMITS -BL- 48 PINC 15+18.44 BORERS ROB8IIS DB 974 PG 6 AhD AS DntEcTED BY TJs sxGL'►m (13.83' RTi DO 9T. Pc 652 me a DB 1PC 6J8 06 %6 PG T99 PC 21 I 8 DR 974 PG 654 0 I I� 2sFBus + I I L,LJ I 'I �`�' 11 I MB r PG 624 DETAIL LP yy z s SPECIAL L*E,RAIIASE DITCH END CONSTRUCTION I V, -E s58 -Y7- STA.13 +M.00 JAC7• S KEPL EY R Er f - zK �' w*� 9 m 2 S7EPEEN C. HARRS K yR 1+ 3-4 r44t 1T s 111} -2 ire° D 1 5.t , l ` > Nln. D • 0.5 Ff. Ili, -Yl- POT STA. I4+M.00 O iB IW PG W6 n ti,titir �t yr B • I Ft. 62 TOW) OF LOW BEACJI -L- lrJL' 1700W AVE. -Jr STA 22+07 ro 24+04 RT z O DB 435 PC SIB N r.rrrE b s 4 � DOE30 PG 732 �-3B' Z003 o: PC NOMB r CPC 304�5 8 m 12 _2 Z025 AD'r IN A07s NOTES. 1) FOR -I- PROFILE SSE SHEET 27, 2) FOR -17, -Y2- AND -Y.- PROFILES SEE SHEET 36. 3) FOR STRUCTURE PLINS SEE SHEETS S- TO S_ p N 1 4) DRIVEWAY RADII ARE 10' UNLESS OnMWISE NOTED. 5) PAVED SHOMDISR TAPERS ARE 8:1 UNLESS 0TBZRWTSE NOTED. 6) -Y- LIRE RADII ARE 30' UNLESS OTHERWISE NOTED. 7) FOR CURB TRANSITION SEE SHEET 2, DETAIL DETAIL SPECIAL CUT DITCH SPECIAL: UT DITCH 6 b1 to , IA .. drp xart • oaos s"y;Q,',� �p;av dra xaF . aooE sm° rrLror bsr A ier aun I D p` M0a- 0 D x•REs os - Iw. •n o YE3 D.s - IFY. •r- � 3TA 33+72 ro U+aa LT eL-]].40 �- STA n+oo to33+u IT L-a3.10 L aTA 34+E3 b 3r+9LT R-0]30 y CA 34+30 ro 34+79 IT EL 23 M L 3TA 33+38 ro 36+02 LT !l-]],90 1_ 11TA ]6+1A ro 17+10 1T EL-2A3O +. 3TA U+S0 ro 37+13 LT !L-]430 N 90 pig 5 RSOH YB 6 PG 1T 6 N 6246013 ELEVATION E 22254463.94 GMT Y L STATION 24.99.53 125.17-LEFT PETERSOn RRS SET IN 10'OAK DB TM PG 923 le 6 PG 174 IO -Y4- POT STA JO+f REGIN CONSTRUCTION II W -Y4- STA 10+50.00 II 's'ze•E -Y4- till dD.Ob 9(i� 2 D (� 59',5'l5'r �.IL92J. @ ']6542B96.MQ9.W" ^Y -I- POT STA T s`s. STA. D+75.70 L +W.W -Y4- ANE N. GDl1$ MO I 13 � 1696PGGIT2p6r x,.� Q7 mot. men \ f06'13 I ——..uayia +°O.COJ PDE 3 rMMS DDi25rD �oFnOWM! "UTTER WX W1DOSFTSNHLF 00' 31DEW - ' 111y1E4I'5],E psgQ A,Istp ROBERTOpO888r5 DB E309 PG EIB YB 4PG 21 'L- 5TA. 24.63.30 20.68' RT= -BE- 53 PING 19.42.86 DETAIL SPECIAL LATERAL BASE DITCH bem or ry D + Gevq N O .0.5 FE. 6 B • I Ft. 1- ETA n+07 b u+04 AT -L.. m P1570 31+42.78 P C�= F07'36.4'(RT) a D = 7' 09" 43.r v L = 127.44' Q T - 63B6' R 800.00' t'« S£ = 0D2 x 42 2A -L_ MIDDLETON WE. 4 u et r ACT IN m( gIN ; I `9 8 9...8' x b•I]']Y Ig 4 = III I g "b•0']9'E= I e � R Por STA. lo+ ; e [e b09')YM [r 5 II I- x SG.9]' q''S'25•v � ' � t - gin 11- 'li 1I II -YS_ S 4, I "IUlu rOWE'• Q ---,---r .ODDS I I 'ln I 24 20 I I x b',4'n 55.6Yp sa•o � 8 YMY°r NERmOON. ETAL 20 OB 586 PG nT FAR 8 PG 8ELLEN AIERNDON 24 OR 586 PG n3 MB8 PS FLOW LEFENNCE NO. 5 Ey No. R-2245 5 w WEFT NO. IOAOY/AY DtlION I HYDRALAICS EN6 slt NGINEM .Not V56 roa CbrvSiAVCTIory 11 -..... TtN.IN/ h RONALD B. POSTON. TRUSTEE OR 6N PG 4Q As 6 PO N h 0 LI_ STEPIEN R. LEIL.AIU 1995P ]a E G - I I II 1d. = Y' DO6 FIG N7 .. .. •'[yor - I m I 3 NARGARET FAKEER DB 463 PG 280 31 IEAYEER.R JOSEPH O. K32 DB !34 PO 9 +24. -Y .wnz,ao �O 9•r sD.m jl: I II I I %f b I .`v.l +a•.E�. iS r M' xb']"32E </ 0ro _` AB 6 PG 34 30 MS 6 P6 N BEN P. TILLMAN DB 553 PG 632 IkI L RICK CUT ORCH� D—L �- II { 1 I II �:T,1 -L PT STA. 32+0636 1 I - "II' soar I I 1 L xCWS 1 4I s _ •A' I 1 I I - _ ` N 12i-27 I 11 I-1,ly�I -Y� STA I7+TI.T7 I II II I I 1 r' I •E o I I W. R-ANS DB 33z PG On 'III I; q, DB 299 PG i97 S C DB w PG 383 DB 289 PG 069 R-50' A6 6 PG 34 �--aAS) w —1 Exl I xsrw ti. xb•sr .E 6'evc —_ `p _YS- POT STA. 78+20.00 Ig'&FYI. ,o o •� 6PGN 5 � � �09�• lip,x b'p'yC yD jl RLIAY 236 PG T. SG TK JR DLE 698 38 9 � w0 6 PO 34 E zsrD 1 ]FeLT•i can Drtcn' / m tiz se DnA1L s• E x00D5 b A pDEUCH ME GMY L. RALBORNE 36 OR 465 PG 487 ]IB 6 PG 34 WY G. COOPER 39 DB 008 PG a96 DB 2038 PG 992 MB 6 PG N NOTES: I) FOR -L- PROPILE SEE SHEETS 27 AhD 2& 2) FOR -Wf PROFILE SEE SHEET 36. 3) FOR -YS- PROPER SEE SHEET 37. 4) DRIVEWAY RADII ARE IV EIMESS OTHERWISE N07ED. 5)PAYED SHOULDER TAPERS ARE &I UNLESS OTHERWISE NOTED. 6) -Y- LAB RADH ARE 30' UNLESS OTMR47SE NOTED. GENERAL NOTES: B ADJUST LENGTH TO CONFORM TO SITE 4 MIN. - 18 MAX. RC DISCHARQE FROM P� ROADWAY I �— — — — I = 12" RCP fD ( DISCHARGE TO STORM CHAMBER I I INV. EL.-12.75 I — — — — — 32'-0'r Ir — WEIR I 6� 15" RCP OVERFLOW I �? a r� I TOP WEIR EL.14.25 — 15" RCPL— — OVERFLOW i INVERT EL.12.75— rr.. rr calm B PLAN -7rr SEE STANDARD 840.54 FOR MANHOLE COVER & FRAME (TOP OF MANHOLE ELEV.18.50) If A it B" 12" RCP DISCHARGE TO - _, STORM CHAMBER "E" BARS 8 CTS. rrGn $ARS � LENGTH TO CONFORM TO SITE — 4' MIN. 16' MAX. SECTION A- A PIPE MUST BE LEVEL -USE FORMS TO CONSTRUCT BOTTOM SLAS.- -SEE STO. DWG. 840.00.FOR CONSTRUCTION OF BOTTOM SLAB IP PIPE IS SET INTO BASE SLAB. -USE CLASS 'S' CONCRETE THROUGHOUT. -REINFORCING STEEL TO BE POSITIONED AS DIRECTED BY THE ENGINEER. -CHAMFER ALL EXPOSED CORNERS 1". -SEE STD. DRAWING 840.34 FOR CONSTRUCTION OF RISER AND MANHOLE, IF REGURED. -JUNCTION BOXES OVER 3'-8" IN DEPTH WITH MANHOLES REQUIRE STEPS PLACED ON 12" CTRS. REFERENCE STD. NO. 840.88. -ADJUST DIMENSIONS FOR SMALLER PIPES. USE A MIN. OF 6" FROM INSIDE OF J.B. WALL TO OUTSIDE OF PIPE ON EACH SIDE. 12" RCP DISCHARGE TO STORM CHAMBER MATCH PIPE SOFFIT TO STORM CHAMBER SOFFIT MANUFACTURER 11'-0» SECTION B-B STORM CHAMBERS TO PROVIDE 1,785 CU. FT. OF STORAGE IV E APR 2 8 2005 DV; Q -ROJ # fvyocoo tt BILL OF MATERIAL BAR NO. SIZE t LENGTH WEIGHT A 26 #8 10'- " 417 8 42 #5 5' - 3" 230 G 18 #5 5'-11" 111 D 10 #5 11 `- 4" 118 E 50 #5 31-9" 196 TOTAL REINF. STEEL 1bS. 1072 t CLASS 9 N CU. S. 6.6 NO DEDUCTIONS HAVE BEEN MADE TO ACCOMMODATE PIPES OR MANHOLE OPENING. PROJECT IIEFERe10E NO. aHEEi NO. R-2245 b PREFORMED SCOUR HOLE PLAN VEW PERMANENT SOIL REINFORCEMENT MAT INS INSTALLED FLUSH WITH Pa 15' pU3LET PIPE NATURAL GILOUED A NATIVE GRASSES H SOUARE PREFORMED AT SCOUR HOLE IPSHI INSTALLATION tRP RAP ON BASH _ SDES NOT 61gwE1 FOR CUM" C •x• / FM FOR BM ON TOP SECTKkI •-A xROF PPE r MO N. 15, PSRY OUTLET PIPE jy _1 BOTTOM OF BAST. r TUC LIEF4 4. BOTTOM LNEPL CONCRETE SLAB, 4' . 4' . /' SDE LNE14 CL IRIP RAP. IS -THICK WITH FILTER FABRIC O JOIr4 ROACH JAMES 41 DB 1008 PG 591 49 ROBERDo TPG SER. JR. NS 6 K 34 MB 6 PG 34 xARNON H.JAMES,JR. 40 DB W8 PG 596 Me 6 PC 34 A7 -L- STA. 38+01.74 22.43' LT= ROBERT WALSER,SR. DB 972 PG 965 MO 6 PG 34 n RONIALD !'POSTON, TRUSTEE -OL- 55 PiNC 32+78.90 46 A 12T4 H. POE RON N DAWN T. WARRICK COB 229 MIS6�PC 34 WLLIAM B. WARP" 53 DB 1658 PG 231 MIS 6 PG 34 DAMN T. WARWCK ®3 DB Piss PG 22T L$ 6 PG 34 JOHN L.WALSER 51 DB 1DTT PC 630 AB 6 PG 34 NO REVISIONS CAN BE MADE TO THE CONTROL OF ACCESS WITHOUT APPROVAL OF NCDOT, DENR AND USAC '. DETAIL 7 INFILTRATION BASIN (Not to Scde1 ..��' dun •� rD rl.D 4' DEPTH CLEAN SAND SEE GRADING PLAN FOR DEPTH EST. DOE. 1,005 CU. YDS. DOM4A L. BROWN. ETALS 58 DB 1926 PG 862 AB 6 PG 34 AN1aE E. nAmPTON 56 MB 260TPG 34133 P DOE TAIL 7 INFI_7RATa4 SWALE NEAST M WEST] (Not to Scde) r—gL A•� rou 4' DEPTH 0, CLEAN SAND SEE GRADING PLAN FOR DEPTH NARVN C. MARTK SR 63 138 13W PG 266 NB 6 PG 34 PALL M. SAWYER 62 DB 17e9 PG 663 LB 6 PG 34 ROBERT W.CON[ER 60 DB MIS PG 377 MB 6 PG 34 PIL EST. ODE. WEST. 2.460 CU. TOS. EST. ODE, EAST. L390 M TDS. 67 PAUL E.MOOPE,`R' DB 1223 PG 689 we 6 K 34 7E GEORGE L.FISHER,ETUX DB Lei PG 593 MB 6 P6 M 66 FRANK LEE. ETUX DB BIT PG 476 LB 6 PG 34 FREDA N RPCH 81 DB 680 PG 6MB 6 PG 34 911 KEN BLACK B C"FIG4823 910 DOUGLAS JOHNSON DBB me 6 PC tWGG 34 ROADWAY D1'MM HYDRAULIC EN04NEEI ENGINEER PRELIMIN.94RY PLAN5 bO Nor U59 FO Cc.\5R71U` X END PROP. 48' CL FENCE 22 V i�B �_ PG-34- — PION b I'4 34 -- ... -_.__-__ ` H 10'17'31'E _.z.,.� _-._ N 10'13'31'E N q'IY 31-E If IO'11-N- - SAPL"- - N .-0'-1 35 N 10' 13' • LL' N 10'13'31'E N q•I3'31•E S N in, w31.E H IO'13'3'E N 10'13,32-E H 0,3'3rE N q•p•3P•E _ 82.4q' - q'I' 3'3rE - - - N 10. 13'32'E N 10'6'3LE 09 v7 + M C 38 I aTo . .. .. TOE q _ 40 m SPECIAL C sEE DFrNL 41 = DRCH a .. -- - ` 46 zg BETTY 2. DOVER : O DB 181 PG 523 CT 44 LOB 6 PO 34 seLRo SP[CIAL CVf SE[ DETAIL - E ZP t � z 47 49 a a N FP z w0005 - 51 & N O 3® !KC CUT DITCH !E! O L ` S3 ! !EE r .. . _ 3 ® 1 CUT 0rtC�L DETAIL .. 56 wl sFo - .. S8 .- = scow y - .DDDs r - 60 = e, J� _�, _ sew �E13 m' ' N Y ' I SPECIAL CUT SQ DETNI'a EW r 9 -DODS LTN 63D a tL 7D .. '!FF' 9 { .. .. N t D C J f l EP 1 NFILTRA _ 66 O E P N aWA1E TRAVEL ff DA.�L z 67 SIR 4 10 + P 9 E 5 Fn� R D u N — 1 U, _1- ' — a. v' _ — N 14' 18.2- E ._ ~� — �- 49.i6" .0259 —L, .. _..—. --.— ----- ,Da99I - ---_ 1 — SIR -- ---- — — -- ------ �E -- — — — — 14 ---- — 14 - .. .. . Jr—ti. SMYi • 11 �Ix C E w0003 SPECIAL CUT DRChI, 7:r_J 4p TO Q bFD u C T E i-&-IA CLR 1MTCH EE[ D AIL - 42 w cc is m ti - P T 5FD Q �R' C TP 4B'wD E �� ME„ ME TDE � TOE lrCaAL cur DifCF� ' o lFECLLL CLJT DRCH o _ woo05 6EC DCrA1L W w 5 ! NL s o N - 52 v _ 57 - 48 aD CLARRE E. CLIE 54 # 55 CARL L. SMITH. ETUX m W 4. DB 172 PG 487 x - DB 14T4 PG 555 _ _ MB 6 PG 34 "' MB 6 PG 34 ? 50 I D F TOE '' 1 sew _ .. .. .. .. 59 -u TDE CL41 cur DRCN 6 DETAIL 61 o �^ G BEG. PROP, 4 L F PUTTEE le ""X .Dods RALPH A. D1CX 64 ) DB r2S6 PG 004 �6 PG 34 S sEE DETNL 1 PREFORMED I. StDtlA. HOLE Js.F 0{� Ir .r n +2' cnL ` sDL•D I P TIO nmm NFTLTRA N !1V39 [pw, ® r -' f 7�+ m N '3�tt- .N 10'13'38'E _ .4. IO' 0' 38' N R• - - - n IO'6'38 E 10' ' 30' E 'Tt Td Ir3II` riaD"Nti 9F• 1 . .80' • - - i�•1i' t x iR' 9 Oa• •d•1.99' - 110.59' 55.0E - - GARY C, COOPER 39 D8 1908 PG R% DB 2038 PG SW AB 6 PG 34 ARTHUR SKIPPER 42 D8 1999 PG 770 LB 6 PG 34 2® KI►BERLY S. ANDERSCN DB 1999 PG TTS US 6 PG 34 y MARY W, CHURCH 45 DB R75 PG TTS COB 4 PG 381 MB 6 PC 34 H. EMANLEL GHENT 48 DS t249 PG 1181 MB 6 K 34 DENSE Lt. WEST 50 DB 1830 PC 945 wa 6 PC 34 54 � 1fO06NPC G01 6 PG 34 AtIEq pJg. COM6Ep6R 55 m 6 PG34 DETAIL SPECIAL CUT DITCH Her ee SedP. DITCH NaoPE • aoox < LAW D D WARES 0.5- IFt,si- J< STA 36+50 to 37+13 LT EL-24.40 -L- STA 37+56 to 37+68 LT EL-24-W _L_ STA 38+13 to 36+24 LT EL-24AO -L_ STA 38+66 to 39+37 LT EL:2A.90 -4-STA 39+75 to 39+09 LT EL-25.00 4- STA 40+26 IW AO+A4 LT EL-25,00 4- STA 40+86 IW 40+90 LT EL-2500 k STA 41+43 to 43+53 LT EL-25AO 4- STA 41+98 to 43+55 LT EL-2510 4- STA 43+97 to "+34 LT EL-25'70 4- STA 44+73 to 45+18 LT EL-2420 -L- STA 45+53 b 45+93 LT EL-26-20 DETAIL SPECIAL CUT DITCH SCA ' Gko D11NN SLOPE ••I1 0.00% Fr r �IO 1 �t ,a D D VARIES 0.5 - I Ft, aI- -L­ STA 36+14 to 37+10 RT EL-24,20 -L- STA 37+50 io 37+44 RT EL-24.60 -L- STA 36+13 to 39+58 RT EL-24.60 A-FrA 40+33 to 40+61 IT EL-25.30 k STA 41+43 tI 42+00 OCT EL-25.60 A. STA 42+53 to 42+63 RT EL-23.80 k STA 43+08 to 43+19 KT EL-26.00 -L- STA 43+64 to 44+45 IT EL-26.20 -Lr STA 44+83 re 45+39 RT EL-26.30 -L- STA 43+64,te 46+49 RT EL-26.90 L- STA. 45+S7.29 22.33' LT= -OL- 56 PI7C 40+34.46 MARSHALL R. CARROLL 59 DS 1895 PG 12A LOB 6 PG 34 61 J. R. CORBETT DB 5% PG 210 DB 596 PG 212 LB 6 PG 34 E W. HICKS ®K►THEiI 0 DB 169 PG 55 MB 6 PG 34 DONALD W-RATCHELOR DB 836 PG 759 MS 6 PC 34 NOTES: 1) FOR -L- PROF= SEE SREET 7A 2) DRIVEWAY RADII ARE 10' UNLESS OTEER97SE ArOMD, 3) PAVED SHOULDER TAPERS ARE 8.1 UNLESS OTBER47SE NOTED. NMI, 8:1 TAPER SBG TYPE III 6' 24' 12' 4' CONCRETE ISLAND 12' 5.5' 24' rr 12' 12' ssc TYPE III 6' 180' MEDIAN TAPER SKETCH SHOWING BRIDGE /PAVEMENT RELATIONSHIP NOT TO SCALE llF, q TYPE III 4 m Mu EP M.kA,TgTu °'c"r-a�-... a rErPETuy c.sEyE++ I GEORGE L.FISKII ETUx 71 DB MPG 593 6 PG 34 1 Cm A5457PG hL KAwTHORNIf BENNY E_ PRINCE pg� � 101 DB E� 6 _Pl. SA -.- - 1 0� I�B 6 PG 3I E. PRINCE BENNNOB G HA99 T8 82 R� 6 PG 34 DO P6 0�DB 169 PG 299 08 149 PG 563 I m DB 192 PG 677 BEGIN RRZOGE l<n BL1202 ELEVATION 22.35'm� N 65397.54E 2254799.62 n NB 6 PG YI �r STA. $3+09.00 t� l� L STATION 54+37.99 212.74' LEFT r, 5 BS' SD,?3• E r i 4 R0RS SET 1N 12' OAK 16.3z `1 RANDY W. GOOONC;HT It OB 1421 PG 1371 NB 6 PG 34 CLASS II RIP Mf CONCRETE SLOPE SEE STRRNC7URE fWys PRDTECTLON I I rav- OF ER A. I m m T.-n I `Y9 POT STA. lo+w.00y u 4 BEGIN APPROACH SLAB 14 N�� was .5 32• E N I. R' 31• p9. — 20.q I �,.ERTB�DX REPFNPIO'P3" 39• E .a"s• k u. k 10' R" 39' E �1 x lL' 71 101 L4 r i Y Q m {} E$FD T-�`JL 1111 EG. END FL V D D�5 5 1 ' R' 4 ■ 5 10' R• ' w s l Q{j a n In' " _ ' E PI�(,R 48� P.n�. N q• l3' 39' i ISAEND ■ EN F arD z 2+e.4. ' s' - - BEGIIP C 80 - 3M33 L STA. 56+36.54 = - I+I I O,r, Q LP L- IN .4 V} a' ' [ia .. I � RFD ) b 5 _Y6_ STA 10+9oau N Pc Rol (51.90' LT) p 0 [P I o l� I ER T� •. 4? I 8 6 PG 34 1 f I q. 1-� EQ »TEW Ri. E 2•11 _21_8• G •61wA Ai• Ill T Wy 6 xn «— �I Tr'-- 1V 1 1_ 1 PI PK 14 o ) " euL1DIeAD 4— 3. H tee. �� PVE r �� 1 11 • n ti - POT STA. 11 t 80 y E EP E 36' I SIxG R, P I E E-STM RI• �� w [•6TFG RI• 000s D !eG K- 0 �� NG 4 w00Ds 5 I I - r CARL F. WIC KEY. rR e, A DS 1341P6 1037 0 0 I ■ 4 1^Si ,m 75 s nFa 1 ' arD ; _ J arl RIB 6 PG 34 L ON -T) 25FD f u 1 J u SEE DET vF 7 7 - 49' 25' E .5'F = 99.I5 N END PROPOSPROPOSEDR1111DIFAD III"`` l I I avD W FE a s fl m El P _ 2 N ID' 39' E rE 0.53" _ may{ N ' ❑' 3g E' D•5° 0 57 301 v CLASS II RIP RAP CONCRETE SLOPE .4'l Il N' RW �� m w R. BATCHELOR SEE STRUCTURE FLANS PROTECTION 0.511!T• POT STA. I3+80.00 N � ®DONALD Q DB 536 PG 759 -L- STA. 5 +77.57 21.59' LT=MB I —y 6 PG 34 -BL-R2245A-5 PINC 48+54. 4 n 1 PN�LIP N.LEwi5 -BY5-R2245-5 PINC 10+76.01 1191 I 0 75 DB 1PG 754 988 END CONSTRUCTION PL z Le 6 PG 34 - ¢ ST .l2t9000 - $_ o .R. D. NEARS m DB 2M PG 533 I 1 m F RB 6 PG �A I \ EP c TNONAS RSTANLEY 4 W z o 77 DB 989 PG 926 NB 6 PG 34 I v a B►RBARA S. BRUNNSON & y 'a EP -� DB [MO PG 950 I RIB 6 PG 34 I ED g.• D3' it E � fn N 39.69" 1 EA ni � � caRP, a ENGFL jM CQIIE IAON TF=T -0iw •e - °i. I � A-"�� 5 93' So' 25• E � 1 360' MEDIAN TRANSITION PROJECT REFERENCE NO. SHEET NO. R-2245 7 9w SHEET NO, ROADWAY DESIGN FIl'DRAUI.IC3 ENDINEER ENGINEER PRSLIMINA W :;NTT USE mi RY PLANS oo, E v'cnma NO REVISIONS CAN BE MADE TO THE CONTROL OF ACCESS TUTHOUT APPROVAL OF NCDOT, DENR AND USACE. -L- STA. 61+77.55 81.25' L7= MEDIAN TRANSITION -BL- R2245A-7 PINC 56+57.27 END APPROACH SLAB END BRJD B -L- STA.62+8VV +,- eEc.PRD . �• W W FENCE xoDD$ ..+, .. f ATLV4TIC INTRACOASTAL WATERWAY ClNTEI LINE fPRpY1DED RY THE UAL ARMY CORD! DP ENGINEERS WILMINGTON DMSTSLCTI ! 7' 07' 31.0' N �I y - 4'CC C. ISLAND 1000, A =75' RT7 CLASS II RIP RAP Set STRUCTURE PLw! -L- STA. 61+82J9 0.79' LT= -GE - EEA Dlur r?a%7 G .TRwco+sTn R.ur.or-..r of N,Rrtw.E EnLNE«T NOTES: 1) FOR -L_ PROFILE SEE SEINETS 28 AND 29. 2) FOR -Y6 PROFILE SEE SHEET 37. 3) FOR STRUCTURE PEAKS SEE SHEETS S- TO S- 4) PAM SHOULDER TAPERS ARE 8:1 UNLESS OTHERWISE NOTED. INFILTRATION BASIN INVERT ELEV: 2 3. 0 FT. MIN. REQ'D SURFACE AREA AT INVERT: 4,310 SQ. FT. MIN REQ'D VOLUME AT ELEV 24' 5,270 CU. FT. MIN REQ'D VOLUME AT ELEV 25' 12 600 CU. FT. MIN REQ'D VOLUME AT ELEV 26' 22,220 CU. FT. SIDE SLOPES: 6:1 OR FLATTER MIN. BASE WIDTH: 34' DIMENSIONS INFILTRATION SWALE (WEST SIDE OF -L-) INVERT ELEV: 20.0 FT. MIN. REQ'D SURFACE AREA AT INVERT: 2,580 SO. FT. MIN REQ'D VOLUME AT ELEV 21' 3,615 CU. FT. MIN REQ'D VOLUME AT ELEV 22' 9,455 CU. FT. SIDE SLOPES: 4:1 OR FLATTER MIN. BASE WIDTH: 10 FT. PROP. 4 " CL FENCE INFILTRATION SWALE (EAST SIDE OF -L ) INVERT ELEV: 20.0 FT. MIN. REQ'D SURFACE AREA AT INVERT: 2,140 SQ. FT. MIN REQ'D VOLUME AT ELEV 21' 3,000 CU. FT. MIN REQ'D VOLUME AT ELEV 22' 7,910 CU. FT. SIDE SLOPES: 4:1 OR FLATTER MIN. BASE WIDTH: 10 FT. NIOJECF REFERBJCE NO. SNEET NO. R —2245 KW SKEET NO. tOADWAY DENGN NYDRAVUCS ENGINEER I ENGMEIR PRELIMINARY PLANS DO NOT USX FOo O KN RUMON \\ INFILTRATION SWALE (WEF6C `�� -- -` C - - - — ` z -L- Sto 49 + 60 - - 4:1 SI E SLOPES 135' Lt 10' NAQ 83 \ -F j rs , ' ----- 250' , - ---L--Sta -47_+ 11 ' 119' Lt` %t/-) Pt c TDE - - 7 IST. p"W BEG. C f — 7z TDE �- ----------------- --GRAD=350-_ ---- TO I- -�- -- DI �� / L / - - - - ` t - � �► - - 14 TO 113 v�MH 15,F r..►_ —_ 1 —LZ'—------------------- --------------------LZ— _ � ----- 1 — L — — -- — — — — — — — TDE TDE BEG. PROP. 48 `E�xls �—GUARWD t�AI CL-FENCE -41' _ Rrw SPUTTER 15 PREFORMED -PL- 3�COtfl� INFILTRATION- BASIN `r 65' RT. - - - HOLE F 5 UP - - - 34' = 100' `--- 6:1 SIDE SLOPES n 5l , � L= Sta 47+19T;�R 121Rt (+�)O SCALE- . 48" CL FENCE ` `- �\PL -L- Sta 48+19 . 50' 0 100' - 1 12V Rt (+i) GRADING PLAN \FOR INFILTRATION BASIN AND INFILTRATION SWALES i' DI T' T T T T T T T T T T T 1 C) L n ---------23—"_ N 10° 13' 51.6 ----- _�� GRAIU-350 �' 180' MEDIAN TAPER I � 5 4 � � 1 \ , --L- Sta 48+96 -, ' � 1 127' T- —+ -L- Sta 51+01 •" r, 150'Rt(f/,-)" 14:1 SIDE = 10' ~ ~ 200; \' c PROP.48"' CL FEN-CE, , INFILTRATION SWALE (EAST) INV. EL.=23.0 —� 15" HDPE DISCHARGE FROM RDADWAY z CTS. - B� a81 A 15" RCP - DISCHARGE TO INFILTERATION BASIN B PLAN SEE STANDARD 840.54 FOR MANHOLE COVER & FRAME (TOP OF MANHOLE ELEV. 27.0) TOP WEIR EL.=24.50 15" HOPE u DISCHARGE FROM ROADWAY T INVERT EL.=23.0 r-Rrr \-15" RCP SECTION A -A grr 15" RCP - DISCHARGE TO 4r, TyP, INFILTERATION BASINTypr 11 GENERAL NOTES: -USE FORMS TO CONSTRUCT BOTTOM SLAB. -SEE STD. DWG. 840.00 FOR CONSTRUCTION OF BOTTOM SLAB IF PIPE IS SET INTO BASE SLAB. -USE CLASS 'B' CONCRETE THROUGHOUT. -REINFORCING STEEL TO BE POSITIONED AS DIRECTED BY THE ENGINEER. -CHAMFER ALL EXPOSED CORNERS 1". -SEE STD. DRAWING 840.34 FOR CONSTRUCTION OF RISER AND MANHOLE, IF REQUIRD. -JUNCTION BOXES OVER 3'-B" IN DEPTH WITH MANHOLES REQUIRE STEPS PLACED ON 12" CTRS. REFERENCE STD. NO. 840.66. -ADJUST DIMENSIONS FOR SMALLER PIPES. USE A MIN. OF 6" FROM INSIDE OF J.B. WALL TO OUTSIDE OF PIPE ON EACH SIDE. SECTION B-B BILL OF MATERIAL BAR O. SIZE LENGTH WEIGHT A 16 06 10'-6" 248 H 9 #5 5'-2 ' 48 TOTAL. REINF. STEEL lbS. 298 LASS B" CONG. Cu. NO DEDUCTIONS HAVE BEEN MADE TO ACCOMMODATE PIPES OR MANHOLE OPENING. RECEIVED APR 2 8 2006 PROJECT SERVICES UNIT STANDARDS AND SPECIAL DESIGN! nffire 010.01M.AZ A FOX 9t9.25C.e}18 DETAIL OF SPUTTER BOX ORIGINAL BY: T.e.Scou — DATE: 01 04 MODIFIED HY: '•e.eo.0 DATE:__It-tc-4."._� CHECKED BY: RATE: FILE SPEC.: +:e.tucasr m tc•e wi^+ ie. aau+6.a PROJECT RFFERENCE NO. SHEET NO. R-2245 8 NO REVISIONS CAN BE MADE TO THE CONTROL "`S `"�` N0' OF ACCESS WITHOUT APPROVAL OF NCDOT, w ENGI aEfIGN !{Y44NEIC7 1 ENGINEER [NOINEER DENR AND USACE. ' ,/ Ky�SVYi C6CY�t 1 1 it PRELIMINA RY PLANS �t�asSu 1 / m NO USE ro M-"MLICTMN J . I N Y t 3 3 36(Y MEOUN s .-- I \\ ? I CL'rr RIr-IAF 104 me zo Pc 4110 / \• /' �a� EST.I TON MB R PG 279 ri7uo L- 57A. 65+59.43 2.76'LT= LSTA. 71+53.2141.66'LT= FILTER FILc_-BL- III P[NC 67r15.67 FsB \ CL..e. PUP-Ltr +7x.00OR " : i CL "r• R!r `b +60. 5 4- +xe. -I. RLT�I TON c ` * HT. 26 ToN t —\ EST. s s4°u {� -L- CS STA. 73+2533 -� + HLTER NY. +25.33 ?� AT 3y, 1 +30,. i ^4- PROP. AB' 63+95-to EkEINI�'O E4 S ANT F r 1e ff E +70.06 l\ C — r sz F LirA F13� 8.3' x I � f r � c4T 3 5�T6 83.42' RT] \ y� ESC. i S"l. 26 C r 8' 4 .3 PpEy�ff. * X \ C \-� 3 $ 47 45T• BUR1Al OF TH[S ��n p �• +35.00 1. A• AS r E Yg 9T0 Ct 1FE IS NOT RECUIRID ` F \ 4 riv 100' (u) + i 01 h 10� jF � - x5 a a 77.3` •n � �� � � ` H D ea.00 a. Sr ' �.. �� � -_•_-: cam. � N IOI 13' SI19 J5 a f� N`�i- _ 4 TG REINFO EK M�AIi OP. 48- -� 3 �U•� �2 r� C t.5' x 45 CHORD M H' PENCE H F C // aafi}�oyRu IPOE—ar \ 01 J O` FILTOI FIURIC p / «000`' E3T.3 51. r + EST. �Od r pR04. 48, ww ly _ C'? SC ? / / ,t `0po Gj \ � � � TS STA. 66+68.75\\ / A Pp � \ / LATERAL WE ORCH P pE 2pO, D BM205 ELEVATION = 21.43' CL'r RIMlAF +00.00 4- Pp� LANE L STATIfNJ674 05.64255623179,51�RIGRT LTE4 FA.ARIC RRS SET IN 24'OAK .7 SY. � \ Q / -L- STA. 73+51.74 3.41' LT= +85M 4- -BL- 65 PINC 69+21.01 L.:S �y � ��CitW E.sDA•t� Q ",..cP+s,.� ""`y • 1 105 MATE OF NORTH CAROLI A 613 Pr as -L- ST STA. 76+8533 1 LATERALRAL BASE 01Tv"H 1 ryP2 TP $.pip] C r 0 T C/5t. Sba 4r Win. 6 = 1 Ft. L Pis Sio 69+ P! S l477.6.9 Pis S1a 74+4555 a = z Ft. a Bs = T 55' 5 13' 04' 16.r (RT) Bs 7 55' 597' Pls S!° 74+4555 1 0 = 5 F+. Ls 360l10' - 424 265' Ls = 360170 Bs = 7' 55' 597' -L-STD 72+50 RT t6 4- STA 77+83 Rr LT 24024' L > 296-57 LT = 24024' Ls - 360.00' ST = 1202' T - 14693' ST = 1202Z LT - 24024' N R - 1,3wD(r ST - 1202Z 1 SE - 0A6 0 04 1 NOTES. aE o 1) FOR -L- PROFILE SEE SHRXT 29. 2) PAVED SHOULDER TAPERS ARE 8,1 LWLESS OTi1ERWI5S NOTED. a;, 3) SEE SHEET 2- FOR so, TRANSITION FROM 1-6" CtYG TO 2'-9" C$ G. w o �w PROJECT REFERENCE NO. SHEET NO. R-2245 9 RAW NiEFT NO. \ * * ROADWAYDESIGN HYDRAULICS ENGINEER NEER PRELIMIN RY PLANS Sk�,o• a 83 \ s * 4 oa NOT use ro oa:cmevenory `V P1 Slo 14+8494 * * \ GG 4- 73'06'47.3-(LTI T 445J6' 1h R �?M r \ * * * / lzC PC STA. 77+94.22 �4CC2- PC STA. 10+39.78 \ + 16 s C90 / \ Ir PT STA. 89+84.04 * \ +46.06 -ACC]- TA +50.00 O \ WOODS �e9CCl- POT STA.10+00.M \ elm\ + -ACC2- POT S7A.10+W.00 ` * / \ BDRY CROSS PIPES WOODS 30' LODANE N&LIAMSON -L- STA. 80+01.95 1.13' LT= IOfi � 942 3 8y233 \ * / \ co -BL- 66 PWC 7�71.18 me 3 I'll90 \ 1 / + F� RTO F-RAP \ �'1h'�/ ' �` m TEST 1 VIA!MC EST. a SYI9RIc ` _ _ * +54.04 k a VIA! MC '8• RJF-RAP• s CL •B, RIP -RAP FILTER PAAR1C -L- STA.87 T LT= ~ 4a ma's -BL- 67 PI C •tj%60.51 �' R a✓ 1 t PROF eieowa A' \ LATERAL SASE " DITCH SEE DET W 2"TO4 EST.•pl FlL JLASNe FILTER SY. PST, s +43.T� 105 STATE OF NORTH MOLINA DB 613 PG 165 li- P1 Sto 83+96,08 & = 2l1613Lr (LT) D = f 47' 258' I L 1J8982' +Rose -Acch T 60186' R 3,200-W SE OD4 i "' 7� ti � FENCE E— \ � N 27. 59' 15.7- E F_ — — \ 44 �ISLw`N°0 ..:..:..................... PS 46 OI 'WS \ HOWL M° V SO• s $� 9CE- 8 L11DANE WILLIAMSON h \ A WOODS \ 106 MB 3 PG B9 33 U) C +43. cc1- \ \ w 3 PG 90 I \ DETAIL \ LATERAL BASE DITCH �. c not to scoie� \ \ � 3 Siope \ � rpuna 3y � 3•` ri�i. S * Mln. D = I Ft. �.6.� EI 2 Ft. D = 5 Ft. 0 = 83' 41' 59.3" (LT) \ I. STA n+so RT a STA 77+ee RT a D � S II' 06.4' L - 1,02259' T - 6-9697'-ACCI-- PC STA. 12+80.26 STATE OF pR P13TH CAROLNA R s 700 Q7 MATCHLINE SEE SHEET 25 D8 N3 PG E ACC1- STA. 13+80.Q0 01 D1 17.61 r 1 � ` rS r� � r 4 'f -T— +54.04 k WOODS VO REVISIONS CAN BE MADE TO THE CONTROL 3F ACCESS WITHOUT APPROVAL OF NCDOT, 7ENR AND USACE. NOTES. ])ACCESS ROADS TO BE CONSTRUCTED BY OTHERS. 2) FOR -L- PROFILE SEE SHEET 29. 3) PAVED SHOULDER TAPERS ARE 8-1 UNLESS OTHERWISE NOTED. 4) SEE SHEET 2- FOR 50'TRANSITION FROM P-6" C&G TO 2'--9" C&G. 1 i PROJECT REFER124a NO, SHEET NO, R-2245 10 &W SHEET NO, ROADWAY DMGN ENGINEER PRELIMIN w NOT V38 poi HYDRAULICS ENGINEER RY PLANS CONSTRllmoN \ x i \ 3 x � A p O * Inm r l * 1L BN206 ELEVATION = 37.64' r �81M * N 69506.14 E 2256359.97 L STATIDN 90+66.32 20022'LEFT f s * RRS SET IN 6.OAK * r\'61 4 m x * * * * \ Do 142 PC 2-13 1d! 3 PG a9 FB 3 PG 90 � -L- STA. 99+70.56 2.33' LT- FILTER TOM * ' �- WRY E4uAt[2ER PIPE -BL- 66 PIVC 95+36.50 \ EST.112 BY. * * 1.0' +34.60 � PROP.4W WW FENCE il \'Ilk * \ •oros * * * \ — — `— — — O 1 * $ Alm * 3i. k +83.00 aEO. PROP. AS' WW FENCE BURY CROSS FIPGS s � �� '� R� � � D1 2' 9' C&G (�7 .I. PQ rf r a j'L�j fl` 551.21;(LTi r r * Q o1 4' � C cJ � END PROF, WrJ FENCE * � x �, of ss ~F— 26' 49.2' E do 53 PRCsP. 4$` FE C CA k 4„K 6' CW 2®a0' 32 r iT � 01 c { LTNtr r` H r 'R' RIP -RAP +34.� d'9' R 8 lS ES T.1 TON EST. I TON � f 1 FILTER FABRIC * EST. a SY. RLTot PASIUC U7.3 SY A' Ps +OO." CL'B' R1F-W EST. 1 TON r r~ F + ~ i ; \ Pi]E +20.00 4- BEG. PRO . 4a' WW FENSE FILTER FABRIC EST.3 SY rr +30.00 k Rh M1I +anal * x * END ROF. 45' WW FENCpy \ x WDODS \ -Ir Pi Sic 105+23.41 p a ZO A' 13T (RT) 0 r 29' !75' L = Q6320' 'r = 688Br �wLe— R = 3,85OD0' PC STA. 98+3460 S.E. = OD4 LODANE RLIAWSON O08 3 vc z33 gas ,s PG „ me 3 PG 90 'D S �1 NOTES: 1) FOR �L- PROFILE SHE SHEETS 29 AND 30. 2) PAVED SHOU.LDRR TAPERS ARE 8:1 E./AMESS 077LERNTSE NOTED. 3) SEE SJMET Z- FOR ArTRANSITION FROM F-6' C&G 70 2'-9' C&G. h W ' MOW REFEUNCE NO, lHtET NO. R -2245 11 ROADWAY bEEIGN ENGINEER HYDRAULIC! EIJGINE!R PRELIMIN DO Nar USE PO RY PLANS Cv..STAVrnoY �O - -L- STA. 110+56.38 7.58' LT= -BL- 70 PINC 106+22.40 * +��- I ., Room / -L- ST►..105.06.38 1.69' LT y -BL- 69 PINC t00+72.17 r6l. s I * * END FR F, u• FENCE euu RY cRor1Pe BEG.G.PRO. <B',vW * , ` * \ \ � —' •• ' IN 1 O � 1.0' * * eultY EQUALIZER. Fin 3 \ LODANE WLLIAMSON\ �y * DB 142 PC 233 05 NB 3 PG a9 \ * 9 7M 0 - 61 CI / s * 1 * I LIB 3 9C 90 WOODS \ \ * \ 65 * * i \ wCe * * \ 66 \ o 11314 ` \ PROP. *g. \ * g PENCE4111,00 \ ' p O 4- c G WW PENCE + ly a] 1 * CL 'B' KuLw ll� h� (,,' CL'V RIF-RAP EST.I TON EST. TON FILTER FABRIC / Bb6 �FRO�. 45' WW FE E ( \ ` , FILTER FAEAIC EST. B SY. I EST. ° !Y. \ 1 1 * 4' ps • } 1�1 1 CL'B' RIP -RAF EST. 10 TON F��LLTlR FABRIC / ` CL 7' RIP -RAP EST.1 TON FILTER FA,��C �P 48+ WOODS MIA iY. � EST. B X -J ` Pl Sro 105f23.41 L= Xp'13.7'(K) a D r f 29' f7.5' r L - 1.363.2(Y T r 668X a R r 3.850!)D' S.E. r 0.04 N NO REVISIONS CAN BE MADE TO THE CONTROL OF ACCESS WITHOUT APPROVAL OF NCDOT, DENR AND USACE LODANE WLLIAMSON QD6 PC 233 3 06 B 3 Pc 89 be3Pc90 ►p00s -L- bld. Rb+Zs.9s U. 9Z' NI= -BL- 71 PINC 111+90.22 NOTES: 1) FOR �L- PROFILE SEE SBEET 30. 2) PAVED SHOLMDER TAPERS ARE 8:1 LN7XSS 077MRRZSE NOTED 3 SEE SHEET 2- FOR 50'TRANSMON FROM 1-6' CdG TO 2'--9- C& 0 �, Ilaecr LEFFSB4CE ND. R-2245 INJ WEET NO. ROADWAY DMXN FF • _ ENGW EEL 1' I .1FD LWAE RLIAMSON 1I m M2 PO 233 so II * \ N I * \ \ -L- ST1J28• * SHEET NO. PRELIMINARY PLANS . NO ... rc,d wNm., M \ x * \ \ -BL- 73 PINE 123-88.36 A -L- PC STA H0+29.43 +20.69 dD I.M•NM' FENCE N6.0.t- 1 N 3g•1j 36.a•E 4'ps � �_� EUE. cuss na * eec.r .u•ww FENCE «2. k 1 b• C4O \ • 30. J� '� 1 * CL •I• EIr2AI EET.13 TON - �T HFUNc n ME 4e' w OW07 ELEVATION - 46.68' N 71157.T2 E 2258136.25 L S7AT6122.20.89 416.14-RIGHT RRS SET IN 12• PINE m 48' W _ \ 69 NCDOT GPS NON\ * s R2245-13 � * F' �\ * AT 31'25.36.7•E .4 P. qB— \ 74 * 48. �94 \ r * x FFNCE n �� E DI * * \ 4 n \ a 73 INC. * -L- STA. 122.65.I4 1.36' RT= � � _ * * \ _ � �3=1�� -BL- 72 PINE I18.31.43 * tKI LoOAW IFILIANSON 06 08 I42 PO 133 fllltt fAWCt WL8Ey. ONJ,v W.TON FILM FASNC \ IB 3 P4 49 _ % * B J PC 9p TO*\ 'Tel lr PI S]O 137+9462 6= 3402'097(LT) WL8— W.a 31. \ 0-r17•306' ---- \ L 1.4E5J' T - 765H R-2-W. S.E.- OD5 NO REVISIONS CAN BE MADE TO THE CONTROL OF ACCESS WITHOUT APPROVAL OF NCDOT, DENR AND USACE. NOTES: 1) FOR —L— PROFILE SEE SHEETS 30 AND 31. 1) PAVED SHOULDER TAPERS ARE 8s1 UNLESS OTHERWISE NOTED. 3) SEE SHEET 2— FOR SO'TRANST170N FROM 1'6" CEFG TO 2-9- C&G. / 3 / / LaDAl4; S * J' ,.+ MO1ECf EffEEENCE NO. SHEEt R-2245 eW MUST BT NO. WO AY 01=14 ENINNEE1 HTORAWO DIGNEEE PRELIMINARY m nor vse ro PLANS wamvrnav � 106 W e}WF4K� 233 01M/ * / * / x a / * x / x x / 1 / k -L- S7A.145-2 14 'RT= x * -BL- 75 PINC 140+91.06 * * x * x x x * * * BM208 ELEVATION = 56.54' * * N 72969.12 E U58552.87 / \ * * L STATION 140�04.30 202.TB' LEFT * * / mw NOAUNK GR / * * * RRj SE CL�V PINE * * HT.I TON / \ * / CL'I i * x * * 6te5 V Oc / \ x T�O/,MJAI / F3T.frwwc x / b CL'e' IUP1 Wl TOM c A y * RLTEe FAeuc W. a R. x "* .- . _ i i .. .. - i A.'! l 41 F3 E lll 116.76 DI CAO 1e o1 — — — — — _ /-- — ' -L- STA. 139.88.60 5.62' RT= . 7'W -BL- R2245-14 PINC 135.53.94 E E _ * ♦00.00 M / i il(11��q * i -L- STA.133-13.913.49'RT= - -BL- T4 PINC 128.80.07 PISIO 137+94.62 A 106 LWAW 9LLILUWSON L— PT STA. 145+14.53 / L- 34'02'O9.7'!LT) w M2 �233 — D = 217' 30V N8 3 Pc w L = 1,485J0 T = 76539 R = 2- W.W' S£.= 005 NO REVISIONS CAN BE MADE TO THE CONTROL OF ACCESS WITHOUT APPROVAL OF NCDOT, DENR AND USACE. NOTES: 1) FOR -X- PROFHX SEE SBEET 31. 2) PAVED SHOULDER TAPERS ARE &I UNLESS OTHERWISE NOTED. 3) SEE SHEET 2- FOR SO'TRANSHTON FROM 1'6- CFIG 70 2-9- C&G. PROJECT REfEJt KE NO. ShUrr NO. R —2245 14 W SWEET NO. ENGINEER ENQNEEJR \ PRELIMINA RY PLANS \ DO MOT un m caNsr =M-N CD Y ` / f .k �� r t ` WSON 0s W 3 / , + S vpo spa 1 1 r, * * 3 + -L- STA. 158+61.40 4.98' LT= r f -BL- 77 PINC 154+26.77 1 -L- STA, 152+60.57 5.03' LT= 1 -BL- 76 PINC 148+25.67 1 E.— J J Q PROP.48' WW FENCE —— — — � r F � � � INC-ao' �'►s � TAa n Z. g In 5' 27' 3.3' c6G ; ea ' S [►� 1rs J 1 , j FA > N 1'36'53.5E Y ' W� _ ,s 1 sq ao ,a, COD F �-7 -- CHORD F" a _ IS CL 'B' R1!'-RAC 1ST. 1 TON CORR"AUA P!J'E-ARCN fIITER FAdRJC FOR /US AU NINUM °4 ESY.D SVV rET"a/R / WRFi COMINON BOTH 8,=5 "HEAOWAtLS 4N WT,i ENDS i SURY:FRFES Mr AN) SAOffIU. ENi1RE U3iGR1 OF EN71 PPi 0 NO REVISIONS CAN BE MADE TO THE CONTROL OF ACCESS WITHOUT APPROVAL OF NCDOT, DENR AND USACE. LaOANE S1ILLIAII$pN IQ6 DO � � 233 -Z,- TS STA. 1SS+1897 Pis Sto 137+5920 Bs = 7' 48' 470 Ls = 360.0(Y LT = 24023' ST = 1202P S.E. - OD6 L— SC STA. 158+78,97 NOTES: 1) FOR -L- PROFILE SEE SREETS 31 AND 32. 2) PAYED SHOULDER TAPIRS ARE 8:1 UNLESS OTHERWISE NOTED. 3) SEE ,SiMET 2- FOR 50'TRANSMON FROM 1'-6* C&r- TO 2'--9" C6G. 2 � * 1 1 �k \ I* SM209 ELEVATION = S8.64' L STATION 9 6+33.71z59297.26' LEFT RRS SET IN 6' PINE »e ts2 Pc 233 1 * 106 LB 3 PG e9 1 * / euRY sAALt ANIMAL rAB3IGe nn`L.o AND EB 3 FIG 90 * L STa, 165+70.54 31.49' LT= * f -BL- 79 PINC 161+52.88 WITH o ErmRe or*nro ` � I TAP ON + 1 * FILTER FASRlC C +50.00� * +� 1 EST. i SY SURY EG1uAl1SER PIPE 00 + 1.01 +50.{ +00.00 k c, VS s' 9B 31 * + a. + .2 � * 93 DI .�- � � T ` � :� � § \ .._-._ � 9s \ -OAF• ■ * � - ,mil 4'PS---- _ ` N4p. �i5. 4•'l � l ►JN CL' CL re• RIPa1AP W.1 TON TONP�� TER FABRIC FILTER FABRIC 160+99.38 99.93' RT= EST.3 SY. LDOINE I ILILLA ESON -BL- 78 PINC 156+78.57 li . 106 LLB 142 PG 233 1$3PG 89 . .. ma 3 PG 90 24• CNP � � 1 ti SNLY SMALL ANWA FASSAGE PIPE MY AND SAMILL ENTIRE UNGTM OF PIPE WTTM MY OF SOIL -L- CS STA. 167+22.27 P1 Stu 163+15-57 PIS Sto 168+42.46 p - 36' 36' 14f' 1RT) t4s 7.48' 47.0' D - 4' 20' 26X Ls - 360DV L - 843.30 LT - 24023, T - 4366U ST 1202r R - 1.320L01 S.E. = 0.06 NO REVISIONS CAN BE MADE TO THE CONTROL OF ACCESS WITHOUT APPROVAL OF NCDOT, DENR AND USACE. PROJECT REFERENCE NO, SHEET NO. R-2245 15 RM' SHOT NO. ROADWAY 01=N NYORAUM ENLEINEER L9iCMEM PRELIMINA RY PLAINS Do Na un m c ,. Ucnov \ - STa, 1T3+75.88 6.07' LT= -BL- 80 PINC I + 4 • C 8 \ +n.27 -L- ST SLL 170+82.27 \ \ NOTES: I) FOR -L- PROFTLE SEE SHEET 32. 2) PAVED SHOULDER TAPERS ARE 8:1 UNLESS OTBERWISE NOTED, 3) SEE SHEET 2- FOR 50'TRANSMON FROM 1-6" C&G TO 2'4" C&G. 2 0 1 m MROJEM REFENNCE NO, SNlEf NO, R-2245 !6 RW SKEET NO. m ROADWAY pESIGN NYDRAUUCS ENGINEER ENGINEER PRELIMIN RY PLANS M NOT USE PO CGSS'TBQCTIOV a Y W w + ; W w w W W W W w + W w W W W W W W w W w � � W W w W W W yi v' LaDAlrE IRLI61lSON � W o + w W \ DB R42 PG 233 6 w W W 106 No 3 PG as w p w W w W + W w W \ us 3 PG 90 W W W V) + * W w % y } W + w BURY EQUALIZER MPE LW +C0.OG W / CO M w -L- ST4185+38.05 3.41'RT= ,,� n BURY EGUAUZER MPE 1,NV W } 81 PINC 181+2V5 w W t w W 4 PS W 4' PS W 4' pg � 101 in �1 [rl e w e^ es� N 2CY 468 " 56' 48' 49.9' E „ 7 W 444 wti_ 4' CON (/y a W W W W N p4 PS IS [n[}.col yry� ps W 4— � \ w ROY. 49" FE E W 1 E / 4 E Illrrr]]] + e.00 \ W + W W W t + ILI w w j, L r� 'yp / f w LOD/JVE IrB LIAN50N 107 GDg 142 PG 233 106 me 3 / ' W / w 4 I RESERVE DEVELOPMENT CO„ LLC DB 202lPG IB 344 24 PG 3�4 W NOTES: I) FOR I- PROFILE SM SZZWTS 32 AND 33. o a ' 2) PAYM SIYOULDER TAPERS ARE 8.1 UAMSS OTAMR97SE NOTED. LODANE WLLIAMSON 08 ,06 " .233 3 ►6 90 NO REVISIONS CAN BE MADE TO THE CONTROL OF ACCESS WITHOUT APPROVAL OF NCDOT, DENR AND USACE. -L- STA. 191*65.02 16.85' RT= -BL- R2245-15 PINC 187+51 -L- STA.198*11.51 9.75, RT= -pi - a,> PImP ios.Oo e /,0 tv YOUNG'S GAS d GROCERY OF WMABOW, TIC 109 DDO O 1436 PG RLPO M0.1w'f Rift"NcE NO. 57 NO. R -2245 kw SKEET NO. IOAQWAY DESIGN HYDRA MICS ENdNi£R a CiNL6L PRELIMIN.4RY PLANS D0 NOT LTS[ rot CONSTT VCTIOY NO R PG V5 2 Ile22 PG 159 \�\ • � w h BMW ELEVATION = 60.I7' N 7693189+ E 22249.3 , RESERVE DEVELOPMENT M LLC L STATION 1ttSET IN 2ag.39'LEFT �Q7 Dg 2021PG 13a3 \ w w w RR$ SET rN 12' PINE / �B 24 PG 3/S SU1LY E4 MFE _ DO w \\ \ FILTER i' sm 1+ I H SY. SITIO +75.00 � µ r -L- PC STA. 192 t 8& 97 { w/ - \ \ \ l t +50,00 4.Op, A8 F s`a•• n { 'o w 1LI7 EQUALIZER niEL \ \ +50.00 12- (Lill to w so" w-4—" F 81 � �r T s A w g '� . ^ - S N qg• 3Y 40 4' E N 56.2V 46$ E O : \ F ODo > IS c N r1 r 34'�26.6 w a g ` r FGi 1 3 0 CD f , � ' �7 A \ r YOUW-S GGR AS 5 OCERY Jqc _ — — — — ' — �~ aO I •r Rtraw OF tru«ABOW. we -- — — F �\ �— — w cEST. � t ipN D8 1337 PG R35 FEET. S 1200 'Y. w MS /; PG 296 Mo ME 23 PG 34 3 +43.DD \ \ \ w 3 -L- POT TA I = O w \ IO7 RESERVE pEVHLDPMENT [O., LLC -ACC3- POT STA IO+OO.OD MB 224 K 34+3 , +ss.00 -Acts-\ \ � \ 107 RESE ERRVLE DEVELOPMENT CO- LLC0 \ \ 00 0 7a PG N 3 �^� W in 0 \ w \ w <a) 1 0 rRaP. Rnv P1510 199f0 M \\ Z�= 3452'189'1LT) g \ w — J \ \ S.E. .. 0A5 w w \ Y ' EDIAN \ \ Ri ` NOTES: 1) FOR L— PROFILE SHE SHEET 33. MATCH LINE SEE SILEET 26 —ACC3— STA. 13+40.00 VACCESS ROAD TO BE CONSTRUCTED BY OTTERS. 3) PAVED SHOULDER TAPERS ARE 8:1 UNLESS OTHERWYSE 110TTP 4) SEE SMET 2- FOR S0'TR.4NS177ON FROM 1 •-6* C&G TO 1'--9" C&G. NO REVISIONS CAN BE MADE TO THE CONTROL OF ACCESS WITHOUT APPROVAL OF NCDOT, DENR AND USACE. A PROJECT UPSRENCE NO. SHEET 1 R-2245 18 W SHEET NO. ROADWAY DESIGN EP401HffX USE PRI LI oo NOT USE ra NYDKAULICS IN&HEER RY PLANS oovsrrtvcTiaN —Z — Pl S1a 199f05L6 o= 34'52'18grLrl OF >.ea4►80K. D+C D = Z 54 30.3' YOLr4G•S GAS a GROCERY L = lJ9900 T = 618.72� DB I33T PG 135 R = 1.970LICT 104 L4 r. PSG ( � ' � 's19 Em S.E. � OA5 n PG �9 �S 23 PG E3 -L- STA. 208+83.17 6.79' LT= r Q BUEY SMALL AHL1AAl PASSAGE PP! 1.0' AND wE -BL- 84 PINC 204+71A BACKMLL ENnRE LENGTH Of PIPE: ` LE -L- STA. 203+26Z E.74' RT= WITH t.0'i0P sou -BL- 83 PING I99+14.16 BURY ANIMAL PASSAGE PPS 1.0'AND s _ i. _ / i SERVE DEVEL Co-t. � g .* RACKRLI ENTIRE UE GTH OF PIPE-7.k. . i * WRR I. OF SOR _ . * s { "1�,sa� . - i w N PG 344 i * 4. i _�,� / * _ % �_+^ WIRY IGUAu PE + i BURY TZR PP! +85.97 � t L i BURY Ep BURY c4u t.D' 114 CiG ; r 4' PS Y i i i "Is s IS r i i i E +50.D0 -L- x i i / ♦ / i i i JL i!OLRWS GAS A GROCERY OF ■ + ROC DB t337 37 PCPG 135CS 436 i 109 K PG PG5 M NB ' re n PG *Us z3Pcas f07 RESERVE DE„LOPUENT CO.. LLL m /OB NO 24 PG 544 1310211 ELEVATION'= 55.79' i * # / N 77905.10 ,F 2252583,40 L STATION 2CG 70.51*02.34'RIGHT i i / / RR$ SET IN 8' PVNE /' l / � ti4 o / s t � i NOTES: * * 1) FOR -U PROFILE SEE SHEETS M AND 34. I 2) PAVED SHOULDER TAPERS ARE 8:1 UNLESS OTHERWISE NOTED. 3) SEE SHEET 2- FOR SO'IRr4NS17TON FROM 1-6' C&G TO Y--9- C&G. -[ [ YOUNG'S GAS & GROCERY OF WMABOIE, REC DB 1337 PG 135 109 meaPPGG2%klOO NB 22 PG 69 r � � we 23 PG RS S W � RUBY ect! L 1.0 { Wn I � � N 1 i 116 h � a• rs x s Y . y t Y Y Y . Y 147 � 02[YP6�3LOPMENT C0 LLC M8 24 PG 344 P! Sto 225+802 p- IZ09'43flLT) D = f58 326' L = 61557' T W35' R 2-QwD0' S.E. - OD4 PROJECT REFERENCE NO. SHEET NO. R-2245 !9 144Y SHEET NO. ROADWAY DESIGN HYOOAULICS [ fWNWEER ENGINEER PRELIMINA FtY PLANS DO vor c^sx pq ctxsrxurnox a YOUNG'S GAS t GROCERY plto . OF WINKA".INC D6 L331 PG R35 \ 109 PG 4B K PG 296120O wS 22 PG 159 \ N6 23 PG 13 S a� 56• it\ 1m, L "R' RIMUP .1TON u6.6z' NO REVISIONS CAN BE MADE TO THE CONTROL OF ACCESS WITHOUT APPROVAL OF NCDOT, DENR AND USACE. NOTES. 1) FOR -I— PROFILE SHE SHEET 34. 2) PAVED SHOULDER TAPERS ARE S:1 UNLESS OTHERWISE NOTED. 3) SAS SHEET 2- FOR 56'TRANSITION FROM P-6- C&G TO 1'-9- CBPG. IRMC! NO. SHEET NO. >45 1 20 w SHEET NO. -L- PI SIC 225+802 p= IZ 09'43f(LT) D = r58'326 L = 815.57' T = 30835' R 2SOOD0 SE.= OD4 BM212 ELEVATION = 55.52' N 80407.77 E 2262706.47 L STATION 231*37.05 391.22' LEFT RRS SET IN 10. PWE m 107 RESERVE OEVEEOPKNT CO_LLC M 20 K 013 W 24 PG 344 YOUNGS GAS 6 GROCERY OF �01. INC W 1337 PG 935 09 DSiMKI N L@ n PG 69 N 3® 23 PO 33 Q c� �a Q a a FDENR REVISIONS CAN BE M DE TO THE CONTROL ACCESS WITHOUT APPROVAL OP NCDOT, AND USACE. g � L N a a a a a � Q a a � a OCL •Y OlJUf M. GR.I TONN / -L- PISIC 23741805 p= Tf39'48.9'(RT) D=Z36159' L = 8782r T = 341BZ R - 2200DO' SE.= OD5 PRELIMINa voRY PLANS 0o nor usdll ronsmurnory 5 NOTES: I) FOR —4 PROME SEE SHEETS 34 A?M 35. 2) PAVED SHOULDER TAPERS ARE 8:1 UNLESS OTHERMSE NOTED. 3) SEE SHEET 2— FOR 50'TRANS177ON FROM I-6• C&C, TO 2'-9" C9&O. NO ' REVISIONS CAN BE MADE TO THE CONTROL OF ACCESS WITHOUT APPROVAL OF NCDOT, DENR AND USA CE. YOUNG'S GAS 3 GROCERY OF WMALBOW. INC OB 1337 PG 135 ,09 08 1436 PG 1200 [� R PC 296 MS 22 PG 69 STA4. I3 SIFT 22 , 7- ST . 13+98.06 23.0 RT= Y6 9 P1NC IO+B 16_ MOVA DICAL MALL. P.A. s DE w2 457 0 y , m Is 23 323 P ` 1 a �4 15 n LATERAL rj y- 1 BASE DITCH M n 40 1 ii $EE DETAIL �4►C 1j 910�� MB 23 PG [3 LATERAI. + 1L •,,p LL �. \�" \ •� RASE DITCH SEE DETAIL (l O � 4t Flrr- DETAIL Bm213 ELEVATION - 44.33' V 11 \ LATERAL BASE DITCH N BIMAI E 2263298.32 II BEG.' vew CE' Ir /6ISIO I Net to S d.r l Y7 STATION 15+24.28 93.09'RIGHT, FU RRS SET IN 12' PINE Sim. D W Hln. D= 1 Ft. SEE LIST BELOW FOR 'B'DR4EHSIDN eL * I r -L- STA 244-00 LT to -L- STA 248-20 LT B=3' -Y7- STA N)+00 RT to -Y7- STA IT+96 RT B=3' g�N,r SEE DETAIL -Y7- STA 12+75 LT to -Y7- STA 16-00 LT B=3' -Y7- STA 19+14 LT to -Y7- STA 23-88 LT B=2' -Y8- STA I2+05 LT to -YB- STA 12.77 LT B=5' -Y8- STA 10+57 RT to -YB- STA 16.50 RT N 3 CL'E' RIP -RAF gT.Z TON J FITTERFABRIC ESTT. TUON F esT.T Sy. t� (v FILTER FIJ RIC c \ EST. T E''T +4 . - - l :'' Pr q�•e 1q00 49 r 1 1 q► �\ ` pIE�P. 46• FED 1� /� h PRDP. 48' GA C +80 OD TOE x 6d { 17 r► /L I j 1 I .94 No Rr 35. T10WSM I'L- - (LT). � i r t ir 117 \ \ r 6RIC N0 +50.50 - \ IATRI0 +DD.DDWas -YM \ \ m E EE vrAL L<T1 �\ TDli ems°' PROJECT REFERENCE NO. smurr NO. R -2245. 21 -- µu SHEET NO, LOADWAY OmGN HYDRAULICS ENGINEER ENGINEER PRELIMINA RY PLANS Pn r er USE roll CGNS U'C N 118 / JOSEPH IL EDWARDS, SR. / ATLANTIC TELEPHONE DB COO PG 779 MEMBERSHIP CW PG 32, 08 723 PG 3T0 IB 23 PG 323 Le s Pc 2E7 -YB- STA. 16+28.66 14.03' LT= / -BL- R2245-17 POT 250+94.04 / y V s )_Y ,r c 14W � X END CONSTRUMON ���►� xeI4D F. ; -YB- POT STA I6+50.00 R� x � u3 LATERAL SASE DITCH WLWM J. BATS SEE DETAIL AIB 11 PG 26T 1 x cra PRO. 4Q00 -r- Q w 'y -L- STA. 24B+41.63 48: 9' RT= - L PIN -BY6- 88 MC l� 15+25.6 PC STA.1243+40.02 0 r LATERAL rOUMG'S GAS & GROCERY OF 135 a. EAS! Drtvi; SEE DETAIL DB 1337 PG 09 DB 1200 POT STA. 248+66.02 POT STA. 18+61.92 KA36 PG 29 me22 Pc 159 -Y7- POT STA. I0+00.00 -YS- A ST. PROF. FENCE END FR. WW I 1 } [M1 } F. AS WW FENCE 1 123 22 } - - P1 S1a 245+91.31 P1 Sia 10+5121 . 10+29.76 p= 15'53'423'1LT1 A- 12'14 28.rQT11 D - 3' 10' 59Z D 28' 338 52.'r Y. 20 L = 49936' L = 4273' T = 25129' T = 21.45' R = 1.800D0 R = 200A0' S.E. = 0,04 END TIP PRO ECT R-2245 POT STA. 248 + 66.42 4 340 .n rz 238 1 -L- MyME7ON AVE. 48- MIDWAY RC: -74 18 7z 20P3 AD7 w Lars 418 NOTES: 1) FOR -Z- PROFILE SEE SHEET 35. 2) FOR -17- AAW -YS- PROFILES SEE SHEET 39. 3) PAYED SHOULDER TAPERS ARE 8:1 UNLESS OTHERWISE NOTED. VFOR Y7- TEMPORARY WIDENEW FOR STAGED CONSTRUCITON, EE SiIEET 2-E AND TRAFFIC CONTROL PLANS. PROIECi REFERENCE NO. 8 RLIAM J.BATUY105 IDS Aht MIT O wP 2*7 I.. -I- Q 3 00 MP WAT PA14NIt w DETAIL DETAIL RIP RAP AT EMBANKMENT LATERAL BASE DITCH bt w smN br ro sew irme s � 3 `fJs1- i.'eo�. Ve,ey D �sw. �T— 1 Ft. Gv M iw D = 2 ft. ipe et Itw . oe.. ift em -Y7- STA 19+14 LT tD -Y7. STA N+38 LT -Y7- STA 23.90 LT DETAIL CUT DITCH Ibr r SCUV w D M1,0 = I Pr. -Y7- STA 21g0 LT to -Y7- STA 23.80 LT -Y7- STA 2. LT to -Y7- STA 27-75 LT wQ N 600' lT. TURN ERNE TAPER N it'Y 50'• N 7t'Y Sp'• 190.9]' tC0.00' JAPES E. MCCRACKEX GENE ALAX BARRETi u4 OB $ss PG 405 IIS m 35T PD 617 MB N Po 1M I VB X PG 2M '!5 Q m1y 7 ; � +oo.00 - - e�'P+M.w zEEN< Sf. MV NiN E E/ TDE I I c PROP. 48-1 WW "Pic, MOA. W % A' ECM: -Y7- 7A1 7 4 -8Y6- 94 `PINC 19+1 `o -Y7- STA.24t -BY6- 91 PINC YOLNG'S GAS A GROCERY OF nNNABO-. NC DB 1337 PG 135 109 ABOB s A n na�0° b n PD 69 MB 23 PG AT / hS4ll 'I 0 C3 tll Ili/ III 4J DrtcX x�l//l /I { III PI El c M' 2u svixro'n suwv nA 27fln i r.4A• ww RT= -Y7- F 116 OBJisOLRG�901 W A PG 296 -L- STA. 247+89.57 003.78 RT= -BY6- 92 POT 25+82.75 Ev . NOT VSL b( GVNST0.VCTON I) FOR -Y7- PROFILE SEE SHEET 38. 2) PAVED SHOULDER TAPERS AU 871 VAMSS onIFRWISE NOTED. 3) FOR -Y7- TEMPORARY WMENZNG FOR STAGED CONSTRUCTION, SEE SHEET 2-E AND TRAFFIC CONTROL PLANS. +• tt r_ . L� z; i