Loading...
HomeMy WebLinkAboutSW8060116_COMPLIANCE_20060106STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW90119OI�& DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE FCOMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD I INFILTRATION BASIN ANALYSIS PROJECT NUMBER 060116 PROJECT NAME Venetian Bay DRAINAGE BASIN Lumber RECEIVING STREAM UT ICWW Index No 15-25 SITE AREA 34 84 acres IMPERVIOUS AREA CALCULATION BUILDINGS Streets/Parking Sidewalks Future TOTAL % IMPERVIOUS, 1= I ELEVATION OF SEASONAL HIGH WATER TABLE REPORTED INFILTRATION RATE SURFACE AREAS AND ELEVATIONS FILENAME S 1WQS11NBASIN1060116 WK1 DATE 20-Jan-06 REVIEWER P Bartlett CLASS SA, HQW If ORW, is site within the 575' AEC? DRAINAGE AREA 801a,87 SF / Rational C 220,208 095 283,640 095 29,621 095 3,000 095 �364$9 0 7b Place a "1" here if Rational RV= 05+ 009 (1) = 0 65 1Z 5 FEET MSL 20,$ INCHES/HOUR or 0000481 FPS Elev (ft) Area, sq ft Inc Volume Acc Volume BOTTOM 145 18,159 145 18,159 0 0 145 18,159 0 0 TOP 18 24,037 73843 73843 VOLUME 1 DEPTH 1 DRAWDOWN CALCULATION DESIGN STORM, INCHES DESIGN VOLUME TOTAL VOLUME AVAILABLE DEPTH OF RUNOFF TIME TO DRAWDOWN 25 YEAR 24 HOUR STORM NIA Intensity, i = 33 inches 1 hour Qr=CiA= Qp through the bottom of the basin= 10 YEAR 10 MIN HIGH INTENSITY EVENT Intensity, i = 6 3 inches 1 hour Volume for 10 yr 10 min event = 15 AM: CUBIC FEET 73843, CUBIC FEET 350 FEET 28 HOURS MUST BE <120 4 26 CFS 8 74 CFS Must be > Qr 48814 30 CF < 73843 CIF COMMENTS Volume and drawdown are (not) within Design Requirements