Loading...
HomeMy WebLinkAboutSW8051135_HISTORICAL FILE_20051220STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW �J�CC ?✓S DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE amfzoZaQ YYYYMMDD State Stormwater Management Systems Permit No SW8 051135 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Dr Ronald Core & UNC - Wilmington UNCW - Wagoner Hall Renovation UNCW - New Hanover County FOR THE construction, operation and maintenance of an underground infiltration trench in compliance with the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit This permit shall be effective from the date of issuance until December 20, 2015, and shall be subject to the following specified conditions and limitations I DESIGN STANDARDS 1 This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described in Section 16 on page 3 of this permit The stormwater control has been designed to handle the runoff from 1,900 square feet of impervious area This trench must be operated with a 30 ft vegetated filter 3 The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans There is no built upon area available for future development in this permit 4 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans 5 The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system Page 2 of 7 State Stormwater Management Systems Permit No SW8 051135 6 The following design criteria have been provided in the infiltration trench and must be maintained at design condition a Drainage 2Area, acres Onsite, ft Offsite, ft 2 b Total impervious Surfaces, ft2 c Design Storm, inches d Trench Dimensions, L x W x H, ft e Perforated Pipe Diameter/Length f Bottom Elevation, FMSL g Bypass Weir Elevation, FMSL h Permitted Storage Volume, ft3 i Type of Soil i Expected Infiltration Rate, inlhr k Seasonal High Water Table, FMSL I Time to Draw Down, hours m Receiving Stream/River Basin n Stream Index Number o Classification of Water Body II SCHEDULE OF COMPLIANCE 020 8,700 0 1,900 1 40x10x12 6' 140 ft 358 385 197 Baymeade 1 338 56 UT, Bradley Creek 1 Cape Fear 18-87-24-4-(2) 1,SCor 1 The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface 2 During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately 3 The permittee small at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to a Semiannual scheduled inspections (every 6 months) b Sediment removal c Mowing and revegetation of slopes and the vegetated filter d Immediate repair of eroded areas e Maintenance of all slopes in accordance with approved plans and specifications f Debris removal and unclogging of bypass structure, filter media, flow spreader, catch basins, piping and vegetated filter g A clear access path to the bypass structure must be available at all times Page 3 of 7 State Stormwater Management Systems Permit No SW8 051135 4 Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ The records will indicate the date, activity, name of person performing the work and what actions were taken 5 The facilities shall be constructed as shown on the approved plans This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data 6 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification A modification may be required for those deviations 7 If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility 8 Access to the stormwater facilities shall be maintained via appropriate easements at all times 9 The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below a Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc b Project name change c Transfer of ownership d Redesign or addition to the approved amount of built -upon area or to the drainage area e Further subdivision, acquisition, lease or sale of all or part of the project area The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan 10 The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction 11 A copy of the approved plans and specifications shall be maintained on file by the Permttee for a minimum of ten years from the date of the completion of construction 12 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made Page 4 of 7 State Stormwater Management Systems Permit No SW8 051135 III GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate The approval of this request will be considered on its merits and may or may not be approved The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request 2 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215 6A to 143-215 6C 3 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having Jurisdiction 4 In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems 5 The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility 6 The permit may be modified, revoked and reissued or terminated for cause The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition 7 Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual 8 Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit 9 The permittee shall notify the Division any name, ownership or mailing address changes within 30 days Permit issued this the 20th day of December, 2005 NOR TIOLINA IONMENTAL MANAGEMENT COMMISSION or A imek, RE , Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No SW8 051135 UNCW - Wagoner Hall Renovation Stormwater Permit No SW8 051135 New Hanover Count Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications The checklist of items on page 2 of this form is included in the Certification Noted deviations from approved plans and specification Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No SW8 051135 Certification Requirements 1 The drainage area to the system contains approximately the permuted acreage 2 The drainage area to the system contains no more than the permitted amount of built -upon area 3 All the built -upon area associated with the protect is graded such that the runoff drains to the system 4 All roof drains are located such that the runoff is directed into the system 5 The bypass structure elevations are per the approved plan 6 The bypass structure is located per the approved plans 7 A Trash Rack is provided on the outlet/bypass structure 8 All slopes are grassed with permanent vegetation 9 Vegetated slopes are no steeper than 3 1 10 The inlets are located per the approved plans and do not cause short- circuiting of the system 11 The permitted amounts of surface area and/or volume have been provided 12 All required design depths are provided 13 All required parts of the system are provided 14 The required system dimensions are provided per the approved plans cc NCDENR-DWQ Regional Office Tony Roberts, New Hanover County Building Inspections Page 7 of 7 DESIGN NARRATIVE FOR WAGONER HALL RENOVATIONS AND PATIO ADDITION UNCW CAMPUS NEW HANOVER CO, N C OCTOBER 2005 TABLE OF CONTENTS 1 0 PROJECT DESCRIPTION 20 SITE DESCRIPTION 30 ADJACENT PROPERTY 40 DRAINAGE CONSIDERATIONS 50 EROSION CONTROL CONSIDERATIONS 60 CONSTRUCTION SCHEDULE 70 VEGETATION PLAN 80 MAINTENANCE PLAN APPENDIX STORM WATER CALCULATIONS 7DEC E'VFD 2 0 2005 BY Wagoner Hall Renovations October 2005 m SEAL PE 0239f7 �4 P 4 Al 4.e �4'�va °f �aa ew�� IZ 1 Project Description The Wagoner Hall Renovations protect is primarily an interior building modification but has the addition of a dining patio outside of the existing building The site is located on the campus of UNCW on Walton Drive The land disturbing activity associated with the protect will consist of clearing and grubbing of vegetation, grading and installation of unit pavers, and the small collection system to an underground infiltration trench The protect area for the site is 0 40 acres, the disturbed area for this protect is 0 25 acres, and the total impervious proposed for the protect is 1900 square feet The protect has been designed as a pocket of high density with an underground infiltration trench for treatment of the stormwater 2 Site Description The protect site is in New Hanover County, NC, located on the campus of UNCW and drains to an unnamed tributary of Bradley Creek New Hanover County Soils Survey by USDA SCS has soil type listed as Baymeade with permeability rates ranging from 1 to 8 0 inches per hour at depth 11-54 inches New construction onsite will consist of a unit -paver patio and concrete sidewalks that will drain to the underground infiltration trench Land use in the vicinity is educational 3 Drainage Considerations The protect being a pocket of high density will require treatment of the 1 inch runoff of built upon areas An infiltration trench is designed to store 188 cubic feet of storm water runoff volume in 40 linear feet of 6" corrugated plastic pipe 5 Erosion Control Considerations The following erosion control measures are used on this protect Temporary Gravel Construction Entrance/Exit To prevent sediment from leaving the site, temporary gravel construction entrance should be installed where Brookhaven Road enters the site For dimensions and specifications, see construction details 2 Land Grading The land will be graded to drain off in all directions from the building Fill on site will be required to have elevation of finished floor above flood elevation Roadways to be sloped to follow with natural grades 3 Silt Fence Silt fence should be installed prior to clearing and grading activities Silt fence should be checked routinely If needed, silt fence should be cleaned and replaced if damaged See Construction Detail for dimensions and specifications Wagoner Hall Renovations October 2005 6 Construction Schedule 1 Obtain plan approval and other applicable permits 2 Hold pre -construction meeting at least one week prior to beginning construction 3 Install temporary construction entrance/exits 4 Before clearing and grading of the site, install silt fencing and clean and replace as necessary 5 Begin clearing and grading of the site 6 Fill site as needed to accomplish finish grades 7 Install patio, drainage system, and infiltration trench 8 Seed and sod areas as required 9 All erosion and sediment control practices will be inspected bi-weekly and after each rainfall event Needed repairs will be made immediately 7 Vegetation Plan 1 After complete stabilization of the entire covered area, top cover soils will be roughened by making 1 "-2" deep grooves perpendicular to the slope 2 Spread lime (agricultural limestone) evenly over the area at a rate of 1 5 tons/acre, spread 10-10-10 fertilizer at a rate of 1000 lb/acre and incorporate into the top 6" of Sol] 3 Loosen surface prior to applying seed 4 Broadcast seed at recommended rates 5 Rake seed into the soil and lightly pack to establish good contact 6 Mulch with 4000 lb/acre grain straw or equivalent and anchor by weighted farm disc set nearly straight or other mulch anchoring tool 7 Mow as needed and refertilize in late winter or early spring by topdressing with 10- 10-10 fertilizer 8 Graded surfaces shall not be exposed without grass coverage for more than 15 days If grades are not complete and exposure is more than 15 days, temporary seed with rye grain at 50 lb/acre 8 Maintenance Plan 1 Contractor shall maintain all sedimentation and erosion control devices during construction Wagoner Hall Renovations October 2005 2 All devices shall be checked after each rain event and weekly Repairs shall be made immediately when detected 3 Contractor shall complete the inspection reports required by the approved Storm Water Permit and have logs available on site 4 Any deficiencies shall be brought to the immediate attention of the Engineer and Owner Seed Types and Application Rate 1 Schedule Temporary Seeding Grass Type Amount/ 1000 SF Time of Seeding Initial Rye Gram 1-2 Ibs Nov —Jan 25 Ibs 10-10-10 Brown Top Mullet 1-2 Ibs June— Aug25 Ibs 10-10-10 Permanent Seeding Grass Type Amount Time of Initial Fertilization 1 Fertilization I Fertilization 1 11000 Seeding 1000 sf 1000 sf 1000 sf sf Maintenance maintenance maintenance Burmuda, 1-2 Ibs Apr — 25 Ibs March -April Each 4-8 Aug -Sept Common June 10-10-10 12lbs Weeks 12lbs 10-10-10 1-2 Ibs N 10-10-10 Fescue, Tall 5-7 Ibs Sept — 25 Ibs Feb -March May & Dec Sept -Oct (Kentucky Oct 10-10-10 12lbs '/2 to 1 lb n 12lbs 31) Feb — 10-10-10 10-10-10 Oct Bermuda March — 25 Ibs March -April Each 4-8 Aug -Sept Sod Apr 10-10-10 12lbs Weeks 12lbs 10-10-10 1-2 Ibs N 10-10-10 END OF PLAN Wagoner Hall Renovations October 2005 GHT ANGLE ENGINEERING, PC 212 Princess Street Wilmington, NC 28401 Tel (910) 251-8544 Fax (910) 251-2208 December 15, 2005 Mr Rob Gordon, PE Environmental Engineer NCDENR 127 Cardinal Dr Ext , Wilmington, NC 28405 Fax 350-2004 Re UNCW Wagoner Hall Renovations Mr Gordon, Per your comments we are enclosing revised design drawings, application, supplement, and calculations for high density development on the above mentioned site If you have any questions during your review, please feel free to call at 251-8544 Si y, neLpp PE Project Engineer Right Angle Engineering RECEIVED DEC 2005 4 LJNCW/Jarrett Bay Subject: UNCW/Jarrett Bay From: Robert Gordon <Robert Gordon@ncmail net> Date: Wed, 07 Dec 2005 16 49 06 -0500 To: shane lippard <raepcsl@be]]south ne/aagoner Shane, I found Vincents site visit for thHall pro3ect (he was out when I did the review Monday) He had written dofrom elevation 38 0 (or SHWT -33 8) Your drawings indicated a SHWT of 33 0 Not sure what implications this has on your drawings, but please make the correction Also, remember to email me the site plan and sketch so I can send to the folks in Raleigh to discuss Directors Certification for the Jarrett Bay pro3ect Let me know if you have any questions Thanks Rob Gordon Express Stormwater Permitting (910) 796-7303 1 of 1 12/9/2005 4 44 PM FAX COVER SHEET Date: December 5, 2005 No. of Pages. 3 To: Shane Uppard, PE From- Robert Gordon Express permitting section Company: Right Angle Engineering FAX # 910-350-2004 FAX #: 910-251-2208 Phone # 910-796-7303 DWQ Stormwater Project Number.SW8 051135 Project Name: UNCW — Wagoner Hall Renovation MESSAGE: Attached is the request for additional information for UNCW — Wagoner Hall Renovation The original will be mailed to the applicant and a copy will also be mailed to you Please give me a call if you have any questions Thank you �oF WATF9Q Michael F Easley, Governor p (� William G Ross, Jr, Secretary 7 North Carolina Department of Environment and Natural Resources 0 Alan W Klimek, P E Director Division of Water Quality December 5, 2005 Dr Ronald J Core UNC Wilmington 601 South College Road Wilmington, NC 28403 Subject Request for Additional Information Stormwater Project No SW8 051135 UNCW -Wagoner Hall Renovation New Hanover County Dear Dr Core The Wilmington Regional Office received a Stormwater Management Permit Application for UNCW - Wagoner Hall Renovation on November 22, 2005 A preliminary review of that information has determined that the application is not complete The following information is needed to continue the stormwater revie 1 Please include Dr Core's titl n�the application 2 Please include a North arrovn -6n the drawings 3 Please define a protect area that includes all pro sed improvements There was a value of 0 25 acres used in the calculations, 0 2-acre value was used on the application (the same as th=in a area) ease also dimension this project area 4 Please show any wetlands project area or add a note indicating that no wetlands exist within the project area 5 Please include a bypass and a 30 ft v �ated filter for the bypass runoff Please also include details for each of these 6 Please specify filter fabric around the infiltration trench (not just the pipe) 7 Please add the bottom and SH elevation to the cross-section of the infiltration trench system 8 The storage elevation liste n the upplement appears to be incorrect 9 Please clarify where the 6"Ihr i f ration rate was from Please note that this request for additional information is in response to a preliminary review The requested information should be received by this Office prior to December 15, 2005, or the application will be returned as incomplete The return of a project will necessitate resubmittal of all required items, including the application fee If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter The request must indicate the date by which you expect to submit the required information North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796 7215 Customer Serncel 877.623 6748 One Mmington Regional Office Mmington, NC 28405 3845 FAX (910) 350 2004 Internet h2a enr state nc us North Carolina An Equal Opportunrt /Affirmative Action Employer — 50% Recycled110% Post Consumer Paper JVataaally UNCW -- Wagoner Hall Renovation December 5, 2005 Stormwater Permit # SW8 051135 The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215 1 and is subject to enforcement action pursuant to NCGS 143-215 6A Please reference the State assigned project number on all correspondence Any original documents that need to be revised have been sent to the engineer or agent All original documents must be returned or new originals must be provided Copies are not acceptable If you have any questions concerning this matter please feel free to call me at (910) 796-7303 Sincerely, , I a�D -'� Robert D Gordon Environmental Engineer II ENBIRDG SIWQSISTORMWATERIADDINFO120051051135Dec5 cc Shane Lippard, PE, Right Angle Engineering Robert D Gordon 1 � , FILE MODE 440- MEMORY TX P 1 COMMUNICATION RESULT REPORT ( DEC. 5 2005 2 52PM ) * * * TTI NCDENR WIRO OPTION - ADDRESS (GROUP) T PAGE ------------------------------- --------------- ---- 9-2512208 P 3/3 ------- ---- ------ - --------------------------------------------------------- __ _ ____ REASON FOR ERROR E-1) HANG UP OR LINE FAIL E-2) BUSY _ E-3) NO ANSWER E-4) NO FACSIMILE CONNECTION FAX COVER SHEET —IT, s1 Date; December 5, 2005 No, of Pages: 3 To: Shane Uppard, PE From: Robert Gordon 0- Express permitting section Company; Right Angie Engineering FAX # 010.3502004 FAX #: 910251.2208 Phone # 910-796-7303 DWQ Stormwater Project Number:SWB 051135 Protect Name: UNCW —Wagoner Hall Renovation MESSAGE: Attached is the request for additional information for UNCW — Wagoner Mall Renovation, The odglnal will be mailed to the applicant and a copy will also be mailed to you. Please give me a call if you have any questions Thank you. 4 f' INFILTRATION SITE VISIT REQUEST Name of the Project ��rtk o"N -I�a.i I A. da-4~i o 5- Location {attach a clear vicinity map} Il ba%vi _ Street address, SR number, community, etc Directions from the nearest major intersection 344J� pr,n -3v--- CGk,(I Ls Owner/Applicant Name N C. \J 3 Consultant Name Consultant Contact Information Phone fax email, etc #1 #2 #3 #4 #5 #6 #7 #8 n , Existing ground elev @basin/trench= 38 SHWT elev = P it SHWT plus 2' {max bottom elev }_ Date/Time of Soils Investigation Summary/Comments // y' S,> >I tG.k fb r c � 1 //2 S ; 3 6 rd s 0aA- All proposed infiltration areas and existing, active utility Imes located within the proposed basin/trench must be (narked and flagged If these areas are not flagged, the Soils Scientist reserves the right to decline to do the investigation If the proposed infiltration system will be located in an area of existing pavement and there is no open area nearby, equipment capable of breaking through the impervious layer must be provided The soils investigation does not take the place of a soils report prepared by an appropriate professional The Soils Scientist will only verify the soil conditions that are reported in the Soils Report, and make a determination as to the suitability of the site to meet the infiltration design requirements under NCAC 2H 1000, and assumes no liability should the system fail dvA sndAv3 M3Nn 26' _ ® OfFI([ FW6 PREP MEf%3,VaCAI Lf�j _ �I-'- 0 € i E E 2x2 CONC CB ki 420 WITH ALUM GRATE TQP=39 0 -atf0 I 37 j I INV =37 0 R10.0 I l 6" DBL WALL T� EXISTING DINING R00 � E CPP 1 FFE = 42 0 PROPOSE CONCRETE PATIO 420 B M REGRADE TO DRAIN J® 1500 SF — t I �--AND SOD AREA INSIDE 335 87 i THIS LINE TO PATIO ACCESSIBLE RAMP 1 _ 110,0 r _ 99 I DRAINAGE AREA -� 5 4 0 }I6,7J PROPOSED SIDEWAL 2x2 CONC C B SQD WITH -I, ALUM GRATE TOP=38 5 `--�--__ �- � EXISTING SIDEWALK - - INV =36 5 — -- 6" DBL WALL `' a ,,,.—SILT FENCE Cpp .a ~` n SAWCUT AND PATCH AS NECESSARY c DRAIN TRENCH PIPE INV TO INF TRENCH=3� O 400 �-1 SILT FENCE r 1t lk(= 4o' f MGHT ANGLE QQ ENGINEERING, PC 510 90,5/l 35 212 Pnncess Street - Wilmington, North Carolina 28401 - Tel (910) 251-8544 • Fax (910) 251-2208 - email raepcCaol com TO C'C�m r W ► Ak-o ATTENTION LETTER OF TRANSMITTAL DATE PROJECT NO RE utic- 0 �Jt6'-0, TRANSMITTAL. NO PAGE OF WE ARE SENDING ❑ Originals ❑ Prints ❑ Shop Drawings ❑ Samples ❑ Specifications ❑ Calculations ❑ Other QUANTITY DRAWING NO REV DESCRIPTION STATUS rc 55 1 Issue Status Code A Preliminary B Fabrication Only C For Information E Construction F For Review & Comments G For Approval Action Status Code I Approved As Submitted 2 Make Corrections Noted 3 Other 4 Amend & Resubmit 5 Rejected - See Remarks D Bid H See Remarks /, 4' s M� 1 1: 1 r .. 1 r Signed ---V A P 1 FILE MODE 761 MEMORY TX * COMMUNICATION RESULT REPORT ( DEC 20 2005 5 00PM ) * * * TTI NCDENR WIRO OPTION — ADDRESS (GROUP) ��#��Stl PAGE —------------------- — --------------------- — 1 REASON FOR ERROR E-1) HANG UP OR LINE FAIL E-3) NO ANSWER ^ 92512208 E-2) BUSY E-4) NO FACSIMILE CONNECTION State of North Carolina Department of Envlratu cnt and Natural Resources Wibnmgton Regional Office Michael 1~ Easley, Governor William G Ross Jr, Secretary fY S FAX COVER SHEET Dote: No. O Pig CIO 2 e ver) To:-40t K— From: CO; CO: NC NR FAX #: FAX#; 910-350-2004 REMARKS :���0�.,,,ti: 121 Cardinal Ov ive Extmaien, VAlmington, N.C. 2840MM Telepbene (410) 796-7215 Fax (010) 330-=4 An Equal Opporwi y Affirmud" Adfan Employer P. 8/8 TINGLE ENGINEERING, P C 212 Princess Street • Wilmington, North Carolina 28401 • Tel (910) 251-8544 • Fax (910) 251-2208 • email raepcOaol corn To 46 6-and. ATTENTION WE ARE SENDING LETTER OF TRANSMITTAL DATE 0r PROJECT NO RE TRANSMITTAL NO PAGE OF ❑ Originals ❑ Prints ❑ Shop Drawings ❑ Specifications ❑ Calculations ❑ Other ❑ Samples QUANTITY DRAWING NO REV DESCRIPTION STATUS I s►iG..h rw&.Va. Sej Issue Status Code A Preliminary B Fabrication Only C For Information E Construction F For Review & Comments G For Approval Action Status Code I Approved As Submitted 2 Make Corrections Noted 3 Other 4 Amend & Resubmit 5 Rejected - See Remarks Signed D Bid H See Remarks TopoZone - The Web's Topographic Map Page 1 of 1 w I- ••' - — fryi{' sty a I000. 41 err : • ' I �� r '`i��Fi1311�� '•/7 `• •S I Ft 'Lp{�§ 'i� {''6r �a f ,� ♦ {rl 'ti aa♦ - ­ ! ; � P«FFn .� (�k • w �9 d01, I" a Ip€iFt' E4j q f " �� �7�� tf, �154��N,,�Y`j`i', • ri��i�Y' p4fi�. aka ���" �ij� � n� � M E �' � ►y , .,ti �i} P '} `� �1 fly E F F ,F' OW t f if (F • . f E � fl N.x �, aj' l s, E�', � q•f y } f a ff i ��","���/i�� .r�g+i See a �""'f= s i fai3P' �•' iY" �95nrµr'Y>a !� ,•w�xg ;�' � } < W � , � �M � �„ ay+i 41 k ,�►'•rn . n�t� 4., 'F%�' .,. fi+�1 ti' X- \ �' •�� may► f " 1"; ��`'r��� eve,..-y.:�' � �°w`,G�.r�'i�,`F~` �,ih��E -' '^.�. ' "• �, 44P 2 c11a"� b� ¢�f`s•A4F€�lCi^fe" �..° 7,. �e4h'��t EF I:E��t� f E t F z$ �•�".■� �f dE��—^V'.T+"4 F'.r � � ,��b"��-t�C �,t 'j ,s;,� 1`i'�`, a � F trbC^ ✓ ��� .�� S. do J Ei " E N { 0 03 06 0.9 12 15km 0 01 02 03 04 05mi Map center is 34 22680N, 77.8735°W (WGS84/NAD83) Wrightsville Beath quadrangle Projection Is UTM Zone 18 !NAD83 Datum n.� M=-9 012 G=-1 616 http //www topozone com/print asp?z=18&n=3791038 8438764&e=235304 754222407&s=48 12/5/2005 NC DENR - DIVISON OF WATER QUALITY 0311 CAPE FEAR RIVER BASIN Classification Name of Stream Description Class Date Index No Wrightsville Recreational Area (including Lees Cut, Motts Channel and portions of Banks (Channel)) Lees Cut Motts Channel Banks Channel Bradley Creek Bradley Creek Shinn Creek In any waters within a line beginning at a point on the mainland along the Intracoastal Waterway 1400 feet north of the U S Hwy 74-76 bridge extending directly across the waterway to the northern edge of Lees Cut, thence along the northern edge of Lees Cut to the end of the Cut, crossing the Cut in a northeasterly direction to a point on Wrightsville Beach 1900 feet northeast of the U S Hwy 74 bridge, thence along the western shoreline of Wrightsville Beach to a point 4000 feet southwest of the U S Hwy 76 bridge, thence in a northwesterly direction across Banks Channel and mud flats to a point on the eastern side of the Intracoastal Waterway across from the southern edge of Bradley Creek, thence along the eastern side of the waterway to a point 1750 feet northeast of Channel Marker #128, thence directly across the waterway in a easterly direction to Money Point and along the western edge of the Intracoastal Waterway in a northeasterly direction to the point of beginning Entire Cut Entire Channel Entire channel south of the Wrightsville Recreational Area From source to U S Hwys 17, 74 & 76 bridge From U S Hwys 17, 74 & 76 bridge to Intracoastal Waterway From Masonboro Inlet to Intracoastal Waterway 60 SB # 10/01/87 18-87-24 SB # 10/01/87 18-87-24-1 SB # 10/01/87 18-87-24-2 SA,HQW 10/01/87 18-87-24-3 SC,HQW # 08/01/90 18-87-24-4-(1) SC # 10/01/87 18-87-24-4-(2) SA,HQW 08/09/81 18-87-25 2B 0300 UNCW School of Nursing Regional Energy Plant (NKT #06179-1) Subject UNCW School of Nursing Regional Energy Plant (NKT #06179-1) From "Amy" <anorris@nkteng com> Date Tue, 18 Mar 2008 09 10 07 -0400 To "'Janet Russell"' <Janet Russell@ncmail net> CC "'Carol Miller"' <Carol Miller@ncmatl net> Janet, Attached is a PDF of the State Stormwater & Erosion Control Express Request package Please review and contact us with an express review date and time for stormwater and erosion control Thanks, Amy Amy S Norris for John S Tunstall, P E Norris, Kuske & Tunstall Consulting Engineers, Inc 902 Market Street Wilmington, NC 28401 910-343-9653(Phone) 910-343-9604 (Fax) It is the professional opinion of Norris, Kuske & Tunstall Consulting Engineers, Inc that this electronic information provides design information current as of the date of its release It shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested In transferring the files in electronic media format, Norris, Kuske & Tunstall makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, w computer hardware differing from those used by Norris, Kuske & Tunstall in the preparation of such data State SW & EC Express Request Package for Janet Russell @ DENR - 03-18-08 pdf Content -Type application/pdf Content -Encoding base64 �ECE' VED MAR 1g2008 PROJ ,J DwQ 1 of 1 3/18/2008 9 20 AM Re UNCW School of Nursing Regional Energy Plant (NKT #06179-1) Subject- Re UNCW School of Nursing Regional Energy Plant (NKT #06179-1) From: Carol Miller <Carol Miller@ncmatl net> Date. Tue, 18 Mar 2008 10 20 40 -0400 To: Amy <anorris@nkteng com> CC: 'Janet Russell' <Janet Russell@ncmatl net> Amy, all we would need would be a revised plan The turn around time would be so quick for such a small proDect, I would think a express would not be necessary Carol Amy wrote IJanet, Attached is a PDF of the State Stormwater & Erosion Control Express Request package Please review and contact us with an express review date and time for stormwater and erosion control Thanks, Amy Amy S Norris for John S Tunstall, P E Norris, Kuske & Tunstall Consulting Engineers, Inc 902 Market Street Wilmington, NC 28401 910-343-9653 (Phone) 910-343-9604 (Fax) It is the professional opinion of Norris, Kuske & Tunstall Consulting Engineers, Inc that this electronic information provides design information current as of the date of its release It shall be the responsibility of the party receiving the data to examine it to see that it contains the necessary files and information requested In transferring the files in electronic media format, Norris, Kuske & Tunstall makes no representations as to the usability or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by Norris, Kuske & Tunstall in the preparation of such data 1 of 1 3/18/2008 11 05 AM North Carolina Department of Environment and Natural Resources Request for Express Permit Review NCDENR p For DENR Use ONLY Reviewer Submit Time confirm FiLL-IN all the information below and CHECK the Permlt(s) you are requesting for express review FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative site plan PDF file and vicinit ma same items expected in the application packa e of the project location include this form in the application package • Asheville Region Alison Davidson 828 296 4698,ahson dav_idson(�ncmailnet • Fayetteville or Raleigh Region -David Lee 919-791-4203, dav)d leetr�ncmail net E • Mooresville & -Patrick Grogan 704-663 3772 or Patrick grogan(u.ncmai! not ���\U -�(� • Washington Region Lyn Hardison 252-946-9215 or lyn hard)son(i�ncmail net • Wilmington Region Janet Russell 910 350 2004 or Janet russellpncmail net i NOTE Project application received after 12 noon will be stamped in the following work day Protect Name UNCW SCHOOL OF NURSING REGIONAL ENERGY PLANT County NEW HANOVER Applicant DR RONALD J CORE Company UNC-WILMINGTON Address 601 SOUTH COLLEGE ROAD City WiLMINGTON, State NC Zip Phone 910-962-3142 Fax 910.962-3550 Email NIA Protect is Drains into SC waters Project Located in CAPE FEAR River Basin Engineer/Consultant John S Tunstall P E Company Noms Kuske & Tunstall Engineers Address 902 MARKET STREET City WILMINGTON, State NC Zip 28401 Phone 910-343-9653 Fax 910-343-9604 Email jtunstall(@nkteng com (Check all that apply) ❑ Scopmg Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER 28403 E C E i V E n V MAR 18 2008 DWQ PROJ # ❑ Stream Origin Determinatlon # of stream calls - Please aftach TOP0 map marking the areas in questions ® State Stormwater ® General ❑ SFR, ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ® Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off --site (SW (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration ,_ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density -Constructive Wetlands — # Treatment Systems ❑ High Density -Other _ # Treatment Systems ❑ MODIFICATION SW (Provide permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® Land Quality ® Erosion and Sedimentation Control Plan with 017 acres to be disturbed (CK # (for DENR use)) WETLANDS 9VES TIONS MUS r 8E ADDRESSED RE'LO W ® Wetlands (401) Check all that apply Wetlands on Site ❑ Yes ® No Wetlands Delineation has been completed ❑ Yes ® No US ACOE Approval of Delineation completed ❑ Yes ❑ No 404 Application in Process wl US ACOE ❑ Yes ❑ No Permit Received from US ACOE ❑ Yes ❑ No Fee Split for multiple permits {Check# Isolated wetland on Property ❑ Yes ® No Buffer Impacts ❑ No ❑ YES acres} Minor Variance ❑ No ❑ YES Major General Variance ❑ No ❑ YES 401 Application required ❑Yes ❑ No If YES, ❑ Regular Perennial, Blue line stream, etc on site ❑ yes ❑ No For DENR use only Total Fee Amount SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance Mal, Min $ SW ❑ HD, ip LD, ❑ Gen $ 401 1 $ LQS $ Stream Deter,,—,,,_ $ G k(-,.S�h r- C--" LG'+ 2- lc') U`,11 PTON.c1 Vj O CNO"--r 0 5- k 13 Jus b cnnvzb