Loading...
HomeMy WebLinkAboutSW8050902_COMPLIANCE_20050907 (2)STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW /95�d2e;q, DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ED COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD DETENTION POND ANALYSIS FILE NAME: G:\DATA\WPDATA\WQS\POND1050902.WK1 buildings gravel conc. Pavement TOTAL SURFACE AREA CALCULATION % IMPERVIOUS 58.37% Des. Depth 4 TSS: 90 12500.00 square feet 33434.00 square feet 3679.00 square feet square feet square feet square feet square feet 0.95 0.85 0.95 iA 0 Rational Cc= 70-.6( SA/DA Ratio 5.14% Req. SA 4366 sf Prov. SA F:':549 sf VOLUME CALCULATION * place a "1" in the box if Rational is used Rational ?* FOREBAY Des. Storm ii1p4 inches Perm. Pool Volume= 12133 Rv= 0.58 Req. Forebay Volume= 2426.6 Bottom 91 msl Provided Volurne= 2427.00 Perm. Pool Design Pool Design SA 1:7 msl 95. . 8 msl 6229 sf i �- Percent= xp�� Req. Volume cf SA @ 5494 6229 6910.00 Prov. Volume689 cf Elevation= 95 95.8 96.00 ORIFICE CALCULATION Avg. Head = 0.38 ft Q2 Area = 1.15 sq. in. Flow Q2, cfs 0.024 cfs Q5 Area = 0.46 sq. in. Flow Q5, cfs; 0.009 cfs Orifice Area 0.79 sq. in. No. of Orifices Q= 0.016 cfs Diameter, inches weir H x W i n x in Drawdown .. ........ 9: ' days COMMENTS Surface Area , Volume and Orifice are within Design Guideline: