HomeMy WebLinkAboutSW8050852_HISTORICAL FILE_20050928 (2)STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
YYYYMMDD
State Stormwater Management Systems
Permit No. SW8 050852
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Mr. James D. Rowe & JRW Partners, LLC
Dollar General - Atkinson
The intersection of Hwy. 53 & Whitehouse Ave., Atkinson - Pender County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with
the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules')
and the approved stormwater management plans and specifications and other
supporting data as attached and on file.with and approved by the Division of Water
Quality and considered a part of this permit.
This permit shall be effective from the date of issuance until September 28, 2015, and
shall be subject to the following specified conditions and limitations:
1. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.6 on page 3 of this permit. The stormwater
control has been designed to handle the runoff from 41164 square feet of
impervious area.
3. The tract will be limited to the amount of built -upon area indicated on page 3 of
this permit, and per approved plans. There is no additional impervious surface
available for future development in this permit.
4. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans:
5. The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system.
Page 2 of 7
f
State Stormwater Management Systems
Permit No. SW8 050852
6. The following design criteria have been provided in the wet detention pond and
must be maintained at design condition:
a.
Drainage Area, acres:
1.64
Onsite, ft :
71438
Offsite, ft2:
0
b.
Total Impervious Surfaces, ft2:
41164
C.
Design Storm, inches: .
1
d.
Pond Depth, feet:
3.5
e.
TSS removal efficiency:
90%
f.
Permanent Pool Elevation, FMSL:
60.5
g.
Permanent Pool Surface Area, ft2:
8184
h.
Permitted Storage Volume, ft3:
5590
i.
Temporary Storage Elevation, FMSL:
61.15
j.
Controlling Orifice:
1 "0 pipe
k.
Permitted Forebay Volume, ft3:
3537
I.
Receiving Stream/River Basin:
Mill Branch 1 Cape Fear
M.
Stream Index Number:
18-68-18-10
n.
Classification of Water Body:
"C;Sw"
II. SCHEDULE OF COMPLIANCE
1. The stormwater, management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance
necessary to assure the permitted stormwater system functions at optimum
efficiency. The approved Operation and Maintenance Plan must be.followed in
its entirety and maintenance must occur at the scheduled intervals including, but
not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow
spreader, catch basins and piping.
g. Access to the outlet structure must be available at all times.
Page 3 of 7
State Stormwater Management Systems
Permit No. SW8 050852
4. Records of maintenance activities must be kept and made available upon
request to authorized personnel of DWQ. The records will indicate the date,
activity, name of person performing the work and what actions were taken.
5. Decorative spray fountains will be allowed in the stormwater treatment system,
subject to the following criteria:
a. The fountain must draw its water from less than 2' below the permanent
pool surface.
b. Separated units, where the nozzle, pump and intake are connected by
tubing, may be used only if they draw water from the surface in the
deepest part of the pond.
c. The falling water from the fountain must be centered in the pond, away
from the shoreline.
d. The maximum horsepower for a fountain in this pond is 1/8 horsepower.
6. The facilities shall be constructed as shown on the approved plans. This permit
shall become voidable unless the facilities are constructed in accordance with
the conditions of this permit, the approved plans and specifications, and other
supporting data.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A
modification may be required for those deviations.
8. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
9. Access to the stormwater facilities shall be maintained via appropriate
easements at all times.
10. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project
area. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMA
Major permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
11. The permittee shall submit final site layout and grading plans for any permitted
future areas shown on the approved plans, prior to construction.
12. A copy of the approved plans and specifications shall be maintained on file by
the Permittee for a minimum of ten years from the date of the completion of
construction.
Page 4 of 7
State Stormwater Management Systems
Permit No. SW8 050852
13, The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
III. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a formal permit transfer request to the Division of Water Quality,
accompanied by a completed name/ownership change form, documentation
from the parties involved, and other supporting materials as may be appropriate.
The approval of this request will be considered on its merits and may or may not
be approved. The permittee is responsible for compliance with all permit
conditions until such time as the Division approves the transfer request.
2. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division of Water Quality, in
accordance with North. Carolina General Statute 143-215.6A to 143-215.6C.
3. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation
of nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
5. The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
6. The permit may be modified, revoked and reissued or terminated for cause. The .
filing of a request for a permit modification, revocation and reissuance or
termination does not stay any permit condition.
7. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
8. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
9. The permittee shall notify the Division any name, ownership or mailing address
changes within 30 days.
Permit issued this the 28th day of September, 2005.
NORTH ROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
for Alan W. Klimek, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
Page 5 of 7
State Stormwater Management Systems
Permit No. SW8 050852
Dollar General - Atkinson
Stormwater Permit No. SW8 050852
Pender County
Designer's Certification
I, , as a duly registered
in the State of North Carolina, having been authorized to observe (periodically/ weekly/
full time) the construction of the project,
(Project)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAT_
Page 6 of 7
State Stormwater Management Systems
Permit No. SW8 050852
Certification Requirements:
1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
5. The outlet/bypass structure elevations are per the approved plan.
6. The outlet structure is located per the approved plans.
7. Trash rack is provided on the outlet/bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
.10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
12. Required drawdown devices are correctly sized per the approved plans.
.13. All required design depths are provided.
14. All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
15. The required system dimensions are provided per the approved plans.
cc:. NCDENR-DWQ Regional Office
Warren Holt, Pender County Building Inspections
Page 7 of 7
Page 1 of t
,v36509SZ
North Carolina
Flame F. Marshall DEPAR 1 MENT OF THE
Secretary SECRETARY OF STATE
Corporations
°Corporations Home
•Important Notice
•Corporate Forms/Fees
*Corporations FAQ
*Tobacco Manufacturers
*Dissolution Reports
ONon-Profit Reports
*Verity Certification
aOnline Annual Reports
Links
*Secretary Of State Home
aRegister for E-Procurement
*Dept. of Revenue
Legislation
41999 Senate Bills
�2001 Bill Summaries
•Annual Reports 1997
$Corporations 1997
*Other Legislation
Search
"By Corporate Name
*For New Corporation
"By Registered Agent
Online Orders
loStart An Order
"New Payment Procedures
Contact Us
•Corporations Division
OSecretary of State's web site
Print
QPrintable Page
PO Box 29622 Raleigh, NC 27626-0622 (919j807-2000
Date: 9/13/2005
Click here to:
View Document Filings 1
t=)Print apre-populated Annual Report Form I File an Annual Report I
Corporation Names
Name Name Type
NC JRW Partners, LLC Legal
Limited Liability Company Information
SOSID:
0779859
FiD:
Status:
Current -Active
Date Formed:
4/29/2005
Citizenship:
Domestic
State of Inc.:
NC
Duration:
12-31-2055
Registered Agent
Agent Name:
Registered Office Address
Registered Mailing
Address:
Principal Office Address:
Principal Mailing Address:
Rowe, James Donald
781 South Us Highway Bypass
Burgaw NC 28425
PO Box 1456
Burgaw NC 28425
781 South Us Highway Bypass
Burgaw NC 28425
PO Box 1456
Burgaw NC 28425
For questions or comments about the North Carolina Secretary of State's web site, please send e-mail to Webmaster,
http://www.secretary.state.tic.us/Corporations/Corp.aspx?Pitemld=7734202 9/13/2005
To: Robert Gordon
Environmental Engineer II
From: Justin Bishop, E.I.
Malpass Engineering, P.C.
Re: DWQ Stormwater project Number SW8 050852
Project Name: Dollar General — Atkinson
I have clarified what the "other on -site" impervious area is in the application, provided
seeding requirements on the plan, and provided areas below the permanent pool on
calculation page.
Clifton L. Moore, Jr. (Retired)
Robert C. Kenna. Jr.
TO
DATE
FAX NO
MOORE & KENAN
ATTORNEYS AT LAW
211 EAST FREMONT STREET
BURGAW, NORTH CAROLINA 28425
EMAIL Itenanlaw bellsouth.net
TELEPHONE (910) 259-9800
FACSIMILE (910) 259-7006
FACSMLE TRANSMITTAL SHEET
Robert Gordon w/Division of Water Quality
Monday, September 12, 2005
350-2004
REF: JRW Partners, LLC '
FROM: Robert C. Kenan, Jr.
NUMBER OF PAGES TO FOLLOW THIS COVER SHEET: 1
F,f
MAILING ADDRESS:
P.O. Sox 957
Burgaw, N.C. 29425
r � =
If you do not receive all of the pages, or if any other problems should occur, ' please telephone at 910-
259-9800;
REMARKS:
"NOTICE/CAUTION: CONFIDENTIAL AND PRIVILEGED rNFORMATIONO*
The information contained in this facsimile message is attorney privileged and confidential information intended only for
the use of the individual or entity named above. If the reader of this message is not the intended recipient, you are hereby
notified that any dissemination, distribution or copy of this communication in error, please immediately notify us by
telephone and return the original message to us at the above address via the U.S. Postal Service. Thank you,
Z00/100'd OZS# 21:Li 50OZ/Zi/60 900L 65Z 016 NdNI} OMd IdOXWOAJ
Clifton L. Muorc, Jr. (Retired)
Robert C. Kennn, Jr.
MOORE & KENAN
ATTORNEYS AT LAW
211 EAST FREMONT STREET
BURGAW, NORTH CAROLINA 28425
EMAIL kenanlawAbellsouth net
TELEPHONE (910) 259-9800
FACSIMILE (910) 259-7006
September 12, 2005
VIA FACSIMILE ONLY 910 350-2004
MAILING ADDRESS;
P.O. Box 957
Burgaw, N.C. 28425
Robert Gordon
Division of Water Quality
North Carolina Department of Environment and Natural Resources
127 Cardinal Drive Extension
Wilmington. North Carolina 28405 d '
Re: JRW Partners, LLC
Dear Mr. Gordon:
I represent JRW partners, LLC, a North Carolina limited liability.company with Articles of
Organization approved by the North! Carolina Secretary of State `on April 29, 2005
Currently, there are three (3) members of the limited liability company who are as follows:
Samuel Eugene Jordan, James Donald Rowe and Jody Dean Woodcock. - '
It is my understanding from Mr. Rowe that you need to know the names of the member of
the limited liability company in order to evaluate its application for a storm water permit.
Should you have any questions regarding the information provided herein or need any
additional information regarding the limited liability company,-please:Aomot hesitate to contact me.
Respectfully yours,
Robert C. Kenan, Jr.
. ,,
Z00/Z00'd 035# 9Z:Lt GOOZ/Zi/60 900L 69Z 016 NVNI} ONV IdOOH:wOJd
P. 1
-FILE -MODE
----�
741 MEMORY TX
* * * COMMUNICATION RESULT REPORT ( SEP.13.2005
OPTION
REASON FOR ERROR
E-3) NONANSWERR LINE FAIL
ADDRESS (GROUP)
----------------
93925203
8:09AM )
TTI
RESULT
---------OK
-
NCDENR WIRO
PAGE
--------- -
P. i-
E-2) BUSY
E-4) NO FACSIMILE CONNECTION
FAX COVER SHEET
Date: September 13, 2005 No. of Pages: 1
To: Justin Bishop I From: Robert Gordon
Jeff Malpass Express permitting section
Company: Malpass Engineering FAX # 910-350-2004
FAX #: 910-392-5203 Phone # 910-796.7303
DWQ Stormwater Project Number: SWa 050852
Project Name; Dollar General - Atkinson
MESSAGE:
Request for additional information for Dollar General. Because there are only a
few items, this will be the only correspondence you receive. The following items
are necessary to complete our review. Most of the items below can be handled
via fax, but I would prefer to have the seeding info on the drawing. Give me a
call if there are any questions. Thanksl
• Please clarify what the "other on -site" impervious area is (listed on
section III (6) of the application),
• Please provide stage storage information for the pond and forebay for
elevations below permanent pool (above permanent pool is alreadv
FAX COVER SHEET
Date: September 13, 2005 No. of Pages: 1
To: Justin Bishop 1 From: Robert Gordon
Jeff Malpass Express permitting section
Company: Malpass Engineering FAX # 910-350-2004
FAX #: 910-392-5203 Phone # 910-796-7303
DWQ Stormwater Project Number: SW8 050852
Project Name: Dollar General - Atkinson
MESSAGE:
Request for additional information for Dollar General. Because there are only a
few items, this will be the only correspondence you receive. The following items
are necessary to complete our review. Most of the items below can be handled
via fax, but I would prefer to have the seeding info on the drawing. Give me a
call if there are any questions. Thanks!
• Please clarify what the "other on -site" impervious area is (listed on
section III (6) of the application).
• Please provide stage storage information for the pond and forebay for
elevations below permanent pool (above permanent pool is already
provided)
• Please provide basic seeding specifications (I just need to know what
type of vegetation will be planted)
06/23/2005 06:30 1910343e214 MALPASS ENGINEERING PAGE 02
'i
J 0 �k' P
RMENR
G North Carolina Department of Environment and Natural Resources Z
127 Cardinal Drive, Wilmington NC 28405 (910) 395-3900 FAX (910) 350-2004
Request for Express permit Review (60 --
FILL-IN all information below and CHECK required Permit(s).
FAX or email to Cameron. WeayerAncmail.net along with a narrative and vicinity map of the project location.
Projects must be submitted by 9:00 A.M. of the review date, unless prior arrangements are made.
APPLICANT Naive
Company
Address_ FT, 9GK t`456 CitylStateJurl4w NC Zip.-2$J25 County fender
Phone q ID - 2a 1, 4 G 57 Fax Email
PROJECT Name Dallyr G e.p1 - A1601 _
PROJECT SYSTEM(S) TRIBUTARY TO ; II Br4n c (STREAM NAME) - Coe Fear RIVER BASIN
ENGINEERICONSULTANT A4 ss
Company a ass I P, C-
Address I134 S' k City/State G---Zip 29q 12 County ry r
Phone 4 b -3U-M3 Fax UO -M-- 5203 mail
State or National Environmental Policy Act (SEPA, NEPA) - EA or EIS Required ❑ Yes J❑ No
❑ STREAM ORIGIN Determination; # of stream calls; Stream Name
❑ STORMWATER ❑ Low Density 0 High Density -Detention Pond ❑ High Density -Other
Wetlands MUST be addressed below ❑ Low Density -Curb & Gutter ❑ High Density -Infiltration ❑ off Site
❑ COASTAL ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures information
MANAGEMENT ❑ Upland Develupment ❑ Manila Development ❑ Urban Waterfront
----------------------- ... ---...... —------ ------------- ------ ------...._._._.----------------------------------------------_____--
[Z LAND QUALITY (2 Erosion and Sedimentation Control Fan with 6. 37 acres to be disturbed.
WETLANDS (401) Wetlands on Property ❑ Yes M No isolated Wetlands on Property ❑ Yes Z No
Check all that apply Wetlands Will Be Impacted ❑ Yes ❑ No Weiland Impacts: Acre(s)
Wetlands Delineation has been completed ❑ Yes ❑ No ❑ Buffers Impacted: Acrc(s)
USA COE Approval of Delineation completed ❑ Yes ❑ No
404 Appliratinn in pmr.Psc wlt1SA(,nE ❑YPS ❑Nn I Permit rer.Pivp.d from USArF ❑Yes ❑No
401 Application required ❑Yes ❑ No If Yes, ❑ Regular ❑ Express
Additional fees, not to exceed 50% of the original Express Review permit application fee, may be charged for
subsequent reviews due to the insufficiency of the permit applications.
For DENP. use only
SUDMITTAL DATCG: Fee Split for multiple permits:
SW $
CAMA
LOS S
401 $ Total Fee Amount $
Fri
TI
Vill,
71 _J\j
,on
08/23/2005 06:30 19103430214 MALPASS ENGINEERING PAGE 04
To: Cameron Weaver
From: Justin Bishop, EI
Malpass Engineering, P.C.
RE: Dollar General - Atkinson
The site is located on the corner of NC HWY 53 & N. Whitehouse Ave, west of N.
Whitehouse Ave. The site is 9.0 acres and we are proposing to disturb 6.37 acres.
Approximately 0.95 acres will be impervious. The project is commercial. The site is for
a Dollar General store. The storm A-ater will be treated in a wet pond.
VOI L.7I GUC1.1 CEO. .]IJ
1 71 VJH 71,141 Y
IT'"LI-f-+77 7-I'll:'I IYCC
~0°v'EP
PAGE _ _
ve
r-R 3 N ,
F��
F' A Y : 3Q — 2c74'f.
i
TEL:
3 pAGE S] TC FOLLOW
U -d I
V C
d era 1
M
�OF NA%Q Michael F. Easley, Governor
O G William G. Ross, Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
September 7, 2005
Mr. James Donald Rowe, Partner
JRW Partners, LLC
PO Box 1456
Burgaw, NC 28425
Subject: Request for Stormwater Management Permit Application
Dollar General -Atkinson
Stormwater Project No. SW8 050852
Pender County
Dear Mr. Rowe:
On August 30, 2005, the Wilmington Regional Office received a copy of a Letter of Receipt for
an Erosion Control Plan Express Review for the subject project. The North Carolina
Administrative Code requires any project that must receive either Sedimentation and Erosion
Control Plan approval and/or a CAMA Major permit to apply for and receive a Stormwater
Management Permit by the Division of Water Quality. Any construction on the subject site,
prior to receipt of the required permit, will constitute a violation of 15A NCAC 2H.1000 and may
result in appropriate enforcement action by this Office.
Either a Stormwater Permit Application Package including 2 sets of plans, 1 completed
application form, fee, and supporting documentation, or a written response regarding the
status of this project and the expected submittal date must be received in this Office no later
than October 7, 2005. Failure to respond to this request may result in the initiation of
enforcement action, and construction may experience a subsequent delay.
The NPDES 010000 Federal Stormwater Permit that accompanies the Erosion Control Plan
approval letter must NOT be considered the Coastal Stormwater Management Permit, which
will be signed by the Water Quality Supervisor. Please reference the Pro'ect Number above
on all correspondence. If you have any questions, please call me at (910-796-7404.
Sincerely,
Linda Lewis
Environmental Engineer
ENB/arl: S:IWQSISTORMWATISTORMSUB1050852.sep05
cc: Ren Holt, Pender County Building Inspections
Jeff Malpass P.E.
Wilmington Regional Office
Central Files
North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796-7215
Wilmington Regional Office Wilmington, NC 28405.3845 FAX (910) 350-2004 Internet: www.enr,state.nc.us One
NorthCaro/l/ina
An Eqval Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper JVaturally
AN
iU�
NCDENR
North Carolina Department of Environment and Natural
Division of Land Resources
James D. Simons, PG, PE
Director and State Geologist
Land Quality Section
RECEIVED
A G 3: 0 2005
sW� _ ,
BY. OAS �%..-
Resources
Michael F. Easley, Governor
William G. Ross Jr., Secretary
8/29/2005
LETTER OF RECEIPT FOR AN EROSION CONTROL PLAN EXPRESS REVIEW
JRW Partners, LLC
Mr. James Donald Rowe, Partner
P.O. Box 1456
Burgaw, NC 28425
RE: Project Name: Dollar General, Express Review
Project ID: Pende-2006-065
County: Pender, Atkinson, NC Hwy 53
River Basin: Cape Fear
Submitted By: Malpass Engineering
Date Received by LQS: August 29, 2005
Plan Type: NEW
Dear Mr. Rowe:
SS,
This office has received a soil erosion and sediment control plan for the project listed above which was
submitted as required by the North Carolina Sedimentation Pollution Control Act (G.S. 113A-57 (4)). The Act
requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil erosion
control plan prior to the commencement of the land -disturbing activity (G.S. 113A-54(d) (4)).
The review period for an express review is three days of receipt of a complete plan. If additional
information is requested, it must be submitted within five working days of receipt.
Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act prior to
the approval of an erosion and sediment control plan is a violation of the Act.
The approval of an erosion and sediment control plan is conditioned on the applicant's compliance
with Federal and State water quality laws, regulations and rules.
If you have questions please do not hesitate to contact this office. Your cooperation in this matter is
appreciated and we look forward to working with you on this project.
Sincerely,
�r.L;A.Z�'Z
Carol N. Miller
t Assistant Regional Engineer
cc: Mr. Jeffery B. Malpass, PE, Malpass Engineering
LQS-WiRO; SWS-WiRO
Wilmington Regional Office
127 Cardinal Drive'Ext., Wilmington, North Carolina 28405-3845 • Phone: 910-395-39001 FAX: 910-350-2004
/�-k-
�N}9y y.Y�>--