Loading...
HomeMy WebLinkAboutSW8050721_COMPLIANCE_20050726STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD DETENTION POND ANALYSIS FILE NAME: G:\DATA\WPDATA\WQS\POND1050721.WK1 PROJECT#: SW8 050721 REVIEWER: P.Bartlett PROJECT NAME: Mount Olive Baptist Church DATE: 26-Jul-05 Receiving Stream: Beaverdam Swamp Class: C; Sw Drainage Basin: Lumber River Index No. 15-25-1-12-3 Site Area 22.72 acres Drainage Area . 221j7,2 square feet Area = 5.09 acres IMPERVIOUS AREAS Rational C blds 21590.00 square feet 0.95 prkg 70825.00 square feet 0.95 sidewalks 1110.00 square feet 0.95 square feet square feet 71 square feet TOTAL square feet Rational Cc= 0.52 SURFACE AREA CALCULATION % IMPERVIOUS 42.18% SA/DA Ratio 2.23% Des. Depth 6 Req. SA 4946 sf TSS: 90 Prov. SA 2$34 sf VOLUME CALCULATION place a "l " in the box if Rational is used Rational ?* 1 FOREBAY Des. Storm 06. inches Perm. Pool Volume= 87957 Rv= 0.43 Req. Forebay Volume= 17591.4 Bottom 34.5 msl Provided Volume= 17690.00 Perm. Pool 4.0,5ti msl Percent= Design Pool 41.5 msl Design SA 23496 sf Req. Volume cf SA @ 8485 20834 23496.00 Prov. Volume cf Elevation= 34.5 40.5 41.50 ORIFICE CALCULATION Avg. Head = 0.47 ft Q2 Area = 2.41 sq. in. Flow Q2, cfs 0.055 cfs Q5 Area = 0.96 sq. in. Flow Q5, cfs 0.022 cfs Orifice Area 1.77 sq. in. No. of Orifices 0.040 cfs; Diameter, inches weir H x W in X in Drawdown =7 days COMMENTS Surface Area , Volume and Orifice are within Design Guideline 7/12/2005 JWH Mount Olive Baptist Church Pond Calculations 05106 Total Draina a Area s . ft, acres 221,700 5.09 Im ervious Area Land Use s . ft. acres buildings 21,590 0.50 arkin Ias halt 70,825 1.63 sidewalks 1,110 0,03 Total 93,525 2.15 Stormwater Calculations: Time of Concentration: Hydraulic Length (L) = 1,000 ft. change in Height (H) = 6 ft, Tc = (L,1H) "' 1 128 11.43 min. Flow for 2 year, 6 hour Storm (Q2): QpRE = (CpRE) x (110) x (Area) - 5.41 cfs QPosr = (CposT) x (lio) x (Area) = 11.90 cfs Sou atora a UaeaCR Tor L Xear atorm: CN = (98)(% imp.) + (60)(1-% imp.) = 77 P = 3.30 in. for2yr, 6 hr storm S = 10001CN - 10 - 2.99 Depth A= [P-(0.2)(S)]21 (P+(0.8)(S)] 1.28 in. Time to Peak Ftow: Tp = ((43.5)(D)(Area)j / Q2,P05T 23.89 min. Detention Pond Design: Pond Size: Elevation (ft.) Surface Area (sq. ft.) Normal Pool 40.50 20,834 Flood Pool 41.50 23.496 Tc of Bank 43,00 26.788 Bottom of Pool 34.50 8,485 Provided Storage Volume: Vol, _ [(Normal pool SA + Fiocd Pool SA) 121 FP 1 NP I 05030ponci % impervious = 0,422 = 42.2% say 43.0% CPRE = 0,25 CposT = (°,6 imp.)(.95)+(1-% imp.)(,25) = 0.55 12 = 4.25 in/hr Iia = 4.92 in/hr Flow for 10 year, 6 hour Storm (010): OPRE _ (CPRL) x (125) x (Area) 6.26 cfs QPosT = (CPCST) x (125) x (Area) = 13.77 cfs Sou atom e L a act for to ear Storm: CN = (98)(% imp.) + (60)(1-% imp.) 77 P = 4.82 in. for 10 yr, 6 hr storm S= 10001CN-10 2.99 Depth (D)= ]P-(02)(S)]21 [P+(0.8)(S)1 = 2.47 in. Time to Peak Flow: Tp = [(43,5)(0)(Area)] 1 oro,posT 39.76 min. 5tate Surface Area Requirement at normalpool: Pond side slopes = 3 :1 Depth below N.P. = 6 ft. SA/DA = 0.0228 (Chart for 90% TSS Removal for Wet Detention Pond without Vegetative Riter) Required SA = (SAlDA) x (Total Drainage Area) - 5.055 s . ft. State Volume Required for Storage of first 1" of runoff: RV = .05+ .009(% imp) x ( , e ev. - . e ev.} = 0,429668 = 22,165 cu. ft. \\\\\������ V= (Design rai nfail) (Rv) (Drainage Area) %% t,AR 0� '�� = 7,938 cu. ft. orAcss;a�y q �. o rhop 4� o& 174 aon do op y: 40 GR rlfilll$ -7. 1 of 2 ECEIVD1 175 BY' �a,acttRbsr�,,�� Ile JA.73 ��, s 7l1212005 Mount Olive Baptist Church 05106 JWH Pond Calculations Pond Volume: Bottom SA = 8,485 sq. ft. Normal Pool SA = 20,834 sq, ft. Vol. _ '[(N.P. SA + Bottom SA) 12] x (N.P, el. - Bottom el.) 87,957 cu. ft. Forebay: Required Volume Vol. = 20% of storage volume 17,591 cu, ft. Outlet Structure Design: Now for 2-day drawdown: for 1st 1" of stormwater, Q = Required Vol. 1 172,800 sec. (2-days) 0.046 cfs Reg uired Area of Pipe for 2-day drawdown: A= Q I [Cd x SQRT(2 x g x h)] Cd = 0.6 g = 32.2 ft.ls� h = (F.P. elev.- N.P. elev.) 12 0.5 ft. A = 0.0135 sq. ft. Diameter of PiDe for 2-dav drawdown DIA. = SQRT[(A x 4)1 pi] = 0,1311 ft. = 1.57 in. 'Use: 1.5 in diameter pipe Outlet Structure Check: Using a 4' x 4' Basin, Perimeter L = 16 ft. Q = CIA C = (% imp.)(.95) + (1-% imp.)(.25) = 0.55 1 = 4.92 in. for a 25 yr. Storm A = 5.09 Acres 13.77 cfs Q= CWxLXH' H = (Q / (Cw x I-)]" Cw = 3 0.44 ft. Peak elevation = flood pool elevation + H 41.94 ft. Provided Volume Bottom SA = 4.586 sq, ft, Normal Pool SA = 7,207 sq, ft. Vol. _ ((N.P. SA+ Bottom SA)12] x (N.P. el. - Bottom el.) 17.690 cu. ft. Flow for 5-day drawdown: for 1st i' of stormwater, Q = Required Vol. 1432,000 sec, (5-days) = 0.018 cfs Required Area of Pipe for 5-day drawdown' A= Q I [Cd x SQRT(2 x g x h)] Cd = 0.6 g = 32.2 ft.fs' h = (F.P. elev, - N.P. elev.)12 = 0.5 ft. A = 0.0054 sq, ft. Diameter of Pipe for 5-day drawdown: 01A. = SQRT((A x 4) 1 pi] - 0.0829 ft. = 0.99 in. 05030pond 2of2