HomeMy WebLinkAboutSW8050611_CURRENT PERMIT_20060327STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW
DOC TYPE
� CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
�`G9Xo0�✓ai�J
YYYYMMDD
klichael F. Easley, Governor
William G. Ress Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division d Water Quality
March 27, 2006
Mr. Leon Johnson, President
Country Boy Riders Motorcycle Club
PO Box 574
Atkinson, NC 28421
Subject:- Stormwater Permit No. SW8 050611
Country Boy Riders Motorcycle Club
High Density Project
Pender County
Dear Mr. Johnson:
The Wilmington Regional Office received a complete-Stormwater Management Permit
Application for Country Boy Riders Motorcycle Club on January 13, 2006. Staff review of the
plans and specifications has determined that the project, as proposed, will comply with the
Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No.
SW8 050611 dated March 27, 2006, for the construction of the subject project.
This permit shall be effective from the date of issuance until March 27, 2016;.and shall be
subject to the conditions and limitations as specified therein. Please pay special attention to
the Operation and Maintenance requirements in this permit. Failure to establish an adequate
system for operation and maintenance of the stormwater management system will result in
future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have
the right to request an adjudicatory hearing upon written request within sixty (60) days
following receipt of this permit. This request must be in the form of a written petition,
conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of
Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands
are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please
contact Linda Lewis, or me at (910) 796-7215.
Sincerely,"
Edward Beck
Regional Supervisor
Surface Water Protection Section
ENS/arl: . S:1WQSISTORMWATIPERMIT1050611.mar06
cc: Mark Walton, P.E.
Pender County Building Inspections
Linda Lewis
Wilmington Regional Office
Central Files
No thCarolina
✓1�atrrrn!!�
North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Cus tourer Service
Wilmington Regional Office Intemei: w%v%v.ncwatergualitvvarx Fax (910) 350-2004 1-877-623-6748
An Equal OpporlunitylAffirmative Action Employer — 50% Recycled110% Post Consumer Paper
State Stormwater Management Systems
Permit No. SW8 050611
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Leon Johnson
Country Boy Riders Motorcycle Club
NCSR 1207 (Halfway School Branch Road), Ivanhoe, Pender County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with
the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules')
and the approved stormwater management plans and specifications and other
supporting data as attached and on file with and approved by the Division of Water
Quality and considered a part of this permit.
This permit shall be effective from the date of issuance until March 27, 2016, and shall
be subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.6 on page 3 of this permit. The stormwater
control has been designed to handle the runoff from 35,250 square feet of
impervious area and must be operated with a 30' vegetated filter..
3. The tract will be limited to the amount of built -upon area indicated on page 3 of
this permit, and per approved plans. This permit does not'provide for the
construction of any future built -upon area.
4. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
5. The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system.
Page 2 of 7
State Stormwater Management Systems
Permit No. SW8 050611
6. The following design criteria have been provided in the wet detention pond and
must be maintained at design condition:
a. Drainage Area, Tcres:
Onsite, ft
Offsite, ft2:
b. Total Impervious Surfaces, ft2
C. Design Storm, inches:
d. Pond Depth, feet:
e. TSS removal efficiency:
f. Permanent Pool Elevation, FMSL:
g. Permanent Pool Surface Area, ft2:
h. Permitted Storage Volume, ft3:
i. Temporary Storage Elevation, FMSL:
j. Controlling Orifice:
k. Permitted-Forebay Volume, ft3:
I. Receiving Stream/River Basin:
M. Stream Index Number:
n. Classification of Water Body:
II. SCHEDULE OF COMPLIANCE
3.82
166,399
0
35,250
1
3.0
85%
(requires a 30' vegetated filter)
45.0
3,560
3,924
49.0
3 pipes @0.5" 0 each
1,640
White Oak Branch 1 Cape Fear
CPF20 18-68-18-5
"C Sw"
1. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance
necessary to assure the permitted stormwater system functions at optimum
efficiency. The approved Operation and Maintenance Plan must be followed in
its entirety and maintenance must occur at the scheduled intervals including, but
not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow
spreader, catch basins and piping.
g. Access to the outlet structure must be available at all times.
Page 3 of 7
State Stormwater Management Systems
Permit No. SW8 050611
4. Records of maintenance activities must be kept and made available upon
request to authorized personnel of DWQ. The records will indicate the date,
activity, name of person performing the work and what actions were taken.
5. Decorative spray fountains will be allowed in the stormwater treatment system,
subject to the following criteria:
a. The fountain must draw its water from less than 2' below the permanent
pool surface.
b. Separated units, where the nozzle, pump and intake are connected by
tubing, may be used only if they draw water from the surface in the
deepest part of the pond.
c. The falling water from the fountain must be centered in the pond, away
from the shoreline.
d. The maximum horsepower for a fountain in this pond is 116 horsepower.
6. The facilities shall be constructed as shown on the approved plans. This permit
shall become voidable unless the facilities are constructed in accordance with
the conditions of this permit, the approved plans and specifications, and other
supporting data.
7. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A
modification maybe required for those deviations..
8. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
9. Access to the stormwater facilities shall be maintained via appropriate
easements at all times.
10. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project
area. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMA
Major permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
11. The permittee shall submit final site layout and grading plans for any permitted
future areas shown on the approved plans, prior to construction.
12. A copy of the approved plans and specifications shall be maintained on file by
the Permittee for a minimum of ten years from the date of the completion of
construction.
Page 4 of 7
State Stormwater Management Systems
Permit No. SW8 050611
1.3. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
Ill. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a formal permit transfer request to the Division of Water Quality,
accompanied by a completed name/ownership change form, documentation
from the parties involved, and other supporting materials as may be appropriate.
The approval of this request will be considered on its merits and may or may not
be approved. The permittee is responsible for compliance with all permit
conditions until such time as the Division approves the transfer request.
2. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division of Water Quality, in
accordance with North Carolina General Statute 143-215.6A to 143-215.6C.
3. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation
of nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
5. The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
6. The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and reissuance or
termination does not stay any permit condition.
7. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual,
8. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
9. The permittee shall notify the Division any name, ownership or mailing address
changes within 30 days.
Permit issued this the 27th day of March 2006.
NORTH ,CAROLINA/ENVIRONMENTAL MANAGEMENT COMMISSION
for Alan W. Klimek, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
Page 5 of 7
State Stormwater Management Systems
Permit No. SW8 050611
Country Boy Riders Motorcycle Club
Stormwater Permit No. SW8 050611
Pender Count
Designer's Certification
I, , as a duly registered in the
State of North Carolina, having been authorized to observe (periodically/ weekly/ full
time) the construction of the project,
(Project)
for
(Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations -from approved plans and specification -
Signature
Registration Number
Date
SEAL
Page 6of7
State Stormwater Management Systems
Permit No. SW8 050611
Certification Requirements:
1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
5. The outletlbypass structure elevations are per the approved plan.
6. The outlet structure is located per the approved plans.
7. Trash rack is provided on the outleVbypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-.
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
12. Required drawdown devices are correctly sized per the approved plans.
13. All required design depths are provided.
14. All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
15. The required system dimensions are provided per the approved plans.
cc: NCDENR-DWQ Regional Office
Pender County Building Inspections
Page 7of7
'1. ^t. .`'�ti '� '..y e.Y '?.." 'S�.`� :.irt�"��'�'la.• �'-7;'.•�.� •� t.t'. yy�� � , cq• ..ti.. ',, �'� .�y.
..f:. v1.14•.��..ly �•. �.:..i` �..�- •���• '�J:: :�.�A'. �� T�[+y^/^�^71 J. .x�'':•
�.".4. \i C: .... .... :•i•. ���:1..]A i��.r1 �F.�� rt'�.'.. ti:�.[ :�•.' �.{: ;Y�..:; ,^;.: �,•�w� `•
Hate Received
Fee Paid
Pennil Number
G• as
103,1-- '0*z 6b
SW C?SU(aI t
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATEP MANAGEMENT PERMIT APPLICATION FORM
This form puny be phoioropied for use as an origi?ial
I. GENERAL INFORMATION
1. Applicants name (specify the name of the corporation, inc i%lida,ad, etc. who owns the project):
Country Boy Riders Motorcvcle Club
2, Print OivnerlSigning Official's name and title (person legally responsible for facility and compliance):
Leon Johnson, PPresident
3. Mailing Address for person listed in item 2 above:
PO Box 57
City: Atkinson State: NC Zap: 28421
Telephone Number:
Project Name (subdivision, facility, or establishment name - should be consistent with project name on
plans, specifications, letters, operation and maintenance agreements, etc.):
Country Boy Riders Moborcycle Club
5_ Location of Project (street address):
Halfway School Branch Rd.
City: Ivanhoe County: P e n d e r
6. Directions to project (from nearest major intersection):
.7 miles northwest of the intersection of Halfway School Branch Rd. (SR 120'
and Tuckahoe Rd.
7. Latitude: N 3 4" 3 5. 2 g' Longitude: W 7 7° 9.981
of project
8. Contact person who can answer questions about the project:
Name: ^Greg Finch, Mark Walton TelephoneNurber; j 910 �59-4800
II. PERMIT INFORMATION:
Specify whether project is (check one): x Nevi Renewal Modification
Four, SWU-101 Version 3-99 Page I of 4
2. Ifthis application is being subnnitied asthe result ofa renewal ormodification to an existing permit, list the.,
existing permit nwriber and its issue date (if ]Mown)
3. Specify the type of project (dieck one)-.
-x .1-m\, Density _I-bgh Density, Rede\Jelop General Permit Other
4. Additional Project Requirements (check applicable blanks):
CAMA Major x Sedimentation/Erosion Control _404/401 Permit NPDE S St orm i�,a t er
Information on required state permits can be obtained by contacting the Customer Sen'ice Center at
3-877-623-6748.
Ill. PROJECT INFORMATION
In the space provided below, sunimarize how storrnwateT will be treated. Also attach a detailed narrative
(one to two pages) describing sLormwater management for the project. S, Stormwater
Stormwater treatment will consist of vegetative conveyance
wil-I be_,a3IQWpd tQ sbeetflow.
2. Stormwater runoff from this project drains to the Cape Fear - River basin.
3. Total Project Area-. 3.82 acres
5, How many drainage areas does the project have? 1
4. Project Built Upon Area: 21 .2 %
Complete the folJoxving information for each drainage area. If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same format as below.
Basininfonnati n
Receiving, Stream Name
EbIte0ak Creek
Receiving Stream Class
Drainage Area
166,399 ft 2 2c<e 5
Eydsting jLnEervious* Area
0
EE02osed hnpervious It Area
--
3 5,250 ft 22
4P Mow; . ...... te�A t-
reaOn-site
R ft IN
Buildings
ding
5,000
On -site Streets
'16, 5 5 0
On -site Parking '12,620
On -site Sidewalks '11080
Other on -site
N.4A
Off -site
IN/A - -
Total.- 3 5, 2 5 0
Total:
Impervious area is defined as the built upon area including, but not limited to, buildings, Toads, parking areas,
siitewalks, gravel areas, etc.
'orm SWU-101 Version 3.99 Page 2 of 4
7. How )vas the off -site impervious area listed above derived? N/A
TV. DEED RESTRICTIONS AN1) PIZOTI-CTJVE COVBNAN'rS
The follovring italicized deed restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot. If Jot sizes vary significantly, a
table listing each lot number, size and the a11ov,,able built -upon area for each lot must be provided as an
attaclh_nhent.
Tire follouling coverlanls are infended to ensure ollgoIilg conllrllarlce with state sfonnwafer 77201ngenlellf pennit
Mvnber as issued by flle Division of lVater Qunhl y_ These covenants may
not be changed or del-eled without the Consent of the State.
2. No mare 9W77 12 4 , 7 9 9 square feet of anylot shall be covered bystructures or inrpe7vious 77InteridIs_
Ima
terials aterials include asphalt, gravel, concrete, brisk, stone, slate or sirlli.lar7naterial but do 77Ot include woad
decking or the water surface of swinlrning pools.
3. Szoaies shall Trot be filled i7r, piped, or, altered except as mxssaly to provide d7iveway crossings.
4. Built -upon area in excess of Vx pe7mit'ted 1271rDU71t requires a State Star-nr Dater n2anagenx7rt pcm it 1t1IJdifICQf]lJr2 P7107' to
ConstnXtion_
3. All pernritied runLrL ff fi-on1 outparcels or future development shall bedirected iWo the perrnitUd stormwater control
system T?iese connections to the stor nWL?ter' COntrol sySte711 SW be pe7fMned UY a Ma? 7iC1. that nraIr7tabts the
mteg'Tity and perfW-manse of the sryst 7n as permitted.
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shh include ail the applicable items required above, that the covenants will be binding on all pasties and
persons claming under them, that they will run with the land, that the required covenants cannot be changed or
deleted without concurrence from the State, and that they will be recorded prior to the sale of any Iot.
V. SUPPLEMENT FORMS
The applicable state st ozmwater management perirdt supplement form(s) listed beIow must be submitted for
each BMJ? specifaed.for this.project. _Contact the Stdrmwaier and General Pem is Unit at (919) 733-5083 for the
status and availability of these forms.
Form SWU-102
Wet Detention Basin Supplement
Form SWU-103
Infiltration Basin Supplement
Form SWU-104
Low Density Supplement
Form SWU-105
Curb Outlet System Supplement
Form SWU-106
Off --Site System Supplement
Form SWU-107
Underground Infiltration Trench Supplement
Form SWU-108
Neuse River Basin Supplement
Form SOU-109
Innovative Best Management Practice Supplement
Form SWU-101 Version 399 Page 3 of 4
Vl. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviei+,ed by the Division of Water Quality (D1'\1Q).
A complete package includes all of the items listed below. The conplete application package should be
ubrnitted to the appropriate DWQ Regional Office.
Please indicate that you have provided the fol DIVing required information by initialing in the space
provided neat to each item.
Initials
• Original and one copy of the Stormwater Managernent PenritAppbcadon Form
• One copy of the applicable Supplement Forni(s) for each EMP
• Pernut application processing fee of $420 (payable to NCDENR)
• Detailed narrative description of storrn;vater treatment/managen3ent
• Two copies of plans and specifications, including: VW
-Development/Project name
- Engineer and firm
- legend
-North arrow
- Scale
- Revision number & date
- Mean high water line
- Dimensioned property/project boundary
- Location reap with named streets or NCSR numbers
- Original contours, proposed contours, spot elevatior►s, finished floor elevations
- Detzils of roads, drainage features, collection systems, and story nivater control measures
- Wetlands delineated, or a note on plans that none exist
- Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations
- Drainage areas delineated
- Vegetated buffers (where required)
VII. AGENT AUTHORIZATION
If you wish to designate authority to another individual or firm so that they may provide infonnation on your
behalf, please complete this section.
Designated agent (individual or firm): W a l t o n — Engineering
Mailing Address: P O Box 895
City: Burgaw State: NC Zap: 28425
Phone: 910 l 259-4800 _ Fax: ( 910 ) 259-1779
VHL APPLICANT'S CERTIFICATION
1, (print or type name of person listed i77 Gewal Infornwtion, item 2) . �LurdJd AxSa
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A
NCAC 2H .1000n
Signature:
Date:` i — �}
Form SWU-101 Version 3.99 Page 4 of 4
PermitNo. <
(to be provided by DWQ)
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
WET DETENTION BASIN SUPPLEMENT
This form may be photocopied for use as an original
DWQ Stormwater Management Plan Review:
A complete stormwater management plan submittal includes an application form, a wet detention basin
supplement for each basin, design calculations, and plans and specifications showing all basin and outlet
structure details.
I. PROJECT INFORMATION
Project Name: K '% p 0!` t vi t C
Contact Person: r a Phone Number: (����) Zjq
For projects with multiple basins, specify which basin this worksheet applies to: Da. r &g sL ti 0�.� y
elevations
Basin Bottom Elevation ft. (floor of the basin)
Permanent Pool Elevation 4S . DO ft. (elevation of the orifice)
Temporary Pool Elevation 49. 6 ft. (elevation of the'discharge structure overflow)
areas +
Permanent Pool Surface Area sq. ft. (water surface area at the orifice elevation) ,
Drainage Area ?�,g' Z, ac. (on -site and off -site drainage to the basin)
Impervious Area C1. if ` ac. (on -site and off -site drainage to the basin)
volumes
Permanent Pool Volume Z cu. ft. (combined volume of main basin and forebay)
Temporary Pool Volume 3 Zt cu. ft. (volume detained above the permanent pool)
Forebay Volume cu. ft. (approximately 20% of total volume)
0
Other parameters
SA/DA1 D• Ok$ 0.97a) (surface area to drainage area ratio from DWQ table)
Diameter of Orifice 3 P u A () ..S in. (2 to 5 day temporary pool draw -down required)
Design Rainfall in.
Design TSS Removal 2 % (minimum 85% required)
Form SWiJ-102 Rev 3.99 Page 1 of 4
Footnotes:
t When using the Division SA/DA tables, the correct SAIDA ratio for permanent pool sizing should be computed based upon the
actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non-
standard table entries.
2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide
90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal.
II. REQUIRED ITEMS CHECKLIST
The following checklist outlines design requirements per the Stormwater Best Management Practices Manual
(N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code
Section: 15 A NCAC 2H .1008.
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached. If the applicant has Ldesignated an agent in the Storm. water Management Permit
Application Form, the agent may initial below. If a requirement has not been met, attach justification.
Applicants Initials
Rmt,.) , a.
b.
C.
?,-M d.
�Z m IJ . e.
The permanent pool depth is between 3 and 6.feet (required minimum of 3 feet).
The forebay volume is approximately equal to 20% of the basin volume.
The temporary pool controls runoff from the design storm event.
The temporary pool draws down in 2 to 5 days.
If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow
calculations)
The basin length to width ratio is greater than'3:1.
The basin side slopes above the permanent pool are no steeper than 3: 1.
A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail).
Vegetative cover above the permanent pool elevation is specified.
A trash rack or similar device is provided for both the overflow and orifice.
A recorded drainage easement is provided for each basin including access to nearest right-
of-way.
R1(v-- W 1. If the basin is used for sediment and erosion control during construction, clean out of the
basin is specified prior to use as a wet detention basin.
m. A mechanism is specified which will drain the basin for maintenance or an emergency.
III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT
The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the
vegetated filter if one is provided. `
This system (check one) 0 does 0 does not incorporate a vegetated filter at the outlet.
This system (check one) 0 does 0 does not incorporate pretreatment other than a forebay.
Form SWU-102 Rev 3.99 Page 2 of
Maintenance activities shall be performed as follows:
1, After, every significant runoff producing rainfall event'and at least monthly:
a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation,
vegetated cover, and general condition,
b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within
2 to 5 days as designed.
2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative
cover to maintain a maximum height of six inches, and remove trash as needed.
3.- Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain
proper functioning.
4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is
reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of
in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e.
stockpiling near a wet detention basin or stream, etc.).
The measuring device used to determine the sediment elevation shall be such that it will give an accurate
depth reading and not readily penetrate into accumulated sediments.
When the permanent pool depth reads 3 feet in the main pond, the sediment shall be,remoyed.
When the permanent pool depth reads y y ' " " • feet in the foreba ,the sediment shall'bi;•removed.'••:•.a;:
BASIN DIAGRAM
(rill in the blanks)Io
C7 Permanent Pool Elevation 48,
Sediment Rei oval E1. 45• 75 o 5.
-------------- -- Sediment Removal Elevation Q 75 /a
Bottom Ele ation 45,D % ------------- ---------------`45,0 ------ -------
Bottom Elevation 25 /o
FOREBAY MAIN POND
5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These
plants shall be encouraged to grow along the vegetated shelf and forebay berm.
6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through
the emergency drain shall be minimized to the maximum extent practical.
Form SWU-102 Rev 3,99 Page 3 of
All components of the wet detention basin system shall be maintained in good working order.
I acknowledge and agree by my signature below that I am responsible for the performance of the seven
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any
changes to the system or responsible party.
Print name: .
Title: ' T
s
`Address: �jl; ✓ s„r /LG ,�? �iia—/
Phone: 7 M _ / / 7
Signature
Date: %D
Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a
resident of the subdivision has been named the president.
I,A A4` rl , a Notary Public for the State of c
County of djr do hereby certify that ��SUI]
personally appeared before me this 5 day of --and acknowledge the due
execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal,
fCOUNt'`.�`,.
SEAL
My commission expires - k)
Form SWU-102 Rev 3.99 Page 4 of