Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8050324_COMPLIANCE_20120402
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE W-COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD Compliance Inspection Report Permit: SW8050324 Effective: 08/15/05 Expiration: 08/15/19 Owner: Bailey and Associates Inc Project: Navy Federal Credit Union County: Onslow 2830 Piney Green Rd Region: Wilmington Midway Park NC 28544 Contact Person: Warren G Bailey Title: Phone: 910-346-8443 Directions to Project: Project is located 550' north on Piney Green Rd., (SR 1413) from intersection of Hwy 24 & NCSR 1413. Type of Project: State Stormwater - HD - Detention Pond Drain Areas: 1 - (Wallace Creek) (03-05-02 ) ( SB;NSW) On -Site Representative(s): Related Permits: Inspection Date: 04/02/2012 Entry Time: 02:10 PM Primary Inspector: Alida R Lewis Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ■ Compliant ❑ Not Compliant Question Areas: E State Stormwater (See attachment summary) Exit Time: 02:15 PM Phone: 910-796-7215 Inspection Type: Compliance Evaluation Page: 1 Permit: SW8050324 Owner - Project: Bailey and Associates Inc Inspection Date: 04/02/2012 Inspection Type: Compliance Evaluation Reason far Visit: Routine Inspection Summary: 1. The site is in compliance with the permit. No issues were observed. File Review Is the permit active? Signed copy of the Engineer's certification is in the file? Signed copy of the Operation & Maintenance Agreement is in the file? Copy of the recorded deed restrictions is in the file? Comment: Built Upon Area Is the site BUA constructed as per the permit and approval plans? Is the drainage area as per the permit and approved plans? Is the BUA (as permitted) graded such that the runoff drains to the system? Comment: SW Measures Are the SW measures constructed as per the approved plans? Are the inlets located per the approved plans? Are the outlet structures located per the approved plans? Yes No NA NE Yes No NA NE Comment: Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ■ ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ ■ ❑ ❑ ❑ upon request? Comment: Page: 2 WET DETENTION POND ANALYSIS FILE NAME: PROJECT #: SW8050324 PROJECT NAME: Navy Federal Credit Union S:IWQSXPOND1050324.WK1 REVIEWER: L. Lewis DATE: 12-Aug-05 Receiving Stream: Wailace Creek Class: SB NSW Drainage Basin: White Oak Index No. WOK02 19-20 Site Area 1.74 acres Drainage Area square feet Offsite = 0.421= 18339.00 Onsite = 1.739 = 75751.00 IMPERVIOUS AREAS Buildings Street/Parking SW Offsite Access Offsite TOTAL SURFACE AREA CALCULATION % IMPERVIOUS 73,53% Des. Depth 5 TS& 90 5700.00 square feet 43058.00 square feet 2126.00 square feet 4792.00 square feet 13504.00 square feet square feet square feet '9i: 00square feet 180 Rational C 1.00 1.00 1.00 1.00 4792 @100% 1.00 Rational Cc= 0.64 SA/DA Ratio 5.25% Req. SA 4937 sf Prov. SA sf VOLUME CALCULATION * place a "'I" in the box if Rational is used FOREBAY Perm, Pool Volurne= 9740 Req. Forebay Volume= 1948 Provided Volume= 1965.00 Percent= Elevation Area Inc. Vol. Acc. Vol. 36.00 6581.00 0.00 37.50 7454.00 10526.25 10526.25 ORIFICE CALCULATION Avg. Head = 0.54 ft Q2 Area = 1.32 sq. inches Flow Q2, cfs 0.032 cfs Q5 Area = 0.53 sq, inches Flow Q5, cfs 0,013 cfs Orifice Area 1.23 sq. inches No. of Orifices 0.030 cfs Diameter, inches 15.1,. 2 weir H x W in X in COMMENTS Surface Area , Volume and Orifice are within Design Guidelines W ► NC DENR - DIVISON OF WATER QUALITY .0312 WHITE OAK RIVER BASIN Classification Name of Stream Description Class Date Index No. Little Northeast Creek From source to Northeast C;NSW 08/01/91 19-16-2 Creek Horse Swamp From source to Little C;NSW 08/01/91 19-16-2-1 Northeast Creek Rocky Run From source to Little C;NSW 08/01/91 19-16-2-2 Northeast Creek Poplar Creek From source to Little C;NSW 08/01/91 19-16-2-3 Northeast Creek Mott Creek From source to Northeast C;NSW 08/01/91 19-16-3 Creek Northeast Creek From N. C. Hwy.24 to SC;HQW,NSW 08/01/91 19-16-(3.5) downstream side of mouth of Scales Creek Scales Creek From source to Northeast SC;HQW,NSW 08/01/91 19-16-4 Creek Northeast Creek From the downstream side SC;NSW 08/01/91 19-16-(4.5) of mouth of Scales Creek to New River Southwest Creek From source to Mill Run C;NSW 08/01/91 19--17-(0.5) Catherine Lake Creek From Catherine Lake to C;NSW 08/01/91 19-17-1 Southeast Creek Catherine Lake Entire Lake B;NSW 08/01/91 19-17-1-1 Deep Run From source to Southwest C;NSW 08/01/91 19-17-2 Creek Harris Creek From source to Southwest C;NSW 08/01/91 19-17-3 Creek Haws Run From source to Southwest C;NSW 08/01/91 19-17-4 Creek Tank Creek From source to Southwest C;NSW 08/01/91 19-17-5 Creek Hicks Run (Hickory Run) From source to Southwest C;NSW 08/01/91 19-17-6 Creek Southwest Creek From Mill Run to New River C;HQW,NSW 08/01/91 19-17-(6.5) Mill Run From source to Southwest SC;NSW 08/01/91 19-17-7 Creek Morgan Bay Entire Bay SC;NSW 08/01/91 19-18 Lewis Creek From source to New River SC;HQW,NSW 08/01/91 19-19 Wallace Creek From source to New River SB;NSW 08/01/91 19-20 Bearhead Creek From source to Wallace Creek SB;NSW 08/01/91 19-20-1 Beaverdam Creek From source to Wallace Creek SB;NSW 08/01/91 19-20-2 Town Creek - From source to New River SC;HQW,NSW 08/01/91 19-21 Farnell Bay Entire Bay SC;NSW 08/01/91 19-22 Cogdels Creek (Coglin Creek) From source to New River SC;NSW 08/01/91 19-23 Frenchs Creek From source to New River SC;NSW 08/01/91 19-24 Jumping Run From source to Frenchs Creek SC;NSW 08/01/91 19-24-1 011 2B .0300 x r � � �" ' � v i it� r fr M 2 p- y 1 • m �•� i • w ' - 0 1 l . . I¢ ``...✓////\JJ � S'��°: I � !^.�pr.'�` �'li ' �{"�d, J�r � ?� ''♦+ � •�, dj ,-, "'�4 ^ �E �f j ���p� / f>I`#_�'" e •�,�.,� n x x ,'rd•' `•-" a' ?5 a r 11 Park ' • 3b'� c..� '�LJJ/ • • ,.c �Gi" ; j..� _ F, zw � ��,' �ia9va; �A� • '� ' ' ".rM1, n t� �.•'� • � y� • � ,�, -. rk. lit �'� � ��- d II =r. • F, ,� • V %r.- l.;a""' • �y. Nl. e,. �, S • '.. .L4 " � `1`r i ,, , 1 9 , . �. 5 rr�.r �ke �^ R � w� t k � � a - .• 1�fk, - � � ��� ♦ C }jF .. 1 r i . y.F4r � +`5� `15 �� �i'-a3, av itk v_ti' p . - �.r � • '.,1Y5V}'r c ,/!!� �'� �'�''1'•S[1�8-.�, f f,l.� 7 y T k . 1 �} - ' -. �, I�.h -�� --W r ,: r•• , � - ► w�.• >?rtt � �s<� "tit v a .F� � !'y �9. i� wi,� 't-t M. ��,'g3W�I; 1 k �,;E !Y l p�,r �v i; y� �y� L�G� ,J.. S` . a •• .r i iiY . � •• • � ••P •'••� t�•fryl ' s t r $3 � �} _ g,fk'a" t_ Air A �1rr {{.. Si.,� � 5�� 4^"1 1 � rs f4i S, 4.'le� Yi°� ' 3y;a S ` 4 � � ♦ �K ne��,� i, fa 7„p ,� �` • ` r#f'".a � ,fit, �n y� l�.Frr 1-,a ,S 4Y y� 4 � �1 ytq'v� '%r'SC- . f�•l "� •+;: I • r4�'P?`r'* Iwr 'h'.�� „ vs� q y''i`g^ zr Rr�"�� -,. s b. ,.,, r �4- .. • u ::� I ..u- ��.• e�r � � u'r OF �► 2 ��,c �� T �r r i,.. L € `'� ' -� r� A r� ! f '}� a ' � r `� , t t1, . •,� 1� � ��♦ r•" "5 3£ �t ' � t `�Ssr� s) ,Zc �k Y qv'� •� x ., Lr� < y� rn s yY 9i� g1)tti � r .,f 3 y H � (. �d;.t.,, • • .4x y EyC • 1• • 1,� j •� )�. •. .'i. SF ° .� ": r/ i 1 Y. F° ° _'s3 P ° a� Y k rfxx �f y ���.� • rl x" �y, ,, e a'SE'.t `.;a 'F�r�,?'� 4 fi t 4� '`� ;M �� � •�f •: � ,�;,b:, �y 1rr ♦. r ,4 - � � �' �S'rT91rCCii. �'0 +': S{3i�~!N - t jc Y v � q4Y i 1 VS({f �? � K°`�` �+��,� 3g�,�t7' �' 6�>,•�. • I rr� ,. �. '�' '► �' ! - y �f ) M,.,4� ,,,,,, # t�7� `5P Si � day ,8�_� �1 i.' .11 -- � k w. �" �,' I �• �' h k y r¢ , S r r r� x t 0 �t� rr'1 { t �Y� 4`. EVA �. •� �,y{a�a:c .. i x'r }•a;'.-4" iM •" «Iwn >;h'el A 1 e .'�i,-! rr . • �:._ t` .S;'�� i d. ..rs .�"��' 3 a. �.�,• �1Fi4.-43� e F S � / � �y t ✓ f rl xJ 1 .a �$, * ' ro! i� L1 9TY �,1 r, y/+y 'r^` ram" mGi� 4�' ' i�# .s i r� � L . 4 '�� y..4 Sao " � µ�• N � 4/'' I S 1 !t•4 -k Il Y� • : 4'�' • • E..�" 4 2 • y��./a' � ` ••. •11 ti.�_;': "� tr"r� U �. ytt'r a, Zn{ -�._�r " �`.l�Lk � �y _.'y-I�,Y my a�-' %�)`°.•�, 'r 0 14 ctX� a � � •Vk >d ..ter .4� .f+� � t -,x t� � ry• ���� 4 sk� � f� �r,- ^�!+'! ry.a'�{ r � fyx � �`r,� } ft �OCk' s` � -''h SiR � � r � � I, .� 'ice �=;�I` - '?' `-•``,\. a+. 'I �• •�• �.• x. Y .i- Oj EP .r P~ �y�%; ;! \l F t K ifs- Kt't� ;.+''� ..?.'�+'�,; \� t - a �'. '. 1.K; :,c .,Cr. ai , b?l as <S• _3 � ,� i aiy'f 'SC 5 x L A VlV . •,� � •Il. •n. . F.S' ;,Pf S to C �'F' 4 �F` � I'y` Y r I;-, l ,{; I� � e`f F;,�5, ffs �� rt� ��� v 'c ° ! I �r� � • l �q`• r � - �,��„ �., � � yy�� Alj• r �'•i,9� 3 Fh:i a� ,r��e. n >v��1, � 3 �r � `'� lr��ee _ l '` ^ � tf �� �, :F � \ ' � ��J •_ r G..,tf" H w-�t :5 l ,T. wYX'lti, • �� Vunf o� i d! 4C/e'S,r ;AY rY I IF +I`.5�i.+ s. � `y •,F � �t-r r���°; x �PT�� !�, T Qa ,;,' y. � •Z� i' �r e '97� p � •�l •I • I . �} � r. ^ t �1 :x 17, F 1 F ���� z•Y ti !F` 3.A I � -1t' r • I � V. ��'•� t' �l\� i `j3 , , r_ +�x�, , ,, :e. Vr` '' �r^- .y :p.- � t r� 'at£� S x? I ' t E � '„r .� 6� J' +v _{'- e �� a u •,y � t • ��, „ � � .r�^, �.¢,.>"q � °' ; `r' + -' ' "' �3 ••3. '.+%t � hi ny � _tJ is ; Y s Y I '�k Q � � x� rx� J r, f} 6 ,;? ,^ ) � � i 'fit 0 � y1 lh �' `*k .• ��! ` °l } y� of � � •� �.� ,<,� y, r4• �� � .yp, E. M d t R' `�,. F�� �3Hf �3 J k 1 • �'��-1xfS � �,� .i S� � � 4 'y_ k � � r 4 � yY _{�":, J�t't. �1}'' "-4'. Nal PQ Aza -uc ' �3 .:� 3-D iopoQuade Copytight 0 1999 DeLatme Yarmouth, Mg 0406 Souice Data: QSGS 1 950 ft Scale: 1 : 24 QQQ Detail: 13-2 Datum: 10514 A9.i;-,;'A NCDENR North Carolina Department of Environment and Natural Division of Land Resources James D. Simons, PG, PE Director and State Geologist Land Quality Section DECEIVED APR a 5 2005 By: Resources April 4, 2005 LETTER OF RECEIPT OF EROSION CONTROL PLAN Bailey & Associates, Inc., 7225 Wrightsville Avenue Wilmington, NC 28403 RE: Project Name: Navy Federal Credit Union Project ID: Onslo-2005-289 County: Onslow River Basin: White Oak Submitted By: Jordan-Tew & Associates, PA Date Received by LQS: April 1, 2005 Plan Type: NEW Dear Sir or Madam: Michael F. Easley, Governor William G. Ross Jr., Secretary This office has received a soil erosion and sediment control plan for the project listed above which was submitted as required by the North Carolina Sedimentation Pol)ution Control Act (G.S. 113A-57 (4)), The Act requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil erosion control plan prior to the commencement of the land -disturbing activity (G.S. 113A-54(d) (4)). The Act further states that this plan must be filed a minimum of 30 days prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days of receipt. Failure of the approving authority to approve or disapprove the submitted plan within the 30-day period will be deemed approval of the plan. Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act prior to the approval of an erosion and sediment control plan is a violation of the Act. We have performed a preliminary review of your submitted plan and have determined that additional information will be necessary before a final review can be completed. Enclosed is a checklist of items that must be submitted before we can complete the review process. Failure to provide the additional information may result in disapproval of your plan. The approval of an erosion and sediment control plan is conditioned on the applicant's compliance with Federal and State water quality laws, regulations and rules. If you have questions please do not hesitate to contact this office. Your cooperation in this matter is appreciated and we look forward to working with you on this project. Sincerely, 6 wl et M. Russell Land Quality Section cc: Glen Tew, Jordan-Tew & Associates LQS-WiRO: SWS-WiRO Wilmington Regional Office 127 Cardinal Drive Ext., Wilmington, North Carolina 28405-3845 • Phone: 910-395-3900/ FAX: 910-350-2004 NORTH CAROLINA DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES LAND QUALITY SECTION EROSION and SEDIMENTATION CONTROL PLAN PRELIMINARY REVIEW CHECKLIST PROJECT NAME: tjiN-j 1pe:= f% k grC<A', �- w�:o_r� DATE: .Z006 PROJECT NO.: a 0Q <— Z$ ct, COUNTY: o To expedite the approval process, a cursory review of your submitted Erosion and Sediment Control Plan application has been made and has shown the need for additional information as specified below. To meet our review schedule, any additional information should be received by this office no later than q,.: l z1 . Failure to meet this schedule may result in disapproval of your plan. The following items shall be incorporated with respect to specific site conditions, in an erosion and sediment control plan: LOCATION INFORMATION Project location (roads, streets, landmarks) North arrow and scale GENERAL SITE FEATURES (Plan elements) Legend- Nonh arrow, scale, etc Property lines Existing contours (topographic lines) Proposed contours Limits of disturbed area (provide acreage total, delineate limits, and label) Planned and existing building locations and elevations Planned & existing road locations & elevations Lot and/or building numbers Geologic features: rock outcrops, seeps, springs, wetland and their limits, streams, lakes. ponds, dams, etc. Easements and drainageways Profiles of streets, utilities, dilchlines, etc. t Stockpiled topsoil or subsoil locations If the same person conducts the land -disturbing activity & any related barrow or waste acliwty, the related borrow or waste activity shalt conslitule pan of the land -disturbing activity unless the borrow or waste act,viy is regulated under the tAning Act of 1971, or is a landfill regulated by the Division of :Haste %lanagemenl If the land -disturbing aclivlty and any relaled borrow or waste activity are not conducted by the same person, they shall be considered separate land -disturbing aclivilies and must be permitted either tnru the Sedimental}on Pollution Ccntrel .Act as a one -use borrow site or Ihrough the Cvlinirrg Act, Requued Army Corps 404 permit and Water Quality 401 certification (e.g. stream disturbariCes over 150 linear feet) EROSIdN CONTROL MEASURES (on plan) Legend Location of temporary measures Location of permanent measures Construction drawings and details for lemporary and permanent measures Maintenance requirements of measures Contact person responsible for maintenance SITE DRAINAGE FEATURES Existing and planned drainage patterns (include off -site areas that drain through project) Method of determination of and calculations for Acreage of land being disturbed Size and Location of culverts and s&.vers Soil information: type, special characteristics Soil information below Culvert storm outlets —1/� Name and classificalion of receiving water course COMMENTS: See the following page STORMWATER CALCULATIONS Pre -construction runoff calculations for each outlet from the site (at peak discharge points) Design calculations for peak discharges of runoff (including the construction phase & the final runoff coefficients of the site) Design talcs of culverts and storm sewers Discharge and velocity calculaf3ons for open channel and ditch flows (easement & right-of-ways) Design talcs of cross sections and method of stabilization of existing and planned channels (include temporary linings) Design calcs and construction details of energy dissipators below culvert and storm sewer outlets (diameters & apron dimensions) Design talcs and dimension of sediment basins Surface area and settling efficiency information for proposed sediment traps and/or basins VEGETATIVE STABILIZATION Area & acreage to be vegetatively stabilized fvlelhod of soil preparation Seed type & rates (lemporary & permanent) Fertilizer type and rates Mulch type and rates NOTE: Plan should include provisions for groundcover on exposed slopes within 15 working days or 30 calendar days (whichever is shorter), following completion of any phase of grading; permanent groundcover for all disturbed areas within 15 working days or 90 calendar days (whichever is shorter) following completion of construction or development. FINANCIAL RESPONSIBILITYIOWNERSHIP FORM Completed, signed & Polarized FRIO Form Accurate application lee ($50.00 per acre rounded up the / next acre v:ith no ceiling amount) V Certificate of assumed name, it the owner is a partnership ✓ Name of Registered Agent (if applicable) Copy of the most current Deed for the site NOTE: For the EE.press Permitting Option, inquire at the local Regional Office for availability. NARRATIVE AND CONSTRUCTION SEQUENCE Narrative describing the nature and purpose of the construction activity Construction sequence related to erosion and sediment control (includino installation of critical measures prior to the initiation of the land -disturbing activity & removal of measures after areas they serve are permanently stabilizec) Bid specifications related only to erosion control Wilmington Regional Cffice 127 Cardinal Orive Extension, Wilmington, NC 25405 • Phone: 910-395-3900 / FAX: 910-350-2004 Jr t Continuation of Erosion and Sedimentation Control Plan Preliminary Review Checklist: Project Name: Navy Federal Credit Union Project Number: Onslo-2005-289 1. Please disclose any connection between the proposed Credit Union development and the proposed car wash adjacent. 2. Disclose why stormwater pond is not being built prior to the site development and grading. 3. #1 on the construction sequence should be to schedule a pre -construction, on -site meeting with the Land Quality inspector. 4. Provide sediment Pit #1 dimensions (length, width and depth) on the Erosion Control Plan. 5. Is a permanent erosion control measure needed at the end of the proposed 6' concrete flume? Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, NC 28405 Phone: 910-395-3900 Fax: 910-350-2004 JORDAN - TEW & ASSOCIATES, P.A. ENGINEERING, SURVEYING, MATERIALS TESTING & PLANNING 102 WEST BROAD STREET (ZIP 28334) P.O. BOX 249 DUNN, N.C. 28335 RONNIE E. JORDAN, P.L.S. EMAIL: jordantew@earthlink.net TELEPHONE: (910) 892-5159 JOHNNY GLENN TGW, P.G. FAX: (910) 892-1893 RECEIVED Navy Federal Credit Union jUN 2 3 2005 Jacksonville, N.C. Storm Water Control Narrative & Calculations pR03 # Sw 8 ()`)'( ? - vy e eral Credit Union project site is located at 2830 Piney Green Road (NCSR 1413) in Midway Park, N.C. The project site is located 550 If to the North from the intersection of Piney Green Road (NCSR 1413) and NC Hwy 24 in the Midway Park community. The project will consist of the Navy Federal Credit Union site (1.74 acres) plus an offsite area used to provide a common entrance drive between the Navy Federal parcel and the adjacent property to the south (this area of offsite drainage is 0.11 acres that is flowing toward the retention pond). A second offsite area that is a part of the upslope drainage area to the retention pond is Lot #3 as shown on the survey by Johnny Williams surveyor. This lot #3 is presently the location of a beauty shop and associated parking at the corner of Piney Green Road and Evergreen Avenue (which is a rear entrance to Piney Green Shopping Center). This lot #3 is 0.31 acres in size. Therefore the total upstream drainage area to the proposed retention pond will be as follows: Navy Federal site 1.74 acres + offsite area for access road 0.1 1 acres + offsite area (lot #3 beauty shop) 0.31 acres Total drainage area = 2.16 acres. Next we determine the percentage impervious area that is present or is to be planned for in the upstream drainage area as follows: On site buildings (navy Federal Parcel) _ On site streets (Navy Federal Parcel) = On site parking (Navy Federal Parcel) = On site sidewalks (Navy Federal Parcel) _ Offsite area (needed for common access drive) _ Off site area (Lot #3 present beauty shop) = Total upslope impervious area = Total impervious area in acres = 5,700 sf "ItoIIII IIII �ao,.•`��1� BAR 30,644 sf 12,414 sf°5! 44;� �m ,.. ES ,....,,°,° /� ,00 °• : �w 2,126 sf l° 4,791.60 sf 13,503.60 sf 580 O • 69,179.20 sf �h+n71 1.588 acres ,�2,o5 Therefore total impervious percentage = 69,179.20 sf - 94,089.60 sf (2.16 ac) = 73.53% Using the SA/DA monograph for costal counties and using the chart that provides 90% T55 removal (no vegetative filter required) we set up a ratio to interpolate the specific SA/DA factor for this situation with a pond depth of 5' as follows: aaIO` . io ..e��, ��i I~o�RV e4F�r b + • r • 580 b 3.53 = x x = 3.53 (0.7) x = 0.247 $ y •�� El f a _ O LEN ,5 Next we add this amount to the SAIDA factor for 70% impervious at 5' deep pond, wh�icC h is 5.0 which gives a total factor of 5.0 + 0.247 = 5.247 for the specific situation of 73.53% impervious area flowing to a 5' retention pond. Knowing this specific SAIDA factor (5.247) we can determine the required surface area of the permanent pool as follows: 2.16 acres (total drainage area) x (5.247 _ 100) = 4936.88 sf surface area required at pennanent pool elevation of 36.00 As can be seen on the attached breakdown of the retention pond areas and dimensions we have provided 6581 sf surface area at the permanent pool elevation of 36.00. Since 6581 sf is greater than 4936.88 sf our design is sufficient to meet the minimum surface area requirement for the retention pond. Next we determine the design runoff volume (temporary water quality pool) to be controlled and held above the pennanent pool elevation as follows: We have designed the temporary pool volume to equal the volume of a 1" deep rainfall over the entire watershed (2.16 acres). This volume was determined as follows: (I " rainfall) (1 /12 ft/inch) (2.16 ac) (43,560 ft2/ac) = 7841 ft3 This is a more conservative value for temporary storage than the Rv method as this method assumes 100% of the 1" rainfall will be transported to the retention basin and temporarily held in the temporary pool volume. Therefore the volume of water to be controlled as a result of a 1" rainfall event over the 2.16 ac drainage area is 7841 ft3. We have determined that the top of the principal spillway needs to be set at elevation 37.13 in order to store 7841 ft3 above the permanent pool elevation of 36.00. Next we use the orifice formula (Q = 0.6 A 2gh) to determine the draw down time that will be required for this volume (7841 ft3) using a l '/" diameter outlet pipe and using an average driving head of 1.13 - 2 = 0.57. We use A = 0.0085 ft2 (1 %" diameter pipe) g = 32.2 and h = 0.57' Q = 0.6 (0.0085 ft2) (6.06) = 0.0309 efs. The orifice fonnula gives :ps the average discharge rate of 0.0309 ft3/sec for the conditions stated above. Next we divide the volume to be controlled (7841 ft3) by the average outflow rate of 0.0309 ft3/sec and we determine the total draw down time of 253,758.69 seconds. This total draw down time in seconds (253,758.69 seconds) is then divided by 60 to give 4,229.31 minutes and then divided by 60 to give 70.49 hours and then divided by 24 to give 2.94 days. This draw down tune is ok as it falls within the allowed draw down time of 2-5 days. Therefore the outlet orifice size of 1.25" diameter is ok to accomplish the desirded draw down time of between 2-5 days. 4`°'�t1k CAll Rp''�. *'6`Y:'� 1 o s POND (EXCLUDES FORBAY) (ABOVE & BELOW PERM. POOL) ELEVATION SURFACE AREA STORAGE (SQ. FT. FT3 31 2119 0 32 594 406.5 33 1041 1224.0 34 1560 2524.5 35 2151 4380.0 36 4638 7774.5 37 5008 12597.5 37.5 5196 15148.5 - 38 5385 17793,75 FORBAY (ABOVE & BELOW PERM. POOL) ELEVATION SURFACE AREA STORAGE _ (SO. FT.) (FT3) 32 8 0 33 121 64.5 34 306 278.0 35 563 712.5 36 1942 1965.0 37 2151 4011.5 37.5 2258 5113.75 38 2368 6270.25 sr� m � Et7 m m C�Cl m POND & FORBAY (ABOVE PERM. POOL1 0 `n ELEVATION 0 SURFACE AREA STORAGE ---------(S0. FT.) -(FTC) 0 36.00 6581 0 37.00 7159 6870.0 0 37.13 7235 7841.0 37.5 7454 10523.25 ° 38 7753 14325.0 STAGE VS. DISCHARGE ELEVATION DISCHARGE (CFS) 36.00 0.0 37.00 0.04 37:35 -0.044 37.50 1.55 38.00 14.3 �9�a+r�rtrrrarrr4� a•°ZN CAR x�• � f � a r 010 r c��NN,..�•` 4rrrrr s/11��� �� �05 lei 85% TSS REMOVAL 30 FOOT 'VEGETATED FILTER REQUIRED PTH ! -3' 1 3.5' 1 4.0' 1 4.5' 1 5.0' 1-5.5' 1 6.0' 1 6.5' 1 7.0' f 7.5' �q 10% .9 1.8 1.7 .6 1.5 10 0 10 0 0 20% 1.7 1.3 1.2 1.1 1 1.0 .9 .8 .7 .6 .5 30 % 2.5 2.2 -1.9 1.8 1.6 - 1.5 .1.3, 1.2 1.0 .9 . _ % 3.4 3.0 2.6 2.4 2.1 1.9 1.6 ' 1.4 1A 1.0 50%-.- - . -.4:2 . 3.7 3.3 3.0 2.7 2.4 2.1 1.8 1.5 .1.3' 140 60% 5.0 4.5 .3.8 3.5 3.2 2.9 2.6 2.3 2.0 1.6 70% 6.0 5.2 4.5 4.1 3.7 *3.3 2.9 2.5 2.1 1.8 80% 6.8 6.0 5.2 4.7 1-4.2- 3.7 3.2 2.7 2.2 2.0 90% 7.5 6.5 5.8 5.3 4.8 4.3 3.8 3.3 2.$ ,ray t4i9ro., 100% 8.2 j 7.4 16.8 b.2 1 5.6 f 5.0 4.4 13.8��•• • ••© ti� *Revised 10/31/97 - 90% TSS REMOVAL � $580 NO VEGETATED FILTER REQUIRED %�;S y%, of PdE��:.•"" ' DEPTH 3 3.5' 4.0' 4.5'• 5.0' 5.5' 6.0' 6.5' 7.0' /tltool l7f 7.5' IMP % 10% 1.3 1 1.0 .8 1.7 1.6 .5 .4 1.3 1.2 .1 20 % 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1 1.0 .9 .6 30% 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 -1.1 .8 40 % 4.5 4.6 3.5 3.1 2.8 2.5 2.1 1.8 1.4 1.1 50 % 5.6 5.0 4.3 3.9 3.5 3.1 2.7 2.3 1.9 1.5 60 % 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 2.4 1.9 70 % 8.1 7.0 6.0 .5 5.0 4.5 3.9 3.4 2.9 2.3 j6.4 5.7 5.2 4.6 4.0 3.4 2.8 80 % 9.4 8.0 7.0 90% .10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 39 3.3 100% 12.0 10.0 8.8 8.1 7.3 6.6 5.8 5.1 4.3 3.6 ==jl Noce: The required surface area calculated from'the tables is to be provided at the permanent pool elevation.