HomeMy WebLinkAboutSW8050322_CURRENT PERMIT_20051017STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW S(D,SD�Ja�
DOC TYPECURRENT
PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
'26V.5-7 0�
YYYYMMDD
�oF W A7r Michael F. Easley, Governor
�O G William G. Ross, Jr., Secretary
7 North Carolina Department of Environment and Natural Resources
0 Alan W. Klimek, P.E. Director
Division of Water Quality
October 17, 2005
Jeffrey LaCroix, Owner
114 Blackbrook Lane
Wilmington, NC 28409
Subject: Stormwater Permit No. SW8 050322
Pine Grove Offices
High Density Project
New Hanover County
Dear Mr. LaCroix:
The Wilmington Regional Office received a complete Stormwater Management Permit
Application for Pine Grove Offices on October 4, 2005. Staff review of the plans and
specifications has determined that the project, as proposed, will comply with the Stormwater
Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 050322
dated October 17, 2005, for the construction of the subject project.
This permit shall be effective from the date of issuance until October 17, 2015, and shall be
subject to the conditions and limitations as specified therein. Please pay special attention to
the Operation and Maintenance requirements in this permit. Failure to establish an adequate
system for operation and maintenance of the stormwater management system will result in
future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have
the right to request an adjudicatory hearing upon written request within thirty (30)'days
following receipt of this permit. This. request must be in the form of a written petition,
conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of
Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands
are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please
contact Rhonda Hall, or me at (910) 796-7215.
Sincerely,
Ott-.
Ed Beck
Regional Supervisor
Surface Water Protection Section
ENBlrbh: S:1WQSISTORMWATIPERMIT1050322.oct05
cc: Charles Cazier, Tripp Engineering, P.C.
New Hanover County Building Inspections
City of Wilmington Stormwater Services
Beth E. Wetherill, New Hanover County Engineering
Rhonda Hall
Wilmington Regional Office
Central Files
North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796-7215 Customer Service 1 -877-623-6748
Wilmington Regional Office Wilmington, NC 28405-3845 FAX (910) 350-2004 Internet: h2o.enr.state.mus No'�rttlCarolina
An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper "Natlrrallil
State Stormwater Management Systems
Permit No. SW8 050322
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Jeffrey LaCroix
Pine Grove Offices
New Hanover County
FOR THE
construction, operation and maintenance of an infiltration basin in compliance with the
provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and
the approved stormwater management plans and specifications and other supporting
data as attached and on file with and approved by the Division of Water Quality and
considered a part of this permit.
This permit shall be effective from the date of issuance until October 17, 2015, and
shall be subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.6 on page 3 of this permit. The stormwater
control has been designed to handle the runoff from 25,110 square feet of
impervious area. This basin must be operated with a 50' vegetated filter.
3. The tract will be limited to the amount of built -upon area indicated on page 3 of
this permit, and per approved plans.
4. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
5. The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system.
Page 2 of 7
State Stormwater Management Systems
Permit No. SW8 050322
6. The following design criteria have been provided in the infiltration basin and must
be maintained at design condition:
a.
Drainage 2Area, acres:
Onsite, ft
Offsite, ft2:
b.
Total Impervious Surfaces, ft2
C.
Design Storm, inches:
d.
Basin Depth, feet:
e.
Bottom Elevation, FMSL:
f.
Bottom Surface Area,, ft2:
g. Bypass Weir Elevation, FMSL:
h. Permitted Storage Volume, ft3:
i. Type of Soil:
j. Expected Infiltration Rate, in/hr:
k. Seasonal High Water Table, FMSL
I. Time to Draw Down, hours:
M. Receiving Stream/River Basin
n. Stream Index Number-
o. Classification of Water Body
II. SCHEDULE OF COMPLIANCE
1.36
59,461
None
25,110
3
2
14.4
629
16.64
8,123
Bh
9
.10
2.67
Hewletts Creek / Cape Fear
18-87-26
"SA; HQW"
1. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance
necessary to assure the permitted stormwater system functions at optimum
efficiency. The approved Operation and Maintenance Plan must be followed in
its entirety and maintenance must occur at the scheduled intervals including, but
not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of bypass structure, infiltration media, flow
spreader, catch basins, piping and vegetated filter.
g. A clear access path to the bypass structure must be available at all times.
Page 3 of 7
State Stormwater Management Systems
Permit No. SW$ 050322
4. Records of maintenance activities must be kept and made available upon
request to authorized personnel of DWQ. The records will indicate the date,
activity, name of person performing the work and what actions were taken.
5. The facilities shall be constructed as shown on the approved plans. This permit
shall become voidable unless the facilities are constructed in accordance with
the conditions of this permit, the approved plans and specifications, and other
supporting data.
6. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A
modification may be required for those deviations.
7. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
8. Access to the stormwater facilities shall be maintained via appropriate
easements at all times.
9. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project
area. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMA
Major permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
10. The permittee shall submit final site layout and grading plans for any permitted
future areas shown on the approved plans, prior to construction.
11. A copy of the approved plans and specifications shall be maintained on file by
the Permittee for a minimum of ten years from the date of the completion of
construction.
12. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
Page 4 of 7
State Stormwater Management Systems
Permit No. SW8 050322
III. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a formal permit transfer request to the Division of Water Quality,
accompanied by a completed name/ownership change form, documentation
from the parties involved, and other supporting materials as may be appropriate.
The approval of this request will be considered on its merits and may or may not
be approved. The permittee is responsible for compliance with all permit
conditions until such time as the Division approves the transfer request.
2. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division of Water Quality, in
accordance with North Carolina General Statute 143-215.6A to 143-215.6C.
3. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation
of nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
5. The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
6. The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and reissuance or
termination does not stay any permit condition.
7. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
8. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
9. The permittee shall notify the Division any name, ownership or mailing address
changes within 30 days.
Permit issued this the 17t' day of October, 2004.
NOR WCAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
'.-, -'V - --�
for Alan W. Klimek, P.E., Director T'
Division of Water Quality
By Authority of the Environmental Management Commission
Page 5 of 7
State Stormwater Management Systems
Permit No. SW8 050322
Pine Grove Offices
Stormwater Permit No. SW8 050322
New Hanover Count
Designer's Certification
I, , as a duly registered
in the State of North Carolina, having been authorized to'observe (periodically/ weekly/
full time) the construction of the project,
(Project)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL
Page 6 of 7
State Stormwater Management Systems
Permit No. SW8 050322
Certification Requirements:
_1. The drainage area to the system contains approximately the permitted
acreage.
.2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
.5. The bypass structure weir elevation is per the approved plan.
6. The bypass structure is located per the approved plans.
.7. A Trash Rack is provided on the bypass structure.
8. All slopes are grassed with permanent vegetation.
.9. Vegetated slopes are no steeper than 3:1.
.10. The inlets are located -per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
.12. All required design depths are provided.
.13. All required parts of the system are provided.
14. The required system dimensions are provided per the approved plans.
cc: NCDENR-DWQ Regional Office
New Hanover County Building Inspections
Page 7 of 7
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This form may be photocopied for use as an original
I. GENERAL INFORMATION
1. Applicants name (specify the name of the corporation, individual, etc. who owns the project):
Jeffrey LaCroix
2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance):
Jeffrey LaCroix Owner
3. Mailing Address for person listed in item 2 above:
rook Lane
City: Wilmington State: NC Zip: 28409
Telephone Number: 910-799-3100
4. Project Name (subdivision, facility, or establishment name — should be consistent with project name on
plans, specifications, letters, operation and maintenance agreements, etc.):
Pine Grove Offices
5. Location of Project (street address):
818 Pine Grove Drive
City: Wilmington County: New Hanover
6. Directions to project (from nearest major intersection):
from the intersection of Hwy 132 and Hwy 17, travel south on .Hwy 132 2 miles, east on Pine Grove Drive
approximately 1.5_ miles, site is on the south side of the road
7. Latitude : N 340 12' 00" Longitude: W 770 00' 00" of project
8. Contact person who can answer questions about the project:
Name: Phillip TrippTelephone Number: 910-763-5100
II. PERMIT INFORMATION:
1. Specify whether project is (check one): X New Renewal Modification
Form SWU-101 Version 3.99 Pagel of4
2
2. If this application is being submitted as the result of a renewal or modification to an existing permit, list
The existing permit number and its issue date (if known)
3. Specify the type of project (check one):
Low Density X High Density Redevelop General Permit Other
4. Additional Project Requirements (check applicable blanks):
CAMA Major ` Sedimentation/Erosion Control 404//401 Permit NPDES Stormwater
Information on required state permits can be obtained by contacting the Customer Service Center at
1-877-623-6748.
Ill. PROJECT INFORMATION
1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative
(one to two pages) describing stormwater management for the project.
infiltration basin
2. Stormwater runoff from this project drains to the Cape Fear River basin.
3. Total Project Area: 1.36 acres 4. Project Built Upon Area: 42.4 %.
5. How many drainage basins does the project have? 1
6. Complete the following information for each drainage area. If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same format as below.
sin Iriforinat�ort-
Drainage Basin 1
' Drainage Basing`
__...
Receiving Stream Name
Hewletts Creek YS&1 -�{o
Receiving Stream Class
SA
Drainage Basin Area
1.36
Existing Impervious * Area
12,459 sf
Proposed Impervious * Area
25,110 sf
% Impervious* Area (total)
42.4%
Impervvious *-Surface Area, , ° '
Dr ainage B'asin`1,
Drainage.Ba i s1n 24
On -site Buildings
8,051 sf
On -site Streets
-
On -site Parking
14,528 sf
On -site Sidewalks
2,531 sf
Other on -site
Off -site
Total:
Z=25,110 sf
Z=
* Impervious area is defined as the built upon area including, but not liniited to, buildings, roads, parking
areas sidewalks, gravel areas, etc.
Form SWU-101 Version 3.99 Page 2 of
7. How was the off -site impervious area listed above derived?
IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
The following italicized deed restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a
table listing each lot number, size and the allowable built -upon area for each lot must be provided as an
attachment.
The following covenants are intended to ensure ongoing compliance with state slonmaater management permit
number as issued by the Division of Water Quality. These covenants may
not be changed or deleted without the consent of the State.
2. No more than square feet of any lot shall be covered by structures of impervious materials.
Impervious materials include asphalt, gravel, concrete, brick stone, slate or similar material but do not inchlde wood
decking or the water surface of snvimtning pools.
3. Swales shall not be filled in, piped or altered except as necessary to provide driveway crossings.
4. Built -upon area in excess of the permitted amount requires a state storntivater management permit ntocliftcation prior
to construction.
S. All permitted runofffrom outparcels or future development slutll be directed into the permitted stormwater control
system. These connections to the stornnvcrter control system shall be performed in a manner that mainlains the
integrity card performance of the syste►n m permitted
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shall include all the applicable items required above, that the covenants will be binding on all parties and
persons claiming under them; that they will run with the land; that the required covenants cannot be changed or
deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot.
V. SUPPLEMENT FORMS
The applicable state stormwater management permit supplement fort-n(s) listed below must be submitted for
each BMP specified for this project. Contact the Stormwater and General Permits Unit at (910) 733-5083 for
the status and availability of these forms.
Form SWU-102
Wet Detention Basin Supplement
Form SWU-103
Infiltration Basin Supplement
Form SWU-104
Low Density Supplement
Form SWU-105
Curb Outlet System Supplement
Form SWU-106
Off -Site System Supplement
Form SWU-107
Underground Infiltration Trench Supplement
Form SWU-108
Neuse River Basin Supplement
Form SWU-109
Innovative Best Management Practice Supplement
Form SWU-101 Version 3.99 Page 3 of
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. The complete application package should be
submitted to the appropriate DWQ Regional Office.
1. Please indicate that you have provided the following required information by initialing in the space
provided next to each item.
Applicant's Initials
• Original and one copy of the Stormwater Management Permit Application Form
• One copy of the applicable Supplement Form(s) for each BMP Ox
• Permit application processing fee of $420 (payable to NCDENR)
• Detailed narrative description of stormwater treatment/management
• Two copies of plans and specifications, including:
- Development/Project name
- Engineer and firm
- Legend
- North arrow
- Scale
- Revision number and date
- Mean high water line
- Dimensioned property/project boundary
- Location map with named streets or NCSR numbers
- Original contours, proposed contours, spot elevations, finished floor elevations
- Details of roads, drainage features, collection systems, and stormwater control measures
- Wetlands delineated, or a note on plans that none exist
- Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations
- Drainage areas delineated
- Vegetated buffers (where required)
VII. AGENT AUTHORIZATION
If you wish to designate authority to another individual or firm so that they may provide information on your
behalf, please complete this section.
Designated agent (individual or firm): Tripp En ing Bering, P.C.
Mailing Address: 419 Chestnut Street
City: Wilmin ton State: NC Zip: _28401
Phone: 910 763-5100 Fax: (910) 763-5631
VIII. APPLICANT'S CERTIFICATION
I, O)rint or type name ofperson listed in General Information, item 2) Jeffrey LaCroix
certify that the information included on this permit application form is, to the best of my knowledge,, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded; and that the proposed project complies with the requirements of 1 5A
NCAC 2H .1000. /7
Signature: / A �,� i�jG _ Date:
Form SWU-101 Version 3.99 Page 4 of 4
Permit No.
(to be provided by DWQ)
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
INFILTRATION BASIN SUPPLEMENT
This form may be photocopied for use as an original
DWQ Stormwater Management Plan Review_
A complete stormwater management plan submittal includes a stormwater management permit application, an
infiltration basin supplement for each system, design calculations, soils report and plans and specifications
showing all stormwater conveyances and system details.
I. PROJECT INFORMATION
Project Name: Pine Grove Offices
Contact Person: Charles Cazier Phone Number: ( 910 ) 763-5100
This worksheet applies to: Basin No. 1 in Drainage Area 1
(as identified on plans) (from Form SWU-101)
IL DESIGN INFORMATION —Attach supporting calculations/documentation. The soils report must be
based upon an actual field investigation and soil borings. County soil maps are not an acceptable
source of soils information. All elevations shall be in feet mean sea level (fmsl).
Soils Report Summary
Soil Type __Bh_ T
Infiltration Rate 9 m/hr or ef/hr/sf (circle appropriate units)
SHWT Elevation 10 fmsl (Seasonal High Water Table elevation)
Basin Design Parameters
Design Storm _ 3.0 inch (1.5 inch event for SA waters, I inch event for others)
Design Volume 6 393 c.f.
Drawdown Time 2.67 days Hours
Basin Dimensions
Basin Size 85 ft. x 3.45 ft. = 293 sq. ft. (bottom dimensions)
Basin Volume Provided 7,120 c.f.
Basin Elevations
Bottom Elevation 14.0 fmsl
Storage Elevation --16.64 fmsl
Top Elevation 17.0 fmsl
III. REQUIRED ITEMS CHECKLIST
The following checklist outlines design requirements per the Stormwater Best Management Practices Manual
(N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code
Section: 15 A NCAC 2H .1008.
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit
Application Form, the agent may initial below. Attach justification if a requirement has not been met.
Applicants Initials
L- a. System is located 50 feet from class SA waters and 30 feet from other surface waters.
b. System is located at least 100 feet from water supply wells.
c. Bottom of system is at least 2 feet above the seasonal high water table.
(� d. Bottom of system is 3 feet above any bedrock or impervious soil horizon.
e. System is not sited on or in fill material or DWQ approval has been obtained
r!('�� f. System is located in a recorded drainage easement for the purposes of operation and
maintenance and has recorded access easements to the nearest public right-of-way.
g. Drainage area for the device is less than 5 acres.
h.. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is
attached.
i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event
for areas draining to SA waters). Design volume and infiltration calculations attached.
j. System is sized to take into account the runoff at the ultimate built -out potential from all
surfaces draining to the system, including any off -site drainage. Calculations attached.
k. All side slopes stabilized with vegetated cover are no steeper than 3 :1 (H: V).
1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or
sediment trap is provided.
Gam- m. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches
or dense vegetative cover is provided.
n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum
length is 50 feet for SA waters, 30 feet for other waters).
o. Flow distribution mechanism within basin is provided.
4: p� p. A benchmark is provided to determine the sediment accumulation in the pretreatment
device.
_ Cj2�� q. Runoff in excess of design volume bypasses off-line systems (bypass detail provided).
r . System is designed to draw down the design storage volume to the proposed bottom
elevation under seasonal high water conditions within five days. A soils report and all
pertinent draw -down calculations are attached.
C s. flans ensure that the installed system sill meet design specifications (constructed or
restored) upon initial operation once the project is complete and the entire drainage area
is stabilized.
Form SWU-103 Rev 3.99 Page 2 of 3
IV., INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT
1. After every runoff producing rainfall event and at least monthly, inspect the infiltration system for erosion,
trash accumulation, grass cover, and general condition.
2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow
vegetative cover to maintain a maximum height of six inches, and remove trash as needed.
3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow
structures for blockage and deterioration. Remove any blockage and repair the structure to approved
design specifications.
4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when
depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored
to the original design depth without over -excavating. Over excavating may cause the required water
table separation to be reduced and may compromise the ability of the system to perform as designed.
Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner
That will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream,
etc.).
A benchmark shall be established in the pretreatment unit. The benchmark will document the original
design depth so that accurate sediment accumulation readings can be taken. The measuring device used
to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not
readily penetrate into accumulated sediments.
When the design depth reads D155 feet in the pretreatment unit, the sediment shall be
removed from both the pretreatment unit and the infiltration basin.
5. If the Division determines that the system is failing, the system will immediately be repaired to original
design specifications. If the system cannot be repaired to perform its design function, other stormwater
control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed.
I acknowledge and agree by my signature below that I am responsible for the performance of the five
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any
changes to the system or responsible party.
Print Name and Title: Jeffrey LaCroix Owner
Address: ,114 Biackbrook Lane, Wilmington, NC 28409 _
Phone: 910-
Signature:
Date: !.2a _ 2 4 - G y
Note: The leggify lyyponsible party should not be a homeowners association unless more than 50% of the lots have been sold and
a resickni of the subdivision has been named the president.
a Notary Public for the State of North Carolina , County of
do hereby certify that personally appeared before me this
Z day of , 2004 , and acknowledge the due execution of the forgoing infiltration basin maintenance
requirements. Witness my handandnfficial seal,
C_
C.
SEAL �a`OexVsion expires jn—ic,:�-C_L
Form SWU-103 Rev 3.: _. ',2e.3,Qf3
COU
//lf 111111041"