HomeMy WebLinkAboutSW8050313_COMPLIANCE_20050506STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW _2(I)5 aaI3
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
COMPLIANCE EVALUATION INSPECTION
DOC DATE
�LY�SOSfXp
YYYYMMDD
DETENTION POND ANALYSIS FILE NAME: G:\DATA\WPDATA\WQS\POND1050313.WK1
PROJECT#: SW8 050313 REVIEWER: P.Bartlett
PROJECT NAME: Preservation Park A�-1610
Ext. Det. Wetlands DATE: 06-May-05
Receiving Stream: Bradley Creek Class: SC
Drainage Basin: Cape Fear Index No. 18-87-24-4-(1)
Site Area 3.06 acres
Drainage Area square feet Area = 0.95 acres
IMPERVIOUS AREAS
Rational C
Bldgs
10800,00
square feet 0.95
pA &t
Streets
4289.00
square feet 0.95
2
Parking/driveways
3491.00
square feet 0.95
feet
yr,
a
square
square feet
A K*w
square feet
TOTAL
square feet Rational Cc=/ 0.54
SURFACE AREA CALCULATION
% IMPERVIOUS
44.90%
SA/DA Ratio 3.79%
Des. Depth
3
Req. SA 1569 sf
TSS:
85
Prov. SA sf
VOLUME CALCULATION
place a "'I" in the box if Rational is used
Rational ?*
FOREBAY
Des. Storm
inches
Perm. Pool Volume=
1770
Rv=
0.45
Req. Forebay Volume=
354
Bottom
19 msl
Provided Volume=
391.00
Perm. Pool
msi
Percent=
Design Pool
23 rnsl
Design SA
2318 sf
Req. Volume
... ....... . cf
SA @
Prov. Volume
1983 cf
Elevation=
ORIFICE CALCULATION
Avg. Head =
0.49
ft
Q2 Area =
0.39
sq. in.
Flow Q2, cfs
0.009
cfs
Q5 Area =
0.15
sq. in.
Flow Q5, cfs
0,004
cfs
Orifice Area
0.20
sq. in.
No. of Orifices
Q=
0.005
cfs
Diameter, inches
0;i5
weir H x W
in
x
in
Drawdown days
COMMENTS
Surface Area , Volume and Orifice are within Design Guideline
TRIPP ENGINEERING, P.C.
419 Chestnut Street
Wilmington, North Carolina 28401
Phone: (910) 763-5100 - FAX: (910) 763-5631
May 4, 2005
NCDENR
Division Water Quality
127 Cardinal Drive
Wilmington, NC 28405-3845
Attn: Mr. Paul Bartlett
Re: Preservation Park
SWS 050313
New Hanover County, NC
TE 04135
Dear Paul:
In response to your correspondence dated March 21, 2005, we offer the following:
l . Drainage area to basin is 0.95 acre. Application and supplement have been
corrected.
2. A note has been provided about Corps approval of wetland delineation.
3. Coastal Tables have been used for SA/DA of 45% = 3.80.
4. A planting plan by the wetland consultant is enclosed.
Please review for approval and contact us with any questions, comments or if you
need additional information. Thank you.
Sincerely,
Tripp Engineering, P.C.
Charles D. Cazier, E.I.
CDC:dcb
Enc.
MAY 0
s )a
13
5/4/2005 Prese ZPrk
CDC Stormwater Wetlands Calculations
04135
Total Drainage Area
s . ft.
acres
41.250
0.95
Impervious Area
Land Use
s . M.
acres
buddin s
10.800
0.25
asphalt
4,289
0.10
concrete
3,491
0.08
Total
18,580
0.43
Stormwater Calculations:
Time of Concentration
Hydraulic Length (L) = 250 ft.
change in Height (H) = 3 ft.
Tc = (Lj !N).soa / 128
- 3.01 min.
use 5.00 min.
Flow for 10 year, 6 hour Storm (Q1o):
QPRE _ (CPRE) x (110) x (Area)
1.71 cfs
OpcsT = (CPosT) x (1i0) x (Area)
3.90 cfs
oou ocora a uaeacia ror lu year Srorm:
CN = (98)(% imp.) + (60)(1-% imp.)
= 78
P = 4.80 in, for 10 yr, 6 hr storm
S= 10001CN-10
2.82
Depth (D)= [P-(0.2)(S)]2 1 [P+(0.8)(S)]
= 2.54 in.
Time to Peak Flow;
Tp = [(43.5)(0)(Area)) 1 010 posT
= 26.84 min.
Pocket Wetlands Design
Pond Size:
Elevation
(ft.)
22,00
Surface Area
(sq. ft.)
1,646
Permanent Pool
Flood Pool
2. 100
2,318
Top of Bank
25.00
3,458
Bottom of Pool
19.00
5
Pond Depth Distribution:
Depth Below
Permanent Pool
Surface Area
(sq. ft.
High Marsh
0 to 9"
572
Low Marsh
9" TO 18"
572
Open Water
> 18"
490
Total Provided Storage Volume:
Vol. _ [(Normal pool SA + Flood Pool SA) / 21
x (F.P. elev. - N.P. elev.)
1,982 cu.ft.
04135STATEPONO
°k impervious = 0.450
= 45.0°%
use 45.0%
CPRE= 0.25
CPosT = (% imp.)(.95)+(1-% imp,)(.25)
0.57
110 = 7.23 in/hr
i50 = 8,87 in/hr
Flow for 50 year, 6 hour Storm (050)
OPRE _ (CvRE) x (110) x (Area)
= 2.10 cis
QposT = (CpasT) x (I10)x (Area)
4.79 cfs
Soil Storage Capacity for 50 year Storm:
CN = (98)(% imp.) + (60)(1-% imp.)
78
P = 6.42 in. for 50 yr, 6 hr storm
S = 10001CN - 10
= 2.82
Depth (D)= [P-(0.2)(S)]21 (P+(0.8)(S)]
3.95 in.
Time to Peak Flow:
Tp = [(43.5) (D) (Area)] / Q50.PoST
34.00 min.
State Surface Area'Re uiroment at normal pooi:
SAIDA = 0.0380
Required SA = (SAIDA) x (Total Drainage Area)
1.568 s . ft.
State Volume Requirement for Storage of first 1" runoff
Rv = .05+,009(Percent Impervious)
0.455 intin
Vol. _ (Design Rainfall)(Rv)(Drainage Area)
= 1565.38 cu.ft.
.���'C,�.CAROC
C.)J./,41ESSIp,=9�'L9
r
SEAL
17374
4a
�i GREGG
�� Iflli11O
1 of 2 05 "04'K
Y -
5/4/2005
CDC
Preservation Park
Stormwater Wetlands Calculations
04135
Forebay:
Required Volume
Vol, = 20% of temporary and permenant
storage volume
354 cu. ft,
'Allowable range 22%-16%
Outlet Structure Design:
Flow for 2-day drawdown:
far 1st 1" of stormwater,
Q = Provided State Vol. 1 172,800 sec. (2-days)
= 0,011 cfs
Required Area of Pipe for 2-day drawdown'.
A= Q I [Cd x SQRT(2 x g x h)]
Cd = 0.6
9 = 32.2 ft./sz
In = (F.P. elev.- N.P. elev.) 12
0.5 ft.
A = 0.0034 s . ft.
Diameter of Pipe for 2-day drawdown:
DIA. = SQRT[(A x 4) 1 pi]
= 0.0655 ft.
= 0.79 in.
USE A .5 IN. DIA. PIPE
Outlet Structure Check:
Using a 4' x 4' Basin,
Perimeter L) = 16 ft,
Q = CIA
C = (% imp.)(.95) + (1-% imp)(25)
0.57
1 = 7.23 in. for a 10 yr. Storm
A = 0.95 Acres
= 3.90 cfs
Q= CwxLxH15
H = (Q / (Cw x L)]"
Cw = 3
Peak elevation = flood pool elevation + H
= 23.19 ft.
Provided Volume
Bottom SA = 2 sq. ft.
Norma{ Pool SA = 311 sq. ft.
Vol. _ [(N.P. SA+ Bottom SA) 121 x (N.P. el. - Bottom el.)
391 cu. ft.
Flow for 5-day drawdown:
for ist 1" of stormwater,
Q = Provided State Vol. 1432,000 sec. (5-days)
0,005 cfs
Required Area of Pipe for 5-day drawdown:
A= Q! [Cd x SQRT(2 x g x h)]
Cd = 0.6
9 = 32.2 ft./s2
h = (F.P. elev. - N.P. elev.) 1 2
0.5 ft.
A = 0.0013 s . ft.
Diameter of Pipe for 5-day drawdown:
DIA. = SQRT[(A x 4) / pi]
0.0414 ft.
= 0.50 in.
04135STATEPOND
2 of 2
.,MAR 10,2005 04:17P 9107635631
NOWNR
North Carolina Department of Environment and Natural Resources
127 Cardinal Drive Extension, Wilmington. NC 28405 (910)395-3900 FAX (910)350-2004
Request for Express Permit Review
FILL-IN all Information below and CHECK required Permit(s).
FAX to Cameron Weaver along with a narrative and vicin4 ma of the project locattion.
Projects must be submitted by 9:00 A.M. of the review date, unless prior arrangements are made,
page 2
APPLICANT Name_ Earl Worslev _ _ —
Company Worsley Investment and Development Co. LLC�
Address P.O. Box 490 City/State Wrightsville Beach Zip 28480 County New Hanover
Phone 910-256-0044 Fax 910-256-0044 Email
PROJECT Name_ Preservation irk
ENGINEERICONSULTANT_ Phillip Tripp
Company TrippEngineering
Address 419 Chestnut Street . CitylState Wilmington, NC_ _Zip 28401 County New Hanover
Phone 910-763-5100 Fax 910-763-5631 Email trip aeng(a7e�,mcom — _
❑ STREAM ORIGINATION CERTIFICATION
L�NSTORMWATER ®tLow�Density High Density -Detention Pond ❑ High Density -Other
❑ Wv4 Density -Curb & Gutter High Density -Infiltration ❑ Off Site
❑ COASTAL ❑ Excavation & Fill - ❑ Bridges & Culverts ❑ Structures Information
MANAGEMENT '❑ Upland Development ❑ Marina Development ❑ Urban Waterfront
❑ LAND QUALITY ❑ Erosion and Sedimentation Control Plan with — acres to be disturbed.
❑ WETLANDS (401) ❑ No Wetlands on Site (letter from COE) ❑Wetlands Delineated/No JD
❑ Greater than 0.1 AC. Wetlands Impacted ❑Jurisdictional Determination has been done
❑ Less than 0.1 AC Wetlands Impacted ❑Greater than 0.5 AC Wetlands Impacted
The legislation allows additional fees, not to excoed 50% of the original Express Review permit application
fee, to be charged for subsequent reviews due to the insufficiency of the permit applications.
For DENR use only
SUBMITTAL DATES: Fee Split for multiple permits:
SW $
CAMA $
LQS $
401_ $
Total Fee Amount $
MAR 10,2005 04:17P
9107635631
page 3,
March 10, 2005
Stormwater Narrative
Preservation Park
Wilmington, NC
77�����s .
` Preservation Park is a 3.06 acre tract proposed for nine single family honks.
Approximately 2.0 acres of th(� site will remain natural with same minor clean up of
overgrown vegetation. The 1.06 acres is to be cleared and graded.
TE 041,35
Sto1e11watcr will be treated by extended detention wetland tacilit The pond will be
designed for the State's 1" and the Cit 's 1U y_�ar pre -past requirements. Approximately
0.95 acre will drain to the facility. Within the 0.95 acre, the nine single family homes will
create 11.808 sf of impervious along with 4,401 sf of concrete driveways and sidewalk a5
well as 3,532 sf of asphalt street. A total of 19.741 sf creates a 14.7% builtluPor area -for
the project.
Overflow from the site will be routed to Bradley creek, Classification C-S W.
•M4AR 10,20G5 04:17P 9107635631
i
page 4
OWNER INFORMATION:
WORSLEY INVESTMENT AND
DEVELOPMENT, LLC
P.O. BOX 490
WIL.MINGTON, NC
�o MA.R 10, 2005 04 :16P 9107635631
m
°m Job No. 1
r
Tf �� �`i `�-5 Date: 3 `
T z'Y-
7 ,0,� Sci b.�J 10
�-g U
�t +R'1VP ENGINEERING, P.C.
4I9 Chestnut Street, Wilmington. NC 2840
ho e: (910) 763-5100 - FAX: (910) 763-5631
0 el Email: trippeng(Duec.rr.coin
LE r TER OF TRANSMITTAL
To:
Attention
Subject'.
J�
m 1' TV )1 P
FAX TRANSMITTAL: NUMBER OF PAGES INCLUDES COVER
I am sending you: (ATTACHED ( ) UNDER SEPARATE COVER
( ) Prints ( ) Tracings ( ) Copy of letter ( ) Specifications ( ) Other
Copies _ Item No. Description_
M
These are transmitted as checked below:
( ) For Approval ( ) For Your Use ( ) Sign & Return (-J'Review
cc:
Signed:
page 1
f
March 10, 2005
Storm water Narrative
Preservation Park
Wilmington, NC
TE 04135
Preservation Park is a 3.06 acre tract proposed for nine single family homes.
Approximately 2.0 acres of the site will remain natural with some minor clean up of
overgrown vegetation. The 1.06 acres is to be cleared and graded.
Stormwater will be treated by extended detention wetland facility. The pond will be
designed for the State's F and the City's 10-year pre -post requirements. Approximately
0.95 acre will drain to the facility. Within the 095 acre, the nine single family homes will
create 11,808 sf of impervious along with 4,401 sf of concrete driveways and sidewalk as
well as 3,532 sf of asphalt street. A total of 19,741 sf creates a 14.7% built upon area for
the project.
Overflow from the site will be routed to Bradley creek, Classification C-S W.