Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8050222_COMPLIANCE_20050225
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SwgcQAl DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE P�2COMPLIANCE EVALUATION INSPECTION DOC DATEo`�j_ YYYYM M DD INFILTRATION TRENCH ANALYSIS Filename: 050222-1 Project # SW8 050222 Project Name Housing Warehouse A, UNCW Recvng Stream Bradley ley Creek Drainage Basin Cape Fear Site Area 0.03 acres Impervious Area Calculation Buildings Parking/Asphalt Concrete Date Reviewer *Classification Index # Drainage Area * outside the 575'AEC 25-Feb-05 P.Bartlett Sc 18-87-24-4-(2) 1310 SF 0.03 Acres Rational Cc (list C after each BUA) 960 0.95 0.95 0.95 .. .. .. .. ... Total Volume/Storage Calculation If Rational Method is used, place a 1 in this box Required Design Storm RV Provided Pipe Diameter Length Of a Single run of Pipe Number of Pipe Runs in Trench Storage In Piping Total Storage in Piping Cross -Sectional Area Of Pipe Runs Length Of Trench Width Of Trench Height Of Trench Cross -Sectional Area Of Trench Voids Volume, 40% Trench Volume per linear foot Minimum Trench length required Total Volume Provided Elevation Of Bottom Of Trench Elevation Of SHWT Overflow Elevation Ekfiltration Rate/ Drawdown Reported Hydraulic Conductivity Bottom Surface Area 25 YEAR 24 HOUR STORM NIA Intensity, i = .33 inches / hour Qr-- C i A = Qp through the bottom of the basin= % Impervious= 73.3% Cc: 0.75 1 in 0.71 €82s CF Pipe Size 1 Pipe Size 2 3 Feet 7.5 Feet 1 '2- 53 Cubic Feet Cubic Feet 7.069 9 Feet 8.35 Feet 1.5 Feet 12.53 SF ........... CF Cubic Feet Feet Cubic Feet 9 3: 34.5 Mean Sea Level 32.5 Mean Sea Level 37.6 Mean Sea Level 26 Cubic Feet Per Hour Per Sq Ft 75-15 Square Feet hours 0.01 CFS 0.5428 CFS Must be > Qr 10 YEAR 10 MIN HIGH INTENSITY EVENT Intensity, i = 6.3 inches / hour Volume for 10 yr. 10 min. event = 85.21 CF < 83 CF CULTEC, Inc. Typical Cross Section Contactor® 10OHD Unpaved H2O Installation I I I 1 2"' — 2" WASHED, CRUSHED STONE FINISHED GRADE CULTEC 410 FILTER FABRIC RECOMMENDED, NOT REQUIRED 85% COMPACTED FILL e CULTEC CONTACTOR 10OHD CULTEC 410 HEAVY DUTY H-24 CHAMER7 7 FILTER FABRIC B TOP, SIDES AND BOTTOM / r In / rfl 1'-0" 36" 6" STONE BASE E GENERAL NOTES TYp, GontacAll CotarO ctorO GO CULTEC,hamber must Brookfield, CT. TYPICAL CROSS SECTION CONTACTOR 10OHD . All Conlactore 1 W Chambers must be installed In acIVEL regulations. F cordance wish alf applicable focal, state and federal R.F C UNPAVED H-20 CULTEC CHAMBER SYSTEM Refer to manufacturer, CULTEC, INC.'s recommended Cont instoaguidettnea. (2.97 CF./ LF.) FEB 2 3 NDa99 Ail Contactors 700WD H2O Heavy Duly units are marked with a 4' stripe along the length of the chamber. N.T.S. � W y- CALCULATIONS BASED ON 40% STONE VOID e I Designed by Checked by Approved ay -date Filename Oate Srale TM R,H LUIS TAPIR G-C 5122/12 CA❑ FILE 6/11/12 N/5 INC. 100 CROSS SECTION CULTEC Contactor®& Recharger"� 878 FEDERAL ALRD.CULTRD. FX: (203) 7751462 " ^•..•�..r Plastic Septic 8 Stormwater Chambers BROKFI ELD CT 06804 PH:18004CULTEC PH: (203) 7754416 140KD UNPVD H21 Edition Sheet .CUl-TEG,COM i L_ 1 CULTEC, Inc. 878 Federal Road • P.O. Box 280 • Brookfield, CT 06804 USA (203) 775-4416 9 (800) 4-CULTEC • Fax: (203) 775-1462 . www.cult2g.co • custservice@cultec.com Copyright 0 2003 CULTEC, Inc. All rights reserved. STORMWATER SECTION Page 34 of 50 J CULTEC, Inc. Storage Capacities of CULTEC Contactor@ & RechargerTM Chambers For design and technical assistance, call CULTEC, Inc. at 800-4-CULTEC (800-428-5832). 4� Table 1 -- -Code Lul Le D., bu A, S, D, Duw Model Lay- Up Length it Length Adjustment It Width In. Height In. Chamber Volume fl3/ft 40% Stone Vold Volume ft3/ft Total Retention Storage ft3/ft TataI Retention Storage' it'/unit Surface Area Required ft2/unit Stone Rewired' ft /unit Depth of installation to top of chamber° it Design Unit Widths it Field DrainTM C- 8.00 0.34 48 8.5 1.68 1.27 2.95 23.54 32.00 25.23 1.21 4.00 Contactors EZ-2 8.00 0.34 16 12.5 0.82 0.66 1.48 11.78 1 12.72 13.05 1.55 1.59 Contactor@ 75 6.25 0.75 30 12.4 1.60 0.90 2..5.0 15.59 15.63 13.96 1.54 2.50 Contactor® 100 7.50 1.50 36 12.5 1.86 1.11 2.97 22.25 1 22.50 20.74 1.55 -3.00 Contactor® 125 6.25 1.00 30 18.0 2.22 1.12 3.34 20.83 15.63 17.38 2.00 2.50 Bechar erTM 180 6.33 1 1.00 36 20.5 1 3.45 1.27 4.72 29.88 18.99 20.10 2.21 3.00 Bechar erTM 280 7.00 1 1.00 47 26.5 6.08 2.04 8.12 56.81 28.00 35.61 2.80 4.00 Bechar erTM 330 6.25 1 1.17 52 30.5 7.44 2.91 10,35 64.63 30.19 45.33 3.05 4.83 Fiechar erTM 400 6.17 1.30 52 32.5 7.96 3.02 10.98 67.72 29.81 46.50 3.21 4;83 RECEIVED SF�E �}-S�-(cD05� Based on lay-up length of chamber Including separation requirement if any. BY: r s Based on lay-up length of chamber including separation requirement - if any. 3 Based on lay-up length of chamber including separation requirement - if any. Calculation does not include burial requirements above the chamber. Refer to Burial Requirements Chart for additional depth requirements. 5 Includes unit width plus separation requirement - If any. Contactor® EZ-24 placed 19" on center. RechargerTm 280 placed 48" on center. Recharger7m 330 & 400 placed 58" on center. CULTEC, Inc. 878 Federal Road • P.O. Box 280 . Brookfield, CT 06804 USA (203) 775-4416 • (800) 4-CULTEC • Fax: (203) 775-1462 + www,cultec.com • custservice@cultec.com Copyright ® 2003 CULTEC, Inc. All rights reserved. STORMWATER SECTION Page 3 of 50 mi Date Design It NORRIS, KUSKE & TUNSTALL Sheet 902Market St. CONSULTING ENGINEERS, INC. Wilmington, N.C.28401 / Of Check Job �Pr7�- ,� For _�� � �j�;� Jo C.L. c Tft7 C�—�. F71VA) �a ti ��fVrwI `c)1v f 2— �-4 rf- r rJ r1 f J 1 t-* fi r- I 'r CA:= �� rl 2 r r- G�� VO& 04194 UNCW Warehouse Expansion Type 11124-hr Rainfall=7.00" Prepared by Andrew & Kuske Consulting Engineers, Inc Page 2 H droCADS 7.01 s/n 000479 01986-2004 Applied Microcomputer Systems 2/13/05 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Warehouse Expansion Runoff Area=1,260 sf Runoff Depth=5.48" Tc=5.0 min CN=87 Runoff=0.18 cfs .0.013 of Pond 2P: Infiltration System Peak Elev=37.62' Storage=86 cf Inflow=4.18 cfs 0.013 of Discarded=0.05 cfs 0.013 of Primary=0.09 cfs 0.001 of Outflow=0.14 cfs 0.013 of Total Runoff Area = 0.029 ac Runoff Volume = 0.013 of Average Runoff Depth = 6.48" 04194 UNCW Warehouse Expansion Type 11124-hr Rainfall=7.00" Prepared by Andrew & Kuske Consulting Engineers, Inc Page 3 HydroCAD® 7.01 s/n 000479 m 1986-2004 Applied_ Microcomputer Systems - 2/13105 Subcatchment 1S: Warehouse Expansion [491 Hint: Tc<2dt may require smaller dt Runoff - 0.18 cfs @ 12.07 hrs, Volume= 0.013 af, Depth= 5.48" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type III 24-hr Rainfall=7.00" Area (sf) CN Description 960 98 Roof area of expansion 300 50 Grass 1,260 87 Weighted Average Tc Length Slope Velocity Capacity Description min feet ftlft ftlsec cfs 5.0 Direct Entry, Draiage area n LL Subcatchment 1S: Warehouse Expansion Hydrograph Time (hours) p RunoTr 04194 UNCW Warehouse Expansion Type 111 24-hr Rainfall=7.00" Prepared by Andrew & Kuske Consulting Engineers, Inc Page 4 HydroCADO 7.01 sin 000479 © 1986-2004 Applied Microcomputer Systems 2/13/05 Pond 2P: Infiltration System (931 Warning: Storage range exceeded by 0.02' (85) Warning: Oscillations may require Finer Routing>1 Inflow Area = 0.029 ac, Inflow Depth = 5.48" Inflow = 0.18 cfs @ 12.07 hrs, Volume= 0.013 of Outflow = 0.14 cfs @ 12.20 hrs, Volume= 0.013 af, Atten= 22%, Lag= 7.7 min Discarded = 0.05 cfs @ 11.80 hrs, Volume= 0.013 of Primary - 0.09 cfs @ 12.20 hrs, Volume= 0.001 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 37.62' @ 12.20 hrs Surf.Area= 79 sf Storage= 86 cf Plug -Flow detention time= 12.8 min calculated for 0.013 of (99% of inflow) Center -of -Mass det. time= 9.8 min ( 797.9 - 788.1 ) # Invert Avail.Storage Storage Description 1 34.50' 36 cf Custom Stage Data (Prismatic) Listed below 119 cf Overall - 28 cf Embedded = 91 cf x 40.0% Voids 2 35.00' 28 cf 32.1"W x 12.0"H x 7.60'L Cuitec C-100 x 2 Inside #1 3 34.00' 22 cf Custom Stage Data (Prismatic) Listed below -impervious 86 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store {feet) (sq-ft) (cubic -feet) (cubic -feet) 34.50 79 0 0 36.00 79 119 119 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 34.00 6 0 0 37.60 6 22 22 # Routina Invert Outlet Devices 1 Discarded 0.00' 0.036100 fpm EAltration over entire Surface area 2 Primary 37.60' 10.0' long x 2.6' high Sharp -Crested Rectangular Weir 2 End Contractions) Discarded OutFlow Max=0.05 cfs @ 11.80 hrs HW=34.51' (Free Discharge) t-I=Exfiltration (Exfiltration Controls 0.05 cfs) PrimaryOutFlow Max=0.06 cfs @ 12.20 hrs HW=37.62' (Free Discharge) L2=S harp -Crested Rectangular weir (Weir Controls 0.06 cfs @ 0.4 fps) 04194 UNCW Warehouse Expansion Type H/ 24-hr Rainfall=7.00" Prepared by Andrew & Kuske Consulting Engineers, Inc Page 5 HydroCAD® 7.01 s/n 000479 C 1986-2004 Applied Microcomputer Systems 2/13/05 Pond 2P: Infiltration System Hydrograph M 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours)