Loading...
HomeMy WebLinkAboutSW8050216_COMPLIANCE_20050520STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW Laf/%r2l(// DOC TYPE El CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD slzvl o 5 re V..� I Permit No. S L) R 0 2 (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM UNDERGROUND INFILTRATION TRENCH SUPPLEMENT This form may be photocopied far use as an original DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an underground infiltration trench supplement for each system, design calculations, and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name: Fore Christ Ministries Contact Person: Decarol Williamson — Phone Number: (910) 251-8543 For projects with multiple infiltration systems, a supplement form must be completed for each system. This worksheet applies to: Trench Bed 2 — (Front) in Drainage Area 2 (from plans) (from Form SWU-101) II. DESIGN INFORMATION (attach supporting calculations/documentation): Soils Report Summary (based upon an actual field investigation and soil borings) Soil Type Sand Infiltration Rate 90 in/hr r cf/hr/sf (circle appropriate units) SHWT Elevation 48' — 49' sl (Seasonal High Water Table elevation) Trench Design Parameters Design Volume 3,851.4 c.f Design Storm 1.5 inch event (1.5 inch event far SA waters, 1 inch event for others) Drawdown Time < I hour Perforated Pipe Size 10 inch diameter Perforated Pipe Length 4,300 ft. No. Observation Wells 1 (may be required on a case -by -case basis) Stone Type #57 Clean Washed (if used) Stone Void Ratio 0.4 Trench Elevations (in feet mean sea level) Bottom Elevation 50.00' finsl Storage/Overflow Elevation 6' finsl Form SW-107 Rev 3.99 Pagel of 4 Trench Dimensions Height ft. Width 93.2 ft. (see plans for trench details) III. REQUIRED ITEMS CHECKLIST Length 100 ft. Volume Provided 3851.4 cu.ft. The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials a. rQ4 System is located 50 feet from class SA waters and 30 feet from other surface waters. b. System is located at least 100 feet from water supply wells. c. _.7ie Bottom of system is at least 2 feet above the seasonal high water table. d.D00 Bottom of the system is 3 feet above any bedrock or impervious soil horizon. e._O�P Off --line system, runoff in excess of the design volume bypasses the system (bypass detail provided). f.COO, System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days based upon, infiltration through the bottom only (a hydrogeologic evaluation may be required). g.Q�10_ Soils have a minimum hydraulic conductivity of 0.52 inches per hour. h.7C�_' System is not sited on or in fill material or DWQ approval has been obtained. i.ZCQ Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. J. IC4 System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. k. _IX .-System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. 1. Re System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). m. Drainage area for the device is less than 5 acres. n.X_A pretreatment device ( filter strip, grassed swale, sediment trap, etc.) is provided. o. 0,CV— Trench bottom is covered with a layer of clean sand to an average depth of 4 inches. p. 31L Sides of the infiltration trench are lined with geotextile fabric. q.0CW_ Rock used is free of fines (washed stone) and has a large void ratio. r. _.BW _Side to bottom area ratio is less than 4:1. S. Observation well(s) are provided (case -by -case basis). t.Vegetated filter is provided for overflow (50 feet for SA waters, 30 feet for other waters) and detail is shown on plans. u. (i A benchmark for checking sediment accumulation is provided. Form SWU-107 Rev 3.99 Page 2 of 4 IV. UNDERGROUND INFILTRATION TRENCH OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the bypass/overflow structure for blockage and deterioration and the infiltration system for erosion, trash accumulation, grass cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash and blockages as needed to maintain system performance. 3. Remove accumulated sediment annually or when depth is reduced to 75% of the original design depth. Restore depth to original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. 4. The water level in any monitoring wells will be recorded after a I inch rainfall event and at least once a month. Chronic high water table elevations (within 1 foot of the bottom of the system for a period of three months) shall be reported to DWQ immediately. 5. If DWQ determines that the system is failing, the system will immediately be repaired or replaced to original design specifications. If the system cannot be repaired to perform its design function, other stormwaier control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. 6. Remove accumulated sediment from the infiltration system annually or when depth in the unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over - excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the infiltration system. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the depth at the benchmark reads, from the system. Form SWU-107 Rev 3.99 Page 3 of 4 the accumulated sediment shall be removed I acknowledge and agree by my signature below that I am responsible for maintaining the stormwater collection system in accordance with the six maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible parry. Print Name and Title: _f_)� e-Q Address: � i. L 'd Q UJ U L t 1�}', i ..V\ ; UOs Phone: G 0 Date: S Signature: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, ,, {{ S�G rfA A il rvJ411a\Notary Public for the State of , County of tU do hereby certify that _ �J e CraOl W : Ul rn, _Y-_Vn personally appeared before me this Y{ day of ,and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness y hand and official seal, t c SV S My, commission expires r n `- V :l s �,'..�.'� .�tti �. b � �, r3 f_. �.� 4 ,�Z . :� __ - t Fore Christ Ministries Hydrologic and Hydraulic Calculations Revised May 2005 R CEIVED MAY 10 2005 Prepared by: SW 8 O jJ6 Zl� MAY' East Coast Engineering Company, P.A. Consulting Engineers Shallotte, North Carolina 28459 Post Office Box 2469 4918 Main Street Office: 910,754,8029 e STORMWATER INFILTRATION TRENCH DESIGN CALCULATION {10 INCH PIPE) FORE CHRIST MINISTRY I AREA INFORMATION . I Impervious Area 54501 SF. Percent Impervious 20 % Soil Type SAND , Infiltration Rate / .5 IN / MIP Infiltration Rate Vr 90 IN / HR Existing Ground Elevation \ 51.5 FT SHWT Elevation 48 Design Storm 1.5 IN Rv Value 0.23 FT Volume Required �----R.-8 2- —31 CF DISTRIBUTION PIPES Perforated Pipe ID 9.90 IN Perforated Pipe OD 11.36 IN Trench Width �2kir7, FT Distance Between Pipes IIIIIIIIIIIIIIIIIIII�j4!64 IN Trench Height � 1436 FT Void Ratio (WASHED STONE)l�OTg Volume per Linear Foot for Stone 0.361 CF Volume per Linear Foot for Pipe 0.535 CF Volume Per Linear Foot for Trench 0.896 CF Total Volume Provided �8,t 51; CF Hegwred VS. Provided Volume OK Drawdown Time 0.190 HOURS Drawdown Time Below 5 Days OK IMPERVIOUS DATA 13173 Buildings 19027 Parking 21017 Drive r 1284 Sidewalk i r r Future Impervious 54501 Total �ED 1 , Number of Trenches 2D Length of each Trench 240 FT Width of each Trench 2.17 FT Trench bed total width 43.3 FT Height of each Trench 16.36 IN Volume Provided 4299.2 CF # 57 stone volume req'd. 10800 CF BED 2 Number of Trenches 43 Length of each Trench 100 FT Width of each Trench 2.17 FT Trench bed total width 93.2 FT Height of each Trench 16.36 IN Volume Provided 3851.4 CF # 57 stone volume req'd. 9675 CF BED 3 Number of Trenches Length of each Trench FT Width of each Trench FT Trench bed total width FT Height of each Trench IN Volume Provided 0.0 CF # 57 stone volume req'd. 0 CF Total Volume Provided 8150.6 CF Total Rock Vole Re 'd 20475 CF Volume Psi. . (Ib/ft') 98.5 1008 TONS 119 r 1K ray a?eo BED 4 Number of Trenches Length of each Trench FT Width of each Trench FT Trench bed total width FT Height of each Trench IN Volume Provided 0.0 CF # 57 stone volume req'd. 0 CF BED 6 Number of Trenches Length of each Trenchl FT Width of each Trench FT Trench bed total width FT Height of each Trench IN Volume Provided 0.0 CF # 57 stone volume req'd. 0 CF BED 6 Number of Trenches Length of each Trench FT Width of each Trench FT Trench bed total width FT Height of each Trench IN Volume Provided 0.0 CF # 57 stone volume req'd. 0 CF Page 1 of 1 Rev.5/6/2005 2 O r- O m C.) z w Q W O m a z O i= a w J W TRENCH BED CROSS SECTION 10" SYSTEM (BED 1 - REAR) TOP PVMNT MIN., 52.53 6" ROCK FILL TOP, 52.37 4" FILL DIRT TOP, 51.87 #57 STONE TOP, 51.53 --------------------------------------------------------------- PIPE TOP, 51.28 #57 STONE BED TOP, 50.34 2 O r O m U z W H lil O m a z O a w J W TRENCH BED CROSS SECTION 10" SYSTEM (BED 2 - FRONT) TOP PVMNT MIN., 52.36 6" ROCK FILL TOP, 52.20 L =� = =� = =�= = � 4" FILL DIRT TOP, 51.70 #57 STONE TOP, 51.36 ---------------------------------------------------------------- PIPE TOP, 51.11 - — - .-., - — - — - — - — - — - — - -- - — - — - — - — - — - — - — - — - — - — - — - � #57 STONE BED TOP, 50.17 Fore Christ Ministry Catch Basin Drainage Flow Calculations East Coast Engineering Company, PA JCR Qao.SD=5', Drainage Area = Drainage Area = Design Storm = Surface Asphalt/Rooftop Grass Total A' Weighted 'C' Q; = C i'A Q to SD=3 Drainage Area Drainage Area = Design Storm = Surface Asphalt/Rooftop Grass Total A' Weighted 'C' Q;=CIA Q to SD 1 Drainage Area = Drainage Area = Design Storm = Surface Asphalt/Rooftop Grass Total A' Weighted 'C' Q; = CIA 28,019 SF QaoSD 4• Drainage Area = 5,994 SF 0.64 Acres Drainage Area = 0.14 Acres 10 -YR storm Design Storm = 1 10 -YR storm Acres C ValueSurface Acres C-Value�'� 10.64 0.95 Asphalt/Rooftop 0.14 0.95 0.00 0.2 Grass 0.00 0.2 0.64323 Total A' 0.1376 0.95 Weighted 'C' 0.95 {,4.33857 cfs Q, = C iA 092813 is 2,764 SF Q;to SD 2' Drainage Area = 21,461 SF 0.06 Acres Drainage Area = 6.49 1 Acres 10 -YR storm Design Storm = i 0 -YR storm Acres C- Value rr� Surface Acres C-Valuer' 0.06 0.95 Asphalt/Rooftop 0.49 0.95 0.00 0.2 Grass 0.00 0.2 0.06345 Total 'A' 0,49268 0.95 Weighted 'C' 0.95 42_799 cfs Q; = C rA 3?3231 cfs 95,453 SF 0.13 Acres 10 -YR storm Acres C-Value�r� 0.13 0.95 0.00 0.2 0.12518 0.95 FT4�436 cfs (1) Table 8.03a; (2) Figure 8.03a; (3) Figure 8.03b of the NCDENR Erosion and Sediment Control Planning and Design Manual. Revision Date: 5/9l2005 Fore Chris Ministry Storm Drain Pipe Calculations East Coast Engineering Company, PA JCR Box ID Total 0 Upstream Pipe Downstream Pipe Pipe Size Type Pie "n" Value Slope % Flow Area (SF) Wetted Perimeter (FT.) Hydraulic Radius I (FT.) Velocity I (FPS) o MAX CHECK SD8 3.32 SD1 OUTLET 15 HDPE 0.012 2.67% 1.23 3.93 0.31 9.32 11.43 OK SD7 4.34 SD3 , SD4 OUTLET 15 HDPE 0.012 1.92% 1.23 3.93 0.31 7.90 9.69 OK SD6 4.34 SD3 , SD4 FRONT BED 15 HDPE 0.012 0.40% 1.23 3.93 0.31 3.61 4.42 OK SD5 4.34 SD3 , SD4 SD6 15 HDPE 0.012 0.40% 1.23 3.93 0.31 3.61 4.42 OK SD4 0.93 SD3 , SD4 SD5 15 HDPE 0.012 0.40% 1.23 3.93 0.31 3.61 4.42 OK SD3 0.43 NONE SD4 15 HDPE 0.012 0.40% 1.23 3.93 0.31 3.61 4.42 OK SD2 3.32 NONE REAR BED 15 HDPE 0.012 0.40% 1.23 3.93 0.31 3.61 4.42 OK SD1 0.84 NONE REAR BED 15 HDPE 0.012 0.40% 1.23 3.93 0.31 3.61 4.42 OK Revision Date. 5/9/2005 SD -1 � SD -2 I I INFlrTRAT ON TRENCH ANALYSIS Project # SW 8 050216-1 Project Name Fore Christ Ministries Recvng Stream Shingletree Swamp Drainage Basin Lumber Site Area 6.22 acres Drainage Area 1: "Bed 1- Rear" Impervious Area Calculation Buildings 13173 Parking/Streets 14320 Sidewalks OS Future Alloc. Total '€7483 Volume/Storage Calculation - Filename: S:IWPDATAIWQSIINTRENCH1050216-1 Date 25-May-05 Reviewer P.Bartlett *Classification C u" (� " ,j .yi 0') Index # 15-23-2 0 `]" L Drainage Area 56113 SF outside the 575' AEC if Rational Method is used, place a 1 in this box 0 Required Design Storm RV Volume tv.�fo Provided Pipe Diameter Length Of a Single run of Pipe Number of Pipe Runs in Trench Storage In Piping Total Storage in Piping Cross -Sectional Area Of Pipe Runs Length Of Trench I Width Of Trench Height Of Trench Cross -Sectional Area Of Trench Voids Volume, 40% Trench Volume per linear foot Minimum Trench length required Total Volume Provided Elevation Of Bottom Of Trench Elevation Of SHWT Overflow Elevation Exfiltration Rate / Drawdown Reported Hydraulic Conductivity Bottom Surface Area 25 YEAR 24 HOUR STORM NIA Intensity, i = .33 inches 1 hour Qr=CIA= Qp through the bottom of the basin= 1.29 Acres Rational Cc (list C after each BUA) 0.95 0.95 % Impervious: 49.0% Cc: 0.57 1.5 in 0.49 3.0 CF Vf h99 P1. Pipe Size 1 Pipe Size 2 0.833 Feet 240 Feet 20 2616 Cubic Feet 26i6€ Cubic Feet 10.900 240 Feet 43.3 Feet 1.36 Feet 58.89 SF F6; CF Cubic Feet €932 Feet 7223: Cubic Feet 50.17 Mean Sea Level 48.17 Mean Sea Level 51.53 Mean Sea Level 7.5 Cubic Feet Per Hour Per Sq Ft 10392 Square Feet :00::1 hours 0.24 CFS 21.6500 CFS Must be > Qr 10 YEAR 10 MIN HIGH INTENSITY EVENT Intensity, i = 6.3 inches 1 hour Volume for 10 yr. 10 min. event = 2763.18 CF < 7223 CF INFI�TRAT ON TRENCH ANALYSIS Filename: S:IWPDATAIWQSIINTRENCH1050216-2 Project # SW8 050216-2 Project Name ,Fore Christ Ministries Recvng Stream Shingletree Swamp Drainage Basin Lumber Site Area 6.22 acres Drainage Area 2: "Bed 2- (Front)" Impervious Area Calculation Buildings a Parking/Streets 25724 i Sidewalks 1284 OS Future Alloc. Total �27p[38 Volume/Storage Calculation' Date Reviewer *Classification Index # Drainage Area * outside the 575' AEC If Rational Method is used, place a 1 in this box Required Design Storm RV V luthe to€;Stole Provided Pipe Diameter Length Of a Single run of Pipe Number of Pipe Runs in Trench Storage In Piping Total Storage in Piping Cross -Sectional Area Of Pipe Runs Length Of Trench Width Of Trench Height Of Trench Cross -Sectional Area Of Trench Voids Volume, 40% Trench Volume per linear foot Minimum Trench length required Total Volume Provided Elevation Of Bottom Of Trench Elevation Of SHWT Overflow Elevation Exfiltration Rate / Drawdown Reported Hjdraulic Conductivity Bottom Surface Area ps~ew+Eiowr €1' rie 25 YEAR 24 HOUR STORM NIA Intensity, i = .33 inches I hour Qr=CiA= Qp through the bottom of the basin= 25-May-05 P.Bartlett C 15-23-2 52222 SF 1.20 Acres Rational Cc (list C after each BUA) 0.95 0.95 % Impervious= 51.7% Cc: 0.59 1.5 in 0.52 i�5$ CF Pipe Size 1 Pipe Size 2 0.833 Feet 100 Feet 43 2343 Cubic Feet a € 3 _.$! Cubic Feet 23.434 100 Feet 93.2 Feet 1.36 Feet 126.75 SF 4.133` CF Cubic Feet Feet Cubic Feet 54G i=€6476 0.23 CFS 19.4167 CFS 50 Mean Sea Level 48 Mean Sea Level 51.36 Mean Sea Level 7.5. Cubic Feet Per Hour Per Sq Ft 9320 Square Feet €Qsi) hours Must be > Or 10 YEAR 10 MIN HIGH INTENSITY EVENT Intensity, i = 6.3 inches i hour Volume for 10 yr. 10 min. event = 2664.08 CF < 6476 CF