Loading...
HomeMy WebLinkAboutSW8050115_COMPLIANCE_20050216PERMIT NO. DOC TYPE STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS sw Lo5d 1�5� ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATES-�(� YYYYMMDD Permit No. '-w 7 L� J d I I (10 be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name: Storage Ideas, LLC Contact Person: William A. Brown Phone Number: (252 ) 726-1005 For projects with multiple basins, specify which basin this worksheet applies to: elevations Basin Bottom Elevation 20.5 ft. -(floor of the basin) Permanent Pool Elevation 26.0 ft. (elevation of the orifice) Temporary Pool Elevation 27.5 ft. (elevation of the discharge structure overflow) areas Permanent Poo! Surface Area 6,234 sq. ft. (water surface area at the orifice elevation) Drainage Area 120,272 ac. (on -site and off -site drainage to the basin) Impervious Area 93,273 ac. (on -site and off -site drainage to the basin) volumes Permanent Pool Volume 14,508 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 11,846 cu. ft. (volume detained above the permanent pool) forebay Volume 3,294 cu. ft. (approximately 20% of total volume) Other parameters SA/DAI 5.06% (surface area to drainage area ratio Porn DIVA table) Diameter of Orifice 1.25 in. (2 to 5 day temporary pool draw -down required) Design Rainfall 1.0 in. Design TSS Removal 2 90 % (minimum 85% required) Fonn SWU-102 Rev 3.99 Page I of 4 Footnotes: When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stortnwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 21-1 .1008. Initial in the space provided to indicate the following design 'requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. The permanent pool depth is between 3 and b feet (required minimum of 3 feet). The forebay volume is approximately equal to 20% of the basin volume. The temporary pool controls runoff from the design stone event. The temporary pool draws down in 2 to 5 days. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) The basin length to width ratio is greater than 3:1. The basin side slopes above the permanent pool are no steeper than 3:1. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). Vegetative cover above the permanent pool elevation is specified. A trash rack or similar device is provided for both the overflow and orifice. A recorded drainage easement is provided for each basin including access to nearest right- of-way. Uc-tom--- 1_ if the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. m. A mechanism is specified which will drain the basin for maintenance or an emergency. J .ryVVQ III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does does not This system (check one) 0 does ><does not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin systetn semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to detennine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4.13 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 2.25 feet in the forebay, the sediment shall be removed. Sediment Ren oval El. 23.75 � 7 Bottom Ele ation 23.0 4 2 FORF,RAY BASIN DIAGRAM (Jill in the blanks) Permanent Pool Elevation 26.0 Sediment Removal Elevation 21.87 — — — T — 75% Bottom Elevation 20.5 25% MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. if the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-102 Rev 3.99 Page 3 of 7. All components of the wet detention basin system shall be maintained in good working order. 1 acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: William A, Brown Title: Member Address: P.O. Box 2418, Morehead City, NC 28557 Phone: (252) 726-1005 Signature:I �o l r—A Z>L.z—L Dater , I Z- -Os— Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, Matthew L. Montanye , a Notary Public for the State of North Carolina County of Craven , do hereby certify that William A. Brown personally appeared before me this /�rday of---Ta—,juAiz j 200t�r , and acknowledge the due execution�Ail-amf•iy4oing wet detention basin maintenance requirements. Witness my hand and official seal, •���`a 1.. M Q �p"[ARV : to _g , PU C �•�; N . Q N , SEAL My commission expires 4rrege` z P7 ze g, Form SWU-102 Rev 3.99 Page 4 of4 oil mrmrmr 5 /1111 fA ommi 111111 wo Smoi STROUD ENGINEERING, P.A. cos Hestron Plaza Two SHEET NO. OF 1F 151 A Hwy. 24 CALCULATED BY 711G CATE _! ICi-tiS MOREHEAD CITY, NC 28557 CHECKED BY DATE (252) 247-7479 SCALE f= %`1deale�a�►id�ej9 a�a'r. C!1 CAP OJ� er....'Oz 'Arr � ' A SE L STORMWATER DETENTION POND DESIGN DRAINAGE AREA = 120,272 SF w;�,F. • o DRAINAGE TO SC WATERS = 1 INCH (NEWPORT RIVER - DEEP CREEK)':,'�2•`� IMPERVIOUS AREA �'��, `r c '•P47reti9 BUILDINGS = 50,825 SF ittl PARKINGIDRIVES = 42,448 SF SIDEWALK = 0 SF TOTAL = 93,273 SF % IMPERVIOUS ' " 77.55% 78.00% (USE FOR DESIGN) USE A 5.5' DEEP POND WITH 90% TSS REMOVAL (SEE SA1DA CHART) SAIDA = 5.06% MIN, REQ-D SA@ PERMANENT POOL = 6086 SF SAREap= (SAIDA)(DRAINAGE AREA) SA PROVIDED = 6234 SF MIN. REQ'D VOLUME Rv = 0.05 { 0.009(%IMP)= 0.75 VOLUME REQ'D = 7537 CF VOLUME PROVIDED = 11846 CF DA-1 DA-2 DA-3 DA-4 DA-5 PIPE1 (DPr1,2,3,4,5) PIPE2 (DA-2,3) PIPE3 (DA-3) PIPE4 (DA-4,5) PIPE5 (DA-5) OVERFLOW PIPE VOLREa.O = (1"112")(Rv)(DRAINAGE AREA) STORMDRAIN PIPE SIZING AREA (SF) AREA (AC) C I Qio 12750 0.29 1.00 7.23 2.12 16556 0.38 1.00 7.23 2.75 37329 0.86 1.00 7.23 6,20 7120 0.16 1.00 7.23 1.18 29924 0.69 1.00 7,23 1 4.97 O (CFS) PIPE PROPOSED % SLOPE Q PROPOSED PIPE FLOWING FULL (CFS) 17.21 24" RCP 1.0% 22.62 8.94 24" RCP 0.2% 10.12 6.20 24" RCP 1 0.2% 10,12 6.15 24" RCP 0.2% 10.12 97 24" RCP 0.2% 10.12F:4 7.21 24" RCP 0.58% 17.23 STROUD ENGINEERING, P.A. Hestron Plaza Two 151 A Hwy. 24 MOREHEAD CITY, NC 28557 (252) 247-7479 PERMANENT POOL VOLUME (method per DWQ) Jag SHEET NO, _ .Z 0F� CALCULATED BY DATE CHECKED 6Y _1 DATE SCALE w C ••mr�F Css/vA•r`'`j s o �Q� QA I v w w e � SEA% j �d v � � V � Vol. CF �"��, "`sC4s!_�-1 �c+• �Gy`r!'fYsir�4� Elevation Section SA SF Avg. SA Ht. FT 26.00 Permanent pool 6234 4685 1.67 7823 24.33 Shelf 3135 1746 3.83 6685 20,50 Bottom 356 t Total Vol. 14508 FORESAY VOLUME , Elevation Section' SA SF Avg. SA Ht. FT Vol. CF 26.00 Permanent pool 1644 1098 3.00 3294 23.00 Bottom 552 Total Vol. 3294 Forebay % of Permanent Pool Volume = 22.70% MAIN BASIN VOLUME Elevation Section SA SF Av . SA Ht. FT Vol. CF 26.00 Permanent pool 4428 3242 1.67 5414 24.33 Shelf 2056 1130 3.83 4326 20.50 Bottom 203 Total Vol. 9740 Storage volume required 7537 CF Elevation Section SA SF Avg. SA Ht. FT Vol. CF 26.00 Permanent pool 6234 7897 1.50 11846 27.50 Storage pool 9560 Total Vol. 11846 OVERFLOW DEVICE L=Q,o1CWH312 Q10 = 17.21 CW = 3.0 (BROAD CRESTED WEIR) H = 1.00 L = 5.74 6 FT MINIMUM WEIR LENGTH STROUD ENGINEERING, P.A. Hestron Plaza Two 151 A Hwy. 24 MOREHEAD CITY, NC 28557 (252) 247-7479 SEDIMENT TRAP DESIGN JOB PM a- '2 (o SHEET NO. OF - CALCULATED DATE % - DATE CHECKED BY _ SCALE CAP, O, SEAL SED. DRAINAGE DRAINAGE TRAP SED. TRAP PROPOSED TRAP AREA (SF) AREA (AC) REQ RSTOAGE DEPTH (FT) AREA (SF) TRAP (SF) 1 30663 0.70 1267 3 422 30 x 15 = 400 2 13068 0.30 540 4 135 10 x 10 = 200 SEDIMENT BASIN (PROPOSED,POND I5l1RING CONSTRUCTION) SED. DRAINAGE DRAINAGE SED. STORAGE BASIN AREA (SF) 'AREA (AC) STORAGE PROVIDED REQ'D (CF) IN POND CF 1 130676 3.00 5400 13034 RIPRAP OUTLET PROTECTION (FOREBAY + MAIN BASIN) Q10 % SLOPE V FT/5 24" DISCHARGE INTO POND 1 17.21 1.00 7.92 1 CLASS B 6'x6x1.5' 24" DISCHARGE FROM OVERFLOW 1 17.21 1 0.58 1 6.25 1 CLASS B 6'x6x1.5' 13343 - STROUD ENGINEERING, P.A. Hestron Plaza Two 151 A Hwy. 24 MOREHEAD CITY, NC 28557 (252) 247-7479 Swale Design Data Table (Utilizing Mannings Eqn.) Q = 1.486(A)(R)2"(S)172 n Trapezoidal Section A=By+My, P = B + 2y(1+m2)112 R=A/P All Sections S= 4 M= 3— i' , JCH PM c� LJ-a SHEET NO. OF _6 CALCULATED BY DATE_1`I CHECKED BY _ DATE I SCALE ""0 'ft0111P1111a'I r1 CA '*.. 4 ' �cQQ 2i-7 � a 13343 ' r: q �QalYfetlittt� n=0.02 n=0.03 DRAINAGE AREA (AC) Qiv WIDTH % SLOPE y v y v 1 0.30 1.74 0.00 0.390 0.55 1.90 0.64 1.40 1 0.71 4.11 0.00 0.570 0.71 2.71 0.82 2.00 Note: V, and y, are for bare earth n=0.02 V2 and y2 are for grassed lined n=0.03 Bare earth V>2.5 ft/s use an erosion control lining. 'Proposing to use erosion control lining in all swales. Grass lined velocities are all non -erosive. STROUD ENGINEERING, P.A. Hestron Plaza Two 151 A Hwy. 24 MOREHEAD CITY, NC 28557 (252) 247-7479 ORIFICE SIZING orifice dia.= 1.25 in. orifice area= 0.0085 sf Job PM (13& - 2 SHEET NO. OF 1 CALCULATED B �4"%� DATE f -1 d Lis CHECKED BY P .Y SCALE �,,a �+ 5 C AP s! ��t-s•`•' pF �.� � ¢P 0 .7 ' � 4 2 Cd= 0.6 time increment 120 minutes storage volume= 7537 ft^3 (required 1") overflow el.= 27.5 perm. pool el.= 26 orifice eqn. = Q=CDA(2gh)A" Time Cumulative Cumulative Volume Height Flow Volume Volume Increments , Timed :ii':..? •Time Initial . Out Out Remaining (minutes),, (minutes) (hours) (ft"3) (feet) (cfs) (cf) (ft-3) 0 0 7537,00 .1,50 0.0502 0.00 7537.00 ­120 120 2 7537.00 1.50 0.0502 361.66 7175.34 120' 240 4 7175,34 1.43 0.0490 352.88 6822.47 120 ; 360 6 6822.47 : 1.36 0.0478 344.09 6478.38 120 480 8 6478,38 1,29 0.0466 335.30 6143.08 120 600 10 6143.08 1.22 0.0453 326.51 5816.57 120 720 12 5816.57 1,16 0,0441 317.71 5498.86 120 840 14 5498,86 1,09 0.0429 308.91 5189.94 120 960 16 5189.94 1.03 0.0417 300.11 4889.83 120 1080 18 4889.83 0.97 0.0405 291.30 4598.53 120 1200 20 4598.53 0.92 0.0392 282.49 4316.03 120 1320 22 4316.03 0.86 0.0380 273.68 4042.35 120 1440 24 4042.35 0.80 0.0368 264.86 3777.49 120 1560 26 3777.49 0.75 0.0356 256.04 3521,46 120 1680 28 3521,46 0.70 0.0343 247.21 3274.25 120 1800 30 3274.25 0.65 0.0331 238.37 3035.88 120 1920 32 3035.88 0.60 0.0319 229.53 2806.35 120 2040 34 2806.35 0.56 0.0307 220.68 2585.66 120 2160 36 2585,66 0,51 0.0294 211.83 2373,83 120 2280 38 2373.83 0.47 0.0282 202.97 2170.87 120 2400 40 2170,87 0,43 0.0270 194.10 1976.77 120 2520 42 1976.77 0.39 0.0257 185.22 1791.55 120 2640 .44 1791.55 0,36 0.0245 176.33 1615-23 120. 2760 46 1615.23 0.32 0.0233 167.42 1447.80 120 2880 48 1447.80 0,29 0.0220 158.51 1289,29 120 3000 50 1289,29 0.26 0.0208 149.58 1139.71 120 3120 52 1139.71 0.23 0.0195 140.64 999.08 120 3240 54 999.08 0.20 0.0183 131.67 867.40 120 3360 56 867.40 0-17 0.0170 122.69 744.71 120 3480 58 744.71 0.15 0.0158 113.68 631.03 120 3600 60 631.03 0.13 0.0145 104.65 526.38 120 3720 62 526.38 0,10 0.0133 95.58 430.81 120 3840 64 430.81 0.09 0.0120 86.47 344.34 120 3960 66 344.34 0.07 0.0107 77.30 267.04 120 4080 68 267.04 0-05 0.0095 68.07 193.96 120 4200 70 198.96 0.04 0.0082 58.76 140.20 120 4320 72 140.20 0,03 0,0069 49.33 90.88 120 4440 74 90.88 0.02 0.0055 39.71 51.16 120 4560 76 51.16 0.01 0.0041 29.80 21.37 120 4680 78 21.37 0.00 0-0027 19.26 2.11 120 4800 80 2.11 0,00 0.0008 6.05 -3.94 = 3.33DAYS f100` •PUBLIC R/1fl 2—�I6/6 ,J/(i � + •, blur,.,;,star Perini; Nc.Le�..o 0 J. DRAINAGE AREA I 8Q 10 2 60 30 SCALE: i" - 60' DRAINAGE AREA 2 SITE PLAN STORAGE IDEAS, LLC DRAINAGE AREA 8 NEWPORT TOWNSHIP, CARTERET COUNTY, NORTH CAROLINA 7CLIENT: STORAGE IDEAS, LLC DESIGNED: � � DRAINAGE AREA s WILLIAM A. BROWN BTN ADDRESS: P.O. BOX 2418 DRAWN: MOREHEAD CITY, NC 28557 BTN DRAINAGE AREA 5 PHONE: 252-726-1005 APPROVED X STROUD ENGINEERING. P.A. I_ _ RD( PROJECT * PM636-26 151A HIGHWAY 24 MOREHEAD CITY, N.C. 28557 f2521 247-7479 DATE 12/30/0d SCALE: DRAIMAGN AREA-L20279 SIP Stwl"...-;ar Iio'nog ew-)/ S' 'ROJECT •: PM636-26 HEFT 0 1 OF 1 TIME WARNER DRIVE (EXISTING DRIVE HWY 70 1100' PUBLIC ") u,u,.aaa.cm.aaaaisar :��;«: WMAR.� STORMWATER DRAINAGE AREA STORAGE IDEAS, LLC NEWPORT TOWNSHIP, CARTERET COUNTY, NORTH CAROLINA CLIENT: STORAGE IDEAS, LLC DESIGNED: WILLIAM A. BROWN BTU ADDRESS: P.O. BOX 2418 DRAWN: MOREHEAD CITY, NC 28557 BTM PHONE: 252-726-1005 APPROVED: RDC g STROUD ENGINEERING, P.A. 151A HIGHWAY 24 DATE: MOREHEAD CITY, N.C. 28557 12/30/04 (252) 247-7479 SCALE: — RONAC.DD. clf— PHER, P.E. — I" - BO' I t `f.. � '• � {^�rrJP f3Ck ',� r -'�, l 1' " ' 42 I 4- \ N i•,s{ 1 � -. N.k � ,. JI W �, - � } 4 WAS i lr.'' '.L �. A 1 �r `.J xf, 1 �N34•Qg���+}Y 104: At to ,,' i• i � t !Iy A .� r > 9 � S� .fir +,y 1 13, � t 'ri� r ' 'J i�'1•!� �"" ,5�St+..,F � ___ N39', 98 ✓ t - � Un�ii�r �;� L , , � J f � Y? •` 1 J :.I: !! ,,\ 11 ti � �ilt� i ; . f !j'�;:,..J„ m� � .1 ��' ,,i � � a` �, a ,� LS. rt>'` � •�• I � r , •� i `rt l - f • Ir 4 r. � jJ+tiY rgis ti. '` - � - cµ � - � 6-_"tom � ,L Y• 1 \ r � t � t,_ y - � F � � Y �` . � J -. '�r� ' ` ' `� k •.ti ,� f/`-.s - JLK�� jt t' i � ' �� •t kk F r`J J t , s ✓ „ _'•,�,r . , "fir i Iva cog 27 1 �•. 4 .� e � J d1 SI'+• i � 4' ' ,'�/ 1I I � .. • ...' ' � • .. . � f -."�I dt . t`fF - 4< �' �.9 y J `V � � -� I � � tii ti , �(,� i• ,� NOLA A" 7OwMro q. i f Jl �+ `-:m;e � ( y vI. - ~ � � �.� ~ Y r, I�� �i�,.. 4, ; C I ' �•� - k � K .. _ r ' � �♦ f � ••F,� l � ]i-J f Y ir. � r . 11 w . j �,1-1{� {}�4 J t ': � -., 9 N� �2.1- • r.'+_f 'r •• 4�� �'- � � _ Sr � ��ri��`\�i� � VL •�~, rJ � i�4 - J.J A Sir �- 'Sw y�0 y �'�^V ' l q � .r �� �' (.u,T. J�•__ s�;, 77 + �` ' �>, y-� kl^ J ti t. a"� -I rJ a• ti..'".....if750iiC m� p d•l� r A, if w -.{ _ l if T `' -. rf /,f, ,,• � � ;�`h 4 ��?i �c1 �1 .: r..J S �}� ,�,y. 1 �" �cl•:... `-4r f - J. Lin I l y' r�f �/ �f •% �yj�J�► rt �-yam /� `..,,J� � /�� � `h✓.0 � I.} 1 i'� 'l �f N34' 98 5 i be - r y H '` Jr r Z e/ ))�rr:L'LRLp" r -'•-� �� Jf r f 'Jr' \: � i Isiah•t. tir 95� -�aF� f��f � :: �\ -!� ��le- .�, •tii1� i "-4s ; r /l� r ,i � J. � �I �'�'�i'Y _J w- �•� - I F Z � -..; f-C�J!S_frfi�' � � .l v r il�.��� ' `t j _ f�r+^•"), t,: � r.: i. 1{ _ _,� ``y,� ; � * ``�. / I � ram• � y' 1_ f r !�-` ! , J Y 1 , �q r J [[r I ✓r ��f\ r � �il` �1... Yl f,l'I 4 � .R w� `+ --'Y'i,7 i Y 5l• 3 � 11•J� 3-D Tgp#cXk is o yiip - P1 k4hl£ $-I'+f. r .4m;t IwA ir::lr: �— � 44 fr };r*i 1: "J(N Nud L3-'_ blrmi l': Q1:U N is I t'J I7Y MAP 1DEhS r LLC N5 . ......... 500 F4F­ CW ik- &i pr ➢mom, got sw S 'R Al M 3 egg Ir "'NIFf 0"A NAJJ Ire pan., ..y a ........... ,I now Te*4 4.1 A 1, og' 04:" 4f V . 'e J tj �lj Si 10- NI; .1 j kr, "keg SAM. v7 t' 14 1 , Qw t- .4, ilk 4, A' ­v� Az 2 ztll' v IC I N 17 V MAP - rage 1 D e A,!S , U_C_ DETENTION POND ANALYSIS FILE NAME: 050115-1 PROJECT#: SW8 050115 REVIEWER: P. Bartlett PROJECT NAME: Receiving Stream: Drainage Basin: Storage Ideas, LLC Deep Creek White Oak DATE: Class: Index No. 09-Feb-05 C 21-11 Site Area 3.00 acres Drainage Area square feet Area 2.76 acres IMPERVIOUS AREAS Rational C buildings 50825.00 square feet 0.95 parking 42448.00 square feet 0.95 square feet square feet square feet square feet TOTAL 7 , square feet Rational Cc= 0.78 SURFACE AREA CALCULATION % IMPERVIOUS 77-55% SA/DA Ratio 5.03% Des. Depth 5.5 Req. SA 6048 sf TSS: 90 Prov. SA sf VOLUME CALCULATION * place a "l " in the box if Rational is used Rational ?* Des. Storm 4 677:1::.00.:inches Rv= 0.75 Bottom 20.5 msl Perm. Pool msl Design Pool 27.5 msl Design SA 9560 sf Req. Volume 7 : : -834cf Prov. Volume A:80cf ORIFICE CALCULATION Avg. Head = Flow Q2, cfs Flow Q5, cfs No. of Orifices Diameter, inches Drawdown = FOREBAY Perm. Pool Volume= Req. Forebay Volume= Provided Volume= Percent= SA @ Elevation= Q2 Area = Q5 Area = Orifice Area Q= in COMMENTS Surface Area , Volume and Orifice are within Design Guideline: 14508 2901.6 3294.00 1.59 sq. in. 0.64 sq. in. 1.23 sq. in. 0.035 cfs x in CURB AND GUTTER ANALYSIS PROJECT NUMBER:] SW8050115 PROJECT NAME: ' Storage Ideas, LLC RECEIVING STREAM: Deep creek DRAINAGE BASIN: White Oak A= BY+MY P= B + 2Y {1 + MA2}^0.5 R= A/P FILE: 050115 DATE: 09-Feb-05 CLASS. C INDEX: 21-11 i, in/hr= 7 n= 0.027 M= 3 FLOWRATE 1 VELOCITY COMPUTATION Q=CiA <=.05 V=Q/A Swale # DA BUA C Q Slope Velocity cfes acres cfs fMt P1 ! 1 �, 0.3 0 0.20 0.42 0.0059 1.14 3d- 2 b_ 0.71 0 0.20 0.99 0.0039 163 3 #DIV/O! #DIV/01 #DIVIO! --4 #DIV/01 #DIV/O! �DIVIO! #DIV/01 #DIV/O! #DIV/O! 3v r 3' 6 #DIV/O! #DIV/O! #DIVIO! j C- 7 #DIV/O! #DIV/O! #DIV/O!4 #DIV/O! #DIV/01 #DIV/O! #DIV/O! #DIV/O! #DIV/O! r 10 #DIV/O! #DIV/0! #DIVIO! NORMAL DEPTH COMPUTATION / SWALE # B Y A '� P R Zav Zreq 1 0 - 2.6' 0.35 .37 2.21 0.17 0.11 0.10 2 0 ^' 3,0' 0.5 0.75 3.16 0.24 0.29 0.29 3 0.00 0.00 #DIV/01 #DIV/O! #DIV/O! 4 0.00 0.00 #DIV/01 #DIV/O! #DIV/O! 5 0.00 0.00 #DIV/01 #DIV/O! #DIV/O! 6 0.00 0.00 #DIV/O! #DIV/O! #DIVIO! 7 0.00 0.00 #DIV/O! #DIV/O! #DIV/O! 8 0.00 0.00 #DIV/O! #DIV/01 #DIV/O! 9 0.00 0.00 #DIVIO! #DIV/O! #DIVIO! 10 0.00 0.00 #DIVIO! #DIV/O! #DIVIO! GRASS COVER SPECIFIED ON PLANS: ALLOWABLE VELOCITY, fps, for slopes 0%-5%, easily erodible soil: Bermuda 5 Bluegrass 4.5 Fescue 4.5 Legume 3.5 Bahia 4.5 COMMENTS *l f+