Loading...
HomeMy WebLinkAboutSW8041210_COMPLIANCE_20070202STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW,on4a.{TJ DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS � ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE oqv__Y/)aU YYYYMMDD STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /v U& DOC TYPE ❑ HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ YYYYMMDD r Permit No 5-W 8 W 2-/a (to be provided b,, DVVQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT Thts form may be photocopted for use as an original DWQ Stormwater Management Plan Review A complete stormwater management plan subrruttal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details I. PROJECT INFORMATION Protect Name 31 �3 ✓ Ile-Ale.,,e c_ --- - - -- -- -- Contact Person ; , 11, k P a Phone Number -73,1 -- This worksheet applies to Basin No (as identified on plans) in Drainage Area I (from Form SWU-101) 11. DESIGN INFORMATION - Attach supporting calculations/documentation The soils report must be based upon an actual field investigation and soil borings County soil maps are not an acceptable source of soils information All elevations shall be in feet mean sea level (fmsl) Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations 'Bottom Elevation storage Elevation Top Elevation 7 Qve, Qr cf/hr/sf (circle appropriate units) f1 fmsl (Seasonal High Water Table elevation) inch (1 S inch event for SA waters, 1 inch event for others) 7 G G- c f G, 0 :!�: days -- ft x r� c f r L �q-! cs L, V 17, G fmsl 1-7r E� fmsl I ta, 4 fmsI ft = I LO / sq ft (bottom dimensions) Fotm SWU-103 Rev 3 99 Page 1 of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N C Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section 15 A NCAC 2H 1008 Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Pernut Application Form, the agent may initial below Attach justification if a requirement has not been met. Applicants Initials . a System is located 50 feet from class SA waters and 30 feet from other surface waters b System is located at least 100 feet from water supply wells c Bottom of system is at least 2 feet above the seasonal high water table d Bottom of the system is 3 feet above any bedrock or impervious soil horizon e System is not sited on or in fill material or DWQ approval has been obtained f System is located in a recorded drainage easement for the purposes of operation and (7o '35 r)6 maintenance and has recorded access easements to the nearest public right-of-way g Drainage area for the device is less than 5 acres h Soils have a minimum hydraulic conductivity of 0 52 inches per hour and soils report is r attached i System captures and infiltrates the runoff from the first 10 inch of rainfall (1 5 inch event for areas draining to SA waters ) Design volume and infiltration calculations attached A j System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage Calculations attached k All side slopes stabilized with vegetated cover are no steeper than 3 1 (H V) 1 A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided in Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided n Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters) �A. o Flow distribution mechanism within the basin is provided p A benchmark is provided to determine the sediment accumulation in the pretreatment device q Runoff in excess of the design volume bypasses off-line systems (bypass detail provided) r r System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days A soils report and all pertinent draw -down calculations are attached s Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized Form SWU-103 Rev 3 99 Page 2 of 3 IV INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1 After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition 2 Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed 3 After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration Remove any blockage and repair the structure to approved design specifications 4 Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth The system shall be restored to the original design depth without over -excavating Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed Removed sediment shall be disposed of in an appropriate manner and sha11 not be handled in a manner that will adversely impact water quality (i a stockpiling near a stormwater treatment device or stream, etc ) A benchmark shall be established in the pretreatment unit The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken The measuring device used to deternune the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the design depth reads feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin 5 If the Division determines that the system is failing, the system will immediately be repaired to onginal design specifications if the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H 1000 must be designed, approved and constructed I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above I agree to notify DWQ of any problems with the system or pnor to any changes to the system or responsible party Print Name and Title 1 " Address �7 3 �� b Date i _ / > !� a 7 Phone Signature Note The legally resfonsible%arry should not be a homeowners association unless more than 50% of the lots have been sold and resident of the subdivision has been named the president et a Nou``blic for the State of _ County of do hereby certify that h "-T personally appeared before me this _ day of 7 and acknowledge the due execution of the forgoing infiltration basin maintenance requirements Witness my hand and official seal, SEAL My commission expires -2 g"&� Form S WU-103 Rev 3 99 Paoe 3 of 3 INFILTRATION BASIN ANALYSIS PROJECT NUMBER 041210 feb05 PROJECT NAME 313 Greenville Avenue DRAINAGE BASIN Cape Fear RECEIVING STREAM Bradley Creek Index No SITE AREA 1 21 acres IMPERVIOUS AREA CALCULATION BUILDINGS PARKING/ASPHALT CONCRETE FUTURE TOTAL % IMPERVIOUS, i= I i;'I NI 37i 9°/a ELEVATION OF SEASONAL HIGH WATER TABLE REPORTED INFILTRATION RATE SURFACE AREAS AND ELEVATIONS FILENAME S IWQSIINBASIN1041210 feb05 WK1 DATE 13-Feb-05 REVIEWER L Lewis CLASS SC If ORW, is site within the 575' AEC? DRAINAGE AREA I1,111 h''' , 52853 SF Rational C 6984 1 8653 1 3388 1 1000 1 F--200251 50 C VllWNU I I 17750 Place a "1" here if Rational IIIII I I 11111 RV= 05+ 009 (I) = 1;11h1 lil k 039 I'lI�'r,l 14 FEET MSL hhhiii� II , 12 INCHES/HOUR or 0 000278 FPS Elev (ft) Area, sq ft Inc Volume Acc Volume BOTTOM 17 1601 0 0 0 TOP 178 2966 18268 18268 VOLUME / DEPTH / DRAWDOWN CALCULATION DESIGN STORM, INCHES DESIGN VOLUME TOTAL VOLUME AVAILABLE DEPTH OF RUNOFF TIME TO DRAWDOWN 25 YEAR 24 HOUR STORM N/A Intensity, i = 33 inches / hour Qr=CIA Qp through the bottom of the basin= 10 YEAR 10 MIN HIGH INTENSITY EVENT Intensity, i = 6 3 inches / hour Volume for 10 yr 10 min event = 'I'' I I 11JAI 1722II CUBIC FEET 1826 8 CUBIC FEET 0 80' FEET 1' 111 HOURS MUST BE <120 020 CFS 044 CFS Must be > Qr 2307 45 CF < 1826 8 CF COMMENTS Volume and drawdown are (not) within Design Requirements 0 INFILTRATION BASIN ANALYSIS PROJECT NUMBER 041210 apr05 PROJECT NAME 313 Greenville Avenue DRAINAGE BASIN Cape Fear RECEIVING STREAM Bradley Creek Index No SITE AREA 1 21 acres IMPERVIOUS AREA CALCULATION BUILDINGS PARKING/ASPHALT CONCRETE FUTURE TOTAL % IMPERVIOUS, 1= 1 37;9%1 ELEVATION OF SEASONAL HIGH WATER TABLE REPORTED INFILTRATION RATE SURFACE AREAS AND ELEVATIONS FILENAME S 1WQS11NBASIN1041210 apr05 WK1 DATE 28-Apr-05 REVIEWER L Lewis CLASS Sc If ORW, is site within the 575' AEC? DRAINAGE AREA I I'll 1''1111'1,111111'!1II 853 SF Rational C 6984 1 8653 1 3388 1 1000 1 7� 20025 c 1IINili �11,11IiJJ, 050 Place a "1" here if Rational I' I I iN9 ' i 11''i RV= 05+ 009 (1) _ !�11111,i111i110'39 "I'I� II14 FEET MSL 12 INCHESIHOUR or 0000278 FPS Elev (ft) Area, sq ft Inc Volume Acc Volume BOTTOM 17 1601 175 2359 TOP 178 2966 VOLUME / DEPTH 1 DRAWDOWN CALCULATION DESIGN STORM, INCHES DESIGN VOLUME TOTAL VOLUME AVAILABLE DEPTH OF RUNOFF TIME TO DRAWDOWN 25 YEAR 24 HOUR STORM NIA Intensity, E = 33 inches / hour Qr=CiA= Qp through the bottom of the basin= 10 YEAR 10 MIN HIGH INTENSITY EVENT Intensity, i = 6 3 inches / hour Volume for 10 yr 10 min event = 0 990 990 799 1789 11111" 1 11 'I 11722 CUBIC FEET Nl; 1 1789 CUBIC FEET 0 78 FEET 1 1 HOURS MUST BE <120 020 CFS 000 CFS Must be > Qr 2307 45 CF < 1788 75 CF COMMENTS Volume and drawdown are (not) within Design Requirements 2 cbpi(250-� shf, 4' mGVe - ����f r1�o�� re� � �n� 11 jj ff__ t,,•� c� �Q /I War' w Z� � j j de 5 ��" %r Q S �L✓��2 e(A/ k) �4r, n� 60n f mr 11(7 5 y ,�e 0