Loading...
HomeMy WebLinkAboutSW8040609_HISTORICAL FILE_20040701STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW.�� DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE ZP%�07,U� YYYYMMDD State Stormwater Management Systems Permit No. SW8 040609 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Southern States Chemical Inc. Southern States Laydown Yard New Hanvoer County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules'D and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until July 1, 2014, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section I.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 283,409 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 2 State Stormwater Management Systems Permit No. SW8 040609 6. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. b. C. d. e. f. 9- h. i. J• k. 1. m n. Drainage Area, acres: 8.20 Onsite, ft2: 357,110 Offsite, ft2: None, per engineer Total Impervious Surfaces, ft2: 283,409 Design Storm, inches: 1" Pond Depth, feet: 4.0 TSS removal efficiency: 90% Permanent Pool Elevation, FMSL: 4.3 Permanent Pool Surface Area, ft2: 33,192 Permitted Storage Volume, ft3: 27,801 Temporary Storage Elevation, FMSL: 5.0 Controlling Orifice: 2.0460 pipe (The orifice must drawdown the 1" volume in 2-5 days) Permitted Forebay Volume, ft3: Receiving Stream/River Basin: Stream Index Number: Classification of Water Body: 111. SCHEDULE OF COMPLIANCE 16,723 NE Cape Fear River / Cape Fear 18-74-(61) "SC; Sw" 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. C. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 3 State Stormwater Management Systems Permit No. SW8 040609 Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: - a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in this pond is 1/3 horsepower. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 4 State Stormwater Management Systems Permit No. SW8 040609 III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the 1 st day of July 2004. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Alan W. Klimek, P.E-, Director Division of Water Quality By Authority of the Environmental Management Commission State Stormwater Management Systems Permit No. SW8 040609 Southern States Laydown Yard Stormwater Permit No. SW8 040609 New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL 6 State Stormwater Management Systems Permit No. SW8 040609 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. H . The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office New Hanover County Building Inspections 7 LETTER OF TRANSMITTAL pswl<WDI community infr structure consultants 909 Market Street Wilmington, North Carolina 28401 TO: NCDENR Division of Water Quality Attn: Laurie Munn 910.762.4200 tel. 9 BY: _ ^� DATE: 6/30/04 RE: Southern States La down Yard for Southern States Chemical, Inc. PROJECT NO: 40132.00.WL We are sending via: ❑ Overnight ❑ Regular Mail ❑ Pick-up ® Hand Delivered The following items. ❑ Correspondence ® Plans ❑ Specifications ❑ Other as listed below: COPIES DATE NO. DESCRIPTION 2 Revised Stormwater Permit Application, Wet Detention Supplement, Drainage Narrative, Stormwater Calculations 2 Revised CO.O/Cover Sheet, SV1.11Existing Conditions, C1.1/Notes and Legend, C2.1/Demolition Plan, C3.1/Site Layout Plan, C4.11Grading, Drainage, Erosion Control, C4.2/Drainage Area Plan, C5.11Miscellaneous Details, C5.2/Miscellaneous Details 1 WKD Response Letter THESE ARE TRANSMITTED as checked below: ❑ For Approval ❑ As Requested ❑ Approved as Submitted ❑ Returned for Corrections ❑ For Your Use ® For Review and Comment ❑ Approved as Noted ❑ Forward to Subcontractor REMARKS: COPY TO: File, Stephen Dees SIGNED_ (L& Lbs�= Carrie H. Bollenbacher, PE fWK DICKSON community infrastructure consultants June 30, 2004 Ms. Laurie Munn NCDENR — Division of Water Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405 RE: Southern States Chemical Company Permit Number GP 31-04 WKD Project Number 40132.00.WL Dear Ms. Munn: Following are responses to comments from you in your letter of June 24, 2004, to Stephen Dees with Southern States Chemical. All responses are prepared in bold text. Comment: 1. Please complete Section VI of the application. The application has been returned to the engineer for completion. Response: Section VI of the application has been revised and enclosed. Comment: 2. Please label and dimension the permanent pool contour on the wet detention pond drawing. Response: Permanent pool contour has been labeled and dimensioned on site layout sheet (see Sheet C3.1). Comment: 3. Please specify the wetland species to be planted on the 6:1 shelf. Response: Wetland species for 6:1 shelf specified on pond cross section (see Sheet C5). Comment: 4_ The forebay should be 20% of the entire volume at the permanent pool (the main pond plus the forebay). The forebay is too small for the current design. Response: Volumes for the forebay have been revised to match those of the drawings. There was an error in the excel spreadsheet that was previously submitted with the drainage calculations (revised drainage calculations enclosed for your review). 909 Market Street Wilmington, NC 28401 Tel. 910, 762.4200 Fax 910.762.4201 www.wkdickson.com North Carolina • South Carolina • Georgia • Florida Ms. Laurie Munn June 30, 2004 Page 2 Comment: 5. The application must be signed by a principal executive officer of at least the level of the vice-president or his authorized representative. Mr. Dees may act as an authorized representative if the principal executive officer submits a letter or authorization. Response: Copy of letter of authorization enclosed as requested. Original has been mailed to DWQ office. If you have additional questions or need further clarifications, please let us know. Sincerely, W. K. Dickson & Co., Inc. Carrie H. Bollenbacher, P.E. /pb Enclosure Jun 25 04 03:11Fi Southern States Chemical ale-e32-It03 p.2 ��''.�'O!/Tif!T�PA.fTi9lfJ APU"MT=Q*4Wi COrMy 16�19 t PrQl�aen� �4. gel vU �1Ca Sn6 �Avannan_ CA 11102 T :992 2S2 110 F go 212-11a 3 rww atcnerl:ril ::wr North Carolina Division OfWater Quality Wilming,on ltcbional Office 127 Cardinal Drive t{xter>tion WilminLKon' NC To Wh(un it may "meern: June 25, 2004 P Sulij*t- SWrmwatcr Projcrt No. SWE 040604 Southern States Lavdown Yard New Harmer County Your recent response dated -June 24, 2004 to our Stormwacur Management Permit Appliewion indicated thus the application must be signed by a prircipal cxecutivc ul'licer or an authoh7xd representa live. For puM)1,,-:s of this application submittal_ Mr. Stephens Dcvs has appropriate uuthonzation to sign on bchulf of Soothcm States Chemical, Inc: YUur~ truly, Kcy L?, Compton President I T Key 0. Compton, A •nsl3ant P,Q aoA 5�Q} Savhnnen, GA 31402 r )122?f•I1i111 F9122°.S,IZ:Lb f..�cam''-. KC11mp1Drsl�whamirlticomr , TI W Ww-FSCh•IhICAI,LOR! �6-il W ArF:q _o �w x DYcxSON j JUN 2 5 2004 o -: RF,CEIVED Mr. Stephen Dees Southern States Chemical, Inc. 2600 US Hwy 421 N Wilmington, NC 2S401 Dear Mr. Dees: Michael F. Easley, Governor William G. Ross Jr., Secretary Nora Carolina Department of Environment and Natural Resources Alan W. Ktimek, P.E.Arector Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality June 24, 2004 Subject: REQUEST FOR ADDITIONAL INFOR\ZaTION Stormwater Project No. SW8 040609 Southern States Laydoa.,n Yard New Hanover County The Wilmington Regional Office received a Stormwater Management Perrrut Application for Southern States Laydo«-n Yard on June 17, 2004. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater reN2e%%,: Please complete Section VI of the application. The application has been returned to the engineer for completion. 2. Please label and dimension the permanent pool contour on .the wet detention pond dra%N7nc, 3. Please specif}, the wetland species to be planted on the 6:1 shelf. :. The forebay should be 20% of the entire Volume at the permanent pool (the main pond plus the forebay). The forebay is too small for the current design. 5. The application must be signed by a principal executive officer of at least the level of the rice -president or his authorized representative. Mr. Dees may act as an authorized representative if the principal executive officer submits a letter or authorization. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to July 1, 2004, or the application will be returred as incomplete. The return of a project Nvill necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the'receipt of a completed application to issue the permit. - FwA N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 395.3900 Customer Service *u Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax 1 800 623-7748 am Mr. Stephen Dees Paze 2 June 24.2004 The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is -subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, Laurie Munn Environmental Engineer RSS/:Ism S:\N�'QSISTORMWATIADDINIFO120041040609 jun04.doc cc: Laurie Munn Carrie Bollenbacher, P.E. ►/ - ,14 - r Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek. P.E.,Director Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality June 24.2004 Mr. Stephen Dees Southern States Chemical, Inc. 2600 US Hwy 421 N Wilmington, NC 25401 Subject: REQUEST FOR ADDITIONAL Ili TFORNLATION Storm%vater Project No. SW8 040609 Southern States Laydown Yard New Hanover County Dear Mr. Dees: The Wilmington Regional Office received a Stormwater Management Permit Application for Southern States Lavdo«-n Yard on June 17, 2004. A preliminary review of that information has determined that the application is not complete. The follwAring information is needed to continue the stormwater review: Please complete Section VI of the application. The application has been returned to the engineer for completion. 2. Please label and dimension the permanent pool contour on the wet detention pond dray.-ing. �. Please specify the wetland species to be planted on the 6:1 shelf. �. The forebay should be 20% of the entire volume at the permanent pool (the main pond plus the forebay). The forebay is too small for the current design. 5. The application must be signed by a principal executive officer of at least the level of the rice -president or his authorized representative. Mr. Dees may act as an authorized representative if the principal executive officer submits a letter or authorization. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to July 1, 2004, or the application Nvill be returned as incomplete. The return of a project Nvill necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900 Customer Service A&A Wilmington Regional Offsce Wilmington, NC 28405 (910) 350-2004 Fax 1 800 623-7748 hl�'i7ENR Nor. Stephen Dees Pasze 2 June 24, 2004 The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a Niolation of NCGS 143-215.1 and is- subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be re,6sed have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. Sincerely, CVQ'k�-U%�� Laurie Munn Environmental Engineer RSS/:lsm S:1WQSISTORMWATIADDINFO12004\040609 jun04.doc cc: Laurie Munn Carrie Bollenbacher, P.E. Please indicate that you have prodded the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of S420 (payable to NCDENR) • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including: - Development/ Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) «. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (indivdual or firm): WK Dickson & Co.. Inc. Mailing Address: 909 Market Street City Wilmington State: Phone: ( 910 ) 762-1200 NTII. APPLICANT'S CERTIFICATION NC Zip: 28401 Fax: 91( 0) 762.4201 1, (print or n pe name of person listed in General Information, Item ?) Stephen Dees certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants v611 be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H.1000. Signature: Date:i f Z10D L{ Form S'WU-101 Version 3.99 Paae 4 of 4 State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Michael F. Easley, Governor William G. Ross Jr., Secretary 1.te: 10q FAX FAX COVER SHEET No. Of Pages: V From: L ,a.1 CO: FAX#: 910-350-2004 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3945 Telephone (910) 395-3900 Fax (910) 350-2004 An Equal Opportunity Affirmative Action Employer Stormwater Narrative Southern States Laydown Yard WKD#: 40132.00.WL June 14, 2004 GENERAL Southern States Chemical, Inc. plans to develop the property commercially with a laydown yard. The site is located at the westerly portion of Southern States Chemical, Inc. property at 2600 US Highway 421 North, which is approximately 2.4 miles north of the intersection of US Highway 117 and US Highway 421 North. The site is moderately flat and drains by means of sheet flow to an existing ditch that borders the proposed disturbed area both north and east. The existing ditch drains to an existing pond located in the southeast corner of the proposed disturbed area. PROPOSED IMPROVEMENTS Proposed improvements will involve the construction of a 6.52 acre laydown yard and will include the construction of a wet detention basin. This basin will improve water quality for post development runoff as well as ensure that our post -development flow (14.90 cfs) is less that that our pre -development flow (16.71 cfs) for the 25-year event. All of the surface water runoff from the developed areas will be sent to a proposed wet detention system. Wetland impacts have been minimized with the road crossing and COE permits obtained. The surface treatment of the laydown yard will be aggregate material. DRAINAGE CONSIDERATIONS Runoff will be conveyed to the detention system by means of a swale that runs along the south and east boundaries of the laydown yard. This swale will ensure positive drainage to the pond. The Swale system will be designed to transport the runoff from the 25-year storm event to the pond. The grades shown on the plans are final grade elevations. The plan currently proposed shows that the imperviousness of the drainage area being conveyed to the pond will be approximately 79%. During construction silt fence, riprap apron, sediment trap (proposed pond), and construction entrance will be place in critical areas as directed by the Drainage Plan. All design criteria is based on. New Hanover County stormwater standards. Drainage areas were delineated for determining the correct swale / culvert size for each drainage segment. Manning's equation was used to determine normal depth of flow in the channels. e_'j t1 C A ?o` t ,r ���• iCy �� anti $OL1,� �` STORMWATER RUNOFF CALCULATIONS PREPARED FOR SOUTHERN STATES CHEMICAL, INC. 2600 US HWY 421 NORTH Wilmington, NC 28401 June 14, 2004 a =h 77 'Sou#hern'S:ta#es Laydown Yard s, F . _ _ h x ,Wilmington, North&Carolina n 4� OF �S5��ti�y' 02931 t W.K. Dickson & Co., Inc. 909 Market Street Wilmington, NC 28401 Phone 910.762.4200 Fax 910.762.4201 WKD No. 40132.00.WL WK DICKSON Engineering 909 Nfarket Street Land Planning Wilmington, NC 28401 Surveying (910) 762-4200 SOUTHERN STATES LAYDOWN YARD TOTAL AREA DRAINING TO POND = 357,110 SF = 8.20 AC TOTAL PRE -DEVELOPMENT FLOW =(C)(I25-YR)(A)=(0.25)(8.15)(8.20) = 16.71 CFS PRE -DEVELOPMENT PEAK FLOW RATE FOR 25-YR RETURN PERIOD: Q = 16.71 CFS TOTAL PROPOSED IMPERVIOUS SURFACE AREA DRAINING TO POND: GRAVEL AREAS = 283,409 SF = 283,409 SF PERCENT IMPERVIOUS DRAINAGE AREA FOR POND: = (283,409 SF / 357,110 SF) x 100 = 79.4 % REQUIRED STORAGE FOR 1-INCH OF RUNOFF FOR POND: (use Schueler Method) = 0.05 + 0.009 (I) = 0.05 + 0.009(79.4) = 0.766 = (1")(0,766)(1/12)(357,110) 22,807 CF (24,221 CF PROVIDED) POND DEPTH SA/DA % (FT) 4.0 6.94 POND SURFACE AREA (MIN.) (SF) IF POND DEPTH = 4.0 FT, MINIMUM SURFACE AREA = 24,783 SF USED 90% TSS CHART TO SIZE POND AREA @ ELEVATION 4.30 = 33,192 SF > 24,783 SF 24,783 REQUIRED STORAGE FOR FOREBAY: 20% OF TOTAL PERMANENT POOL VOLUME = (0.2)(81,901 CF) . 16,380 CF (15,597 CF PROVIDED) PROJECT: S. STATES LAYDOWN YARD SUBJECT: POND CALCULATIONS JOB NO.: 40132.00.WL PREPARED BY: CHB DATE: 6/14/04 CHECKED BY: MNH DATE: PAGE NO OF WK DICKSON Engineering Land Planning Surveying 909 Market Street Wilmington, NC 28401 (910) 762-4200 Pond Volume Contour Incremental Cumulative Elevation Area Volume Volume (ft) (sf) (cf) (cf) Bottom Elevation ` : =: Q:3 : ` = " 15823' 0 0 T. -' 17124. 11532 11532 2 s.. .,- 719044. 18084 29616 3 "_µ `.:: 21783 20414 50029 25978 23881 73910 Permanent Pool 7992 81901 Forebay Volume Contour Incremental Cumulative Elevation Area Volume Volume (ft) (sf) (cf) (cf) Bottom Elevation 0.3: ;: - _ , 2652.. '. ` 0 0 1: ';! ,285.5, 1928 1928 3217 5144 43J74•-:. 3976 9120 r' !4 <.:. ,' S24>>' 4808 - 13928 Permanent.Pooi 4':3: .;5$92, 1670 15597 Forebay Volume is 19.0% of Pond Volume PROJECT: S. STATES LAYDOWN YARD SUBJECT: POND CALCULATIONS JOB NO.: 40132.00.WL PREPARED BY: CHB DATE- 6114104 CHECKED BY: MNH DATE: PAGE NO OF WK DICKSON Engineering 909 Market Street Land Planning Wilmington, NC 28401 Surveying (910) 762-4200 POND RELEASE TIME FOR CONTROL PIPE: POND ELEV. EFF. STORAGE VOL. RELEASED OUTFLOW RATE RELEASE TIME (FT) (CF) (CF) (CFS) (HOURS) 5.00 24,221 3552 0.088 11.2. 4.90 20,669 3527 0.081 12.0 4.80 17,142 6973 0.074 26.1 4.60 10,169 10169 0.058 49.1 4.30 0 TOTAL HOURS 98..4 DAYS f 4.1 CONTROL PIPE: 2 INCH ORIFICE BOLES USED ORIFICE EQUATION TO DETERMINE OUTFLOW RATE Q = Cd"A`(2gh)"1/2 PROJECT: S. STATES LAYDOWN YARD SUBJECT: POND CALCULATIONS JOB NO.: 40132.00.WL PREPARED BY: CHB DATE. 6/14/04 CHECKED BY: MNH DATE: PAGE NO OF P LETTER OF TRANSMITTAL k6l; community Infrastructure consultants 909 Market Street Wilmington, North Carolina 28401 TO: NCDENR Division of Water Quality Attn: Laurie Munn 910.762.4200 tel. 910.762.4201 fax DATE: 6/16/04 RE: Southern States Laydown Yard for Southern States Chemical, Inc. PROJECT NO: 40132,00.WL We are sending via: ❑ Overnight ❑ Regular Mail ❑ Pick-up ® Hand Delivered The following items: ❑ Correspondence ® Plans ❑ Specifications ❑ Other as listed below: COPIES DATE NO. DESCRIPTION 2 Stormwater Permit Application, Wet Detention Supplement, Drainage Narrative, Stormwater Calculations 2 C0.0/Cover Sheet, SV1.1/Existing Conditions, C1.1/Notes and Legend, C2.1/Demolition Plan, C3.1/Site Layout Plan, C4.1/Grading, Drainage, Erosion Control, C4.2/Drainage Area Plan, C5.1/Miscellaneous Details, C5.2/Miscellaneous Details 1 $4000.00 application fee THESE ARE TRANSMITTED as checked below: ❑ For Approval ❑ As Requested ❑ Approved as Submitted ❑ Returned for Corrections ❑ For Your Use ® For Review and Comment ❑ Approved as Noted ❑ Forward to Subcontractor REMARKS: COPY TO: File. Stephen Dees SIGNED: C_ 1 ' f36 Carrie H. Bollenbacher, PE .05/06/2004 13:11 9107624201 WK DICKSON FAGS 81/03 S�1 O 7 1wMWKSIMILE DICKSON community infrasiructure consultants 909 Market Street Wilmington, North Carolina 28401 910.762.4200 tel. 910.762,4201 fax DATE: (, AFFILIATION: VW Q- _ FAX NO: -350 ^ tDo MESSAGE: l( C FROM: ofta-te T�D"-;et� W.K. Dickson & Co., Inc. 910.762.4200 tel. 910.761.4201 fax Number of pages including cover sheet: 05/06/2004 13:11 9107624201 WK DICKSON PAGE 02/03 PROJECT NARRATIVE FOR SOUTHERN STATES LAYDOWN YARD (40132.00.WL) GENERAL INFORMATION Owner: Southern States Chemical Inc. 2600 Highway 421 North Wilmington, NC 28401 ATTN: Stephen Dees Design Engineer: Carrie H. Bollenbacher, PE do W.K. Dickson & Co., Inc. , 909 Market Street Wilmington, NC 28401 Applicable Fast -Track Permits: Stormwater EXISTING IMPROVEMENTS The project site is located at 2600 Highway 421 North in New Hanover County. The topography of the existing site shows mild to moderate slopes currently draining by sheet flow to the existing ditch that borders proposed disturbed area of the site both north and east. The existing ditch drains to an existing pond located in the southeast corner of the proposed disturbed area. PROPOSED IMPROVEMENTS The proposed disturbed acreage totals approximately 9.8 acres of the west portion of the Southern States property. Proposed improvements will include the construction of an 8.5 acre laydown yard. No underground utilities are necessary to serve this development. This development will also include the construction of a wet detention basin to provide detention and improvement of water quality for post development runoff. This wet detention basin has been appropriately designed for 90% TSS removal and for storage and release of the first inch of runoff. Runoff to the detention system will be conveyed by means of a swale that runs along the south and east boundaries of the laydown yard. This Swale will ensure positive drainage to the pond. All design criteria is based on New Hanover County stormwater and erosion control standards. 05/06/2004 13:11 9107624291 WK DICKSON PAGE 03/03 ac 21 C N S 47 � w U N O 2 Aas�� S VECIN Y MAe N.T.S.