Loading...
HomeMy WebLinkAboutSW8040609_COMPLIANCE_20040701STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW XA(/1�a6� DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD WET DETENTION POND ANALYSIS FILE NAME: S:kWPDATA\WQSkPOND1040609.jun04.xis PROJECT #- SW8 040609.jun04 REVIEWER: L. Munn PROJECT NAME: Southern States Laydown Yard DATE: 01-Jul-04 Receiving Stream: NE Cape Fear River Class: C Sw Drainage Basin: Cape Fear Index No. Site Area 9.46 acres Drainage Area 3571A square feet Area in Acres 8.20 IMPERVIOUS AREAS Rational C Gravel Areas 283409.00 square feet square feet square feet square feet square feet square feet TOTAL square feet SURFACE AREA CALCULATION % IMPERVIOUS 79.36% Des. Depth 4 TSS: 90 VOLUME CALCULATION Rational ?* Des. Storm inches Rv= 0.764 Bottbm 0.3 msl Perm. Pool msl 4' 1:1 Design Pool 5 msl Storage met @elev 4.99 msl 2-- Req. Volume :7 c f Vol. Prov, at DID 34cf _1 ORIFICE CALCULATION Avg. Head = Flow Q2, cfs Flow Q5, cfs No, of Orifices Diameter, inches Drawdown Rational Cc= 0.04 SA/DA Ratio 6.94% Req. SA 24770 sf Prov. SA sf * place a "'I " in the box if Rational is used Perm. Pool Volume= 81901 Req. Forebay Volume= 16380.2 Provided Volume= 16723.00 Percent= Elevation 4.30 5.00 Area Inc. Vol. Acc. Vol. 33192.00 33192.00 23234.40 23234.40 Q2 Area = 7.09 Q5 Area = 2.84 Orifice Area 3.14 Q= 0.058 7777777r77777= in x Surface Area @DP = Falling Head Drawdown COMMENTS Surface Area , Volume and Orifice are within Design Guidelines. sq. inches sq. inches sq. inches cfs in 33192 sq. ft. 6.1 days