HomeMy WebLinkAboutSW8040522_COMPLIANCE_20040527STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW��D��
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
COMPLIANCE EVALUATION INSPECTION
DOC DATE
42(�S 2-7
YYYYMMDD
INFILTRATION TRENCH ANALYSIS
Filename: S:IWPDATAIWQSIINTRENCH1040522.may04
Project # 040522,may04
Project Name The Pavilion at Carolina Beach
Recvng Stream Snows Cut
Drainage Basin Cape Fear
Site Area 2.74 acres
Impervious Area Calculation
Buildings 27660
Parking/Asphalt 67960
Concrete 350
Total
Volume/Storage Calculation
If Rational Method is used, place a 1 in this box
Required
Provided
Design Storm
RV
Volume toStore
Pipe Diameter
Length Of a Single run of Pipe
Number of Pipe Runs in Trench
Storage In Piping
Total Storage in Piping
Cross -Sectional Area Of Pipe Runs
Length Of Trench
Width Of Trench
Height Of Trench
Cross -Sectional Area Of Trench
Voids Volume, 40%
Trench Volume per linear foot
Minimum Trench length required
Total Volume Provided
Elevation Of Bottom Of Trench
Elevation Of SHWT
Overflow Elevation
Exfiltration Rate / Drawdown
Reported Hydraulic Conductivity
Bottom Surface Area
Date 27-May-04
Reviewer L S Munn
Classification SC
Index # *18-87-31.5
Drainage Area 119354 SF
2.74 Acres
Rational Cc (list C after each BUA)
% Impervious: 80.4%
Cc: 0.61
2 in
0.77
5330 CF
Pipe Size 1 1 Pipe Size 2
Comments:
Required volume, storage, and drawdown guidelines are met.
21.7 Mean Sea Level
18 Mean Sea Level
25.8 Mean Sea Level
6.95 Cubic Feet Per Hour Per Sq Ft
8994.7 Square Feet
"10 2 3 5' hours
J;