Loading...
HomeMy WebLinkAboutSW8040416_HISTORICAL FILE_20040423STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW �G%J r DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD State Stormwater Management Systems Permit No. SWS O40416 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Southstar Holdings, LLC Ogden Walgreens #7919 New Hanover County FOR THE construction, operation and maintenance of an infiltration trench system in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until April 23, 2014, and shall be subject to the following specified conditions and limitations: 1. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 56,000 square feet of impervious area. This system meets the requirements of holding the 10 year - 10 minute event and infiltrating the 25 year — 24 hour event. Therefore a vegetative filter is not required. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. A permit modification must be submitted and approved prior to the construction of additional built -upon area from outside of the approved drainage area. 2 State Stormwater Management Systems Permit No. SW8 040416 Project Name: Permit Number: Location: Applicant: Mailing Address: Application Date: DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET Ogden Walgreens 47919 S W 8 040416 Receiving Stream/River Basin Stream Index Number: Classification of Water Body: Drainage Area, acres: Ofsite, sq. ft.: Offsite, sq. ft.: Design Storm: Total Impervious Surfaces, ft': Building, ft': Roads/Parking, ft 2: Other, ft2. Offsite, ft2: Trench Dimensions, LxWxH,feet Trench Bottom Elevation, FMSL: Required Storage Volume, ft': Provided Storage Volume, ft': Bypass Elevation, FMSL: New Hanover County Mr. E. Blanton Hamilton, Jr. Southstar Holdings, LLC 200 Providence Road, Suite 106 Charlotte, NC 28207 April 23, 2004 Burnt Mill Creek / Cape Fear CPF23 18-74-63-2 "C S W" 1.56 67,800 none, per engineer 1" 56,000 15,200 39,200 1,600 0 Connected Trench System 128.17' x 30.48' x 4.38' 44.8 4,483 6,917 2@78.17' x6.33' x4.38' 44.8 System can hold the 10 year — 10 minute event and infiltrate the 25 yr — 24 hour event, therefore no bypass required. t State Stonnwater Management Systems Permit No. SW8 040416 II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, now spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification maybe required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 4 State Stormwater Management Systems Permit No. SW8 040416 9. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. If the proposed BUA exceeds the amount permitted under this permit, a modification to the permit must be submitted and approved prior to construction. 10. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 11. At least 30 days prior to the sale or lease of any portion of the property, the permittee shall notify DWQ and provide the name, mailing address and phone number of the purchaser or leasee. An access/maintenance easement to the stormwater facilities shall be granted in favor of the pennittee if access to the stormwater facilities will be restricted by the sale or lease of any portion of the property. 12. The permittee must maintain compliance with the proposed built -upon area and ensure that the runoff from all the built -upon is directed into the permitted system. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 14. The permittee must maintain the current permitted drainage area. No additional runoff from outside of the permitted drainage area boundary may enter the permitted stormwater facilities without first applying for and receiving a permit modification. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The penmittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 5 State Stormwater Management Systems Permit No. SW8 040416 Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the 23rd day of April 2004. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION -1 Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission 2 State Stormwater Management Systems Permit No. SW8 040416 Ogden Walgreens #7919 Stormwater Permit No. SW8 040416 New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL 7 State Stormwater Management Systems ' Permit No. SW$ 040416 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. The outletibypass structure elevations are per the approved plan. 5. The outlet structure is located per the approved plans. 6. Trash rack is provided on the outlet/bypass structure. 7. All slopes are grassed with permanent vegetation. S. Vegetated slopes are no steeper than 3:1. 9. The inlets are located per the approved plans and do not cause short-circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. 11. Required drawdown devices are correctly sized per the approved plans. .12. All required design depths are provided. .13. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 14. The overall dimensions of the system, as shown on the approved plans, are provided. cc: NCDENR-DWQ Regional Office New Hanover County Building Inspections Date Design NORMS, KUSKE & TUNSTALL Sheet S 0 C 902 Market St, CONSULTING ENGINEERS, INC. Wilmington, N.C. 28401 Of 2 Check Job For Job No. \vALCfZA 79/� SdV14oL,D) ,; 1 0302d 3TOT��t\vAYG tc �q�G S 5- I Cr 'p A i �1 L67 Arz(A A-C)3, -DIS; Urzr367-0 `rO 7q L ?CIS -r U tz8 C 0 Ih,, RpC- 6V-4 GUI/ 1�fiCL 0ug17r� TAvIt4c' eA- 0 6�F� S1—c � D><hn�a r✓ �R/vc oft ID a D€Ll-k5 UIZ.r.r LAiJC SID4\vniic r� jio�s `io-T4L- Ufr- Sr rcf To . "a- 1 tin 1'crZv" o 11 r nc_nc 4 CArjoT X PAv/ S F A G tA'A4 ���oe„esW any '� `rN fip I'U'/Sao p,cr.2 a ` l G 912 !,J, 700 7 S' e �toaHc:t �� 1¢1e 4-' Gov G,v2 32'1 Sao 0,75' 1 ¢ 4,9, (,vim (,1 f°0 0. l S Drtlglur orf- Sf7r: 70.9 0,a1 Or-A-jr OFr--5a7c 'E00 I o,07 iDr?A111is or--F-Srrc 11`�do O.D4- DJ7./.l" r Q('r-SrTL'-. lI "7 00 0 27 r AVEIVED CJu-s�7ce � LL ISr z. o 0 0. 3�;` 42, 5cna 0,97 3/ moo O.vYi APR 16 2004 DWQ PRO # `��K� 1 16 70 1+-Ap I, E3-7 - 77 30 I+yT/C-71LA-rlar1 $Y57-6II" DefOCfv C F1fLAar'jT Orel- -13 L D,' t CAr,0O t' Y I SI 2 0 e p, 3 S p%gv,r'Z 9, 26u 6,90 Got"'6"ar.s 121;vL 51 pC-v-,4 f1 6ao 0,o4� �TaiF} � €Jh f'Cizu/gut SGr oa u 1, Z s - eC' RVIOVr /- Mc5A i JI f3oa 0,27 (o7I v /,2s//,s`6 -iC -9065 NUT A-fL 'q r/./ fZ, a'W. bate Design N 0 R R I S, K U S K E & T U N S T A L L sheet ¢lS o G(-5 902Market St, CONSULTING ENGINEERS, INC. Wilmington, N,C. 28401 2 Of Z Check Job For Job No. \vAr- ��c��r/f �S %�!F Jvir�S n. r� F!o�.UrrsG'� 03(12o Sliu �7 /�raif 'Ta CSw� \vn�Crzs C13Vf2.rT Psr�� C1xc=-Cle, � U 130 A 0, � [ C+It boo / O, z.) C 2 0) doo Cr- I?eq D V5E CULTcs:c. C,4An1o5le-r /ram S -c)n1C` ?3Gp 'Fo+~ $TaC!IC;��NFlGTlt� i��>L f- 6 TZa,-" VC-rJ gf4o GF 2 - 1 rZ d— "%'EO V= % � � a C!� Zed �?e-o cr —F-0 7l+L S olcflC, Lz �� 2 U !1= /W/ar4 A73c— 3�3a PO Cd-f/)MI3012_f (ScG A-r-rllCH4L1) 1)Lrf<r= CAGC-J ;=ah= cr1Ar:Ni3GR-1Sra'N/C V0LVk,L5 rnar/t-r[a"T/or./ Ai i/Jcl—ft, rnf4-r 'CI�UftiT� 1,lg,z o f?Au• o r 1v N = S goo 5F4 O,O r9F-r1, SI JG S r- e/c-rrz. - 9a /1fM f -Lp = + I 13, r( j /C-' r( I H !Z/6 A AC rJ" 7 PM Avg 72p:, (k)rC r-atz -D&PeA/ 56;- e! 7"''AC H A// P /c u C A CAL C T O V it r. 4 Sr/n•,r<01/_1Py C�Cl NrZ Si af? L\/ANT Tic--5 re-w fLArr,/ �r v G21V7 Y12 rJGP i Cr,r} II CG FS/ c 1 1 J /o �,a,� �,� 47,Z 2 5- ¢ S- 1 5`0 9, d 11, 2. a 4 8, 1 /Jo /4.a 12,E ¢,o a-?, Drsc/fin. nG� D> -s/;c -ro ( OmOonr rLoA9 ti y Go rr rorap�r,s C13 � ► >��^� 48,9- �l`-1C ilrnErF,.Un1 "�/afZrcrr✓c, La � G(^�1/ = Q_R, r 'PrZECar.�57R C7.a,,,i -R. Ur.r6 (--If CV5'& 10 I'AN/ f7oCA" CSV6 7- ra Z cr s r1 ok 6;2,,r = [o7,A�� 2,2. Cr-r J Gas C)K 03020 Ogden Walgreens Type I// 24-hr 2 Yr Rainfall=4.50" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. - Page 1 HydroCADO 7.01 sln 000479 © 1986-2004 Applied Microcomputer Systems 4/14/2004 11:58:20 AM Subcatchment S1: SITE AREA TO INFILTRATION SYSTEM Runoff - 5.02 cfs @ 12.14 hrs, Volume= 0.294 af, Depth= 2.26" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Type Ill 24-hr 2 Yr Rainfali=4.50" Area (sf) CN Description 11,800 39 >75% Grass cover, Good, HSG A 56,000 98 Paved parking & roofs 67,800 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) _ (feet) (ftlft) (ftlsec) (cfs) 10.0 Direct Entry, Pond P1: INFILTRATION BASIN Inflow Area = 1.556 ac, Inflow Depth = 2.26" for 2 Yr event Inflow - 5.02 cfs @ 12.14 hrs, Volume= 0.294 of Outflow = 1.62 cfs @ 11.89 hrs, Volume= 0.293 af, Atten= 68%, Lag= 0.0 min Discarded = 1.62 cfs @ 11.89 hrs, Volume= 0.293 of Primary - 0.00 cfs @ 11.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 45.82' @ 12.50 hrs Surf.Area= 0.118 ac Storage= 0.074 of Plug -Flow detention time= 13.7 min calculated for 0.293 of (100% of inflow) Center -of -Mass det. time= 13.4 min ( 763.1 - 749.7 ) # Invert Avail.Storage Storage Description 1 44.80' 0.139 of 6.33'W x 810.00'L x 4.30'H Prismatoid 0.506 of Overall - 0.159 of Embedded = 0.347 of x 40.0% Voids 2 45.30' 0.154 of 47.8"W x 30.0"H x 6.25'L Cultec R-330x 144 Inside #1 3 45.30' 0.005 of 33.6"W x 20.0"H x 6.33'L Cultec R-180x 11 Inside #1 0.298 of Total Available Storage # Routing Invert Outlet Devices 1 Discarded 0.00' 0.019000 fpm Exfiltration over entire Horizontal area 2 Primary 48.40' 3.0' long x 3.0' high Sharp -Crested Rectangular Weir 2 End Contraction(s) Discarded OutFlow Max=1.62 cfs @ 11.89 hrs HW=44.84' (Free Discharge) t-1=Exfiltration (Exfiltration Controls 1.62 cfs) Primary OutFlow Max=0.00 cfs @ 11.00 hrs HW=44.80' (Free Discharge) t-2=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) 03020 Ogden Walgreens Type I/124-hr 10 Yr Rainfall=7.00" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 2 HydroCAD® 7.01 s/n 000479 © 1986-2004 Applied Microcomputer Systems 4/14/2004 11:58:20 AM Subcatchment S1: SITE AREA TO INFILTRATION SYSTEM Runoff = 8.56 cfs @ 12.14 hrs, Volume= 0.501 af, Depth= 3.86" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Type III 24-hr 10 Yr Rainfall=7.00" Area (sf) CN Description 11,800 39 >75% Grass cover, Good, HSG A 56,000 98 Paved parking & roofs _ 67,800 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) __(ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Pond P1: INFILTRATION BASIN Inflow Area = 1.556 ac, Inflow Depth = 3.86" for 10 Yr event Inflow = 8.56 cfs @ 12.14 hrs, Volume= 0.501 of Outflow = 1.62 cfs @ 11.73 hrs, Volume= 0.490 af, Atten= 81 %, Lag= 0.0 min Discarded = 1.62 cfs @ 11.73 hrs, Volume= 0.490 of Primary = 0.00 cfs @ 11.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 47.19' @ 12.62 hrs Surf.Area= 0.118 ac Storage= 0.198 of Plug -Flow detention time= 45.4 min calculated for 0.488 of (98% of inflow) Center -of -Mass det. time= 42.1 min ( 790.1 - 748.0 ) # Invert Avail.Stora a Storage Description 1 44.80' 0.139 of 6.33'W x 810.001 x 4.30'H Prismatoid 0.506 of Overall - 0.159 of Embedded = 0.347 of x 40.0% Voids 2 45.30' 0.154 of 47.8"W x 30.0"H x 6.25'L Cultec R-330x 144 Inside #1 3 45.30' 0.005 of 33.6"W x 20.0"H x 6.33'L Cultec R-180x 11 Inside #1 0.298 of Total Available Storage # Routing Invert Outlet Devices 1 Discarded 0.00' 0.019000 fpm Exfiltration over entire Horizontal area 2 Primary 48.40' 3.0' long x 3.0' high Sharp -Crested Rectangular Weir 2 End Contraction(s) Discarded OutFlow Max=1.62 cfs @ 11.73 hrs HW=44.84' (Free Discharge) L1=Exfiltration (Exfiltration Controls 1.62 cfs) Primary OutFlow Max=0.00 cfs @ 11.00 hrs HW=44.80' (Free Discharge) L2=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) 03020 Ogden Walgreens Type 11124-hr 25 Yr ►4ainfall=8.00" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 3 HydroCAD® 7.01 sln 000479 O 1986-2004 Applied Microcomputer Systems 4/14/2004 11:58:20 AM Subcatchment S1: SITE AREA TO INFILTRATION SYSTEM Runoff - 9.96 cfs @ 12.14 hrs, Volume= 0.583 af, Depth= 4.49" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Type III 24-hr 25 Yr Rainfall=8.00" Area (sD _C_N Description 11,800 39 >75% Grass cover, Good, HSG A 56,000 _98_ Paved_pa_r_king & roofs 67,800 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) _(feet)_ (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Pond P1: INFILTRATION BASIN Inflow Area = 1.556 ac, inflow Depth = 4.49" for 25 Yr event Inflow = 9.96 cfs @ 12.14 hrs, Volume= 0.583 of Outflow = 1.62 cfs @ 11.69 hrs, Volume= 0.499 af, Atten= 84%, Lag= 0.0 min Discarded = 1.62 cfs @ 11.69 hrs, Volume= 0.499 of Primary = 0.00 cfs @ 11.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 48.10' @ 12.67 hrs Surf.Area= 0.118 ac Storage= 0.251 of Plug -Flow detention time= 57.2 min calculated for 0.497 of (85% of inflow) Center -of -Mass det. time= 40.5 min (788.1 - 747.6) # Invert Avail.Stora a Storage Description 1 44.80' 0.139 of 6.33'W x 810.001 x 4.30'H Prismatoid 0.506 of Overall - 0.159 of Embedded = 0.347 of x 40.0% Voids 2 45.30' 0.154 of 47.8"W x 30.0"H x 6.25'L Cultec R-330x 144 Inside #1 3 45.30' 0.005 of 33.6"W x 20.0"H x 6.33'L Cultec R-180x 11 Inside #1 0.298 of Total Available Storage # Routinq Invert Outlet Devices 1 Discarded 0.00' 0.019000 fpm Exfiltration over entire Horizontal area 2 Primary 48.40' 3.0' long x 3.0' high Sharp -Crested Rectangular Weir 2 End Contraction(s) Discarded OutFlow Max=1.62 cfs @ 11.69 hrs HW=44.84' (Free Discharge) L1=Exfiltration (Exfiltration Controls 1.62 cfs) Primary OutFlow Max=0.00 cfs @ 11.00 hrs HW=44.80' (Free Discharge) L2=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) 03020 Ogden Walgreens Type 11124-hr 50 Yr Rainfall=9.00" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 4 HydroCADO 7.01 sln 000479 O 1986-2004 Applied Microcomputer Systems 4/14/2004.11:58:20 AM Subcatchment S1: SITE AREA TO INFILTRATION SYSTEM Runoff = 11.35 cfs @ 12.13 hrs, Volume= 0.665 af, Depth= 5.13" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Type III 24-hr 50 Yr Rainfall=9.00" Area (sf) CN Description 11,800 39 >75% Grass cover, Good, HSG A 56,000 98 Paved parking & roofs 67,800 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ftlft) (ftlsec) (cfs) _ 10.0 Direct Entry, Pond P1: INFILTRATION BASIN Inflow Area = 1.556 ac, Inflow Depth = 5.13" for 50 Yr event Inflow = 11.35 cfs @ 12.13 hrs, Volume= 0.665 of Outflow = 3.46 cfs @ 12.50 hrs, Volume= 0.545 af, Atten= 69%, Lag= 22.1 min Discarded = 1.62 cfs @ 11.66 hrs, Volume= 0.507 of Primary = 1.84 cfs @ 12.50 hrs, Volume= 0.038 of Routing by Stor-Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 48.73' @ 12.50 hrs Surf.Area= 0.118 ac Storage= 0.281 of Plug -Flow detention time= 56.2 min calculated for 0.543 of (82% of inflow) Center -of -Mass det. time= 36.8 min ( 784.2 - 747.3 ) # Invert Avail.Storaae Storaoe Description 1 44.80' 0.139 of 6.33'W x 810.00'L x 4.30'H Prismatoid 0.506 of Overall - 0.159 of Embedded = 0,347 of x 40.0% Voids 2 45.30' 0.154 of 47.8"W x 30.0"H x 6.25'L Cultec R-330x 144 Inside #1 3 45.30' 0.005 of 33.6"W x Z0.0"H x 6.33'L Cultec R-180x 11 Inside*1 0.298 of Total Available Storage # Routing Invert Outlet Devices 1 Discarded 0.00' 0.019000 fpm Exfiltration over entire Horizontal area 2 Primary 48.40' 3.0' long x 3.0' high Sharp -Crested Rectangular Weir 2 End Contraction(s) Discarded OutFlow Max=1.62 cfs @ 11.66 hrs HW=44.84' (Free Discharge) L1=Exfiltration (Exfiltration Controls 1.62 cfs) Primary OutFlow Max=1.83 cfs @ 12.50 hrs HW=48.73' (Free Discharge) t--2=Sharp-Crested Rectangular Weir (Weir Controls 1.83 cfs @ 1.9 fps) 03020 Ogden Walgreens Type 1/1 24-hr 100 Yr Rainfall=10.00" Prepared by Norris, Kuske, & Tunstall Consulting Engineers, Inc. Page 5 HydroCADO 7.01 s/n 000479 01986-2004 Applied Microcomputer Systems 4/14/2004 11:58*20 AM Subcatchment S1: SITE AREA TO INFILTRATION SYSTEM Runoff = 12.74 cfs @ 12.13 hrs, Volume= 0.747 af, Depth= 5.76" Runoff by SCS TR-20 method, UH=SCS, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Type III 24-hr 100 Yr Rainfall=10.00" Areas CN Description 11,800 39 >75% Grass cover, Good, HSG A 56.000 98 Paved r)arkina & roofs 67,800 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) _ 10.0 Direct Entry, Pond P1: INFILTRATION BASIN Inflow Area = 1.556 ac, Inflow Depth = 5.76" for 100 Yr event Inflow = 12.74 cfs @ 12.13 hrs, Volume= 0.747 of Outflow = 5.46 cfs @ 12.40 hrs, Volume= 0.609 af, Atten= 57%, Lag= 15.6 min Discarded = 1.62 cfs @ 11.61 hrs, Volume= 0.515 of Primary = 3.84 cfs @ 12.40 hrs, Volume= 0.095 of Routing by Stor-Ind method, Time Span= 11.00-15.00 hrs, dt= 0.01 hrs Peak Elev= 48.94' @ 12.40 hrs Surf.Area= 0.118 ac Storage= 0.291 of Plug -Flow detention time= 51.8 min calculated for 0.608 of (81 % of inflow) Center -of -Mass det. time= 32.3 min ( 779.4 - 747.1 ) _# Invert Avail.Storage Storage Description 1 44.80' 0.139 of 6.33'W x 810.00'L x 4.30'H Prismatoid 0.506 of Overall - 0.159 of Embedded = 0.347 of x 40.0% Voids 2 45.30' 0.154 of 47.8"W x 30.0"H x 6.25'L Cultec R-330x 144 Inside #1 3 45.30' 0.005 of 33.6"W x 20.0"H x 6.33'L Cultec R-180x 11 Inside #1 0.298 of Total Available Storage # Routing Invert Outlet Devices 1 Discarded 0.00' 0.019000 fpm Exfiltration over entire Horizontal area 2 Primary 48.40' 3.0' long x 3.0' high Sharp -Crested Rectangular Weir 2 End Contraction(s) Discarded OutFlow Max=1.62 cfs @ 11.61 hrs HW=44.84' (Free Discharge) L1=Exfiltration (Exfiltration Controls 1.62 cfs) Primary OutFlow Max=3.83 cfs @ 12.40 hrs HW=48.94' (Free Discharge) L2=Sharp-Crested Rectangular Weir (Weir Controls 3.83 cfs @ 2.5 fps) CULTEC, Inc. 878 Federal Road P.O. Box 280 Brookfield, CT 06804 PREPARED FOR: (COMPANY NAME) (ADDRESS) (CITY, STATE ZIP) (PHONE) (FAX) (800) 4-CULTEC (203) 775-4416 Fax (203) 775-5887 www.cultec.com custservice@cultec.com CULTEC SYSTEM CALCULATIONS G -R O \., .3E.0 PROJECT INFORMATION: Ogden Walgreens Gordon Rd. @ Market St. Wilmington, NC INPUT Please fill in your parameters Restrictive Horizon (ft): 6 Paved? (t=no, 07res) 0 Wheel Load'. (1=H2O, 0=H10) 1 Storage Required (ft3) 7800 Limiting Dimension (ft) 32 ENGINEER: Larry Sneeden Andrew & Kuske 902 Market Street Wilmington, NC 28401 910-343-9653 910-343-9604 a hie- he Insraend "ndar thw¢n naramerers9 40OHD 400 EZ 24HD EZ 24 28QHD YES NO YES NO YES 330HD 330 10OHD 100 280 YES NO YES NO NO 180HD 180 75HD 75 YES NO YES NO 125H0 125 FDC-4HD FDC-4 YES NO YES NO Model name Approx. Unit Count # of Rows wide # of Units Long Total #of I Chambers Needed Storage Provided (ft3 Bed Area Needed (fl2j Bed Width (ft) Bed Length (ftt Min mum Bed Depth (ft), Volume of Stone Needed (ft3) Rechar erT" 40OHD Heavy Duty H2O 115 6 19 114 8115.32 3673.75 30.48 120.53 4.46 6131.76 Rechar erT" 400 Standard Duty K10 - - - - - - - Rechar erT" 330HD Heavy Duty H2O 120 6 20 120 8140.42 3906.62 30.48 128.17 4.38 6282.97 Rechar er'" 330 Standard Duty H10 -- -- - - -- -- Recharge T" 28OHD Heavy Duty H2O 137 7 19 133 7958.03 4056,88 29,83 136.00 4,30 5656.22 Rechar erT" 280 Standard Duty H10 -- - - - -- -- -- - - -- Rechar erT" 18OHD Heavy Duty H2O 261 10 25 250 7854.73 5160.00 32.00 161.25 3.38 5909.48 Rechar erT" 180 Standard Du H10 -- - - -- -- - - -- -- Contactor® 125HD Heavy Duty H2O 373 12 30 360 7907.88 6096.00 32,00 190,50 3.00 7170.36 Contactor® 125 Standard Du H10 -- -- - -- -- -- -- -- -- COntactorO 1DOHD Heavy Du H2O 350 10 34 340 7975.79 8272,00 32.00 258.50 2.72 8050.70 Contactor@ 100 Standard Duty H10 -- -- -- - -- -- Contactor®75HDHeavy Duty H2O 499 12 40 480 7870.85 8088.00 32.00 252.75 2,54 7641.12 ContactorO75 Standard D H10 -- -- - -- -- - -- -- COntaclorqDEZ-24HD Heavy Du H2O 658 19 34 646 7950.80 8699.32 131,71 274.34 2,72 9240.89 Contactor® EZ-24 Standard Duty H10 - - -- -- -- i -- -- - ContactorQD Field Drain C-41-ID Heavy Du H2O 33D 7 45 315 7818.87 10870.20 30.00 362.34 2.38 8915,34 ContactorO Field Drain C-4 Standard Du H10 - __ - -- -- This calculator program is for estimation purposes only and should not take the place of a comprehensive engineering design. Ali calculations take into consideration a r'stone border at 40% volume capacity surrounding bed. Reconfiguring the bed layout may effect actuel storage provided. Contact Cuitec Technical Assistance at 800-428-5832 or 203-775-4416 for further assistance. Copyright (C) 2002 CULTEC, Inc. All rights reserved, CULTEC, Inc. (800) 4-CULTEC 873 Federal Road (203) 775-4416 P.O. Box 280 Fax (203) 775-5887 Brookfield, CT 06804 www.cultec.com custservice@cu Itec.com CULTEC SYSTEM CALCULATIONS the toilowing table contains Cultec specifications used in all calculations Model name Design Unit Height (ft) Design Unit Volume (tt3) Chamber Length Adjustment (ft) Chamber Lay-up Length (ft) Design Unit Width (ft) Stone Border Excess jft) H10 Min. Cover (ft) Paved H2O Min. Cover (ft) Unpaved H2O Min. Cover (ft) Unamber Volume per Linear Foot (ft311t) Rechar erTM 40OHD Heavy Duty H2O 3.21 m9al 1.3 6.17 4.83 1.61 0.75 1.25 1.4161 7,96 Rechar erTM 400 Standard Duty H10 3.21 10.981 1.3 6.17 4,83 14 0.75 10000 100001 7.96 Recha 330HD Heavy Duty H2O 3,051 10.35 1.17 6.25 4.83 1,5 0.75 1.333 1.5 7.44 _qerTM Rechar erTM 330 Standard Duty H10 3D5 10.35 1.17 6.25 4,83 1.5 0.75 10000 10000 7A4 Rechar erTM 28OHD Heavy Duty H2O 2.8 8.12 1 7 4 1.83 0.75 1.5 1.166 6.08 Rechar erTM 280 Standard Duty H10 2.6 8A2 1 7 4 1.83 0.75 10000 10000 6.06 Rechar erTM 18OHD Heavy Duty H2O 2.21 4.72 1 6,33 3 2 075 1,1666 1.333 3.45 Rechar erTM 180 Standard Duty H10 2.21 4.72 1 6.33 3 2 0.75 10000 10000 3.45 ContactorV 125HD Heavy Duty H2O 2 3.34 1 6.25 2.5 21 0.75 t 1A666 2.22 CDntactorO 125 Standard Du H10 21 3.34 1 6.251 2.5 21 0.75 100001 10000 2.22 Contactor® 10OHD Heavy Duty H2O 1 1.55 2.97 1.5 7.5 3 21 0.75 1.16661 1.333 1.86 Conlactor(D 100 Standard Duty H10 1.55 2.97 1.5 7.5 3 2 0.75 100001 10000 1.86 C ontactorO 75HD Heavy D uV H2O 1.54 2.5 0.75 6,25 2.5 2 o.75 1 1.1666 1.6 CDntactortrU75 Standard Duty Hi 1.54 2.5 0.75 6.25 2.5 2 0.75 10000 10000 1.6 Contactoro EZ-24HD Heavy Duty H2O 1.55 1.48 0.34 8 1.59 1.5 0,75 1.166 1.5 0.82 Contactor@) EZ-24 Standard Duty H10 1.55 1.48 0,34 a 1.59 1.5 0.751 10000 10000 0,82 ContactorO Field Drain C-4HD HeavyDu H2O 1.21 2.95 0.34 B a z o.75 L1666 1.5 tss Conlactor,$t Field Drain C 4 Standard Out H10 1.21 2.95 0.34 8 4 2 0.75 10000 t4000 1.68 This calculator program is forestimation purposes only and should not take the place of a comprehensive engineering design. All calculations take into consideradon a 1'stone border at 40% volume capacity surrounding bed. Reconfiguring the bed layout may effect actual storage provided. Contact Cultec Technical Assistance of 800-428-5832 or 203-775-4416 for further assistance. Copyright (C) 2002 CULTEC, Inc. All rights reserved. CULTEC, Inc. 878 Federal Road P.O. Box 280 Brookfield, CT 06804 PREPARED FOR: (COMPANY NAME) (ADDRESS) (CITY, STATE ZIP) (PHONE) (FAX) (800) 4-CULTEC (203) 775-4416 Fax (203) 775-5887 www.cultec.com custservice@cultec.com CULTEC SYSTEM CALCULATIONS S 1 s 1�. f � PROJECT INFORMATION: Ogden Walgreens Gordon Rd. @ Market St. Wilmington, NC INPUT Please Till in your parameters O Restrictive Horizon ow 6 Paved? (1=no, 0-yes) 0 Wheel Load: (1=1-112O, 0=1,110) 1 Storage Required (ft3) 900 Limiting Dimension (ft) 8 ENGINEER: Larry Sneeden Andrew & Kuske 902 Market Street Wilmington, NC 28401 910-343-9653 910-343-9604 a hie 1n hn InctallnA ,roll., ffinnnram f-7 40OHD 400 EZ 24HD EZ 24 28OHD YES NO YES NO YES 330HD 330 100HD 100 280 YES NO YES NO NQ 18OHD 180 75HD 75 YES NO YES NO 125HD 125 FDC-4HD FDC4 YES NO YES NO Model name Approx. Unit Count r1 of Rows wide 0 of Units Long I otal 0 of Chambers Needed storage Provided M3 Bed Area Needed (ft2) Bed Width (rt) Bed Length (tt) Minimum Bed Depth (ft), Volume or Stone Needed (n3) Rechar erT" 40OHD Heavy Outy H2O 13 1 11 11 908,96 450.51 6.33 71,17 4.46 895.53 Rechar erT" 400 Standard Dyy H10 -- - -- - -- Rechar erT" 330HO Heavy Duty H2O 13 1 12 12 943.20 494.82 6.33 78A 7 4.38 942.48 Rechar erT" 330 Standard Duty H10 -- I -- -- Rechar erT" 280HD Heavy Du H2O 15 1 13 13 948.66 548.02 5.83 94,00 4.30 975.10 Rechar er' 280 Standard Duty H10 -- -- -- -- -- -- Rechar erT" 18OHD Heavy Duty H2O 30 2 13 26 947.66 682.32 800 85.29 3.38 933.23 Rechar erT" 180 Standard Duty H10 -- -- -- -- -- -- -- - - -- ContactorO 125HD Heavy Duty H2O 43 2 18 36 950.98 808.50 7.00 115.50 3.00 1113.06 Contactor(D126 Standard Du H10 -- -- -- -- -- -- - - -- -- ContactorO 104HD Heayy Duty H2O 40 2 17 34 936.14 1048,00 8.00 131.00 2.72 1144.52 ContactorO 100 Standard Duy H10 -- -- - - - -- - - -- -- ContactorO 75HD Heavy Du H2O 57 2 23 46 909.15 1025.50 7,00 146.50 2.54 1116.87 Contactoa 75 Standard Duty H10 -- - - - -- -- -- -- - -- ContaclorQD EZ-24HD Heavy Du H2O 76 4 17 68 943.68 1087.35 7,86 138.34 2.72 1238.20 ContaclorV £Z-24 Standard Duty H10 -- - I -- -- -- -- -- -- -- -- ContactorO Field Drain C-4HD Heavy Duty H2O 38 1 29 29 916.12 1406.04 6.00 234.34 2.38 1310.98 Contactorb Field Drain C-4 Standard Duty H10 - - - -- I - -- -- -- -- -- This calculator program is for estimation purposes only and should not take the place of a comprehensive engineering design. All calculations take into consideration a 1'stone bonier at 40% volume capacity surmunding bed. Reconfiguring the bed layout may effect actual storage provided. Contact Cultec Technical Assistance at 800-428-5832 or 203-775-44 15 for further assistance. Copyright (C) 2002 CULTEC, Inc. All rights reserved. CULTEC, Inc. (800) 4-CULTEC 878 Federal Road (203) 775-44% P.Q. Box 280 Fax (203) 775-5887 Brookfield, CT 06804 www.cultec.com custservice@cultec.com CULTEC SYSTEM CALCULATIONS the follovrin tahle contains Cu11ec specifications used in all calculations Model name es gn Unit Height (ft) Design Unit Volume (ft3) Chamber Length Adjustment (ft) Chamber Lay-up Length (ft) Design Unit Width (ft) Stone Border Excess (ft) H10 Min. Cover (ft) Paved H2O Min, Cover (ft) Unpaved H2O Min. Cover (ft) Chamber Volume per Linear Foot (ft31ft) Rechar erT" 40OHD Heavy Duty H2O 3.21 10.98 1,3 6.17 4.83 1.5 0.75 1.25 1.416 7,96 Rechar erT" 400 Standard Duty H10 3.21 10.98 1.3 6.17 4.83 1.5 0.75 10000 10000 7,96 Rechar erT" 330HD Heavy Duty H2O 3.05 10.35 1.17 6.25 4.83 1.5 0.75 1.333 15 7.44 Rechar erT'" 330 Standard Duty H10 3.05 10.35 1.17 6251 4.83 1.5 0.75 10000 to000 7.44 Rechar erT" 28DHD Heavy Du H2O 2.B 8.12 1 7 4 1.83 0.75 1.5 1.166 608 Rechar erT" 280 Standard Du H10 2,8 8.12 1 7 4 1.83 0.75 10000 10000 6.08 Rechar erT" 18OHD HeavyDU H2O 2.21 4.72 1 6.33 3 2 0.75 1.1666 1.333 3.45 Rechar erT" 180 Standard Du H10 2.21 4.72 1 6.33 3 2 0.75 10000 10000 3.45 Contactor(D125HD HeavyDu H2O 2 3.34 1 6.25 2.5 2 0.75 1 1.1666 2.22 ContactorO 125 Standard Du H10 2 3,34 1 6.25 2.51 21 0.751 100001 100001 2.22 COntaClorlD 100HD KeaDuty H2O 1.55 2.97 1.5 7.5 31 2 0.75 1AG661 1.3331 1 Ze Contactors 100 Standard Duty H10 1.55 2.97 1.5 7.5 3 2 0.75 100001 10000 1.85 ContactoKID 75HD Heavy Duty H2O 1.54 2.5 0.75 6.25 2.5 2 0.75 1 1.1666 1.6 COntactorlD 75 Standard Duty H10 1.54 2.5 0.75 6.25 2.5 2 0.75 10000 10000 1.6 ContactorlD EZ-24HD Hea Du H2O 1.55 1.48 0.34 8 1.59 1.5 0.75 1,166 1.5 0.82 Contactor® EZ-24 Standard Duty H10 1.55 1.48 0.34 8 1.59 1.5 0.75 10000 10000 0.82 Contactor(!) Field Drain Ci-4HD Heavy Duty H2O 1.21 2.95 0.34 6 4 2 0.75 1.1666 1.5 1.68 Contactors Field Drain C-4 Standard Du H10 1,21 2.95 0.34 a ��41 21 0.751 10000 IG0001 1.68 This calculator program is for estimation purposes only and should not take the place of a comprehensive engineering design. All calculations take into consideration a 1' stone border at 40% volume capacity surrounding bed. Reconfiguring the bed layout may effect actual storage provided. Contact Cultec Technical Assistance at 8D0-42B-5832 or 203-775-4416 for further assistance. Copyright (C) 2002 CULTFC, Inc. All rights reserved. CULTEC, Inc. i 878 Federal Road P.O. Box 280 Brookfield, CT 06804 PREPARED FOR: (COMPANY NAME) (ADDRESS) (CITY, STATE ZIP) (PHONE) (FAX) (800) 4-CULTEC (203) 775-4416 Fax (203) 775-5887 www.cultec.com custservice@cultec.com CULTEC SYSTEM CALCULATIONS SrN+; utS r-6\-y 1 a .40 INPUT Please fill in your parameters Restrictive Horizon (ft): Payed? (1=no,0=yes) Wheel Load: (1=H20,0=H10) Storage Required (ft3) Limiting Dimension (ft) 6 0 1 450 7 PROJECT INFORMATION: Ogden Walgreens Gordon Rd. @ Market St. Wilmington, NC ENGINEER: Larry Sneeden Andrew & Kuske 902 Market Street Wilmington, NC 28401 910-343-9653 910-343-9604 ahlo kn he Inele IIs.1 iiniln• H�ees narn.nels.a] 40OHD 400 EZ 24HD EZ 24 28OHD YES NO YES NO YES 33OHD 330 100HD 100 280 YES NO YES NO NO 18OHD 180 75HD 75 YES NO YES NO 125HD 125 FDC-4HD FDC•4 YES NO YES NO Model name Approx. Unit Count # of Rows Wide #or Units Long Total N o Chambers Needed Storage Provideditt3 Bed Area Nceded (92) Bed Width V0 Bed Length (11) mum Bed Depth iflp alume of Stone Needed (M) Rechar erTM 40OHD Heavy Duty H2O 6 1 6 6 510.81 255,23 6.33 40.32 4.46 514.25 Rechar erTM 400 Standard Duty H10 - -- -- -- -- -- -- - Rechar erTM 330HD Heavy Duty H2O 6 1 6 6 486.45 257.44 6.33 40.67 4.38 497.49 Rechar erTM 330 Standard Du H10 RechargerTM 28OHD Heavy Duty H2O 7 1 6 6 450,35 262.35 5.83 45,00 4.30 473.14 Rechar erTM 280 Standard Duy H10 -- -- -- -- -- -- - Rechar erTM 18OHD Heavy Duty H2O 15 1 11 11 467.09 363.15 5.00 72.63 3.38 558.89 Rechar erTM 180 Standard Duty H10 -- - -- - - - -- - -- - ContactorO 125HD Heavy Duty H2O 21 2 9 18 485.23 414.75 7.00 59.25 3.00 575,31 ContactorlD 125 Standard Duty H10 -- -- -- -- -- -- -- -- -- Contactor@ 1 OOHItLan Duty H2O 20 1 14 14 454.57 542.50 5.00 108.50 2,72 642.79 Contactor® 100 Standard Duty H10 - -- -- -- -- -- - -- - -- ContactorD 75HD Heavy Duty H2O 28 2 12 24 480.70 544.25 7.00 77.75 2.54 595.75 Contactor® 75 Standard Duty HID -- -- -- -- -- -- -- -- -- -- Contactor® EZ-24HD Heavy Duty H2O 38 3 11 33 482.16 566.43 6.27 90.34 2,72 660.65 Contactor® EZ-24 Standard Duty H10 -- -- -- -- -- -- -- -- -- - ContactorO Field Drain C-411D Heavy Duty H2O 19 1 15 15 477.30 734.04 6.00 122.34 2.38 686.02 ContactorV Field Drain C-4 Standard Duty H10 - -- - I -- I -- -- - - -- -- This cafculatorprogram is forestimadon purposes only and should not take the place of a comprehensive engineering design. All calculations take into consideration a 1' stone border at 40% volume capacity surrounding bed. Reconfiguring the bed layout may effect actual storage provided. Conlact Cultec Technical Assistance at 800-428-5832 or 203-775-4416 forfurther assistance. Copyright (C) 2002 CULTEC, tnc. All rights reserved. OULTEC, Inc. 878 Federal Road P.O. Box 280 r Brookfield, CT 06804 (800) 4-CULTE=C (203) 775-4416 Fax (203) 775-5887 www.cultec.com custservice@cultec.com CULTEC SYSTEM CALCULATIONS the following table contains Cultec specifications used in all calculations Model name esrgn Unit Height (ft) ❑esign Unit Volume (ft3) Chamber Length Adjustment (ft) Chamber Lay-up Length (ft) Design Unit Width (ft) Stone Border Excess (ft) H10 Min. Cover (ft) Paved H2O Min. Cover (ft) Unpaved H2O Min. Cover (ft) am er Volume per Linear Foot (ft31ft) Rechar erT" 400HO Heavy Duty H2O 3,21 10.98 1.3 6,17 4.83 1.5 0.75 1.25 1.416 7.96 Rechar erT° 400 Standard Dtity H10 3.21 10,98 11 6.17 4.83 1.5 0.75 10000 10000 7.96 Rechar erT" 330HD Heavy Duty H2O 3.05 10.35 1.17 6.25 4.83 1.5 0.75 11333 1.5 7.44 Rechar erTM' 330 Standard DU H10 3.05 10.35 1.17 6.25 4.83 1.5 0.75 10000 10000 7.44 Rechar erTM' 28OHD Heavy Duty H2O 2.8 8.12 1 7 4 1.83 0.75 15 1 A66 6,08 Rechar erT" 280 Standard Duty H10 2.81 8.12 1 7 4 1.83 0.75 10000 10000 6.08 Rechar erT" 180HD Heavy Duty H2O 2.21 1 4.72 1 6.33 3 2 0.75 1.1666 1.333 3.45 Rechar erT" 180 Standard Duty H10 2.21 4.721 1 6.33 3 2 0.75 10000 10000 3.45 Contactor¢? 125HD Heav Du H2O 2 3.34 1 6.251 2.5 2 0.75 1 1.1666 Z22 ConlactorlD 125 Standard Du H10 2 3.34 1 6.25 2.5 2 0.75 10000 l0000l 2.22 ContactorV 100HD Heavy Duty H2O 1.55 2.97 1.5 7.5 3 2 0.75 1.1666 1.333 1.86 Contactor$ 100 Standard Duty H10 1.55 2.97 1.5 7.5 3 2 0.75 10000 100001 1.86 ContactorlD 75HD Heavy Duty H2O 1.541 2.5 0.75 6.25 2.5 2 0,75 1 1,1666 1.6 Contactor® 75 Standard Duty H10 1.54 2 51 0.75 6,25 2.5 2 0.75 10000 10000 1.6 Contactor® EZ-24HD Heavy Duty H2O 1.55 1,48 0.34 B 1.59 1.-51 0.75 1.166 1.5 0.82 ContactorD EZ-24 Standard Duty H10 1.55 1.48 0.34 8 1.591 1.5 0.751 10000 10000 0.82 ContactorO Field Drain C-4HD Heavy Duty H2O 1.21 2.95 0.34 8 4 21 0,75 1A666 1.5 1.68 Contactor® Field Drain C-4 Standard Duty H10 1,21 i 2.95 0.34 8 41 21 0.751 10000 10000 1.68 This calculator program is for esdmaiion purposes only and should not take the place of a comprehensive engineering design. All calculations take into consideration a ]'stone border at 40% volume capacity surrounding bed. Reconfiguring the bed layout may effect actual storage provided. Contact Cultec Technical Assistance at 800-428.5832 or 203.775.4416 for further assistance. Copyright (C) 2002 CULTEC, Inc. All rights reserved. j2.PAAe,vJ q /Z,3 / o q NORRIS, KUSKE & TUNSTALL CONSULTING ENGINEERS, INC. 902 MARKET STREET • WILMINGTON, NC 28401 PHONE (910) 343-9653 + FAX (910) 343-9604 April 14, 2004 Ms. Laurie Munn, Environmental Engineer NC DENR Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: State Stormwater Express Permit Submittal Ogden Walgreens #7919 Wilmington, NC NKT Project No. 03020 Dear Ms. Munn: J. PHILLIP NORRIS, P.E. JOHN A. KUSKE, 111, RE. JOHN S. TUNSTALL, P.E. J.A. KUSKE, P.E. OF COUNSEL Enclosed are two (2) sets of plans for the subject project, one (1) set of calculations, one (1) copy of the Double Ring Infiltrometer Testing report by S&ME, Inc., one (1) copy of the Subsurface Soils report by S&ME, Inc., one (1) copy of a memo from Larry Sneeden, Jr., P.E. referencing a soils infiltration investigation meeting he had at the subject site, one (1) copy of the USGS map of the site (8 '/2 x 11), the original Division of Water Quality Stormwater Management Permit application, the original SWU-103 supplement form, one (1) copy of the stormwater narrative and a $4,000.00 check for the express permit review fee. Please review this information for approval and contact us with any questions or comments you may have. Thank you for your assistance on this project. Sincerely,_ NORRIS, KUSKE, & TUNSTALL CONSULTING ENGIN ERS, INC. C. Lawrence Sneeden, Jr., P.E. CLSlasn RECEIVJ.:J1J APR -16 2'J' 4 pear# DWe0404L 03020 04-14-04-s-sw-Itr Enclosures CC' Cameron Weaver 1 NC DENR Express Division Blanton Hamilton, Jr. 1 Southstar Holdings, LLC STORMWATER SYSTEM NARRATIVE WALGREENS #7919 6861 MARKET STREET WILMINGTON, NORTH CAROLINA For Southstar Holdings, LLC 200 Providence Road, Suite 106 Charlotte, NC 28207 (704) 333-8484 V%Wh ,rs_+,, . T'1 �JPn. a� ` '.AL • a • • �0972 r iI/ •r• �! f9�� c•y !!!\ � � %P� �`�ustiNlli` April 2004 Prepared by: RECEIVED APR 16 2004 DWQ PROJ # NORRIS, KUSKE, & TUNSTALL CONSULTING ENGINEERS, INC. 902 Market Street Wilmington, North Carolina 28401 (910) 343-9653 (910) 343-9604 — (Fax) NKT Project No. 03141 M NARRATIVE DESCRIPTION: The site is a 1.41-acre tract located in the southwest quadrant of the intersection of Market Street (US Hwy 17) and Gordon Road (SR 2048). The tract is bounded by residential and commercial uses to the west, commercial uses to the south, and right-of- way to the north and east. The site vegetation ranges from bare earth to dense undergrowth to large hardwoods. A portion of the site was a convenience store that will be demolished. There are no regulated wetlands on this site. The site is on a ridge that drains to Smith Creek (C-Sw). The project is new development consisting of clearing, grading, and construction of a 14,490 sf drug store, parking areas, stormwater management system and utilities. Design impervious for the site is computed at 81 %. Approximately 0.42 acres adjacent to the site will be disturbed to provide for a shared driveway and turning lanes and drives within the right-of-way. An erosion control permit will be required from New Hanover County. STORMWATER MANAGEMENT MEASURES: The site is proposed as high density with infiltration for the treatment system. The infiltration system is sized to store a 2-inch storm and will have no discharge off -site in a 25-year storm. There is no direct discharge from impervious surfaces to a watercourse, except for pavement within the right-of-way draining to a piped system. The grading contractor and developer will provide maintenance during construction. The property owners association will provide maintenance after completion. ANDREW & KUSKE CONSULTING ENGINEERS, INC. Memorandum To: Blanton Hamilton, Tribeck Properties From: Larry Sneeden Date: April 8, 2003 Re: Soil Infiltration Investigation Project: Market & Gordon A&K # 03020 I visited the Market & Gordon site last Friday with representatives of DENR to look at the suitability of site soils for an infiltration system. We found soils to have a depth to seasonal high water table of 40 inches in the depression. The ground elevation at that point was 46 MSL, giving you an SHWT elevation of 42.7 +/-. This finding will allow open infiltration basins or below grade trenches to be used on your site. By copy of this memo, we are requesting S&ME to proceed with infiltration rate testing at boring locations 1 & 4 as shown in their 3/25/03 report. Cc: Linda Lewis, DENR Mike Behen, S&ME Jack Kilbourne, MWM 902 MARKET STREET WILMINGTON, NORTH CAROLINA 28401-4733 9101343-9653 FAX 910/343-9604 APR- 16-03 1 3 :'S1 FROM = S&ME W I LMI NIGTONI ID=910793995FI PAGE 1/5 n rj � k 3 Tribek Properties 200 Providence Road, Suite 106 Charlotte, North Carolina 28207 Attention: Mr- Blanton fi=ilton April 16, 2003 Since 197 3 p Three Decades ... Three Reasons We listen. We respond. We solve. Reference: Double Ring Iafiltrometer Testing Proposed Walgreen's Site Market Street @ Gordon Road Wilmington, North Carolina S&ME Job Number 1063-03-608 Dear Mr. Hamilton: As requested, S&ME personnel have recently conducted two double -ring infiltrometer tests of the suriicial soils at the subject site at the approximate locations shown in Figure 1. Specifically, our representatives performed the following work items on April 12, 2003: 1. Advanced one hand -angered boring near each inf0trometer test location in order to visually classify the in -place soils. A Munsell Soil Color Chart as used to define the hue and chroma of the recovered soil samples. 2. Conducted two double -zing infiltrormieter tests at a depth of 12 inches below the existing ground surface. This testing was conducted m general accordance with American Society for Testing and Materials (ASTM) procedure -D-3385 entitled, "Infiltration Rate of Soils in Field Using Double -Ring Infiltrometer". Based on our deld classifications of the excavated soils at the hand -angered boring locations, the in -place soils at. Location 1 generally consist of silty fine sands which extended to a depth of about 7 feet. Slightly silty fine to medium sands were then sampled from a depth of 7 feet to the completed boring depth of 7-3 feet below the existing ground surface. At Location 4, the 10- inch thick surficial layer of silty fine sand was underlain by slightly silty fine sands that extended to a depth of about 9 feet. Silty fine sands were there noted from a depth of 9 feet to the completed Ming depth of 10 feet. S&ME, Inc. I (9101 7w99945 6409 Amsterdcm Way, Building B-3 (910) 799-9958 fox Wilmington, North Carolina 28405 APR-16-03 13:SI FROM:S&ME WILMINGTON ID=91079999se PAGE 2/5 Tribek Properties April 16, 2003 S&ME Job Number 1063-03-608 Page Two Water was encountered at a depth of approximately 7 feet below the existing ground surface at location 1, whereas no water was encountered in the borehole at location 4. The site water level will fluctuate with climatic and seasonal conditions, however, and may be higher or lower at other times of the year. The rneas ed infiltration rates at location 1 ranged from about 7.5 to 11.5 inches per hour with an average infiltration rate of approximately 9 inches per hour. At location 4, the measured infiltration rates ranged from about 15 to 22 inches per hour with an average infiltration rate of approximately 18 inches per hour. A summary of the field test results is presorted in Tables 1 and 2. S&ME appreciates the opportunity to provide our services during this phase of the project. Should you have any questions after reviewing this letter, or if we can be of additional assistance, please do not hesitate to contact us at your convenience. Very truly yours, S&ME, INC. C. Richard Conncl.L II Senior Engineering Technician Michael W. Behen, P.E. Senior Geotechnical Engineer CRC:MWBIjns Attachments Fax: Andrew & Kuske Consulting Engineers, Mr. Lary Sneeden APR- 16-03 1 3 : 51 FROM : 5&ME W I LM I NGTON I D : 91 07999556 0 PAGE 3/5 00 Double Ring Infiltrometer Testing Proposed Walgreen's Site Market Street @ Gordon Road Wilmington, North Carolina S&ME Job Number 1063-03-608 Vocation: 1 Date of Test: April 12, 2003 Depth of Test Below Site Grade: 12 inches Depth of Water in Rings: 61/4 inches Inner Diameter of Twer Ring: i 13/4 inches inner Diameter of Outer Ring: 221/z inches Depth to Groundwater: 7 feet Average Infiltration Rate: 9 inches per hour SOIL PROFILE Depth Value/ Location Inches Hue Chroma Soil Description 1 0-72 2.5 Y 3/1 Very Dark Gray Fine SAND - Some Silt (Some Cemented) 72-84 2.5 Y 2.5/1 Black Fine SAND - Some Silt (Heavily Cemerted) 84-88 2.5 Y 6/1 Gray Fine to Medium SAND - Trace of Silt Water was encountered at a depth of approximately 7 feet below the existing ground surface_ APR-1G-03 13:51 FROM:S&ME WILMINGTON ID:9107999958 PAGE 4/5 TABLE 2 Double Ring Infiltrometer Testing Proposed Walgreen's Site Market Street @ Gordon Road Wilmington, North Carolina S&ME Job Number 1063-03-608 Location: 4 Date of Test: April 12, 2003 Depth of Test Below Site Grade: 12 inches Depth of Water in Rings: 6'/2 inches inner Diameter of Inner Ring: 11 Y4 inches Inner Diameter of Outer Ring: 22'/z inches Depth to Groundwater: No water was encountered to depth investigated. Average Infiltration Rate: 18 inches per hour . SOIL PROFILE Depth Value/ Location Inches Hue Chroma Soil Description 4 0-10 2.5 Y 3/1 Very Dark Gray Fine SAND - Some Silt 10-72 2.5 Y 4/4 Olive Brown Fine SAND - Trace of Silt 72-82 2.5 Y 6/4 Light Yellowish Brown Fine SAND - Trace of Silt 82-91 10 YR 4/2 Dark Grayish Brown Fine SAND - Trace of Silt 91-108 10 YR 5/1 Grayish Brown Fine SAND - Trace of Silt 108-120 10 YR 2/1 Black Fine SAND - Some Silt No water was encountered to depth investigated. n 1 1 a K1W b"I IIN. 45.55 • V i Note: Site plan drawing provided to SWE by Andrew & Kuske Consulting Engineers. LEGEND A Approximate Location. of Infiltration Test E rr 3 z c� 0 z PROJECT SCALE: Not to Scale & I &M PROPOSED WALGREEN'S SITE m J 0 B NO.: 1063-03-608 WILKIWTON, NORTH CAROLINA S E F 1G NO'. X In cn MAR-25-03 09:58 FROM:S&ME WILMINGTON ID:9107999958 PAGE 1/5 03()� () z_ ., !PAP,, Tribek Properties 200 Providence Road, Suite 106 Charlotte, North Carolina 28207 Attention, Mr. Blanton Hamilton March 25, 2003 Reference_ Subsurface Soils Proposed Walgreeds Site Market -Street @ Gordon Road Wilmington, North Carolina S&ME Job Number 1063-03-608 Dear Mr. Hamilton.: Since 1973 Three Decades ... Three Reasons We listen. tfre respond. K sore. As requested, S&ME personnel have advanced four hand-augered borings at the subject site at the approximate locations shown in Figure 1. The borings were advanced to depths ranging from about 7.3 to 9 feet below the existing ground surface. Our representative visually classed the recovered soil samples using a MunselI Soil Color Chart, and measuired the depth to water, if any, in each borehole upon completion of the field work. The subsurface soils encountered at the boring locations generally consisted of silty sands, slightly silty sands, or clayey sands that extended to the maximum completed boring depth of 9 feet. At Location 1, however, some lenses of cemented sands (known locally as "hardpan") wcrc encountered within the upper 7 feet of the in -place soils. "Hardpan" soils are relatively impermeable and restrict the gravity flow of surface waters through the subsurface soils. No "hardpan" was noted at Locations 2, 3, or 4. Water was measured upon completion of the field work at Location 1 at a depth of approximately 7 feet. No water was observed in the boreholes at Locations 2, 3, and 4. The depth to water will fluctuate with climatic and seasonal changes, however, -and might be higher at other times of the y=. In addition, the presence of cemented sands at Location 1 suggests that a perched water condition would develop in that area after periods of heavy or extended rainfall - Based on the information provided in the U.S. Department of Agriculture's publication entitled, "Soil Survey of New Hanover Co=y, North Carolina", the depth to the seasonal high water table exceeds six feet. It is our opinion that the seasonal high water table at Location 1 could occur at a depth less than sic feet due to the presence of "hardpan"_ We recommend that a preliminary assessment of the seasonal high water table be obtained from the appropriate regulatory personnel before an infiltration system is designed. 5&ME, Inc. i (910) 799-9945 1 6409 Amsterdam Way, Building M i (910) 799-9955 fax Wilmington, North Carolina 28405 ww xs r;n�,�om MAR-25-03 09:59 FROM:9&ME WILMINGTON ID-9107993956 PAGE 2/5 I Tribek Properties March 25, 2003 Page Two We appreciate having the opportunity to provide our services during this phase of the project. If you have any questions after reviewing this letter, please do not hesitate to contact us at your convenience. Very truly yours, S&ME, INC. C. Richard Connell, Il Senior Engineering Technician Michael W. Behen, P.E. Senior Geotechnical Engineer CRC:MWB/jn,s Attachments Fax: Andrew & Kuske Consulting Engineers, Mr. L=y Sneeden MAR-25-e3 09:59 FROM:S&ME WILMINGTON ID-9107999950 IMAGE 3/5 TABLE I Subsurface Conditions Proposed Walgreen's Site Market Street @ Gordon Road Wilmington, North Carolina Job Number 1063-03-608 Depth Value/ Location (Inchesl Hue Chroma Soil Description 1 0-72 2.5 Y 3/1 Very Dark Gray Fine SAND - Sorne Silt (Some Cemented) 72-84 2.5 Y 2.5/1 Black Fine SAND - Some Silt (Heavily Cemented) 84-98 2.5 Y 6/1 Gray Fife to Medium, SAND - Trace of Silt Water was encountered at a depth of approximately 7 feet below the existing ground surface. Depth Value/ Location(Inches) Hue Chroma Soil Description 2 0-24 2.5 Y 3/1 Very Dark Gray Fine SAND - Some Silt with Rock 24-36 2.5 Y 3/2 Very Dark Grayish Brown Fine SAND - Some Silt 36-48 2.5 Y 4/1 Dark Gray Fine SAND - Trace of Silt 48-53 2.5 Y 511 Gray Fine SAND - Trace of Silt 53-78 2.5 Y 2.5/1 Black Fine SAND - Some Silt 78-84 10 YR 2/2 Very Dark Brown Fine SAND - Some Silt and Clay 84-96 10 YR 4/2 Dark Grayish Brown Fine SAND - Some CIay 96-108 2.5 Y 3/1 Very Dark Gray Fitre SAND - Some Silt No water was encountered to depth investigated. MAR-25-03 09:S9 FROM:S&ME WILMINGTON ID:9107999950 r TABLE 1 (Continued) Subsurface Conditions Proposed Walgreen's Site Market Street @ Gordon Road Wilmington, North Carolina Job Number 1063-03-608 PAGE 4/5 Depth Value) Location Inches Hue Chroana Soil_ Description 3 0-10 2-5 Y 311 Very Dark Gray Fine SAND - Some Silt 10-14 2.5 Y 4/2 Dark Grayish Brown Fine SAND - Some Silt with Clay Lumps 14-20 2.5 Y 4/1 'Dark Gray Fine SAND - Trace of Silt 20-24 10 YR 4/3 Brown Fine SAND - Trace of Silt 24-84 10 YR 4/4 Dank Yellowish Brown Fine SAND - Trace of Silt 84-120 2.5 Y 3/1 Very Dark Gray Fine SAND - Some Silt No grater was encountered to depth investigated. Depth Value/ Location Inches Hue Chroma Soil Description 4 0-10 2.5 Y 3/1 Very Dark Gray Fine SAND - Some Silt 10-72 • 2.5 Y 4/4 Olive Brown Fine SAND - Trace of Silt 72-82 2.5 Y 6/4 Light Yellowish Brown Fine SAND - Trace of Silt 82-91 10 YR 4/2 Dark Grayish Brown Fine SAND - Trace of Silt 91-108 10 YR 511 Grayish Brolxn Fine SAND - Trace of Silt 108-120 10 YR 2/1 Black Fine SAND - Some Silt No water was encountered to depth investigated. Note: Site plan drawing provided to S&M8 by Andrew & Kuske Consulting Engineers personnel.. LEGEND O 1 Approximate Boring Location PROJECT PROPOSED VALGREEN'S SITE WILMINGTON, NORTH CAROLINA SK A L E . Not to Seal J 05 NO., 1063-03-608 FAG NO 1 J � •lrti!• �.i• ate- L� � 0 �} O Q � � C - r M.`•�t 47,•�. D i � �. - � ;• � Cerri=s � �� •' � .z t^► fr c J 632 ° I - IdwaYP p Ce ~ 01 • \ • . _ mac• �. 1 �' �� J �-. �j}`�`-•,'=5 (^;�\ �� ,`?�''�,`�• '•, •� q r Sg 3O , ! f L•r`��.1 3 16 ��1/'-f�,/,•'.�J •. vav f r '�' � •.> t � :. �� S�� 36 fed States Geological Survey photogrammetric methods from aerial Planimetry derived from imagery taken 1997 ;y control current as of 1970 to compiled from NOS Chart 833SC(1971) ended for navigational purposes. 11983 (NAD 83). Projection and a] Transverse Mercator, one 18 arohna Coordinate System Of 1983 ' 1927 (NAD 27) is shown by dashed f the shift between ]!AD 83 and ersections are obtainable from NADCON software I which only landmark buildings are shown MI•? .� GN By, ° 151 MILS 1 - 35, 28 MILS UTM GRID AND 2n00 MAGNETIC NORTH DECLINATION AT CEItiTER OF SHEET 50 • -4u '41 '42 SCALE 1:24 000 0,5 0 KILOMETERS I 1000 O METBS 1000 pp D, 5 0 MILES moo o mop aaa �oaa _ a000 �IOo soon �-� 7RRo sooR�,�oo FEET i N 3¢ 1 S r¢¢ CONTOUR INTERVAL 5 FELT \v 7NATIONAL GEODETIC VERTICAL DATUM OF 1929 7"�F' ¢f3�' THIS MAP COMPLIES WITH NATIONAL MAP ACCURACY STANDARDS -; -P)wfF ( Y� [ � � 1Q��.�cc,c.. Yeo� � r ti '► _ �f �-f g 3 c� ilabfe- 2-1 = 0, 02o c,-Pi s at e I ematt,ar 19 . io ow N�A- L414-9 )(I O ZT-7 OF W 2,3 `7 c-P N ss 3 c-P Me � -Pb t (o w v') rem yew4„�3 r - 1 0 L= 10/1 Om cp S S tM 1�ra� Z5 r - 2C4 Kr PTV C.�v-f- C �-r C 3o'X 1 LIO � 4- (� 2' VC2- ' S 2 CLlq Ll CC- 0-4 PJIe�v CIO ZZCv C� co RX bo ,&•1ulo.0 ap Gam" 9 .E 1'�5C) (S �� dc.c�n� �-f S = c G_ 2-?L�C� c wb-7c -Pf aura` f a b k- r - 1.� A- 25 - Zu h x �,0� -C 5 Gh G(.)r _ . _ ...... h 0 b-ehe