HomeMy WebLinkAboutSW8040401_COMPLIANCE_20040427STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
COMPLIANCE EVALUATION INSPECTION
DOC DATE
YYYYMMDD
Compliance Inspection Report
Permit: SW8040401 Effective: 04/27/04 Expiration: Owner: Interstate Business Park LLC
Project: Interstate Business Park
County: New Hanover Sw Of The Intersection Of Sr 1002 sr 1318
Region: Wilmington
Contact Person: Howard A Penton Title:
Directions to Project:
Southwest of the intersection of SR 1002 & SR 1318
Type of Project: State Stormwater - HD - Detention Pond
Drain Areas: 1 - (Prince George Creek) (03-06-23 ) ( C;Sw)
2 - (Prince George Creek) (03-06-23 ) ( C;Sw)
3 - (Prince George Creek) (03-06-23 ) ( C;Sw)
4 - (Prince George Creek) (03-06-23 ) ( C;Sw)
On -Site Representative(s):
Related Permits:
Inspection Date: 1011112010 Entry Time: 10:30 AM
Primary Inspector: Angela K Hammers
Secondary Inspector(s):
Reason for Inspection: Other
Permit Inspection Type: State Stormwater
Facility Status: ❑ Compliant ❑ Not Compliant
Question Areas:
0 State Stormwater
(See attachment summary)
Wilmington NC 28402
Phone: 910-452-1401
Exit Time: 11:00 AM
Phone: 919-796-7215
Ext.7317
Inspection Type: Compliance Evaluation
Page: 1
Permit: SW8040401 Owner - Project: Interstate Business Park LLC
Inspection Date: 10/1112010 Inspection Type: Compliance Evaluation Reason for Visit: Other
Inspection Summary:
Project was not built yet.
Is the permit active?
Signed copy of the Engineer's certification is in the file?
Signed copy of the Operation & Maintenance Agreement is in the file?
Copy of the recorded deed restrictions is in the file?
Comment: Project not built yet.
Other Permit Conditions
Is the site compliant with other conditions of the permit?
Comment:
1■NERNEW
Page: 2
4
WETDETENT|ON POND ANALYSIS
FILE NAME/
PROJECT#:SVV8 040401.apr04
Pond '
S:1WNQS\POyAD1040401.m r04. ha
PROJECT NAME: Interstate Business Park DATE: 27-Apr-04
Ruou|xUngEtpaam: NE-efp� �ear C|000: C Svv
Drainage Basin: Cape Fear Index No
8doArem 72.53 oonas
Drainage Area 1:::7;'.1:8Z4 33.0WIscluare feet Area in Acres 30.40
IMPERVIOUS AREAS
Lobs 813585.00
Gtna*Nn 62300.00
TOTAL
SURFACE AREA CALCULATION
square feet
square feet
square feet
square feet
square feet
square feet
square feet
Rational C
%|MPERNOUS 88.15% SA/OARatio 271%
Des. Depth 7 Roq.8A 35848 sf
sf
VOLUME CALCULATION
Rational?°
Des. Storm
d.
inches
Rv=
0.645
Bottom
16.5mo|
Perm. Pool
ma|
Design Pool
25.5 mo|
Storage nnet@a|ev 25.33 ms|
Roq.Vo|unna
cf
Vol. Pnov. at DP
cf
ORIFICE CALCULATION
Avg. Head =
F|owO2. ofs
Flow O5. cfe
No. ofOrifices
Diameter, inches
Orawdown =
COMMENTS
0.93
ft
0.412
ofs
0.165
cfs
weir HxVV
days
* place a "ll" in the box if Rational is used
Perm. Pool Vo|ume= 182701
Req. ForaboyVo|umo= 32540.2
ProvidmdVo|unno= 35188.00
Elevation Area Inc. Vol. Acc. Vol.
23.50 36252.00
{]3Area = 12.80
C)5Area = 512
Orifice Area 9.62
Q= 0.310
in x
Surface Area@OPFailing Head Drawdown
aq.inchea
sq. inches
oq.incham
nfs
in
41388 sq.fL
4.0 days
WET DETENTION POND ANALYSIS
FILE NAME
PROJECT#:8VV8 040401.apdJ4
Pond
PROJECT NAME: Interstate Business Park
S:XWQS1FONO104041.mpr04.xIs
DATE: 27-Apr-04
Receiving Stream: NECape Fear River Class: C8w
Drainage Basin: Cape Fear Index No.
7ite Area 72.53 acres
Drainage Area square feet Area in Acres 1256
IMPERVIOUS AREAS
Lots
Streets
TOTAL
SURFACE AREA CALCULATION
33930.00 square feet
37885.00 square feet
square feet
square feet
square feet
square feet
square feet
Rational C
Rahono|Co= [i07
%|yWPERV|OUS 67.09Y6 8/VOARotio 27596
Des. Depth 7 Req.SA 15075 af
TSS: 80 Pmv.8A af
VOLUME CALCULATION * place a "T' in the box if Rational is used
Rational ?°
Des. Storm inches
Rv= 0.654
Bottom
18.5ms|
Perm. Pool
nns|
Design Pool
25.5ms|
Storage nnut@e|uw
25.23 ms|
Rmq.Vu|ume
of
Vol. Pmv.atDP
cf
Avg, Head=
Flow O2.cfs
Flow O5.cfs
No. ofOrifices
Diameter, inches
Drawdown=
[iO5
ft
0.173
ohs
0.069
ofs
days
FOREBAY
Perm. Pool Wduma=
Req. FurebamVolume=
PnovdedVo|unme=
Pement=
Elevation Area
23.50' 15619.00
25.50 18756.00
O2Area =
5.30
Q5Area =
2.12
Orifice Area
4.91
Q=
0.160
n
x
Surface Area @OP=
Falling Head Dnawdown=
COMMENTS
Surface Area , Volume and Orifice are within Design Guidelines.
84481
12896.2
14112.08
Inc. Vol. Acc. Vol.
sq. inches
sq.|nches
sq.|nohes
cfs
in
18758sq. ft.
3.4doys
WET DETENTION POND ANALYSIS
FILE NAME
PROJECT #:SVV8 040401.apr04
Pond
PROJECT NAME: Interstate Business Park
S:XWkQS1POND%�40401.apr04.x|s
DATE: 27-Apr-04
Receiving Stream: NE Cape Fear River Class: CGw
Drainage Basin: Cape Fear Index N
Site Area 72.53 acres
Drainage Area square feet Area in Acres 15.56
IMPERVIOUS AREAS Rational C
Lots 453200.00 square feet
Streets 32878.00 square feet
square feet
square feet
square feet
square feet
TOTAL square feet
SURFACE AREA CALCULATION
% IMPERVIOUS
71.7496
8AJOARado
2.99%
Des. Depth
7
Req.SA
20348 af
T88:
80
Pnm. SA
af
VOLUME CALCULATION * place a "'I" in the box if Rational is used
Rodono|?^
Des. Storm
inches
Rv=
0.696
Bottom
18.5ms|
Perm, Pool
ms|
Design Pool
25.9mo|
Storage met@e|ev 25.17
ma|
Req. Volume
of
Vol. Pnov. at DP
cf
ORIFICE CALCULATION
Avg, Head =
0i85
ft
Flow Q2. nfs
0.227
cfm
Flow {]5. ofs
D�081
ofa
No, of Orifices
Diarneter, inches
weir xVV
Oravvdown=
days
FOREBAY
Perm. Pool Voun1e=
Req. ForebayVo|ume=
Pro*idedVo|ume=
Elevation Area
23.50 21552.00
25.50 35353.00
Q2Area =
6.88
O5Area =
279
Orifice Area
4.91
C)=
0,160
in
x
Surface Area @OP=
Falling Head Drovvdown=
COMMENTS
Surface Area , Volume and Orifice are within Design Guidelines.
92834
18588.8
19764.00
Inc. Vol. Acc.lVot
eq.inohes
aq.|nches
aq.inohes
cfS
in
35358 aq, ft.
47 days
WET DETENTION POND ANALYSIS
FILE NAME:
PROJECT #: SW8 040401.apr04
Pond 4
PROJECT NAME: Interstate 131.1siness Park
S:IWQSIPOND1040401.apr04.xls
REVIEWER:
DATE: 27-Apr-04
Receiving Stream: NE Cape Fear River Class: C Sw
Drainage Basin: Cape Fear Index No.
Site Area 7 2.53 acres
Drainage Area r 00 square feet Area in Acres 5.67
IMPERVIOUS AREAS Rational C
Lots 236300.00 square feet
Streets 0.00 square feet
square feet
square feet
square feet
square feet
TOTAL 2330 00' square feet Rational Cc= 0.07
SURFACE AREA CALCULATION
% IMPERVIOUS 62.55%
Des. Depth 6
TSS: 90
SAIDA Ratio 3.53%
Req. SA 13326 sf
Prov. SA _ .M 14-149 sf
VOLUME CALCULATION * place a "1" in the box if Rational is used
Rational ?*
Des. Storm
.CO;
inches
Rv=
0.613
Bottom
17 msl
Perm. Pool
2OJ' msl
................. .
Design Pool
25.5 msl
Storage met @elev 24.0£ msl
Req. Volume
9297;j
cf
1cf
Vol. Prov. at DP
4'+sOz3 .
ORIFICE CALCULATION
Avg. Head =
Flow Q2, cfs
Flow Q5, cfs
No. of Orifices
Diameter, inches
Drawdown =
FOREBAY
Perm, Pool Volume=
Req. Forebay Volume=
Provided Volume=
Percent=
46146 (]
9229.2
10050.00
Elevation Area Inc. Vol. Acc. Vol.
23.00 14149.00
25.00 21596.00 35745.00 35745.00
1.21 ft
Q2 Area =
3.04
sq. inches
0.112 cfs
Q5 Area =
1.22
sq. inches
0.045 cfs
Orifice Area
3.11
sq. inches
Q=
0.114
cfs
weir H x W J in x
days Surface Area @DP =
Falling Head Drawdown =
COMMENTS
Surface Area , Volume and Orifice are within Design Guidelines
J in
21596 sq. ft.
6.3 days