HomeMy WebLinkAboutSW8040345_COMPLIANCE_20040628STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SWTQ90'ZFI�
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
�P COMPLIANCE EVALUATION INSPECTION
DOC DATE
�{Ib�Ol22�Sf
YYYYMMDD
INFIL I RATION TRENCH ANALYSIS
Filename: S:IWPDATAIWQSIINTRENCH1040345.jun04
Project # 040345.jun04
Project Name Crosswinds Townhomes Phase IV
Recvng Stream ICWW
Drainage Basin Cape Fear
Site Area 1.58 acres
Impervious Area Calculation
Buildings 6426
Parking/Asphalt 11315
Concrete
Total €€a17A 7
Volume/Storage Calculation
If Rational Method is used, place a 1 in this box
Required
Provided
Design Storm
RV
VolU a to store
Pipe Diameter
Length Of a Single run of Pipe
Number of Pipe Runs in Trench
Storage In Piping
Total Storage in Piping
Cross -Sectional Area Of Pipe Runs
Length Of Trench
Width Of Trench
Height Of Trench
Cross -Sectional Area Of Trench
Voids Volume, 40%
Trench Volume per linear foot
Minimum Trench length required
Total Volume Provided
Elevation Of Bottom Of Trench
Elevation Of SHWT
Overflow Elevation
Exfiltration Rate /Drawdown
Reported Hydraulic Conductivity
Bottom Surface Area
Q j�a vi ci ovtii ri T i �i e
Date 28-Jun-04
Reviewer L Munn
Classification
Index #
Drainage Area 25854 SF
0.59 Acres
Rational Cc (list C after each BUA)
1
1
% Impervious= 68.6%
Cc: 0.75
1.5 in
0.67
€29€ CF
Pipe Size I Pipe Size 2
0.5 Feet
266 Feet
1
0 52 Cubic Feet
52 Cubic Feet
....................
0.000 0.196
266 Feet
10 Feet
1 Feet
10.00 SF
€ ;1043€ CF
4`12 Cubic Feet
=524 Feet
aQ9:5 Cubic Feet
Comments:
Required volume, storage, and drawdown guidelines are met.
5.25 Mean Sea Level
3.25 Mean Sea Level
7 Mean Sea Level
2.3 Cubic Feet Per Hour Per Sq Ft
2660 Square Feet
a`0:3.5 hours
10-IR = 2,11L, ✓
INFILTRATION TRENCH ANALYSIS Filename:
Project # 040345.jun04 Date
Project Name Crosswinds Townhomes Phase IV Reviewer
Recvng Stream ICWW Classification
Drainage Basin Cape Fear Index #
Site Area 1.58 acres Drainage Area
Impervious Area Calculation
Buildings 6426
Parking/Asphalt 11315
Concrete
Total ' 1'14t::
Volume/Storage Calculation
If Rational Method is used, place a 1 in this box 0
Required
Design Storm
RV
..................
11i71t1rri�€to€$tire
Provided
Pipe Diameter
Length Of a Single run of Pipe
Number of Pipe Runs in Trench
Storage In Piping
Total Storage in Piping
Cross -Sectional Area Of Pipe Runs
Length Of Trench
Width Of Trench
Height Of Trench
Cross -Sectional Area Of Trench
Voids Volume, 40%
Trench Volume per linear foot
Minimum Trench length required
Total Volume Provided
Elevation Of Bottom Of Trench
Elevation Of SHWT
Overflow Elevation
Exfil tra Pion Ra to / Drawdown
Reported Hydraulic Conductivity
Bottom Surface Area
..................
Drawdown lt. me
S:\WPDATA\WQSkINTRENCH\040345.junO4
28-Jun-04
L Munn
25854 SF
0.59 Acres
Rational Cc (list C after each BUA)
1
1
% Impervious- 68.6%
Cc: 0.75
1.5 in
0.67
€€2tT CF
Pipe Size 1 Pipe Size 2
0.5 Feet
262 Feet
1
0 51 Cubic Feet
€€51 Cubic Feet
0.000 0.196
262 Feet
10 Feet
1 Feet
10.00 SF
1:027: CF
412 Cubic Feet
i i524'? Feet
1.0.79 Cubic Feet
5.25 Mean Sea Level
3.25 Mean Sea Level
7 Mean Sea Level
Comments:
Required volume, storage, and drawdown guidelines are met.
2.3 Cubic Feet Per Hour Per Sq Ft
2620 Square Feet
'6.36? hours
R1
INFILTRATION BASIN ANALYSIS
FILENAME: S:IWQSIINBASIN1040345.jun04.XLS
PROJECT NUMBER: 040345.jun04 DATE: 29-Jon-04
PROJECT NAME: Crosswinds Townhomes - Phase IV
DRAINAGE BASIN: Cape Fear REVIEWER: L Munn
R VING STREAM: ICWW CLASS: SA
Index No.: If ORW, is site within the 575' AEC?
(�DA#2
AREA 1.58 acres DRAINAGE AREA: 139 SF
IMPERVIOUS AREA CALCULATION
BUILDINGS
PARKING/ASPHALT
CONCRETE
OTHER
TOTAL
% IMPERVIOUS, I=
ELEVATION OF SEASONAL HIGH WATER TABLE
REPORTED INFILTRATION RATE
SURFACE AREAS AND ELEVATIONS
Rational C
12852 0.95
Place a "1" here if Rational
RV= .05+.009 (I)
FEET MSL
i27i5 INCHES/HOUR
or 0.000637 FPS
Elev. (ft) Area, sq ft Inc. Volume Acc. Volume
BOTTOM 5.25 516
-1354.5-1354.5
0-1354.5
TOP 7 1233 4315.5 2961
VOLUME 1 DEPTH 1 DRAWDOWN CALCULATION
DESIGN STORM, INCHES
DESIGN VOLUME
TOTAL VOLUME AVAILABLE
DEPTH OF RUNOFF
TIME TO DRAWDOWN
25 YEAR 24 HOUR STORM NIA
Intensity, i = .33 inches 1 hour
Qr=CiA=
Qp through the bottom of the basin=
10 YEAR 10 MIN HIGH INTENSITY EVENT
Intensity, i = 6.3 inches I hour
Volume for 10 yr. 10 min. event =
CUBIC FEET
CUBIC FEET
FEET
HOURS MUST BE <120
0.09 CFS
0.33 CFS Must be > Qr
1067.77 CF < 1530.375 CF
COMMENTS
Volume and drawdown are (not) within Design Requirements.
INFILTRATION BASIN ANALYSIS
PROJECT NUMBER:
PROJECT NAME:
DRAINAGE BASIN:
R VING STREAM:
Index No.:
DA
ITE AREA 1.
FILENAME: S:1WQS11NBASIN1040345.jun04.XLS
040345.jun04 DATE: 29-Jun-04
Crosswinds Townhomes - Phase IV
Cape Fear REVIEWER: L Munn
ICW W CLASS: SA
If ORW, is site within the 575' AEC?
acres DRAINAGE AREA: 13d6$ SF
IMPERVIOUS AREA CALCULATION
BUILDINGS
PARKING/ASPHALT
CONCRETE
OTHER
TOTAL
% IMPERVIOUS, 1=
ELEVATION OF SEASONAL HIGH WATER TABLE
REPORTED INFILTRATION RATE
SURFACE AREAS AND ELEVATIONS
Rational C
6426 0.95
Elev. (ft) Area, sq ft Inc. Volume Acc, Volume
BOTTOM 5.25 219
-574.875-574.875
0-574.875
TOP 7 736 2576 2001.125
VOLUME I DEPTH I DRAWDOWN CALCULATION
DESIGN STORM, INCHES
DESIGN VOLUME
TOTAL VOLUME AVAILABLE
DEPTH OF RUNOFF
TIME TO DRAWDOWN
25 YEAR 24 HOUR STORM NIA
Intensity, i = .33 inches 1 hour
Qr=CiA=
Qp through the bottom of the basin=
10 YEAR 10 MIN HIGH INTENSITY EVENT
Intensity, i = 6.3 inches 1 hour
Volume for 10 yr. 10 min. event =
y
805 CUBIC FEET
835625 CUBIC FEET
: 7.5 FEET
€:1 HOURS MUST BE <120
0.06 CFS
0.14 CFS Must be > Qr
645.02 CF < 835,625 CF
COMMENTS
Volume and drawdown are (not) within Design Requirements.
INFILTRATION TRENCH ANALYSIS Filename
Project # 040345.jun04
Date
Project Name Crosswinds Townhomes Phase IV
Reviewer
Recvng Stream ICWW
Classification
Drainage Basin Cape Fear
Index #
Site Area 1.58 acres
Drainage Area
OA-6,q
Impervious Area Calculation
Buildings 0
Parking/Asphalt 3920
Concrete
Total 3920:
Volume/Storage Calculation
If Rational Method is used, place a 1 in this box
Required
Provided
Design Storm
RV
:Vol iris:#� Store
Pipe Diameter
Length Of a Single run of Pipe
Number of Pipe Runs in Trench
Storage In Piping
Total Storage in Piping
Cross -Sectional Area Of Pipe Runs
Length Of Trench
Width Of Trench
Height Of Trench
Cross -Sectional Area Of Trench
Voids Volume, 40%
Trench Volume per linear foot
Minimum Trench length required
Total Volume Provided
Elevation Of Bottom Of Trench
Elevation Of SHWT
Overflow Elevation
Exfiltration Rate/Drawdown
Reported Hydraulic Conductivity
Bottom Surface Area
D awdq.wn JIr; ie
S:\WPDATA\WQS\INTRENCH\040345.junO4
28-Jun-04
L Munn
3920 SF
0.09 Acres
Rational Cc (list C after each BUA)
1
% Impervious: 100.0%
Cc: 1.00
1.5 in
0.95
it6t ': CIF
Pipe Size I Pipe Size 2
0.5 Feet
114 Feet
1
0 22 Cubic Feet
2i Cubic Feet
0.000 0.195
114 Feet
10 Feet
1 Feet
10.00 SF
CF
1:2 Cubic Feet
'1113',i Feet
Cubic Feet
Mean Sea Level
Mean Sea Level
Mean Sea Level
2.3 Cubic Feet Per Hour Per Sq Ft
1140 Square Feet
hours
Comments:
Required volume, storage, and drawdown guidelines are met.