Loading...
HomeMy WebLinkAboutSW8040107_APPROVED PLANS_20040513STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE USG YYYYMMDD DITCH ' STORMWATER DETENTION POND �,� �� t,q Se TOP OF BANK 41.5 +' CONTRACTOR TO LOCATE SDMH No. 6 AT CITY FLOOD POOL 40.25 +'j9 1 OR DOWNSTREAM OF PLASTIC/CONCRETE ' +,,�5 PERMANENT POOL 36.5 INV. 35.6537 JUNCTION. ENGINEER TO BE NOTIFIED OF �ti1r r APPROXI ATE LOCATION BOTTOM 30.5 `Z..-„2 ANY CONFLICTS. N/F BULLOCK OF EXISTING 8" PVC SS I ■ 'SDMH No. 6 DB 721 PG 95 STREETYARD I TREE LINE a 24" CONCRETE PIPE +� RIM 41.0 1s ZONING: CB +3915 '� INV 36.0 '� SDMH No. q� USE: RESIDENTIAL ■ �fl f' 3g36 } + RIM 40.5 5' CONCRETE A + + + 42.192 SIDEWALK s- INV 36.59 3q ' - -- +,� ,4e o.aaeapm ,zq ++�'. I X '~ X _ `- TSF X ---- X LIMITS OF DISTURBANCE ` 5,v 2o3 20 EMERGENCY-- SPILLWAY .wf �- �j+ j ? I LEV 41.0 >.,, J� �X `X �� 4" _ X X X X �� 9X , '2 39 f EXISTING WAY TO a - ' ++°' _X 1 a• REMOVED DAND EREPLACED EWITH �' NCDOT CURB & GUTTER 20' BUFFER c V 1- - �- `-�j L �-�1�PT`.J bq414U.2 � �� OUTLET STRUCTURE; 18" RCP SDMH Iro. 5 + .q� (200) '� Z r SEE DETAIL RIM 40.5 EXISTING PIPE/DITCH TO BE �1VOTE'- FRONT' FACE OF V o +* t 1240 Y ,2.51 + " x INV 36.35 REMOVED AND BACKFILLED BUILDING HEIGHT IS 16' (25 _I 1 +' 62' WITH CLEAN SELECT FILL + °i �Q 4 • I j ,373 + (� •` �' „ NOTE: REAR HALF OF 8 Cl ,ti•a .2 + + F e4 CITY OF ILMINGTON +, e� RIMN41.25 + M + ,34 ONE + + " . BUILDING HEIGHT IS 24 : O 75 .� .� 43 W +ab ; �. q7 +,op 6 INV 38.5 �- WAY �� CONCR APRON; ti REFEREN E DETAILS ON to ' • • , \, -' Mp1g3 +4 4 •y Q1 r�l'..ILEi C LL E h t I • 15� PROPOSED BUILDIN y cn 37.5 v� . 1, r� 1 0 V ~ +..s RIPRAP STABILIZATION, ELEV \ \ 15,000 S.F. ` R25' ,gin ,3� A 35.5 + f 9 �o • . 4 TEMPORARY GRAVEL L� `� F.F.E. 42.E 4' \ \ \� �. \ \ ,\ ' �'�, 6 ' x • +_ +°76 �.4 CONSTRUCTION ENTRANCE ( ,� (600) ' o NOTE: 31 \ \ \� n \,4 ,3 ' 37.5' r INSTALLATION OF PROPOSED BYPASS SYSTEM I \ �ti�` I p 1 O TO Bt COMPLETED PRIOR TO REMOVAL OF _ " •02°` 43.4726 �\; �; m, ,_�=� 1 24" PIPE �II�- FILLING OF D CH- _ ' 18" FES w \ _ % \ : ii c�v a _ , 1 1 ,1 f , : XLij��,_ �L �+' +=1'63 10 x15 .18/ ED 11tiE''. .. _; + �` ? eL\ WHEEL STOF� +,sue' j6+. (885) y ; ...� \ Cl No. 2 �v. TS 33pin _ INV 36.5 + 34� +`Q RIM 41.5 (TYPICAL) o +,, +, ONE -i EXISTING DRIVEWAY TO BE 1 0 ' 15' \ '1A�. ��. WAY 43 z� INV 38.2 A �� �- REMOVED AND REPLACED WITH 4 S8 NOTE' \ + TYP '' s a I NCDOT CURB &GUTTER s 25 ( } z'� ;;�,n4, .S• nP r� ROOF DRAINAGE TO BE ROOTED +,y6, O '6" S SERVIC ® 0.6 . MIN o 150 I \ '•4 S26.03`00"E 1 TO FOREBAY OF PROPOSED DETENTION POND 1*@`�' CO (250) (250),,,,, �r, + - a a , 12D.68' +' S 9 L(250 + O CONTRACTOR TO VERIFY EXISTING SS `'� ,r -. j + 1 1 ' 1" WATER SERVICE �r -- -- + 'y SERVICE TO BE 6" AND AT 36 MIN. BURY ' 18 RCS +'tiS2 ,�3,b7 ` \ 28 pine A +•+j6 4Js I ACCEPTABLE DEPTH TO SERVE ` 1 •"° n� 4° �s �j` FFER'�■': �' lE� PROPOSED BULL ING. CLEANOUT TO 13 pin UNDERBRUSH THINN P'r'� C �� \ `+ B °° g +"° ' B RELOCATED 0 SHOWN LOCATION ' ` �1I� + CiCPPR(3�EIMLY 30' 1 \'`'' _ DLO + M1y' LIMITS OF DISTURBANCE, ,� 03• , 4as7°° +,33965 f.4'i3.95t4 414372 '' a]`' •� -_4°J \ '`� f37.95 , + I_ Q ` =,,2 +nAl +4 2l� C56�L1�f �-. EXISTING SS ` 1 4 pine +�' 1 J 2 \ +.,� I L _ 9 f �'.� 143+54�I� .,,, - STREETYARD CLEANOUT RCP \ E " 1 " 2 W F IU " , \ SDMH No. 2 1 ELEV 1 + - r �rj4 56 2 I (WATER METER TO i BE RIM 40.5 ,�� oak - (S �w. r- EXISTING GRAVEL /'" L �+ RELOCATED OUTSIDE \ \ NV 36.8 X 15 pine TSF �� � 10 x10 DUMPSTER PARKING AREA / ,..SSA 1OF SIDEWALK \ ` 0 2p• �►��� X I NSF X + SDMH No. 3 PAD w/ SCREENING I M NIMUM 10' LANDSCAPED STRIP ' 3`"'� "'` �'�q + 44.1317 `t ' B\ err i RIM 41.75 BETWEEN PARKING AREAS SDMH 41. 7 � RIM 41.75 I � 4 37 E `+,°.� INV 37.24 r 1�j55 0 INV 38.0p97 - �� • EXISTING `WATER SERVICE I I DITCH \ +457 �' + d TO BE EQUIPPED WITH CITY j \ 24" FES OF WILMINGT`O�N APPROVED \ �J� SDMH No. 1 INV 37.5 ,Z 7q +,z71ACKFLOW PREVENTER F �` RIM 40.0 CONTRACTOR TO LINE OPENING TO I + I .4 I i N INV 37.25 FES WITH FABRIC AND CLASS B 1 STORY , \ +µ7RIPRAP AND MAINTAIN POSITIVE SLOPE I I \ 1 BUILDING \ \ I I ___� \ \ NOTE. I ,, 4 :' 30 \ \ PRIOR TO FILLING OF EXISTING DITCH, STANDING b` \ WATER TO BE PUMPED THROUGH A FILTER N F CDTTLE j +,�.341 +,2.37=+4„476 I W (VEGETATED UPLANDS) BEFORE BEING RELEASED / \ \. TO WETLANDS ON OR OFF SITE. DB 1168 PG 1120 I N/F COTTLE DB 1 168 PG 1 120' I ZONING: CB ++=z= ZONING: CB } \ I USE: RESIDENTIAL I I N/F CAMERON I I USE: COMMERCIAL ' Z N PROPERTIES /F COTTLE'+ - - -- - - - _ - - - - - + _ r-•a ZONING: R-15 DB 1880 PG 768 .3b� � USE: VA ZONING: CB I CANT N/F BULLOCK USE: VACANT FIGURE_ 1 I DB 721 PG 95 ZONING: CB ��•' USE: RESIDENTIAL 19 pine ■ r + rk a; N BARE004 �-- cD R UNDISTURBED ' �,�;,< 01 20' BUFFER W P +ry rr-1`rr + 110 Ilk ■ ` lose g pine -4 I . 1 N/F CAMERON \ Z PROPERTIES ' `', \ 11 oak ' ZONING: R-15 T _ Z. USE: VACANT O N 38 U 12 pine 3e , %r) r + 6 r,�3 FIGURE 2 DITC ■ + 7r1 Re iremibnt' N/F MILLER DB 1369 PG 1575 ZONING: CB USE: COMMERCIAL SITE DATA ZONING CB BUILDING USE COMMERCIAL TAX I.D. # R06511-001-011-000 TOTAL AREA (GROSS) 1.99 ACRES BUILDING HEIGHT: FRONT HALF 16' REAR HALF 26' SETBACKS ADJACENT TO CB: ADJACENT TO R15: FRONT 30' SIDE 6' SIDE 20' REAR 10' REAR 25' PROPOSED BUILDING AREA 15,000 SF TOTAL PARKING SPACES REQUIRED 38•-60 TOTAL PARKING SPACES PROVIDED 45 PROPOSED ASPHALT AREA 18,166 SF PROPOSED CONCRETE AREA 615 SF TOTAL IMPERVIOUS AREA 33,781 SF LOT COVERAGE 39% STREETYARD AREA REQUIRED 1,512 SF STREETYARD AREA PROVIDED 2,125 SF LANDSCAPING AREA REQUIRED (.08%) 1,453 SF LANDSCAPING AREA PROVIDED 2,550 SF FOUNDATION PLANTING REQUIRED (.12%) 192 SF FOUNDATION PLANTING PROVIDED 225 SF THIS PROJECT NOT LOCATED IN A FLOOD ZONE CAMA LAND USE DESIGNATION DEVELOPED LEGEND - EXISTING CONTOUL` .� EXISTING SPOT ELEVATION 0 P '_LEVATION r PROPOSED SPOT TSF X TEMPORARY SILT FENCE ® CURB INLET w/INI.ET PROTECTION -� -� STORMWATER RUN)FF DIRECTION (125) LANDSCAPING w/AREA LIMITS OF DISTURBANCE (125) STREETYARD w/APEA CONCRETE AREA FOUNDATION PLANTING AREA y EXISTING TREE P EXISTING TREE T( BE REMOVED 1 APPROVED -4� NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION RECEIVED DIVISION OF WATER QUALITY IS- MA`1 - zau4 MANY 11 2004 DWQ SITE PLAN PRQJ # SGU eb 4o io7 1" = 20' BAR SCALE 1 09==20' p : WETLANDS DATE PRINTED J MAY 1 1 2V 20' 10' 0' VICINITY MAP NTS 20' 40' BISHOP & ZAPPLE, LLC. AD RQ ESS 2831 CAROLINA BEACH ROAD WILMINGTON, NC 28412 r m REVISIONS Date Description By 5-10 04 Pond 1�h 01 Q n la., Z �-4 >-I oE-i H � W Z E"I I --I o04 Z� W w C I T 1 w Z IiJ Z L� W E7'1 � ��No Z zH Qz �,. o Z N z h� E-i Z C) P"i E �oz ce N L a� 00 tit cd F-I G r_4 W ILI O W �U z ZUl O � � a: W ^Z co co CO �� � � I w I z O O p a_+_) ,-1 0rnrn _ 0 �N"; '•1--1 rd••l S E A L 17374 CRl p� I ~ DATE 4-16--04 DESIGN PGT DRAWN MBH C.1 SHEET 1 OF 2 03102 1 f f T` �• -i i 1 - r- ,I -. •') s�tlil� +.; < ; 'i '' 1 '' .I ' f'1 sl , j / 1 c. `! / # h 1 ! ! 1; it t., n • a" n »..�, - 'i.5 5, y r r. i 1 .7 5 :+ ••.lr : 1 . '. 11 . ,' � ' �f!-� J: (� �:I. __. • .'�. �!..._'�r.'i•i.g'7.1 _I.i.e �L+�.:��",;7 �'F,I�:r i.1 L�1. 2" TYPE 1-2 (N000?) - Ir ABC STONE (NC)OT) NOTE: � &I�W�PVIMVSECrION. PAVEMENT SECTION In WHERE RUNOFF IS SHALL S�OPE CURB CLAS` DRAINAGE AWAY FROM CURB CLASS A CONC. ASPHALT SLOPE 2 3 3.. r :; fed.. ;r. •:. I DRAINAGE TOWARD CURB CURB SECTION NTS R/W STANDARD WATER VALVE BOX CONC. SIDEWALK COVER MARKED CCj1 COMC. CURB i GUTTER SEAL CLEAN -OUT STACK w/DUCT TAPE PVC OR GIP (SEE NOTE 2) !_ 1/8• BEND PLUG w/4' SINGLE TEST PVC DR CIP SEWER MAIN PLUG w/WING NUT 4' TAPPING SADDLE (SEE NOTE 2) TEE OR WYE (SEE NOTE 1) NOTESs 1. SEWER TAPS TO BE PERFORMED BY CITY CREWS EXCEPT WHEN TEES OR WYES ARE INSTALLED IN NEW MATHS LAID BY THE CONTRACTOR. 2. THESE ITEMS SWILL BE INSTALLED WHEN NO HOUSE CONNECTION IS MADE AT C.Q. GUIDELINES fOR STANLM CfM-Off SANITARY SEWER HOUSE SERVICE NTS NOTM 1. SWWLX THOMESS SVAL BE 4- UN1190 Holm OI 011111 . 2. OWMA01011 J01M S (CA) VACE 10110E AS WDKX WWK 3. THICKEN SDMKX TO 6• AT OIIIYE1S1VL 4. THICKEN SIMMU TO r N LW S TI Eli IFAs= M006 s wn" NO CURL 1/ E70w1N10M�) aM I1F�As AT 1 AWL ID' �iwK Ji AT AHo As NOIm sRE F'UIFL e. PROM A LAYER OF 150 6LOO. FELT IIEFWEEN WU AM ADVCEIR PAPAiM CUM OR STMJCrUFW- 7. MEIFORCE w/64-1O/10 RWAL cm 3W AMOf LATE WINTER & EARLY SPRING `= TEMPORARY GRASSING DETAIL '- ' R SEEDING MIXTURE SPECIES /acre RATE Qb) RYE (grain) 120 ANNUAL LESPEDEZA (Kobe in PLAN 1AD0-S11111CnJRE Piedmont and Coastal Plain, Korean in Mountains) 50 1 silt vooLm m Omit annual lespedezo when duration of temporary cover is not to extend beyond June. fi SEEDING DATES: .1i 1�irt E�A1rr1aN ANTEWAL Mountains -Above 2500 ft: Feb. 15-May 15 Below 2500 ft: Feb. 1-May 1 OrAM��h Piedmont - Jan. 1-May 1 EXPANSION JOINT CMR1irWM JW u.) Coastal Plain - Dec. 1-Apr. 15 SOIL AMENDMENTS SIDEWALK JOINT DETAILS Follow recommendations of soil tests or apply 2.000 lb/acre ground agricul- tural limestone and 750 lb/acre 10-10-10 fertilizer. MULCH ` Apply 4.000 LB/Acre Straw. Anchor straw by tocking with osphalt, netting, { or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool MAINTENANCE` Refertilize if growth is not fully adequate. Reseed, refertilize and mulch im- mediately following erosion or other damage. TEMPORARY GRAIrI"''c:LL.ED SPRING --'SUMMER CONSTRUCTION ENTRANCE PERMANENT GRASSING DETAILNIS SEEDING MIXTURE SPECIES RATE i1b/acre) 30 TEMPORARY FALL GRASSING DETAIL COMMON WMUDAGRASS 10 GERMAN MILLET 10 SEEDING MIXTURE TALL FESCUE 50 SEEDING NOTES SPECIES MX (ib/acre) RYE (grain) 120 1. Where a neat oppeorence is desired. omit sericea. 2. Use common Bermuda grass only on sites where A cannot become a Last. SEEDING NOTES Bermuda grass may be replaced with 5 LB/Acre centipedegrass. MOUNTAINS - AUG. 15-DEC. 15 COASTAL PLAIN and PIEDMONT - AUG. 15-DEC 30 SEEDING DATES APRfL 1 -DULY 15 SOIL AMENDMENTS Follow recomendations of soil tests or apply 2,000 LB/Acre ground SOIL AMENDMENTS agricultural limestone and 1,000 LB/Acre 10-10-10 fertilizer. Apply lime and fertilizer accordinngg to sal tests, or apply 3.000 LB/Acre ground agricultural limestone and Sao LB/Acre 10-10-10 fertilizer. MULCH Apply 4,000 LB/Acre Straw. Anchor straw by tockNHg with asphalt, netting. or a mulch anchoring tool. A disk with blades set nearly straight can be MULCH used as a mulch anchoring tool. Apply 4.000 LB/Acre groin straw or equivalent cover of another a toble mulch. MAINTENANCE Anchor by tacking with asphalt, roving. or netting or by romping with a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Repair and refertilize dame areas immediately. T rwss with 50 LB Acre ely• / Of nitrogen in March. If it is necessary to extend temporary cover beyond June 15. overseed with 50 LB/Acre Kobe (Piedmont and Coastal Plain) or Korean (Mountains) lespedezo in late February or early March. MAINTENANCE Refertilize the fallowing April with 50 LB/Acre nitrogen. Repeat as growth requires. May be mewed only once a year. Where a neat appearance is desired. omit FALL -WINTER Sericea and mow as often as needed. PERMANENT GRASSING DETAIL TEMPORARY SUMMER GRASSING DETAIL SEEDING MIXTURE SEEDING MIXTURE SPECIES Qb/acre) SPECIES RATE Qb/acre) .RATE FESCUE (tom of two or ALRYE GERMAN MILLET 40200 ) � E � In the peidmont and mountains, a small -stemmed sundangross may be SEEDING DATES substituted at a rate of 50 LB/Acre. NOTES UAPRIL AUGUST DECEM 3ERSEEDING MOUNTAINS - MAY 15-AUG. 15 SOIL AMENDMENTS PIEDMONT - MAY 1-AUG. 15 COASTAL PLAN - APR. 15-AUG. 15 rime and fertilizer according to & A tests, or apply 3,000-5,000 LB/Acre AApply 1,000 LB Acre �0-10-,o lower rate on smhdy soils) and SOIL AMENDMENTS eit arthe Follow recomendotions of soil tests or oppy 2.000 LB/Acre ground MULCH agricultural limestone and 750 LB/Acre 10-10-10 fertilizer. Apply 4,000 LB/Acre grain straw or equivalent elver d another suitable mukA. MULCH Anchor by tacking with asphalt roving, or netting or by crimping with a mulch t be anchoring tool. A disk with blades set nearly dmkj can used as a mulch anchoring tool. Apply 4.000 LB/Akre Straw. Anchor straw by tacking with asphalt netting. or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. MAINTENANCE MAINTENANCE Fertilize according to sod tests or apply 40 LB/Acre nNinerN in January or 40 LB in September 4d LB in Novertbr. from 12-4-8, 16-4-8, g lly adequate. Reseed, refertilize and mulch im- Refertilize if growth is not fully a ebruary, and a or similar turf fertilizer. Avoid fert'Bzer opprlcations durieg worm weather, as this leases stand losses to disease. Reseed, fertTme, and mulch damaged areas mediotely following erosion or other damage. mmediately. Mow to a height of 2.5-3.5 inches as needed. A „s 70 [) o� 0 EXPIYmm JarrI �NO. 2 - OUAL i FL4Z51 \ A YETi1Y FL4791 7 I PRE -CAST CON:. e>aHIAIOav'Alwr cum AE1R W FLOW _au - B" Dh AVWV JaW- .SEL- 7Xr1N f�-A VAqAfff s- B SEC" a-e STANDARD DRIVEWAY DETAIL An 6" CONC. 4000 psi 6"x6"xW2.9xW2.9 WELDED WIRE FABRIC REINFORCEMENT �- 4" ABC STONE DUMPSTER PAD DETAIL ►'fi73 ..: ,,Na.l :.r71 WIRE FABRIC Cr GA o F1LTM FABRIC WIRESI ,n o: o ANCHOR FABRIC SKIRT AS DIRECTED BY ENGINEER II "I$ II 3 NOTES: 1. FENCE FABRIC SHALL BE A MIN. OF 32- IN WITH AND SHALL HAVE A MIN. OF SIX LINE: WIRES WITH 12 STAY SPACING. 2. FABRIC SHALL BE FOR EROSION CONTROL AND MIN. OF 36' IN WIDTH. FABRIC SHALL BE FASTENED ADEQUATELY TO THE WIRE FABRIC AS DIRECTED BY THE ENGINEER. 3. STEEL POST SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER STEEL ANGLE TYPE. 4. WOOD POST SHALL BE A MIN. OF 6' IN HEIGHT AND 3' TO 4' IN DIAMETER. WIRE FABRIC SHALL BE FASTENED TO WOODEN POST WITH NOT LESS THAN #9 WIRE STAOLE 1 1/2' LONG NTS 2' wide white stopbar sidewalk °siitlIk. -- . 41 4" double yellow entedine with V r CL 6 separation ' optional 0 4r white +� lane line 12' 1' 1 illy standard DRIVEWAY MARKING DETAIL pavement marking NTS NDIE 1. CONe04 M IIAY USE MRNX WIN MAX OOROM 1' PER COUPW X OOWRIICIOR MAY USE ECCENM MR urn ';` PLAN ' P1111DW 4IlDI IMO 1 I�� I ,rcc T-T MW. 3"-1 - IraL MN RHOS SECTION STORM DRAIN MANHOLE DETAIL 1 CH-BN-2001 PAVEMENT rJt � qgS CURB INLET DETAIL Alt: CONCRETE FOOTINGS TOP Of t k4K EL 41.5 4'Xe POSTS X • X Ir CONCRETE PAD f �AT 3000 PSI W/ 6X6 - 6/6 W.W.F. X11 14' 22'-4" PLAN 2'Xe CAP ASPHALT PAYMENT ENCLOSURE GATES ti /roncc_oo►nur_ \L 4-X4- POSTS HORIZONTAL (TREATED) WOOD SIDING ELEVATIONS DUMPSTER PAD do ENCLOSURE DETAIL 3' 6' VEGErATED EMBANKMENT SHELF NORMAL POOL EL. 36.5 1 1 �1 C. 3 FOREBAY 3 BOTTOM EL. 33.5 • POND SLOPE TO BE SEEDED IN ACCORDANCE TO SEEDING SPECIFICATIONS • 6:1 VEGETATED SHELF TO BE PLANTED WITH WETLAND SPECIES I.E. COMMON THREE SQUARE, DUCKWEED, PICKEREL WEED, PONDWEED, DETENTION POND & FORFBAY SECTION SEDGES, SMARTMEED,WATERWEED do WILD CELERY NTS / I PLAN 4'0 Pa. f 0014011/ 6 cur 011 loaiD + 4• Silt SLOIOOIIOE 4• .O'-• _ 1I- 31FICIION F OeiEhIS1011 b 4e• QRa E xTM XW RAKES SHOULD NNIE A 1,10 SLOPE r Marcum 0 LESS 11MN 4i TlA1E3 s = WIFE A 1.1. SilaPE V_r Awlaw meow` Jprlr 1■ w-1o/10 w.w.IL WAGNME I !r I I r qw. nM r 1NFEE't. CHAR lOf W TYPICAL SIDEWALK AND fiHEEL GEWR RAMP DETAIL A Ac �1s I K Le'L s•-n' l, • oALY. BAR OMT01R - 1• x 1 eFAdNO TYPE J CnPL ATTACH TO 1-14; x 1- ANM rPAM MORI FIMAIE To TOP CV TOP OF 4 's BANK _31 1 TOOLED UI/I1I �cllDli NORMAL POOL EL. 36.5 1 MAIN POOL 1.5 :-. REVISIONS SITE WORK NOTES Date Description By 1. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIARIZED WITH EXISTING pond CONDTIONS BOTH ON AND IMMEDIATELY ADJACENT TO THE SITE. s-1o1 rJBH 2. CLEARING: CONTRACTOR SHALL REMOVE ALL TREES AND VEGETATION WITHIN LIMITS OF CONSTRUCTION UNLESS OTHERWISE DESIGNATED TO REMAIN. 3. GRUBBING AND STRIPPING: CONTRACTOR SHALL RAKE AND REMOVE ROOTS, STUMPS, VEGETATION, DEBRIS, EXISTING STRUCTURES ABOVE AND BELOW GRADE, ORGANIC MATERIAL OR ANY OTHER UNSUITABLE MATERIAL WITHIN LIMITS OF CONSTRUCTION. 4. MUCKING: CONTRACTOR SHALL COORDINATE WITH OWNER AND THEIR GEOTECHNICAL REPRESENTATIVE TO COORDINATE REMOVAL OF ANY SOFT AREAS. 5. DISPOSAL- CLEARED, GRUBBED, STRIPPED OR OTHER WASTE MATERIAL SHALL BE REMOVED FROM SITE AND DISPOSED OF IN A PROPERLY PERMITTED FACILITY. 6. FILL AND COMPACTION SHOULD COMPLY WITH GEOTECHNICAL REPORT. 7. THE CONTRACTOR SHALL NOTE THAT THE GRADING PLAN MAY NOT REPRESENT A BALANCED EARTHWORK CONDITION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CUT AND FILL QUANTITIES AND COMPLETE INSTALLATION TO SPECIFIED GRADES. 8. THE CONTRACTOR SHALL FURNISH SUITABLE BORROW MATERIAL FROM AN OFF -SITE PROPERLY PERMITTED FACILITY AS REQUIRED. 9. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES DURING CONSTRUCTION. BEFORE COMMENCING ANY EXCAVATIONS IN OR ALONG ROADWAYS OR RIGHT-OF-WAYS, PUBLIC AREAS OR IN PRIVATE EASEMENTS, THE CONTRACTOR SHALL NOTIFY ALL APPROPRIATE PERSONNEL OF THEIR INTENT TO EXCAVATE, IN WRITING, NOT LESS THAN 10 DAYS PRIOR TO EXCAVATING. 10. THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE DISCONNECTION/ RECONNECTION AND/OR THE RELOCATION OF ALL EXISTING UTILITIES WITH APPROPRIATE PERSONNEL 11. EXISTING SURVEYING PERFORMED BY HANOVER DESIGN SERVICES COMPANY, INC. AND SUPPLIED BY THE OWNER W 12. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AT THE SITE. FURTHERMORE THE CONTRACTOR SHALL REPORT ALL DISCREPANCIES OR QUESTIONS TO THE ENGINEER PRIOR TO INSTALLATION. 13. THE CONTRACTOR SHALL PROVIDE ANY AND ALL LAYOUT REQUIRED TO CONSTRUCT HIS WORK UNLESS OTHERWISE DIRECTED BY OWNER. 14. ALL PVC UTILITY MAINS SHALL BE INSTALLED WITH A MINIMUM OF 36r COVER AT FINAL GRADE. 15. ALL SERVICE CONNECTIONS SHALL BE INSTALLED TO MEET ALL LOCAL AND STATE CODES. METERS, TAPS, MATERIALS, WORKMANSHIP AND ALL FEES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL COMPLY WITH ALL REQUIREMENTS. 16. ALL PAVEMENT, BASE AND SUBGRADE SHALL COMFORM TO NCDOT STANDARDS INCLUDING WORKMANSHIP, MATERIALS AND EQUIPMENT. APPROPRIATE BARRICADES, SIGNS, LIGHTS OR OTHER TRAFFIC CONTROL DEVICES SHALL BE PROVIDED IN ACCORDANCE WITH NCDOT V 1 TO MAINTAIN SAFETY AND TWO WAY TRAFFIC. ]" 17. ALL AREAS SHALL BE GRADED FOR POSITIVE DRAINAGE. THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO INSTALLATION. ALL AREAS SHALL BE 18. SLOPED TO DRAIN AWAY FROM BUILDINGS AT ALL TIMES. CONCRETE STORM DRAINAGE PIPE SHALL BE CLASS III WITH RUBBED GASKETED JOINTS AND INSTALLED IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS. Tn Z 19. USE WHITE LANE MARKING PAINT FOR ALL PAVEMENT MARKINGS. PAINT SHALL BE A V 1 1 -4 CHLORINATED RUBBER ALKYD, FS TT-P-115, TYPE III, FACTORY MIXED, QUICK DRYING, 1-4 NON BLEEDING. REFLECTIVE MATERIAL MAY BE ADDED AT OWNER'S OPTION FOR O 20. NIGHT REFLECTING. DUCTILE IRON SHALL BE CLASS 50. Z 21. CONCRETE FOR WALKS, CURBS AND DRIVES SHALL HAVE A MINIMUMN COMPRESSIVE QI STRENGTH OF 3000 PSI 0 28 DAYS - AIR ENTRAINED. 22. FIELD TESTING SHALL BE DONE BY AN INDEPENDENT TESTING LABORATORY PAID FOR BY THE OWNER. FURTHER TESTING REQUIRED DUE TO A FAILED TEST WILL BE PAID FOR BY THE CONTRACTOR. U� W !••+•t E-4 CONSTRUCTION SEQUENCE O 04 1. NO CUT SLOPE OR FILL SLOPE SHALL EXCEED A RISE OR FALL OF ONE FOOT FOR Z O EVERY RUN OF 3 FEET (1 VERTICAL TO 3 HORIZONTAL). �rl Z 2. NO SEDIMENT WILL BE ALLOWED TO EXIT THE SITE. ALL EROSION SHALL BE CONTROLLED INCLUDING SIDE SLOPES DURING AND AFTER CONSTRUCTION. Q Z 3. INSTALL PRIMARY EROSION CONTROL MEASURES BEFORE BEGINNING CONSTRUCTION z Hz INCLUDING, BUT NOT LIMITED TO GRAVELLED CONSTRUCTION ENTRANCE, SILT FENCE, �� CHECK DAMS, ETC. INSTALL ALL SECONDARY EROSION CONTROL MEASURES AS SOON AS Q POSSIBLE AFTER BEGINING CONSTRUCTION. E.-.i 4. ALL EROSION CONTROL MEASURES TO BE INSPECTED AFTER EACH RAIN. 0 SILT FENCE, SILT TRAPS, AND INLET PROTECTION TO BE CLEANED WHEN HALF FULL. 5. IF APPLICABLE, CONSTRUCT PROPOSED RETENTION POND TO ACT AS A SEDIMENT BASIN I� y DURING CONSTRUCTION. REMOVE ACCUMULATION OF SILT AS REQUIRED TO ALLOW PROPER FUNCTIONING. RESTORE POND TO DESIGN LEVELS AT THE COMPLETION OF � Q4 CONSRUCTION. 6. IF APPLICABLE, INSTALL DROP INLETS WITH INLET PROTECTION TO ACT AS SILT TRAPS DURING CONSTRUCTION. REMOVE ACCUMULATED SILT AS NEEDED TO PREVENT SILT FROM �..% ENTERING STORM DRAIN PIPING. 7. A 4" LAYER OF TOPSOIL SHALL BE APPLIED TO ALL NEW AREAS TO BE GRASSED. r �� 8. ALL DISTURBED AREAS SHALL BE SEEDED IN ACCORDANCE WITH SEEDING SCHEDULE AS SOON AS POSSIBLE BUT NO LATER THAN 15 DAYS AFTER DISTURBANCE. ALL SLOPED AREAS TO BE SEEDED NO LATER THAN 15 DAYS. ^• W ,� 9. MAINTAIN ALL EROSION CONTROL MEASURES UNITL PROJECT IS COMPLETE. O 10. MORE STRINGENT MEASURES MAY BE REQUIRED TO HALT EROSION IF THOSE ON THIS d4 PLAN PROVE TO BE LESS EFFECTIVE. CD 11. REMOVE ALL TEMPORARY EROSION CONTROL MEASURES UPON COMPLETION OF CONSTRUCTION. ALL PERMANENT MEASURES SHALL BE WELL ESTABLISHED PRIOR TO PROJECT COMPLETION. Z co MAINTENANCE REQUIREMENTS .� 1. CONSTRUCTION ENTRANCE MUST BE MAINTAINED TO PREVENT MUD OR SEDIMENT FROM ram, 0 LEAVING SITE. PERIODIC TOP DRESSING WITH TWO INCH STONE MAY BE REQUIRED. W ILA 2. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND W ca U OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL, BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL z Q ) O co PRACTICES AS DESIGNED. 3. SEDIMENT BASINS WILL BE CLEANED WHEN THE LEVEL OF SEDIMENT REACHES 2.0 FEEL f~ LO Lo a BELOW THE TOP OF THE RISER. #57 GRAVEL WILL BE CLEANED OR REPLACED WHEN THE 0 I ( SEDIMENT POOL NO LONGER DRAINS PROPERLY. ZT .�.� Z co 4. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT W cCD 0.5 FEET DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY I Z TO MAINTAIN A BARRIER.rA +� z 5. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING +� a TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, to D, a DENSE VEGETATIVE COVER. '� G U • r-1 Iv N 0 o o F`I 1 O V__q r,� � - � w U 2X4 11000 FRAW- V I MOOD OR STEEL STAKE FA100 BARED FA W 1 AS pOtEM BY t V-6" x 1'-O' x .OLIO STD. ALUM. 1 \1 ' `:' .y RESEWHANDICAPPED PARKING SIGN I] o . / j� TO READ "RESERVED PARKING' o � S E A L cO fAY1RIfIV BOLT TO WD POST w%M3�/eL• CALADIUM STEEL ST STAKE `t3 PLATED NUTS. BOLTS R WASHERS. _ �{ 17374 ® - v BIAIED FA9eC SIw[T Y •• .... 9• x 1'-0' x oeo STD ALUA1. SIGN To READ 'MAXIM1uM PENALTY S100, . /A GS 20-37.8'. BOLT TO WD. POST �- i//� "►[i��r I(`�'(`) �\ I PLATED 12" , NUT BOLTS h&WASHSHERS. 00 cam -PRESSURE TREATED 4•x4• POST LEGENID AND BORDER GREEN MRif►T FINISHED GRADE �~ 1-1/2"R(TYP) Na►E: � DATE 4-16-04 MAXIMUM 1. AS S1Nn1 M "MM USE A PEIMM SICET OF' NYLON. a TO nRohDE NEE= S UNL'1r TO 7HE OIS1AlA7% DESIGN PGT Po1.YEs7E1L E'"n TiMn l#.iIwmw MY AM AT A'w ° IMOFOF 1As Lrt AMM THE DROP Msx _T DRAWN M B H `s AN FA111e0 SHOULD Ni w1FF10ENILY c c POROUS To P110YDE 1DFAlN7E DW&WE OF THE TEMPORARY L PUGE THE BOTTOM 12 092M OF TIE FAreO N A TRENCH AD PENALTY -I I f=I1! I_ 119-11 I� o , , B11,r„P ,ter „ _TM BAC1ffl1 TIE TRF17PJ1 MILLI AT EiJ\4r 4 NCiES OF tl1V5iD Slplf 2 5 0 3/6"(LAP) I I II I I I 1 1I I I I LI ! II II I I I I I II I II APPLx71ThaKs IF Musr eE REPLJ� EMExr rD D4Ys. OR 12 wnE's OF aaMPACIED sow. _ i _ z CUT PABIIC FIpM A 0011110 DUS HILL 10 ELiA01TE JOINTS. 7. FWMN FABRIC sEMAIELY TO THE SDYaS AND FRAnE. JOWLS MIJSr BE - -I l I! E=1 I _ I 1={ a FOR SWES. LIST �4�IC11 w0pp(PREFaeiED)OR ORWAZW OVEROMM TO TIE IEYT SYNC:. -I=�1 I I MEUL WITH MNMM WIM of 3 FT. 1L TW 10P OF DE rTUINE AND FROW IEUSF BE WELL BELOW I E GROUND 124 VWX WW= 9MY MOUE TTE 11011MEM OF nit RLET DRAT ON 0011100ME FROM 1+E DHOP MM TO KEEP RUNOFF F#DM A NIpIL11A1 OF 3 FT APART. AD SECURELY DIr.E 1MEM "M NOV530�16 7HE INLET. K MAY OE NECESSARY 10 BUILD A TEMP0RMr1' LEGEND AND BORDER - GREEN TFE oRacslO. APPIIOIEWa to INCHES DEEP. ors ON THE oOwNxGPE SOLE OF THE shhilJCIURE MCKCRaUND - WHnE TYPICAL HANDICAPPED SIGN DETAIL FABRIC DROP INLET EROSION CONTROL F 2 NIS MEET 2 0 DATE PRINTEL 31 O2 0 j � ,, ��.; t s• ' r;. i:� i, i �r,'IT� �� I.'' f �i?•��y�:r .'h li.!.Ti r'��?IJ•��f jrY 15 r' � 1. .. .. r t .. - .. .,. .''1.. ... - .1 ltl ✓LH POLL APPROXf ATE LOCATION / OF EXISTING 8" PVC SS (YARD rANHOLE 0, .•� 5' CONCRETE # + 42.1921I + SIDEWALK } II a1 j + 1 EXISTING DRIVEWAY TO BE a REMOVED AND REPLACED WITH ` NCDOT CURB & GUTTER d to) 42.5,31 x}., INV 36.35 REMOVED AND BACKFILLED BUILDING HEIGHT IS 16 N (25 WITH CLEAN SELECT FILL I`I{ # a' { 73 +3�y'9 },, }• r r NOTE: REAR HALF OF [[[[ v \ ..- Cl No. 1 + •,.+�' } i } ,3.�sO N E ��•+ • } •�. } "'. �.y. - ; d -..- - C 1,RIM C\ ' },abaj7 BUILDING HEIGHT IS 24;�6�9 39 © INV 38.5 5 / i WAY A2 CITY OF ILMINGTON ONCRET APRON; y976Z � - r ` �� } _ REFEREN E DETAILS ON W ' a 1 SHEET C _ ;° 37.5 15' PROPOSED BUILDIN (n 5 R2s , Conic AR I M I 4 0` }•,s RIPRAP STABILIZATION; EL '� 15,000 S.F. N •'r:.. *„'S g 4 �`'� • _. TEMPORA GRAVEL } 25 LF TREATED F.F.E. 4.2. ,Z2 4 = • � 35.5 � �:� � ` � `� ` ` � ` I ` (g � ,z. CONSTRUCTION ENTRANCE LL_ t • BAFFL (TYPICAL) + „°, + "� .�76 1 } r ro n a NOTE: I-NSTALLATION OF PROPOIL SYSTEM 1 �ti' U ® ►� „ * - 1 , p TO Bt COMPLETED PRIOR T REMOVAL OF \ �6.. "� / 439726 p �, I air+ urn `. S " 24 PIPE A�IB FILLING OF D CH \ N l a -; I+ r� h ,6�3 18� FES w/ INV. 36. %2 ,� ¢S \ p a\ WHEEL STO jd'. (885) W 4� ,,• 10 x15 x18 ED C14y,� *' �°' � \ Cl No. 2' ONE r POLE rs #53pin� \ INV 36.5 +' I „bs +�,2N. RIM 41.5 (TYPICAL) r� \ ��o },3 WAY }• s -d. EXISTING DRIVEWAY TO BE 1 0 -1 z 6 15 \ INV 38.2 �`' �` t- RS REMOVED AND REPLACED WITH \ \ } � \ a� TYP '- �- °`'` 25 _ O �Adr o �� 150 8 . • � NCDOT CURB &I GUTTER NEE' I --- 14 p, �S• ROOF DRAINAGE TO BE RO ED 2 ( ) n ' '� f r .i t.: r ^ 3.77°3 Z' `, ' y �- \ TO FOREBAY OF PROPOSED l } �� CO 1 6" S SERVIC ® 6 " MIN - 4 d ,, *.. 526 03b0 E J ( 3 B Y , „6 120.68' a DETENTION POND I (250) (250, - ti.�� r <, #,,."" 1 1 #'' i "r9 (250 © ,. CONTRACTOR T VERIFY EXISTING SS U I 1 # �+ s 1 WATER SERVICE _ } SERVICE TO BE 6" AND AT 18" RCP-" }"'z ` obi ` \ 28 pine \ \36 MIN. B }4tiyg76 ¢�.3 I ACCEPTABLE DE TH TO SERVE 15 n e '' } �s EER rrr�ri rim �rrri�■■� �wri,�� UNDERBRUSH THINN Pine \0 oa LIMITS 0 DISTURBANCE .� #„,, PROPOSED BUILDING. CLEANOUT TO 13 pi + .33 1 \ t, 1 p 3 • 9 a a ,4 ,39772 B LOCATED 0 SHOWN LOCATION CK �4PPF�OXIM LY �30 \\ \o k +,L, .� z - 5%4 } �j �,,s a STING SS- \ �►� 14 pine + ,.,3 I L 1� # amp A- 1 CLIEANOUT C. . ,. ~ r �� +�� 143.5 --POWER i'OLE STREETYARD IN 39.87 + \ I RCP E �. 6' 22 W 1 CLEAN U I TOP 43.36 \ ` I ELEV � S54 5 CAS WATER METER TOI BE \ ` SDMH .5 2 \ oak /1�- E� ISTING GRAVEL RELOCATED OUTSI E l \ RIM 40.5 �, - RKING AREA '" OF SIDEWALK NV 36.8 x 15 pine TSF � � 10 x10 DUMPSTER � ■'•,,,� f # SDMH No. 3 a ,�' y53 \ 2p• 7k +irr♦w� X ISF X PAD w/ SCREENING IM�NIMUM 10 LANDSCAPED STRIP },,.,311 \ # o RIM 41.75 BETWEEN PARKING AREAS ~� �X X7 3 SDMH No. 7 INV 37.24 BETW I x. 5.04 37 E RIM 41.75 I qq7 g Nrj INV 38.0 EXISTING' ATE' SERVICE I I TO B UIP WITH CITY DITCH }4°3, 'Is�,,� 24" FES OF WILMINGEIN APPROVED Fj2 SDMH No. 1 I INV 37.5 ,,g �,§ACKFLOW PREVENTER � � COO �' RIM 40.0 CONTRACTOR TO LINE OPENING TO I }a� *'� � I � � ,.4083 I O FES WITH FABRIC AND CLASS B 1 STORY ' ` \ N INV 37.25 RIPRAP AND MAINTAIN POSITIVE SLOPE BUILDINGNOTE: L\ I 1 0 ,n95 PRIOR TO FILLING OF EXISTING DITCH, STANDING l , } •"1 \� \ WATER TO BE PUMPED THROUGH A FILTER \ N F COTTLE +,2.3„6 } },31' (VEGETATED UPLANDS) BEFORE BEING RELEASED / N F COTTLE I '144n W TO WETLANDS ON OR OFF SITE. DB 1168 PG 1 120 I / ZONING: CB ,yz ,° DB 1168 PG 1120� I I \ I I USE: RESIDENTIAL + ZONING: CB 1 I I USE: COMMERCIAL I Z I N/F CAMERON I I : ;31 � }.3�5 y ,9 PROPERTIES N/F COTTLE } •�' a +.n ZONING: R-15 DB 1880 PG 768 USE: VACANT ZONING: CB N/F BULLOCK USE: VACANT - FIGURE 1. I DB 721 PG 95 I ZONING: CB � N/F MILLER USE: RESIDENTIAL 19 pine ■ I DB 1369 PG 1575 i REUEIVED - _ r _ ,,, _ I ZONING: CB f 9 oak - 1 I USE: COMMERCIAL U3 ARE fO UNDI�TURE ED ' = :� CA -� � °O Lv 20' BUFFER � (A (0 - _ 14 pine } ry NIA A � y / 0 r_ 20'e� . Ia #,. 8 pine �R� '"8' V 11 0` k 0 Ld N/F CAMERON Z PROPERTIES pine \ 11 oak ' ZONING: R-15 Z USE: VACANT ' + } ipz" - -_- I N V. 3S V (�I �r`- 12 pine 1�9A1 BOOK 2J r` t�E 49 ,oV r 12 pine'-DF FIGURE j? ITC ■ ■ ! �l I (f I ' STORMWATER DETENTION I'ONU ,'' `'o. CONTRACTOR TO LOCATE SDMH No. 6 AT TOP OF BANK 41 .� 1 OR DOWNSTREAM OF PLASTIC/CONCRETE FNCROACIIMF N! CITY FLOOD POOL 4U.:", ' # ,y,'r JUNCTION. ENGINEER TO BE NOTIFIED OF +, PERMANENT POOL 36.5 INV. �1 3' ANY CONFLICTS. BorroM 30.3 39�� N F BULLOCK 5 ,,9tiZ SDMH No. 6 DB 721 PG 95 USE: ,2 #� . �` ZONING: CB TREE 24" CONCRETE PIPE RIM 41.0 SDMH No +'' 15 pine INV 36.0 E: RESIDENTIAL RIM 40.5 � INV 36.59 _ xP 463'34'00 .1:��..�.,..._`�`� LIMITS 0FQSTURBANCE77�7_� 2Q' EMERGENCX-SPILLWAY + ��!!mX � X �-- X �` ' 1 X �- X��; 0 oti ELEV 41.0 r mom f- X X ��- X' RCP 0- �',F X 20' BUFFER I - +�'� -- T+ #„z'4 18" RCP SDMH No. 5 \... / o + z.4-3z / (200) OUTLET STRUCTURE; \ - - SEE DETAIL RIM 40.5 EXISTING PIPE/DITCH TO BE � w �� ONTIFACE OF v � fCl rti.ficatxon Ra ir4mants . l- v_ .`,. �� c-.i-.,.3.._' 'Dell aii-f".'E.t. .fir .a •.i .��.( k:£ _ci_r..jt )t 11".1 r° f 1 '[ _ _ , c. '11 _ - : yF+, t` , i•.. . AL t r ti n t i �; # r ! , I . f: - '•: ,i z/z7�y rr,t�,'r i -10, SITE DATA ZONING CB BUILDING USE COMMERCIAL TAX 1.D. # R06511-001-01 1-000 TOTAL AREA (GROSS) 1.99 ACRES BUILDING HEIGHT: FRONT HALF 16' REAR HALF 26' SETBACKS ADJACENT TO CB: ADJACENT TO R15: FRONT 30' SIDE 6' SIDE 20' REAR 10' REAR 25' PROPOSED BUILDING AREA 15,000 SF TOTAL PARKING SPACES REQUIRED 38-60 TOTAL PARKING SPACES PROVIDED 45 PROPOSED ASPHALT AREA 18,166 SF PROPOSED CONCRETE AREA 615 SF TOTAL IMPERVIOUS AREA 33,781 SF LOT COVERAGE 39% STREETYARD AREA REQUIRED 1,512 SF STREETYARD AREA PROVIDED 2,125 SF LANDSCAPING AREA REQUIRED (.08%) 1,453 SF LANDSCAPING AREA PROVIDED 2,550 SF FOUNDATION PLANTING REQUIRED (.12%) 192 SF FOUNDATION PLANTING PROVIDED 225 SF THIS PROJECT NOT LOCATED IN A FLOOD ZONE CAMA LAND USE DESIGNATION DEVELOPED -42 - EXISTING CONTOUR +1,55 EXISTING SPOT ELEVATION 0�°r2p PROPOSED SPOT ELEVATION X TSF TEMPORARY SILT FENCE ® CURB INLET w/INLET PROTECTION STORMWATER RUNOFF DIRECTION (125) LANDSCAPING w/AREA LIMITS OF DISTURBANCE k�25) STREETYARD w/AREA - - CONCRETE AREA FOUNDATION PLANTING AREA EXISTING TREE EXISTING TREE TO BE REMOVED WETLANDS I APR 0 8 2004 DWQ NOR-4 C MANAGEMENT coWylssior4 0rv':siQr� OF WATER 1;sr°A"ITY lZ-.��,�_ 0` SITE PLAN 1 " - 20' BAR SCALE 1 "=20' 20' 10' 0' 20' 40' VICINITY MAP N'PS BISHOP & ZAPPLE, LLC. ADDRESS: DATA ��� � % 2831 CAROLINA BEACH ROAD �qg WILMINGTON, NC 28412 REVISIONS a}e I Description I By �_4 z 01 x r y E� w lz O E-I U � zE-IA o�� A oZ� W V) W Z WE .:I � U) o Z W N� Z W pz� >.4 W � � o Z z A E-4 � Z0 ~ E-+ a 0 0z N o P-IH�� U) U) L) Cj w 0o z cd 110-1 W rI G W O Q �--� $~ ♦' Ln kn 0 I I Z z co co � � z W LJ z n 0 0 6 z LLI � 4.0 O M a G _ N A cd � [I P , I;, 60' CA = 17374 ` DATE 4-08-04 DESIGN PGT DRAWN MBH Cl SHEET 1 OF 2 03102 T - .. r. TI r ! , F r ,� ' s� r r , r �; ! r .z - :_ -r -.. I17 r �l�i•j r y1 •i� }�h11� .'.. r� r.' 11'. ,.1� t"r.. .. .. ... ... ,' r` .. ,. •r r 41;•5 {�;#:Lrp4S,+ i�.. } r .r.� 6. a ' I i �'�'?, r I i � ''r f .•Ir+%.� i, �.. rsit� 1 . 'tI '�'�!� � 2- TYPE 1-2 (NCDOT) - 8' ABC STONE (NCOOT) NOTE R �VPHA FIFA¢ CONDfiK)NS. w OWNER do GEOTECHNICAL [CHNxra� TE ACTUAL. PAVEMENT PAVEMENTPAVEMENT SECTION WHERE RUNOFF IS DIRECTED AWAY FROM CURB GUTTER ' " » SHALL SLOPE AWAY! AS SHOW CLASS A CONC. ASPHALT 93" ; ■ SLOPE • 1 8�. DRAINAGE AWAY FROM CURB _» CLASS A CONC. ASPHALT SCOPE ' 2 3" 3 . • 1 DRAINAGE TOWARD CURB CURB SECTION NTS LATE WINTER & EARLY SPRING TEMPORARY GRASSING DETAIL SEEDING MIXTURE SPECIES RATE (IbZgcre) RYE (graln} 120 ANNUAL LESPEDEZA (Kobe in Piedmont and Coastal Plain, Korean in Mountains) 50 Omit annual lespedezo when duration of temporary cover is not to extend beyond June. SEEDING DATES: Mountains - Above 2500 ft: Feb. 15-May 15 Below 2500 ft: Feb. 1-May 1 Piedmont - Jan. 1-May 1 Coastal Plain - Dec. 1-Apr. 15 SOIL AMENDMENTS Follow recommendations of soil tests or apply 2.000 Ib/ocre ground agricul- tural limestone and 750 lb/acre 10-10-10 fertilizer. MULCH Apply 4.000 LB/Acre Straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. MAINTENANCE Refertilize if growth is not fully adequate. Reseed, refertilize and mulch im- mediately following erosion or other damage. SPRING --SUMMER PERMANENT GRASSING DETAIL SEEDING MIXTURE SPECIES RATE(Ib/acre) PENSACOLA BAHOGRAss 50 SERK:EA LESPEDEZA 30 COMMON BERMUDaGRASS 10 GERMAN MILLET 10 TALI. FESCUE 50 SEEDING NOTES 1. Where a neat appearence is desired, omit sericea. 2. Uncommon Bermuda grass only on sites where it cannot become a pest. Bermuda grass may be replaced with 5 LB/Acre centipedegrass. SEEDING DATES APRIL 1 - JULY 15 SOIL AMENDMENTS Apply lime and fertilizer according to soil tests, or apply 3,000 LB/Acre ground agricultural limestone and 500 LB/Acre 10-10-10 fertilizer. CURB R/W CONC SIDEWALK STANDARD WATER VALVE BOX & COVER MARKED C.O. CONC. CURB & GUTTER iT SEAL CLEAN -OUT STACK w/DUCT TAPE PVC OR CIP (SEE NOTE 2) 1/8' BEND PVC OR CIP SEWER MAIN PLUG w/4' SINGLE TEST PLUG w/WING NUT 41 TAPPING SADDLE (SEE NOTE 2) TEE OR WYE (SEE NOTE 1) NOTES- 1. SEWER TAPS TO BE PERFORMED BY CITY CREWS EXCEPT WHEN TEES DR WYES ARE INSTALLED IN NEW MAINS LAID BY THE CONTRACTOR. 2. THESE ITEMS SHALL BE INSTALLED WHEN NO HOUSE CONNECTION IS MADE AT C.O. GUIDELINES fW STANDARD CLMN DUT SANITARY SEWER HOUSE SERVICE NTS NOTES: 1. SMEIMLK THICKNESS SHALL BE 4' UNLESS NOTED ODIERW-W- L CONTRACTION JOINTS (C.I.) SPACE SAME AS SIDENNLK WUrK 3. TMICM S DEWMLII To e' AT DPoYE11Y1YS. 4. THICKEII SHOEWMLK TD e' N LAST 3• WHEAT IT ABUTS PAVEMENT WITH NO CURB. S 1/2" EXPANSION JOINT E.J.) REOLMED AT 30• MAX AT SI ERALK A* CWNL AT STRUCTUItES, AND AS NOTED ON SITE PLAN. IL PROVIDE P A � OR 1 e1D11. FELT SE1M1FEN WMX AND ADJACENT 7. RE7ro= w/eue-10/10 W.W.M. 3o MAX SPACING ' ' d 7u, PION 1rLDG. srRuclvrr 71 TOOLED 1/4"x1' DEEP w/AN Jiiw 1/e'R TOOLED JOINT 2• EKFwISIOTI /e' ABC STONE{NCDOT) rAATFIfSML e' ABC STOIE(NMOT) D(PANSION JOINT (E.J.) CONTP CTION JOINT (C.J.) y-_3- COARSE AGGREGATE 1 TEMPORARY GRAVELLED CONSTRUCTION ENTRANCE NTS TEMPORARY FALL GRASSING DETAIL SEEDING MIXTURE SPECIES MX (lb/acre) RYE (grain) 120 SEEDING NOTES MOUNTAINS - AUG. 15-DEC. 15 COASTAL PLAIN and PIEDMONT - AUG. 15-DEC 30 SOIL AMENDMENTS Follow recomendations of soil tests or apply 2.000 LB/Acre ground agricultural limestone and 1.000 LB/Acre 10-10-10 fertilizer. MULCH Apply 4.000 LB/Acre Straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool MULCH Apply 4,000 LB/Acre grain straw or equivalent cover of another suitable mulch. MAINTENANCE Anchor by tacking with asphalt, roving, or netting or by crimping with a mulch anchoring tool. A disk with blades set nearly straight port be used as a mulch Repair and refertilize domoc�ed areas immediately. Topdress with 50 LB/Acre anchoring tool. of nitrogen in March. If it fs necessary to extend temporary cover beyond June 15. overseed with 50 LB/Acre Kobe (Piedmont and Coastal Plain) or Korean (Mountains) lespedeza in late February or early March. MAINTENANCE Refertilize the following April with 50 LB/Acre nitrogen. Repeat as growth requires. May be mowed only once a year. Where a neat appearance is desired, omit FALL -WINTER Sedew and mow as often as needed. PERMANENT GRASSING DETAIL TEMPORARY SUMMER GRASSING DETAIL SEEDING MIXTURE SEEDING MIXTURE SPECK ATE (Ib/acre) SPECIES TALL FESCUE (blend of two or GERMAN MILLET 40 three im varieties) 200 RYE (grain 25 In the peidmont and mountains, a small -stemmed sundongross may be SEEDING DATES substituted at a rate of 50 LB/Acre. JANUARY - APRIL SEEDING NOTES AucusT - DECEMBER MOUNTAINS - MAY 15-AUG. 15 SOIL AMENDMENTS PIEDMONT - MAY 1-AUG. 15 COASTAL PLAN -- APR. 15-AUG. 15 Apply lime and fertilizer according to soil tests, or apply 3,000-5,000 LB/Acre round ricultural limestone (use the lower rate on sandy soils) and .� LBAt:re 10-10-10 fertirizer. 501E AMENDMENTS Follow recomendations of soil tests or apply 2.000 LB/Acre ground MULCH agricultural limestone and 750 LB/Acre 10-10-10 fertilizer. Apply 4,000 LB/Acre grain straw or equivalent cover of anotW suitable mulch. Anchor by tacking with asphalt, roving, or netting or by crimping with a mulch MULCH anchoring tool. A disk with bkides set nearly straight can be used as a mulch anchoring tool. Apply 4,000 LB/Acre Straw. Anchor straw by tacking with asphalt. netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. MAINTENANCE MAINTENANCE Fertilize according to soil tests or apply 40 LB/Acre nitrogen in January or February, 40 LB in September and 40 LB in November, from a 12-4-8. 16-4-8. or similar turf fertilizer. Avoid fertilizer applications during warm weather, as this Refertilize if growth is not fully adequate. Reseed, refertilize and mulct, im- increases stand losses to disease. Reseed, fertilize, and mulch damaged areas mediately following erosion or other damage. mmediat . Mow to a ely height of 2.5-3.5 inches as needed. DOW 010 OR taWA SVENHLK SECMV � F11O31A�iGM/ dHAM) � PN"A \ ta�erENNrA7 PxAzl I am f 4 PER r -0 B' E>r>9VHt my jonr- 7! AI A --A VAgH&E s'f= '2- 6' s- SECWV B-e STANDARD DRIVEWAY DETAIL An 6" CONC. 4000 psi 6"x6"xW2.9xW2.9 WELDED WIRE FABRIC REINFORCEMENT `-4" ABC STONE DUMPSTER PAD DETAIL NIS VARIES (6•--8' STEEL OR WOOD POST WIRE FABRIC \MIN. 12-1/2 GA o FILTER FABRIC INTERMEDIATE WIRESI r•1 In O ANCHOR FABRIC SKIRT s 0 o. Moo I I AS DIRECTED BY ENGINEER I -I NOTES: 1. FENCE FABRIC SHALL BE A MIN. OF 32- IN W1Qjl AND SHALL HAVE A MIN. OF SIX LINE WIRES WITH 12 STAY SPACING. 2. FABRIC SHALL BE FOR EROSION CONTROL AND MIN. OF 36' IN WIDTH. FABRIC SHALL BE FASTENED ADEQUATELY TO THE WIRE FABRIC AS DIRECTED BY THE ENGINEER. 3. STEEL POST SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER STEEL ANGLE TYPE. ! 4. WOOD POST SHALL BE A MIN. OF 6' IN HEIGHT AND 3' TO 4' IN DIAMETER. MARE FABRIC SHALL BE FASTENED TO WOODEN POST WITH NOT LESS THAN 19 WIRE STAOLE 1 1/2- LONG IET bd E!O RARY $ U FENCE NTS 2' wide white stopbar .:sidewalk- sldewQlk 4' ,. l 4' double yellow l entedine with U6' separation C optional 4' white N -4 **t: lane line L 12' 12' - L:��j - ity standard DRIVEWAY MARKING DETAIL apa�voe went marking NTS NOTE 1. OONIAACIOR MAY USE NICK WWH IAAL COMM 1' FO 00LLtSE 4. DONT111C= MY tME FCLEMM M.N. UW PLAN M OMl1 4' W8EI1 F" 3-3- OK 3'-1 "MIL MN Nr168 ,ilESeGJJSfJ.7 STORM DRAIN MANHOLE DETAIL •% 0 4 0# raG -d x k 2 �SEL G-z0a, W �D FILIAL PAVEMENT PRE -CAST COerC. FLOW T 300o Psi oaNc ORIENTATION do SIZES CURB INLET DETAIL rNe, co ewe I D 2'ii6- rr ,r H SES ON TOP OF BANK EL 41.5 CONCRETE FoonNGs �4"X4- POSTS x X 8' CONCRETE PAD_\ AT 3W00 PSI W/ 6X6 - 6/6 W.W.F. x 14' 22'-e L PLAN 2"X6" CAP 4"X4" POSTS \_ HORIZONTAL (TREATED) WOOD SIDING ELEVATIONS J ASPHALT PAVEMENT ENCLOSURE GATES ut /Tama-00areur_ DUMPSTER PAD & ENCLOSURE DETAIL 3. 6' VEGETATED EMBANKMENT SHELF FOREBAY WALL BEYOND FLOOD POOL EL 40.25 NORMAL POOL EL 38.5 EL 38.5 1 1 1 RIPRAP SPILLWAY 6 3 FOREBAY 3 BOTTOM EL 33.5 1 MAIN POOL a POND SLOPE TO BE SEEDED IN ACCORDANCE TO SEEDING SPECIFICATIONS a 6:1 VEGETATED SHELF TO BE PLANTED WITH WETLAND SPECIES I.E. COMMON THREE SQUARE, DUCKWEED. PICKEREL WEED. PONDWEED• DEMISMON POND & FOREBAY SECTION SEDGES. SMARTWEED.wATERWEED & WILD CELERY NTS SECTION - PLM e 9�EwMK 00"Cam rvr ate 1oalAD } 31! � fans 1. "-10/10 w.wJL ri, 4 rr SiflcTM OONCREFOr OMIENWOii A 4i' ON OKFAOER E JET FLAWSOLLDMWA 1:10sm W DaWW1N a un 1qw 4r RAW ME= WME A 142 81DPE 1jY- __ASRML rPWE1>MEn 371 �.. I I P L •r-10/10 WWAL SUeI1MlE` SFJ�, I I e CTIM H WHM CWAtMW TYPICAL SIDEWALK AND WHEEL CHAIR RAMP DETAIL NORMAL POOL G&W. MR ,71A7010 - A! CIE F� t TOP OF 414 A I Aa L--:1e _1 "I- ' ELM 1 e RESERVED 1 D x 1'-D- x .DOG STD. ALAI. HMANDICJWPED PARKING SIGN TO READ "RESERVED PARKING" P�Lj�ING WITH IDENTIFICATION SYMBOL. ao r�TNl�tf`I BOLT TO WD. POST W/ 3/8" CANG ® P1.ATEp NUTS. BOLTS & WASHERS.- 9' x 1'-0' x .080 STD ALUM. SIGN TO READ "MAXIMUM PENALTY f10Q GS 20-37.6'_ BDLT TO WO. POST WITH 3/8' CAND)IUM PI A r; 12' ^1 NUTS. BOLTS & WASHERS. CIali QRS PRESSURE TREATED 4'x4' POST LEGEND AND BORDERL �- GREEN �N WHIiEE WKGROuND FINISHED GRADE- 1-1 /2 "R(TYP) MAXIMUM 10 PENALTY 250 3/8-(TYP) 12' LEGEND AND BORDER - GREEN BACKGROUND - WHITE YPICAL HANDICAPPED BOTTOM 'v CO REVISIONS SITE WORK NOTES Date Description By 1. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIARIZED WITH EXISTING CONDTIONS BOTH ON AND IMMEDIATELY ADJACENT TO THE SITE. 2. CLEARING: CONTRACTOR SHALL REMOVE ALL TREES AND VEGETATION WITHIN LIMITS OF CONSTRUCTION UNLESS OTHERWISE DESIGNATED TO REMAIN. 3. GRUBBING AND STRIPPING: CONTRACTOR SHALL RAKE AND REMOVE ROOTS, STUMPS, VEGETATION, DEBRIS, EXISTING STRUCTURES ABOVE AND BELOW GRADE, ORGANIC MATERIAL. OR ANY OTHER UNSUITABLE MATERIAL WITHIN LIMITS OF CONSTRUCTION. 4. MUCKING: CONTRACTOR SHALL COORDINATE WITH OWNER AND THEIR GEOTECHNICAL REPRESENTATIVE TO COORDINATE REMOVAL OF ANY SOFT AREAS. 5. DISPOSAL: CLEARED, GRUBBED, STRIPPED OR OTHER WASTE MATERIAL SHALL BE REMOVED FROM SITE AND DISPOSED OF IN A PROPERLY PERMITTED FACILITY. 6. FILL AND COMPACTION SHOULD COMPLY WITH GEOTECHNICAL REPORT. 7. THE CONTRACTOR SHALL NOTE THAT THE GRADING PLAN MAY NOT REPRESENT A BALANCED EARTHWORK CONDITION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CUT AND FILL QUANTITIES AND COMPLETE INSTALLATION TO SPECIFIED GRADES. 8. THE CONTRACTOR SHALL FURNISH SUITABLE BORROW MATERIAL FROM AN OFF -SITE PROPERLY PERMITTED FACILITY AS REQUIRED. 9. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES DURING CONSTRUCTION. BEFORE COMMENCING ANY EXCAVATIONS IN OR ALONG ROADWAYS OR RIGHT-OF-WAYS, PUBLIC AREAS OR IN PRIVATE EASEMENTS, THE CONTRACTOR SHALL NOTIFY ALL APPROPRIATE PERSONNEL OF THEIR INTENT TO EXCAVATE, IN WRITING, NOT LESS THAN 10 DAYS PRIOR TO EXCAVATING. h . 10. THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE DISCONNECTION/ RECONNECTION AND/OR THE RELOCATION OF ALL EXISTING UTILITIES WITH APPROPRIATE PERSONNEL. 11. EXISTING SURVEYING PERFORMED BY HANOVER DESIGN SERVICES COMPANY, INC. AND SUPPLIED BY THE OWNER 12. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AT THE SITE. FURTHERMORE THE CONTRACTOR SHALL REPORT ALL DISCREPANCIES OR QUESTIONS TO THE ENGINEER PRIOR TO INSTALLATION. 13. THE CONTRACTOR SHALL PROVIDE ANY AND ALL LAYOUT REQUIRED TO CONSTRUCT HIS WORK UNLESS OTHERWISE DIRECTED BY OWNER, 14. ALL PVC UTILITY MAINS SHALL BE INSTALLED WITH A MINIMUM OF 36' COVER AT FINAL GRADE. 15. ALL. SERVICE CONNECTIONS SHALL BE INSTALLED TO MEET ALL LOCAL AND STATE CODES. METERS, TAPS, MATERIALS, WORKMANSHIP AND ALL FEES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL COMPLY WITH ALL REQUIREMENTS. 16. ALL PAVEMENT, BASE AND SUBGRADE SHALL COMFORM TO NCDOT STANDARDS INCLUDING WORKMANSHIP, MATERIALS AND EQUIPMENT. APPROPRIATE BARRICADES, SIGNS, LIGHTS /-� OR OTHER TRAFFIC CONTROL DEVICES SHALL BE PROVIDED IN ACCORDANCE WITH NCDOT CIO CI 1 TO MAINTAIN SAFETY AND TWO WAY TRAFFIC. �r 1 17. ALL AREAS SHALL BE GRADED FOR POSITIVE DRAINAGE. THE CONTRACTOR SHALL REPORT v ANY DISCREPANCIES TO THE ENGINEER PRIOR TO INSTALLATION. ALL AREAS SHALL BE SLOPED TO DRAIN AWAY FROM BUILDINGS AT ALL TIMES. r 18. CONCRETE STORM DRAINAGE PIPE SHALL BE CLASS III WITH RUBBER GASKETED JOINTS AND INSTALLED IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS. Z 19. USE WHITE LANE MARKING PAINT FOR ALL PAVEMENT MARKINGS. PAINT SHALL BE A �J 1 CHLORINATED RUBBER ALKYD, FS TT-P-115, TYPE III, FACTORY MIXED, QUICK DRYING, NON BLEEDING. REFLECTIVE MATERIAL MAY BE ADDED AT OWNER'S OPTION FOR O NIGHT REFLECTING. 20. DUCTILE IRON SHALL BE CLASS 50. 21. CONCRETE FOR WALKS, CURBS AND DRIVES SHALL HAVE A MINIMUMN COMPRESSIVE STRENGTH OF 3000 PSI 028 DAYS - AIR ENTRAINED. 22. FIELD TESTING SHALL BE DONE BY AN INDEPENDENT TESTING LABORATORY PAID FOR BY THE OWNER. FURTHER TESTING REQUIRED DUE TO A FAILED TEST WILL BE PAID FOR BY THE CONTRACTOR. CONSTRUCTION SEQUENCE E 4 v N� W 1. NO CUT SLOPE OR FILL SLOPE SHALL EXCEED A RISE OR FALL OF ONE FOOT FOR 0�. Z 0 EVERY RUN OF 3 FEET (1 VERTICAL TO 3 HORIZONTAL). Sri Z 2. NO SEDIMENT WILL BE ALLOWED TO EXIT THE SITE. ALL EROSION SHALL BE CONTROLLED INCLUDING SIDE SLOPES DURING AND AFTER CONSTRUCTION. Q 3. INSTALL PRIMARY EROSION CONTROL MEASURES BEFORE BEGINNING CONSTRUCTION z I-� z INCLUDING, BUT NOT LIMITED TO GRAVELLED CONSTRUCTION ENTRANCE, SILT FENCE, �� CHECK DAMS, ETC. INSTALL ALL SECONDARY EROSION CONTROL MEASURES AS SOON AS 0 POSSIBLE AFTER BEGINING CONSTRUCTION. 4. ALL EROSION CONTROL MEASURES TO BE INSPECTED AFTER EACH RAIN. V SILT FENCE, SILT TRAPS, AND INLET PROTECTION TO BE CLEANED WHEN HALF FULL. 5. IF APPLICABLE, CONSTRUCT PROPOSED RETENTION POND TO ACT AS A SEDIMENT BASIN 11,4 z DURING CONSTRUCTION. REMOVE ACCUMULATION OF SILT AS REQUIRED TO ALLOW PROPER FUNCTIONING. RESTORE POND TO DESIGN LEVELS AT THE COMPLETION OF.., E4 CONSRUCTION. 6. IF APPLICABLE, INSTALL DROP INLETS WITH INLET PROTECTION TO ACT AS SILT TRAPS W� DURING CONSTRUCTION. REMOVE ACCUMULATED SILT AS NEEDED TO PREVENT SILT FROM ENTERING STORM DRAIN PIPING. 7. A 4' LAYER OF TOPSOIL SHALL BE APPLIED TO ALL NEW AREAS TO BE GRASSED. rr ��• 8. ALL DISTURBED AREAS SHALL BE SEEDED IN ACCORDANCE WITH SEEDING SCHEDULE AS V SOON AS POSSIBLE BUT NO LATER THAN 15 DAYS AFTER DISTURBANCE. • ALL SLOPED AREAS TO BE SEEDED NO LATER THAN 15 DAYS. .--1 9. MAINTAIN ALL EROSION CONTROL MEASURES UNITL PROJECT IS COMPLETE. p 10. MORE STRINGENT MEASURES MAY BE REQUIRED TO HALT EROSION IF THOSE ON THIS d+ PLAN PROVE TO BE LESS EFFECTIVE. OD 11. REMOVE ALL TEMPORARY EROSION CONTROL MEASURES UPON COMPLETION OF CONSTRUCTION. L\2 ALL PERMANENT MEASURES SHALL BE WELL ESTABLISHED PRIOR TO PROJECT COMPLETION. F-1 (a z MAINTENANCE REQUIREMENTS r .r-4 1. CONSTRUCTION ENTRANCE MUST BE MAINTAINED TO PREVENT MUD OR SEDIMENT FROM r O LEAVING SITE. PERIODIC TOP DRESSING WITH TWO INCH STONE MAY BE REQUIRED. FT-1 ;_1 2. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND W OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL, BUT IN NO CASE LESS THAN 0o ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN Al I PRACTICES AS DESIGNED. 1--11 ;-, T-4 CO 3. SEDIMENT BASINS WILL BE CLEANED WHEN THE LEVEL OF SEDIMENT REACHES 2.0 FEET ♦' ;_1 �y � ko Lo U BELOW THE TOP OF THE RISER. 157 GRAVEL WILL BE CLEANED OR REPLACED WHEN THE O I I a SEDIMENT POOL NO LONGER DRAINS PROPERLY. Lam--! +j Z co co 4. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT W OR 0.5 FEET DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY z TO MAINTAIN A BARRIER 5. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING -P O W TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, W 4 0) a. DENSE VEGETATIVE COVER. != 0 N � Er-1 M rill U yq MOOD FTIAAEJ U� WOOD�FFA EET w/art,E N ICE ,�1111111IlI!/�rf CA4b4 N % Is S E A L 17374 = �ff111111111111 NOTIM 1. AS SYNTHEM FANM USE A POWIDUS SHOEr OF NnAK s POLYESTER OR EDMI E YMHN-Fx,TM Snwam 1em I K)-THMT 001rU" ULTAl %XU RAY AID SrAEIIffDS FABRIC sHIDItD 81 SifFFHGEfITLY a PORGUS 70 PMKIE ADEMATE DRA VM OF 1K TEMPORARI SFJ,e1EErr POOL SLOW WW BE USIM FOR SHORT-TEM APPL1104111101118. OF MAST TIE mum EVERT so mm To PR WE ►EE = STABVIY TO Tie Rf MUA„ON. FRNIE yea -Nip) WOOD III RIPS MOIDC THE QRW of TW MEA N A MAMW OF is FT ABOVE THE mw BIET P 11E BOTTOM 12 rNafs OF THe FABRIC N A MD y BACIWWI THe 7NE M WE H AT LEAST 4 NCJES OF CRIVIED SMNE OR 12 OCM OF 00iVAc1m soi. DATE 4-08-04 DESIGN PGT DRAWN MBH 2. cur FAENC FROM A CGNIINUOUS N LL TO EUmWE JOWM 7. FASTEN FANIIe SBLXMY 70 LIE STMMS AHD nVUL JONM Misr TIE i FOR STAKES UBE 2M-NAi WOOD�IEFE1111100 W-VIOLENT QVERLAIM TO TW /Err suw_ FETAL WRN A NNMAM IJDrrrrH DF 3 FT. R TIE TOP OF THE RAAiE AHD FABRIC MUST BE WELL SUM RE CROUiD 4. S Wa MM 10AXY AIIOIID RE FFRIiElER OF THE N.Er A MAXIM B1 OF 3 FT APARr, AND SII9:I11rELY DRAB THEM eno gEA�kq1�AiNM DO�WN�SU E FROM THE DROP SLET To KEEP nLMW FROM OM pN 11en DON40•G E W 0r� E" A IMIPORIM C2 11e OROUIO. APPRm{ WMY 16 MMM TEEY. EORARY FABRIC DROP INLU EROSION CQ Q1- $ PRINTED SHEET 2 OF 2 03102 APR 0 8 200il -,- 1­ j7�7:e Y!. I. •i! �' ;P F 1 1 + !' .. t 1 it 1. t I I' I-�4ES•t1 7 I . rfr. 4r, ! r ,.:, d• S ,I,t i.. • ...., • . .. .. .... r. . r•1. ?l.y�.,tf , ,p 0 DITCH STORMWATER DETENTION POND CONTRACTOR TO LOCATE SDMH No. 6 AT PROPOSED 6' TOP OF BANK 41.5 OR DOWNSTREAM OF PLASTIC/CONCRETE ' CHAIN -LINK FENCE CITY FLOOD POOL 40-25 3g59 JUNCTION. ENGINEER TO BE NOTIFIED OF 3959 ERMANENT POOL 36.5 (1) INV. 35.65 4' GATE ,6'' ANY CONFLICTS. •3,bS BOTTOM 30.5 34 ,q 52 pA �,` EXIST. SDMH PROPOSED 5' ; ' ' _ 24" CONCRETE PIPE--------_�- RIM 41.0 ,°ss ' CHAIN -LINK FENCE 39.2, e (2) 5' GATES 39,5010 INV 36.0 9, .3936 15 ' GA,Tf` 20' _ E_MERGEN- Y-S-PILLWA`! L,;, _ ELEV 41 - \MCP r r _2RC� �" => - o. .. .0 r 20' BUFFER wqi9 O I APPROXIM TE LOCATION OF EXISTING 12" WATER APPROXI ATE LOCATION I�OF EXISTING 8" PVC SS r ONZO 7 z�,,, EXIST. 5' CONC ETE �1921� SIDEWALK 4�b42g • 26$y3 ! • 9. I f[ a• 3 EXIST TREES 4 EX ST SHRUBS LLI _ -� - OUTLET STRUCTURE; 8" RCP EXIST. SDMH m SEE DETAIL RIM 40.5 i , I a INV 36.35 D1 Q 5 �ECRE'ATION ,. 36.75' I AREA I �415 \ A5 4618 LLJ'`. NOTE: REAR HALE OF C N4 1 2 EXIST TREES I i W 3 .0 �? ,44�73 BUILDING HEIGHT IS 24��9�� ao� O I R M 41 .25 7 EXIST SHRUBS IN✓ 38.5 3=5 W d / 16 EXIST SHRUBS BLDG. ENCROACHMENT 1 EXIST TREE N/F BULLOCK 4 EXIST SHRUBS DB 721 PG 95 ZONING: CB 1 EXIST TREES Fx ST. SDMFj USE: RESIDENTIAL 9 EXIST SHRUBS R I h.' 40.5 j . . I% 36.59 zI... O:, Lj 6 NNN I 0% POWER POLE 30' STREETYARD TELE. MANHOLE p4 . s. 4 I • IIF f2 5 4 I 38S13 -if1{rl a2' , !1g0 N E -EXIST. CITY OF WILMINGTON 43.44g" WAY I "f EXISTING • •4 ` CONCRETE' APRON EA A40j3'+ d b a 4 EXI A303 ,Q 6 2 EXIST TREES 15' EXIST. BUILDING I� z CONC ARE 10 EXIST SHRUBS 37.5' 15,000 S.F. ,3� �- RIPRAP STABILIZATION; ELEV _ i4 I 'Ia 4,S F.F.E. 42.5 \r•- n t j�l _ ~` "CJ 35.5 ° � 40.25 A.�x 4a¢�Z ,a�b ,4 ..\° f` I- ` _ 1 Cfl • 40393i � ` • q LiJ ,3 " n I 1 E LIST TREE > `k1 J C1 •� ` I » 4 EIS SHRUBS rye S _ _ - Icy S �rj 18' FES w/ I 'r i� by �\ WHEEL STOP Aa'° 4 P ' 3 43 INV. ��.72 39 ONE POLE °j to 10'x15 x18 ED cn --.`a' I -CI No. 2 e o. (TYPICAL) � _ yyy, ,,�° 3s� , �,::. INV 36.5 • ( ( 39.66 - `3g6a+2 �, �-� K'V 5 \ �1 �. WAY 4 43.5 a, 2 EXIST TREES U ' S3� r�i r '�}J ri. \ 15' INV �R.2 43. ` 3 EXIST SHRUBS ',� � nl. '\ • 3 3�58 \ TYP 25' ^ a I offi 2 S26'03 00 E -`S S E RV I C � 0.6 6 MIN • ° 37,y3 " r� CATCH BASIN ' (M 3' B Y) 43365 , ,Ab4 120.68' ♦ ��ty `l, „ ry' 269 RIM 42.35 ) \; } i 3 GO 2ao, \ 90�� A\. ' ♦ - �/ - V� � G aS -'- , 'J ~ ✓ �'I 0 0 --.,/` . 45+q9 \,.... „_,_.,__ -_.,k - �1 � _ 39 ' - r, 1 6 J .a 4403 3; ��� 1yk�l %,'- �• _ \'_ u f .,= , s �_:. <,�+ 1 WATER SERVICE _ w �/ WA ER5 A =' At 36" MIN. BURY ,6 5 %fA p n „RitP­ Pin00 45 s�6166 1 ?ir 4se _ - 1';. ' �� 5965 -� 43.937 } 446 17J '-c- Y - d "•' - • . • d ,l , - .` 5\�_ ni k 2 4 `� 43.5 00 '// < / ! I J f�• --- + _ ,__,-�I�R "t 4 • \ \ _ y 3g6 r .. 5� /Y _ _ e. �ap9.._, by • r°� y,a' i•� ''71 », A f �'L- -� $ n s'�p 54 _ 4, 'yam Vyyi 0V 6$ 1�Y 43 39s'., al`' 3 �\ ♦ ` r- ne 1 r y 3gA3 H \ ne_ \ EXIST. • S`DMH T \ RIM 40.5 �� P PROPOSED BUILDING \ \ \ ♦ V 36.\ F.F.Q. 42.5 pi fi P I \ -PROPOSED 6' o I 149 CHAIN -LINK -FENCE ` - \ T 19. q p5 � `DITCH 52 \\ SWH N o.3 RIM / \ �.0 ,1.� N SITE DATA \ INV 37.0- SDMH No.2 PROPERTY OWNER BISHOP & ZAPPLE LLC \ \ RIM 42.0 <_ PROJECT ADDRESS 3529 CAROLINA BEACH RD ,0$5 INV 37.5 PIN NUMBER R06511-001-011-000 \ \ AREA NOT IN A FEMA 100-YEAR FLOOD ZONE. ` ZONING DISTRICT CB -COMMUNITY BUSINESS \ \ DISTURBED AREA .13 AC (5,650 SF) SETBACKS REQUIRED FRONT: 20' \ SIDE: 0'/0' N/F CAMERON PROPERTIES A. ,3.�z3 GLEANOUT ELEV -� G r: - 14'J�54� -POWER POLE /._ _STREETYARD !N 39.87 �, 22 1N 1 EXIST TREE CLEAN U TOP 43.36 I ELEV 65 7 EXIST. SHR BS GAS I EXIST. WATER METER ,�'_;,��,. �' - - �� � ��Te K_LL EXISTING GRAVEL EXIST. 10'x10' DUMPSTE PARKING AREA 1 EXIST TREE ,2- �•3a •��:-�� =X. SDMH PAD w/ SCREENING IM NIMUM 10' LAN SCAPED STRIP •AIM 41.75 , 441357 I EX. SDMH 1 EXIST TREE BETWEEN PARKING AREAS 02� �Y 38,E RIM 41.75 `IV 37.24 3 EXIST SHRUBS 1 r"'u, 7 j 5 04 37 E INV 38.0 SHRUBSy 16 EXIST � , 24" FES SDMH No.1 I INV 37.5 RIM 41.75 CONTRACTOR TO LINE OPENING TO INV 37.7 FES WITH FABRIC AND C-ASS 8 RIPRAP AND MAINTAIN POSITIVE SLOPE i I I N/F COTTLE PROPOSED SETBACKS FRONT: 247' ZONING: R-15 DB 1880 PG 768 RFAR- 247' USE: VACANT - - - TRACT AREA 86,554 5F (1.961 AL:) BUILDING USE GYMNASTICS EXISTING BUILDING AREA 15,000 SF PROPOSED BUILDING AREA (GROSS) 2,523 SF BUILDING LOT COVERAGE (2,523/86,554) 3% NUMBER OF BUILDINGS 2 BUILDING HEIGHT 16'/26' NUMBER OF STORIES 1 SF PER FLOOR 15,000 SF & 2,523 SF EXISTING IMPERVIOUS AREAS: EXISTING BUILDING 15,000 SF EXISTING ASPHALT + CURB 18,166 SF EXISTING CONCRETE (SIDEWALK) 1,560 SF 34,726 SF (40%) EXISTING IMPERVIOUS AREA PROPOSED IMPERVIOUS AREAS: (ON -SITE) PROPOSED BUILDING FOOTPRINT 2,523 SF PROPOSED ASPHALT + CURB 0 SF PROPOSED CONCRETE 0 SF PROPOSED IMPERVIOUS AREA 2,523 SF (3%) PROPOSED+EXISTING IMPERVIOUS AREA 37,249 SF (43%) PARKING REQUIRED: MINIMUM: 1/300 ((17,523Y,400) 44 SPACES MAXIMUM: 1 /200 (i 7,523 300) 58 SPACES 45 SPACES PARKING PROVIDED: CAMA LAND USE: URBAN PUBLIC WATER AND SEWER BY CFPUA EXISTING WATER FLOW: 1980 GPD EXISTING SEWER FLOW: 1,800 GPD PROPOSED WATER FLOW: (120 GPD/1,000 SF x 17,523 x 110%) 2,313 GPD PROPOSED SEWER FLOW: (120 GPD/1000 SF x 17,523 SF) 2,103 GPD HANDICAP SPOTS REQUIRED PROPOSED (1-25 SPOTS= 1 HANDICAP SPOT) 45 SPOTS/25=1.8 2 HANIDCAP SPOTS NOTE: 1) WATER AND SEWER SERVICE FROM EXISTING BUILDING 2) BUILDING NOT SPRINKLERED. ZONING: CB USE: VACANT I 4003 I N/F BULLOCK ' I D8 721 PG 95 PROPOSED 6' ZONING: CB CHAIN -LINT FENCE C USE: RESIDENTIAL �� 19 pine 2 / ,a3q �, .�_ ,� ���• (1) 3 GATE �::_�• ' n t N ' 1 /FORMERLY WE-PLANb -` f D9 NOTctiSTUR , "':, I W �1"rqi ( 2 BUFFER • r 2 RECROATON AREA 1- 49= s cok - ' 1 Li ♦' rya BUFF ♦ FR *5 "a 1 / iV � 1 C ) vi N/F CAMERON PROPERTIES ZONING: R-15 USE: VACANT Li / 41 P DITCH--- 12 pine �_ _�`;� J A, \n MAP OF NEWKIRK U MAP BOOK 25 PAGE 149 3ag9 `°p6 :h �.> Q N/F COTTLE DB 1168 PG 1120 ZONING: CB USE: RESIDENTIAL EXISTING WA SERVICE TO BE EQUIP E WITH CITY OF WILMINGTON APPROVED AZ,,9 RZ",5ACKFLOW PREVENTER 1 STORYCD �Y f BUILOING �� I CD L� _�- •� --1 �3 r 4 .6930 l 41 9 . 42.3449 . 443�43;a25 *yaY4,b I N/ F COTTLE 1 I I .b� D B 1 168 PG 1 1201 4 a�fi ',z24.9 ZONING: CB 1 I 4o USE: COMMERCIAL i N/F MILLER DB 1369 PG 1575 i ZONING: CB I USE: COMMERCIAL � I � 4Y APPROXIM TE LOCATION OF FIRE HYDRANT LEGEND SITE PLAN - - -- - �z - - - EXISTIPG CONTOUR BAR SCALE 1 "=20' . 395g EXISTItG SPOT ELEVATION 0\ PROPOSED SPOT ELEVATION X TSF TEMPCRARY SILT FENCE 20' 10' 0' 20' 40' F; PROP'SED CHAIN LINK FENCE N ® CURB NLET w/INLET PROTECTION � STORMVATER RUNOFF DIRECTION d B (125) LANDSCAPING w/AREA ■�■mmommm LIMITS DF DISTURBANCE s'c jec STREEYARD w/AREA U) �o a r ae EXIST. CONCRETE AREA e� t• R EXISTIC TREE VICINITY MAP EXISTIIG TREE TO BE REMOVED NTS OWNER; DATE PRINTED --� BISHOP & ZAPPLE, LLC. WETLADS a +' APR 0 4 2013✓ADDRESS: 2831 CAROLINA BEACH ROAD _ WILMINGTON, NC 28412 M REVISIONS Description I By w z z up ^�� O � r V1 Z ZF� o �I F-i z E"I O Q W 1r`oy'. Z A 1� W � W Z H.4 04 4 U V i x �-1 E-1 0 E-4 z zo 111.4z w,, o E. 11?_­11 E1 U) U) U U O 00 cd �1 • r w ° W �U O 4� O I a z �z CoCe,0I v) O O O W' N O 0) al �.� . Q) _M W O 0 °I' Q N H� awe �R S E A L '9 17374 i'rrrllllli���� DATE 04-04-13 DESIGN PGT DRAWN EJW C 1 SHEET 1 OF 2 gill IV 7-1Y i ? f�►�►i .'t(t r�z �r +. rI 1, i r :i ;t 3�' �i ri .. `e,, y,. ,A •l� ;j: 'riu:> r r ilr f3'S h� n'l: , i:!, .s �.}} 4t.Y.1•'t{i ,.;•i"y• t--♦,i �, ! .i o t 4 �fi i..i1. it 1 Z l 'l'l'... Llif tiAwu TOP OF BANK EL. 41.5 STEEL POST WIRE FABRIC GA. o m FILTER FABRIC WIRESI U r� U.1 J k ANCHOR FABRIC SKIRT O AcZ MITT r%TF'r) RV CKI1_1K1CCl7 M u u NOTES: 1. FENCE FABRIC SHALL BE A MIN. OF 32" IN WIDTH AND SHALL HAVE A MIN. OF SIX LINE WIRES WITH 12" STAY SPACING. 2. FABRIC SHALL BE FOR EROSION CONTROL AND MIN. OF 36" IN WIDTH. FABRIC SHALL BE FASTENED ADEQUATELY TO THE WIRE FABRIC AS DIRECTED BY THE ENGINEER. 3. STEEL POST SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER STEEL ANGLE TYPE. TEMPORARY SILT FENCE a 3' 6' VEGETATED EMBANKMENT SHELF NORMAL POOL EL. 36.75 1� �1 3 FOREBAY 3 BOTTOM EL. 33.5 * POND SLOPE TO BE SEEDED IN ACCORDANCE TO SEEDING SPECIFICATIONS " 6:1 VEGETATED SHELF TO BE PLANTED WITH WETLAND SPECIES I.E. COMMON THREE SQUARE, DUCKWEED, PICKEREL WEED, PONDWEED, DETENTIONPOND & FOREBAY SECTION SEDGES, SMARTWEED,WATERWEED & WILD CELERY NTS Approved Construction Plan Name Date Planning Traffic Fi re A I 5 1.D. A 5TL PIPE A - 18"RC r I II R I�IL PLAN TYPE JEJ1CRUPS. ATTACH TO 1-1 1 /�4� BEARING. BARS, //4"GALVANIZED ANGLE FRAME. MORTOR FRAMETO TOP OF OUTLET STRUCTURE. A C TOP OF BANK C 41.5 � 1 iLool 18"RFP I " SECTION A - A FLOOD POOL EL. 40.25 NORMAL POOL EL. 36.75 1 .5 MAIN POOL 1 GALVANIZED WIRE 0 R SMALL DUIMETER r8 MESH .020 WIRE) TEMPORARY GRAVEL 31 FILTER 80TTOM 30.5 DETENTION POND OUTLET STRUCTURE NTS WUPKE VNINH Public Services • Engineering Division APPROVED DRAINAGE PLAN Date: ______- -- Permit #_--- Signed: BOTTOM I=I -47 For each open utility cut of City streets, a $325 permit shall be required from the City prior to occupancy and/or project acceptance. L L c [ M L L L L is NCDOT #5 OR #57 WASHED STONE NCDOT #5 OR WASHED STONI 1. UNFORMLY GRADE A SHALLOW DEPRESSION APPROACHING THE INLET. 2. DRIVE 5-FOOT STEEL POSTS 2 FEET INTO THE GROUND SURROUNDING THE INLET. SPACE POSTS EVENLY AROUND THE PERIMETER OF THE INLET, A MAXIMUM OF 4 FEET APART, 3. SURROIR+D THE PosTS WITH WIRE INESN HARt1WA1tE CIATH. SECURE THE WIRE MESH TO THE SIEEI. POSTS AT THE TOP• MIDOLL AND BOTTOM. PLACINGA 2-FOOT FLAP OF wNRE MESH UNDER THE ORWEL FOR ANCHORING SIS RREECOMMENDED. 4. SLOPE WITH AA HEIGHT ONF1 6 INCHES I�ROUND THEE WIRE.ON A 2AND SMOOTH TO AN EVEN GRADE 3. ONCE THE CONTRIBUTING DRAINAGE AREA HAS KEN STABILIZED, REMOVE ACCUMULATED SEDIMENT, AND ESTABLISH FINAL GRADING ELEVATIONS, S. COMPACT THE AREA PROPERLY AND STABLIZED IT WITH GROUNDCOVER. INSPECT MEETS AT LEAST WEEKLY AND AFTER EACH SICINCANT 4 ARCH OR GREATER) FAWNFALL £VENT. CLEAR THE MESH WERE OF NM DEV43 OR OTHER OBJECTS TO PROVIDE ADEOUATE FLAW FOR SUBSfNatIEM RNNS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE MARE MESH DURING SEDIMENT REM(ML. REPLACE STONE AS HMO. HARDWARE CLOTH AND GRAVEL INLET PROTECTION NTS SEE PLAN FOR PIPE Y 0 IENTATION I I F-+-+--I I I J__ CONC. COLLAR _ -I I CONC. COL BRICK MASON FLOW 3000 PSI CONC FINISH AS GRADED PLAN 1 -o" r / 1//.cMeey�.MREI�re CASTING NOTE: USE DEWEY BROS. CH -ON 3A FOR CATCH FORT YARD DIN LEE'S N-47 SECTION DROP INLET DETAIL NTS STD. CITY OF WILMINGTON M.H. COVER. SEE DETAIL SHEET SD-14-01 & 14-02 -3/4" CEMENT PLASTER MAX. CORBEL 1 " PER L1 COURSE PAVEMENT P LAN SECTION "A -A" GUIDELINES FOR STORM DRAIN MANHOLE SD 2 -03 NOT TO SCALE DATE PRINTED APR 042013 HARDWARE CLOTH OPENINGS) SITE AREA STABILIZATION STABILIZATION DESCRIPTION TIMEFRAME TIMEFRAME L&Qums PERIMETER DIKES, 7 DAYS NONE SWALES, DITCHES AND SLOPES HIGH QUALITY 7 DAYS NONE WATER (HOW) ZONES SLOPES STEEPER 7 DAYS IF SLOPES ARE 10' OR THAN 3:1 LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. SLOPES 3:1 OR 14 DAYS 7 DAYS FOR SLOPES FLATTER GREATER THAN 50 FEET IN LENGTH ALL OTHER AREAS 14 DAYS NONE (EXCEPT FOR WITH SLOPES PERIMETERS AND FLATTER THAN 4:1 HOW ZONES) NPDES GROUND STABILIZATION CRITERIA NTS LATE WINTER do EARLY SPRING TEMPORARY GRASSING DETAIL SEEDING MIXTURE JEEM RATE (Ib4gaa Rye (grain) 120 Mnual laapodeza (Kobe in Piedmont and Coastal Plain, Korean in Mountains) 50 Omit annual Mepedezo wtm duration of temporary cover is not to extend beyond Jun*. SEEDING DATES: Mowkaina - Above 250D ft: Feb. 1%r 15 BNow 2500 ft Feb. 1-May 1 PI*dmont - Jan. 1-May 1 Coodal Plain - Dec. 1-Apr. 15 SOIL AMENDMENTS Follow recommendatlom of sail t**te or appy 2,000 lb/acre ground agricul- tural imeetone and 750 Ib/oere 10-10-10 ferUlizer. MULCH APPLY 4,000 LB{ACRE STRAMi. ANCHOR STRAW BY TACKING WITH ASPHALT. NETTING, OR A MULCH NG TOOL A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE ReferUllxe if growth Is not fully adequote. R*e*ed. referlilize and mulch Hm- m*dlately folbeAnq er*Won or oth*r damage. TEMPORARY SUMMER GRASSING DETAIL SEEDING MIXTURE SPMES BATE (lb/am) Guam MILLET 40 IN THE PIEDMONT MID MOUNTAINS A SMALL-STl]NL1ED SU NQMIGWASS MAY BE SUBSTITUTED AT A RATE of 50 LB/ACRE SEEDING NOTES MOUNTAINS - MAY 15-AXS. 15 PIEDMONT - MAY 1-11UG' 15 ODWAL PLAN - APR. 15 AM 15 SOIL AMENDMENTS FOLLOW LIMESMAT TONS F SOL TEST o-10PPLAFE S0CRE LB/AGROUND A RICUL- 7URALMULCH APPLY 4,000 �SIRAW. ANNL710R STRAW BY TMXM WITH ASPHALT, NETTING. OR A MULCH TOOL A WW WITH BLADES SET NEARLY STRAIGT CAN BE AS NIA.CH ANCFtOfBNG TOOL SITE WORK NOTES 1. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIARIZED WITH EXISTING CONDITIONS BOTH ON AND IMMEDIATELY ADJACENT TO THE SITE. 2. CLEARING: CONTRACTOR SHALL REMOVE ALL TREES AND VEGETATION WITHIN LIMITS OF CONSTRUCTION UNLESS OTHERWISE DESIGNATED TO REMAIN. 3, GRUBBING AND STRIPPING, CONTRACTOR SHALL RAKE AND REMOVE ROOTS, STUMPS, VEGETATION, DEBRIS, EXISTING STRUCTURES ABOVE AND BELOW GRADE, ORGANIC MATERIAL OR ANY OTHER UNSUITABLE MATERIAL WITHIN LIMITS OF CONSTRUCTION. 4. MUCKING: CONTRACTOR SHALL COORDINATE WITH OWNER AND THEIR GEOTECHNICAL REPRESENTATIVE TO COORDINATE REMOVAL OF ANY SOFT AREAS. 5. DISPOSAL: CLEARED, GRUBBED, STRIPPED OR OTHER WASTE MATERIAL SHALL BE REMOVED FROM SITE AND DISPOSED OF IN A PROPERLY PERMITTED FACILITY. 6. FILL AND COMPACTION SHOULD COMPLY WITH GEOTECHNICAL REPORT. 7. THE CONTRACTOR SHALL NOTE THAT THE GRADING PLAN MAY NOT REPRESENT A BALANCED EARTHWORK CONDITION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CUT AND FILL QUANTITIES AND COMPLETE INSTALLATION TO SPECIFIED GRADES. 8. THE CONTRACTOR SHALL FURNISH SUITABLE BORROW MATERIAL FROM AN OFF -SITE PROPERLY PERMITTED FACILITY AS REQUIRED. 9. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES DURING CONSTRUCTION. BEFORE COMMENCING ANY EXCAVATIONS IN OR ALONG ROADWAYS OR RIGHT-OF-WAYS, PUBLIC AREAS OR IN PRIVATE EASEMENTS, THE CONTRACTOR SHALL NOTIFY ALL APPROPRIATE PERSONNEL OF THEIR INTENT TO EXCAVATE, IN WRITING, NOT LESS THAN 10 DAYS PRIOR TO EXCAVATING, 10, THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE DISCONNECTION/ RECONNECTION AND/OR THE RELOCATION OF ALL EXISTING UTILITIES WITH APPROPRIATE PERSONNEL, 11, EXISTING SURVEYING PERFORMED TRIPP ENGINEERING, P.C. 12. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AT THE SITE. FURTHERMORE THE CONTRACTOR SHALL REPORT ALL DISCREPANCIES OR QUESTIONS TO THE ENGINEER PRIOR TO INSTALLATION. 13. THE CONTRACTOR SHALL PROVIDE ANY AND ALL LAYOUT REQUIRED TO CONSTRUCT HIS WORK UNLESS OTHERWISE DIRECTED BY OWNER. 14. ALL PVC UTILITY MAINS SMALL BE INSTALLED WITH A MINIMUM OF 36" COVER AT FINAL GRADE. 15. ALL SERVICE CONNECTIONS SHALL BE INSTALLED TO MEET ALL LOCAL AND STATE CODES. METERS, TAPS, MATERIALS, WORKMANSHIP AND ALL FEES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL COMPLY WITH ALL REQUIREMENTS. 16. ALL PAVEMENT, BASE AND SUBGRADE SHALL CONFORM TO NCDOT STANDARDS INCLUDING WORKMANSHIP, MATERIALS AND EQUIPMENT. APPROPRIATE BARRICADES, SIGNS, LIGHTS OR OTHER TRAFFIC CONTROL DEVICES SHALL BE PROVIDED IN ACCORDANCE WITH NCDOT TO MAINTAIN SAFETY AND TWO WAY TRAFFIC. 17, ALL AREAS SHALL BE GRADED FOR POSITIVE DRAINAGE. THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO INSTALLATION, ALL AREAS SHALL BE SLOPED TO DRAIN AWAY FROM BUILDINGS AT ALL TIMES. 18, CONCRETE STORM DRAINAGE PIPE SHALL BE CLASS III WITH RUBBER GASKETED JOINTS AND INSTALLED IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS, 19, USE WHITE LANE MARKING PAINT FOR ALL PAVEMENT MARKINGS, PAINT SHALL BE A CHLORINATED RUBBER ALKYD, FS TT-P-115, TYPE III, FACTORY MIXED, QUICK DRYING, NON BLEEDING. REFLECTIVE MATERIAL MAY BE ADDED AT OWNER'S OPTION FOR NIGHT REFLECTING. 20. DUCTILE IRON SHALL BE CLASS 50. 21. CONCRETE FOR WALKS, CURBS AND DRIVES SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI ® 28 DAYS - AIR ENTRAINED. 22. FIELD TESTING SHALL BE DONE BY AN INDEPENDENT TESTING LABORATORY PAID FOR BY THE OWNER. FURTHER TESTING REQUIRED DUE TO A FAILED TEST WILL BE PAID FOR BY THE CONTRACTOR. 23_ SEE GEOTECHNICAL REPORT NO. --------, DATED -----, BY --------- ------ FOR ADDITIONAL REQUIREMENTS. CONSTRUCTION SEQUENCE 1. NO CUT SLOPE OR FILL SLOPE SHALL EXCEED A RISE OR FALL OF ONE FOOT FOR EVERY RUN OF 3 FEET (1 VERTICAL TO 3 HORIZONTAL), 2. NO SEDIMENT WILL BE ALLOWED TO EXIT THE SITE. ALL EROSION SHALL BE CONTROLLED INCLUDING SIDE SLOPES DURING AND AFTER CONSTRUCTION, 3. INSTALL PRIMARY EROSION CONTROL MEASURES BEFORE BEGINNING CONSTRUCTION INCLUDING BUT NOT LIMITED TO GRAVELED CONSTRUCTION ENTRANCE, SILT FENCE, CHECK DAMS, ETC. INSTALL ALL SECONDARY EROSION CONTROL MEASURES AS SOON AS POSSIBLE AFTER BEGINNING CONSTRUCTION. 4. ALL EROSION CONTROL MEASURES TO BE INSPECTED AFTER EACH RAIN. SILT FENCE AND INLET PROTECTION ARE TO BE CLEANED WHEN 0.5 FEET OF SEDIMENT HAVE ACCUMULATED IN FRONT OF THE DEVICE OR WHEN THEY LEAK OR FAIL. SEDIMENT TRAPS ARE CLEANED OUT AS STATED OR WHEN HALF FULL. 5. IF APPLICABLE, CONSTRUCT PROPOSED RETENTION POND TO ACT AS A SEDIMENT BASIN DURING CONSTRUCTION. REMOVE ACCUMULATION OF SILT AS REQUIRED TO ALLOW PROPER FUNCTIONING, RESTORE POND TO DESIGN LEVELS AT THE COMPLETION OF CONSTRUCTION. 6. IF APPLICABLE, INSTALL DROP INLETS WITH INLET PROTECTION TO ACT AS SILT TRAPS DURING CONSTRUCTION. REMOVE ACCUMULATED SILT AS NEEDED TO PREVENT SILT FROM ENTERING STORM DRAIN PIPING. 7. A 4" LAYER OF TOPSOIL SHALL BE APPLIED TO ALL NEW AREAS TO BE GRASSED. 8. ALL DISTURBED AREAS WILL BE STABILIZED WITHIN 21 CALENDAR DAYS OF CEASE OF ANY PHASE OF ACTIVITY. THIS INCLUDES SLOPES, SWALES, STOCKPILES AND OTHER UNSTABILIZED AREAS, 9. MAINTAIN ALL EROSION CONTROL MEASURES UNTIL PROJECT IS COMPLETE. 10. MORE STRINGENT MEASURES MAY BE REQUIRED TO HALT EROSION IF THOSE ON THIS PLAN PROVE TO BE LESS EFFECTIVE. 11. REMOVE ALL TEMPORARY EROSION CONTROL MEASURES UPON COMPLETION OF CONSTRUCTION, ALL PERMANENT MEASURES SHALL BE WELL ESTABLISHED PRIOR TO PROJECT COMPLETION. -MAINTENANCE PLAN 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL, BUT IN NO CASE, LESS THAN ONCE EVERY WEEK AND WITHIN 24 HOURS OF EVERY HALF INCH RAINFALL, 2. ALL POINTS OF EGRESS WILL HAVE CONSTRUCTION ENTRANCES THAT WILL BE PERIODICALLY TOP -DRESSED WITH AN ADDITIONAL 2 INCHES OF #4 STONE TO MAINTAIN PROPER DEPTH. THEY WILL BE MAINTAINED IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE SITE. IMMEDIATELY REMOVE OBJECTIONABLE MATERIAL SPILLED, WASHED OR TRACKED ONTO THE CONSTRUCTION ENTRANCE OR ROADWAYS. 3, SEDIMENT WILL BE REMOVED FROM HARDWARE CLOTH AND GRAVEL INLET PROTECTION, BLOCK AND GRAVEL INLET, ROCK DOUGHNUT INLET PROTECTION AND ROCK PIPE INLET PROTECTION WHEN THE DESIGNED STORAGE CAPACITY HAS BEEN HALF FILLED WITH SEDIMENT. ROCK WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS AS DESIGNED. DEBRIS WILL BE REMOVED FROM THE ROCK AND HARDWARE CLOTH TO ALLOW PROPER DRAINAGE. SILT SACKS WILL BE EMPTIED ONCE A WEEK AND AFTER EVERY RAIN EVENT. SEDIMENT WILL BE REMOVED FROM AROUND BEAVER DAMS, DANDY SACKS AND SOCKS ONCE A WEEK AND AFTER EVERY RAIN EVENT. 4. DIVERSION DITCHES WILL BE CLEANED OUT IMMEDIATELY TO REMOVE SEDIMENT OR OBSTRUCTIONS FROM THE FLOW AREA. THE DIVERSION RIDGES WILL ALSO BE REPAIRED. SWALES MUST BE TEMPORARILY STABILIZED WITHIN 21 CALENDAR DAYS OF CEASE OF ANY PHASE OF ACTIVITY ASSOCIATED WITH A SWALE. 5. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES HALF FILLED. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER, STAKES MUST BE STEEL, STAKE SPACING WILL BE 6 FEET MAX. WITH THE USE OF EXTRA STRENGTH FABRIC, WITHOUT WIRE BACKING. STAKE SPACING WILL BE 8 FEET MAX. WHEN STANDARD STRENGTH FABRIC AND WIRE BACKING ARE USED, IF ROCK FILTERS ARE DESIGNED AT LOW POINTS IN THE IN THE SEDIMENT FENCE THE ROCK WILL BE REPAIRED OR REPLACED IF IT BECOMES HALF FULL OF SEDIMENT, NO LONGER DRAINS AS DESIGNED OR IS DAMAGED. 6, SEDIMENT WILL BE REMOVED FROM SEDIMENT TRAPS WHEN THE DESIGNED STORAGE CAPACITY HAS BEEN HALF FILLED WITH SEDIMENT, THE ROCK WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS OR WHEN THE ROCK IS DISLODGED. BAFFLES WILL BE REPAIRED OR REPLACED IF THEY COLLAPSE. TEAR, DECOMPOSE OR BECOME INEFFECTIVE, THEY WILL BE REPLACED PROMPTLY. SEDIMENT WILL BE REMOVED WHEN DEPOSITS REACH HALF THE HEIGHT OF THE 1ST BAFFLE. FLOATING SKIMMERS WILL BE INSPECTED WEEKLY AND WILL BE KEPT CLEAN, 7. SEDIMENT WILL BE REMOVED FROM THE SEDIMENT BASIN WHEN THE DESIGN STORAGE CAPACITY HAS BEEN HALF FILLED WITH SEDIMENT. ROCK WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS OR IF THE ROCK IS DISLODGED. BAFFLES WILL BE REPAIRED OR REPLACED IF THEY TEAR, DECOMPOSE OR BECOME INEFFECTIVE. THEY WILL BE REPLACED PROMPTLY. SEDIMENT WILL BE REMOVED FROM BAFFLES WHEN DEPOSITS REACH HALF THE HEIGHT OF THE 1ST BAFFLE. FLOATING SKIMMERS WILL BE INSPECTED WEEKLY AND WILL BE KEPT CLEAN. 8. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER, ALL SLOPES WILL BE STABILIZED WITHIN 21 CALENDAR DAYS. ALL OTHER AREAS WILL BE STABILIZED WITHIN 15 WORKING DAYS. 9. FLOCCULATES WILL BE USED TO ADDRESS TURBIDITY ISSUES. THE PUMPS, TANKS, HOSES AND INJECTION SYSTEMS WILL BE CHECKED FOR PROBLEMS OR TURBID DISCHARGES DAILY. , USED A �Ir�ln��a-.7VMImcr� MAINTENANCE PERMANENT GRASSING DETAIL' SEEDING MIXTURE ME�YY F LGROWTH IS "Or L17M 0 FULLY OTHERR M%W4E_ REFER11LiZE AND MULCH s1- , ,, PATE AbZMMI FALL -WINTER PENSACOLA 151T00RA55 50 A� PERMANENT GRASSING DETAIL B� "am e T MILLET 10 TEMPORARY FALL GRASSING DETAIL SEEDING MIXTURE50 SEEDING MIXTURE 1EEM RATE AbZQgMl SEEDING NOTES RATE (IbIOCT'� 1 TMRW�YEDIOD OF TOD OR ZD0 1. WHERE NEAT APPEARANCE IS DES, OMIT SERICEA. 2. 115E COMMON BERMUDA GRASS ONLY ON ISOLATED STIES WHERE :FrCAIWWWT Rye (grain) 120 RYE (GRAM) 23 COLS A PEST. BERMUDA GRASS MAY BE REPLACED WITH 5 Ib/aa* SEEDING NOTES SEEDING DATES JIO ARf - APRL SEEDING DATES MOUNTAINS - AUG. 15-DEC. 15 IICIST - DECEMNBER COASTAL PLAN and PIEDMONT - AM. 15-DO 30 APRL 1 - JMY 15 SOL AMENDMENTS SOIL AMENDMENTS IDLY LTAE AND FTRIL¢ER ATX:OROINO TO SOL TESTS, OR APPLY 3.000•-S.DOD Ib/ocn SOIL AMENDMENTS O b MICULUMLI��ocm 10-10-10 � THE LOWER RATE ON SANDY SONS) AND APPLY LIME AND FERTILIZER ACCORDING TO SOL TESTS, OR APPLY (2y FOLLOW SOIL 1ES15 OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL / GROUND AGRICULTURE LrESTOME AND SOD b/ocm 10-10-10 FEIMMER. LIMESTONE AND 1,000 LB/ACRE 1D-10-10 FEFTTILMER. MILCH MULCH /PLY 4,00D b/ocm GRAIL STRAW OR EOIINALENT WvER OF ANOTHER sUITABLE MULCH WLCHI 440M STRAW BY TACIONO WITH ASPHALT iiDAI. A OR NEr= OR BY MFI APPLY 4,000 LB/ACRE SrRtW. ANCHOR SWW BY TACLDNG WITH ASPMT, NEnW-, � Wn A MULCH ANCHORIIO TOOL. A DISK WITH aADE5 SET NEARLY STRAIGHT CAN _ OR A MULCH NG TOOL A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE H USED AS A MULCH AK FgR1NG TOOL APPLY 4,ODO b TACKING MWOSPHALT, OF ANOTHER SUITABLE USED AS A MULCH ANCHORING TOOL i WITH A MULOH ANCHORING TOOL A DISK WT114 USED AS A MULCH ANCHORING TOOL 2: MAINTENANCE M#flMNANCE Repair and refertilize damaged arose imm*dlat*Iy Topdrsee with 50 Ib/aero FB1TXIZE ACCORDING TO SOL TESTS OR APPLY 40 �6�[/o�cve� �NRRUGEN IN JANLWM '` U iJ of niUngen in March. N It s ne Remy to extend t*rnporary cover 09 ITORUARY, 40 b IN SEPTEMBER AND 40 b IN NOAIETABE7R. FROM A 12-4-8. MNINTENANCE < June 15. overseed with SO /acre Kobe (Piedmont and Coastal P1a 0- i OR SIMIAR TURF Funta R. AVOID FERILLZQt APPLICATIONS DURING € = or Korean (Mountains) kapedeaa in late February tw eery March. Wft WEATHER, AS THIS: DICREASES STAND LOSSES TO DISEASE. REMM, FESTL�E REFERILIZE THE FOLLOAHING APRL WITH 50 Ib/ INfrR00p1. REPEAT AS GROWTH AD MULCH DALNGED AREAS IMMEDIATELY. MOW TO A HEIGHT OF 2.5-3.5 INCHES REWIRES • 1MY BE MOWED ONLY ONCE A YEAk A NEAT. APPFj1RANCE 1$ _.... _ AS NEEDED. DESIED, OMIT SER CEA AND MOW AS OFTEN AS NEEDED. REVISIONS Date I Description I By U1 U � z o W � E z � o � z A � th Cl)z E A V W T...I O llqdq r �w 01) ZV W O Z04 O �--1 rr�� ,�`cam^^D L0cc cc Lo U z O I I a O O O w ° z O -1--> ,--I r-I O_ w 4w a Z n r ��-•--II �V, O � � a, 4",O DATE 04-04-13 DESIGN PGT DRAWN EJW c2 SHEET 2 OF 2 13004 - - .. I .. - -� -� -- .- i- �---,j! �•r�Try {r-,�r1;-� S l:l 'L '�',',1 -:: � �I 1, �.1� .}"A1T-i3��{�': �1T,F'11�1� NPDES GROUND STABILIZATION CRITERIA NTS LATE WINTER do EARLY SPRING TEMPORARY GRASSING DETAIL SEEDING MIXTURE JEEM RATE (Ib4gaa Rye (grain) 120 Mnual laapodeza (Kobe in Piedmont and Coastal Plain, Korean in Mountains) 50 Omit annual Mepedezo wtm duration of temporary cover is not to extend beyond Jun*. SEEDING DATES: Mowkaina - Above 250D ft: Feb. 1%r 15 BNow 2500 ft Feb. 1-May 1 PI*dmont - Jan. 1-May 1 Coodal Plain - Dec. 1-Apr. 15 SOIL AMENDMENTS Follow recommendatlom of sail t**te or appy 2,000 lb/acre ground agricul- tural imeetone and 750 Ib/oere 10-10-10 ferUlizer. MULCH APPLY 4,000 LB{ACRE STRAMi. ANCHOR STRAW BY TACKING WITH ASPHALT. NETTING, OR A MULCH NG TOOL A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE ReferUllxe if growth Is not fully adequote. R*e*ed. referlilize and mulch Hm- m*dlately folbeAnq er*Won or oth*r damage. TEMPORARY SUMMER GRASSING DETAIL SEEDING MIXTURE SPMES BATE (lb/am) Guam MILLET 40 IN THE PIEDMONT MID MOUNTAINS A SMALL-STl]NL1ED SU NQMIGWASS MAY BE SUBSTITUTED AT A RATE of 50 LB/ACRE SEEDING NOTES MOUNTAINS - MAY 15-AXS. 15 PIEDMONT - MAY 1-11UG' 15 ODWAL PLAN - APR. 15 AM 15 SOIL AMENDMENTS FOLLOW LIMESMAT TONS F SOL TEST o-10PPLAFE S0CRE LB/AGROUND A RICUL- 7URALMULCH APPLY 4,000 �SIRAW. ANNL710R STRAW BY TMXM WITH ASPHALT, NETTING. OR A MULCH TOOL A WW WITH BLADES SET NEARLY STRAIGT CAN BE AS NIA.CH ANCFtOfBNG TOOL SITE WORK NOTES 1. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIARIZED WITH EXISTING CONDITIONS BOTH ON AND IMMEDIATELY ADJACENT TO THE SITE. 2. CLEARING: CONTRACTOR SHALL REMOVE ALL TREES AND VEGETATION WITHIN LIMITS OF CONSTRUCTION UNLESS OTHERWISE DESIGNATED TO REMAIN. 3, GRUBBING AND STRIPPING, CONTRACTOR SHALL RAKE AND REMOVE ROOTS, STUMPS, VEGETATION, DEBRIS, EXISTING STRUCTURES ABOVE AND BELOW GRADE, ORGANIC MATERIAL OR ANY OTHER UNSUITABLE MATERIAL WITHIN LIMITS OF CONSTRUCTION. 4. MUCKING: CONTRACTOR SHALL COORDINATE WITH OWNER AND THEIR GEOTECHNICAL REPRESENTATIVE TO COORDINATE REMOVAL OF ANY SOFT AREAS. 5. DISPOSAL: CLEARED, GRUBBED, STRIPPED OR OTHER WASTE MATERIAL SHALL BE REMOVED FROM SITE AND DISPOSED OF IN A PROPERLY PERMITTED FACILITY. 6. FILL AND COMPACTION SHOULD COMPLY WITH GEOTECHNICAL REPORT. 7. THE CONTRACTOR SHALL NOTE THAT THE GRADING PLAN MAY NOT REPRESENT A BALANCED EARTHWORK CONDITION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CUT AND FILL QUANTITIES AND COMPLETE INSTALLATION TO SPECIFIED GRADES. 8. THE CONTRACTOR SHALL FURNISH SUITABLE BORROW MATERIAL FROM AN OFF -SITE PROPERLY PERMITTED FACILITY AS REQUIRED. 9. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES DURING CONSTRUCTION. BEFORE COMMENCING ANY EXCAVATIONS IN OR ALONG ROADWAYS OR RIGHT-OF-WAYS, PUBLIC AREAS OR IN PRIVATE EASEMENTS, THE CONTRACTOR SHALL NOTIFY ALL APPROPRIATE PERSONNEL OF THEIR INTENT TO EXCAVATE, IN WRITING, NOT LESS THAN 10 DAYS PRIOR TO EXCAVATING, 10, THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE DISCONNECTION/ RECONNECTION AND/OR THE RELOCATION OF ALL EXISTING UTILITIES WITH APPROPRIATE PERSONNEL, 11, EXISTING SURVEYING PERFORMED TRIPP ENGINEERING, P.C. 12. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AT THE SITE. FURTHERMORE THE CONTRACTOR SHALL REPORT ALL DISCREPANCIES OR QUESTIONS TO THE ENGINEER PRIOR TO INSTALLATION. 13. THE CONTRACTOR SHALL PROVIDE ANY AND ALL LAYOUT REQUIRED TO CONSTRUCT HIS WORK UNLESS OTHERWISE DIRECTED BY OWNER. 14. ALL PVC UTILITY MAINS SMALL BE INSTALLED WITH A MINIMUM OF 36" COVER AT FINAL GRADE. 15. ALL SERVICE CONNECTIONS SHALL BE INSTALLED TO MEET ALL LOCAL AND STATE CODES. METERS, TAPS, MATERIALS, WORKMANSHIP AND ALL FEES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL COMPLY WITH ALL REQUIREMENTS. 16. ALL PAVEMENT, BASE AND SUBGRADE SHALL CONFORM TO NCDOT STANDARDS INCLUDING WORKMANSHIP, MATERIALS AND EQUIPMENT. APPROPRIATE BARRICADES, SIGNS, LIGHTS OR OTHER TRAFFIC CONTROL DEVICES SHALL BE PROVIDED IN ACCORDANCE WITH NCDOT TO MAINTAIN SAFETY AND TWO WAY TRAFFIC. 17, ALL AREAS SHALL BE GRADED FOR POSITIVE DRAINAGE. THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO INSTALLATION, ALL AREAS SHALL BE SLOPED TO DRAIN AWAY FROM BUILDINGS AT ALL TIMES. 18, CONCRETE STORM DRAINAGE PIPE SHALL BE CLASS III WITH RUBBER GASKETED JOINTS AND INSTALLED IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS, 19, USE WHITE LANE MARKING PAINT FOR ALL PAVEMENT MARKINGS, PAINT SHALL BE A CHLORINATED RUBBER ALKYD, FS TT-P-115, TYPE III, FACTORY MIXED, QUICK DRYING, NON BLEEDING. REFLECTIVE MATERIAL MAY BE ADDED AT OWNER'S OPTION FOR NIGHT REFLECTING. 20. DUCTILE IRON SHALL BE CLASS 50. 21. CONCRETE FOR WALKS, CURBS AND DRIVES SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI ® 28 DAYS - AIR ENTRAINED. 22. FIELD TESTING SHALL BE DONE BY AN INDEPENDENT TESTING LABORATORY PAID FOR BY THE OWNER. FURTHER TESTING REQUIRED DUE TO A FAILED TEST WILL BE PAID FOR BY THE CONTRACTOR. 23_ SEE GEOTECHNICAL REPORT NO. --------, DATED -----, BY --------- ------ FOR ADDITIONAL REQUIREMENTS. CONSTRUCTION SEQUENCE 1. NO CUT SLOPE OR FILL SLOPE SHALL EXCEED A RISE OR FALL OF ONE FOOT FOR EVERY RUN OF 3 FEET (1 VERTICAL TO 3 HORIZONTAL), 2. NO SEDIMENT WILL BE ALLOWED TO EXIT THE SITE. ALL EROSION SHALL BE CONTROLLED INCLUDING SIDE SLOPES DURING AND AFTER CONSTRUCTION, 3. INSTALL PRIMARY EROSION CONTROL MEASURES BEFORE BEGINNING CONSTRUCTION INCLUDING BUT NOT LIMITED TO GRAVELED CONSTRUCTION ENTRANCE, SILT FENCE, CHECK DAMS, ETC. INSTALL ALL SECONDARY EROSION CONTROL MEASURES AS SOON AS POSSIBLE AFTER BEGINNING CONSTRUCTION. 4. ALL EROSION CONTROL MEASURES TO BE INSPECTED AFTER EACH RAIN. SILT FENCE AND INLET PROTECTION ARE TO BE CLEANED WHEN 0.5 FEET OF SEDIMENT HAVE ACCUMULATED IN FRONT OF THE DEVICE OR WHEN THEY LEAK OR FAIL. SEDIMENT TRAPS ARE CLEANED OUT AS STATED OR WHEN HALF FULL. 5. IF APPLICABLE, CONSTRUCT PROPOSED RETENTION POND TO ACT AS A SEDIMENT BASIN DURING CONSTRUCTION. REMOVE ACCUMULATION OF SILT AS REQUIRED TO ALLOW PROPER FUNCTIONING, RESTORE POND TO DESIGN LEVELS AT THE COMPLETION OF CONSTRUCTION. 6. IF APPLICABLE, INSTALL DROP INLETS WITH INLET PROTECTION TO ACT AS SILT TRAPS DURING CONSTRUCTION. REMOVE ACCUMULATED SILT AS NEEDED TO PREVENT SILT FROM ENTERING STORM DRAIN PIPING. 7. A 4" LAYER OF TOPSOIL SHALL BE APPLIED TO ALL NEW AREAS TO BE GRASSED. 8. ALL DISTURBED AREAS WILL BE STABILIZED WITHIN 21 CALENDAR DAYS OF CEASE OF ANY PHASE OF ACTIVITY. THIS INCLUDES SLOPES, SWALES, STOCKPILES AND OTHER UNSTABILIZED AREAS, 9. MAINTAIN ALL EROSION CONTROL MEASURES UNTIL PROJECT IS COMPLETE. 10. MORE STRINGENT MEASURES MAY BE REQUIRED TO HALT EROSION IF THOSE ON THIS PLAN PROVE TO BE LESS EFFECTIVE. 11. REMOVE ALL TEMPORARY EROSION CONTROL MEASURES UPON COMPLETION OF CONSTRUCTION, ALL PERMANENT MEASURES SHALL BE WELL ESTABLISHED PRIOR TO PROJECT COMPLETION. -MAINTENANCE PLAN 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL, BUT IN NO CASE, LESS THAN ONCE EVERY WEEK AND WITHIN 24 HOURS OF EVERY HALF INCH RAINFALL, 2. ALL POINTS OF EGRESS WILL HAVE CONSTRUCTION ENTRANCES THAT WILL BE PERIODICALLY TOP -DRESSED WITH AN ADDITIONAL 2 INCHES OF #4 STONE TO MAINTAIN PROPER DEPTH. THEY WILL BE MAINTAINED IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE SITE. IMMEDIATELY REMOVE OBJECTIONABLE MATERIAL SPILLED, WASHED OR TRACKED ONTO THE CONSTRUCTION ENTRANCE OR ROADWAYS. 3, SEDIMENT WILL BE REMOVED FROM HARDWARE CLOTH AND GRAVEL INLET PROTECTION, BLOCK AND GRAVEL INLET, ROCK DOUGHNUT INLET PROTECTION AND ROCK PIPE INLET PROTECTION WHEN THE DESIGNED STORAGE CAPACITY HAS BEEN HALF FILLED WITH SEDIMENT. ROCK WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS AS DESIGNED. DEBRIS WILL BE REMOVED FROM THE ROCK AND HARDWARE CLOTH TO ALLOW PROPER DRAINAGE. SILT SACKS WILL BE EMPTIED ONCE A WEEK AND AFTER EVERY RAIN EVENT. SEDIMENT WILL BE REMOVED FROM AROUND BEAVER DAMS, DANDY SACKS AND SOCKS ONCE A WEEK AND AFTER EVERY RAIN EVENT. 4. DIVERSION DITCHES WILL BE CLEANED OUT IMMEDIATELY TO REMOVE SEDIMENT OR OBSTRUCTIONS FROM THE FLOW AREA. THE DIVERSION RIDGES WILL ALSO BE REPAIRED. SWALES MUST BE TEMPORARILY STABILIZED WITHIN 21 CALENDAR DAYS OF CEASE OF ANY PHASE OF ACTIVITY ASSOCIATED WITH A SWALE. 5. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES HALF FILLED. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER, STAKES MUST BE STEEL, STAKE SPACING WILL BE 6 FEET MAX. WITH THE USE OF EXTRA STRENGTH FABRIC, WITHOUT WIRE BACKING. STAKE SPACING WILL BE 8 FEET MAX. WHEN STANDARD STRENGTH FABRIC AND WIRE BACKING ARE USED, IF ROCK FILTERS ARE DESIGNED AT LOW POINTS IN THE IN THE SEDIMENT FENCE THE ROCK WILL BE REPAIRED OR REPLACED IF IT BECOMES HALF FULL OF SEDIMENT, NO LONGER DRAINS AS DESIGNED OR IS DAMAGED. 6, SEDIMENT WILL BE REMOVED FROM SEDIMENT TRAPS WHEN THE DESIGNED STORAGE CAPACITY HAS BEEN HALF FILLED WITH SEDIMENT, THE ROCK WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS OR WHEN THE ROCK IS DISLODGED. BAFFLES WILL BE REPAIRED OR REPLACED IF THEY COLLAPSE. TEAR, DECOMPOSE OR BECOME INEFFECTIVE, THEY WILL BE REPLACED PROMPTLY. SEDIMENT WILL BE REMOVED WHEN DEPOSITS REACH HALF THE HEIGHT OF THE 1ST BAFFLE. FLOATING SKIMMERS WILL BE INSPECTED WEEKLY AND WILL BE KEPT CLEAN, 7. SEDIMENT WILL BE REMOVED FROM THE SEDIMENT BASIN WHEN THE DESIGN STORAGE CAPACITY HAS BEEN HALF FILLED WITH SEDIMENT. ROCK WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS OR IF THE ROCK IS DISLODGED. BAFFLES WILL BE REPAIRED OR REPLACED IF THEY TEAR, DECOMPOSE OR BECOME INEFFECTIVE. THEY WILL BE REPLACED PROMPTLY. SEDIMENT WILL BE REMOVED FROM BAFFLES WHEN DEPOSITS REACH HALF THE HEIGHT OF THE 1ST BAFFLE. FLOATING SKIMMERS WILL BE INSPECTED WEEKLY AND WILL BE KEPT CLEAN. 8. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER, ALL SLOPES WILL BE STABILIZED WITHIN 21 CALENDAR DAYS. ALL OTHER AREAS WILL BE STABILIZED WITHIN 15 WORKING DAYS. 9. FLOCCULATES WILL BE USED TO ADDRESS TURBIDITY ISSUES. THE PUMPS, TANKS, HOSES AND INJECTION SYSTEMS WILL BE CHECKED FOR PROBLEMS OR TURBID DISCHARGES DAILY. , USED A �Ir�ln��a-.7VMImcr� MAINTENANCE PERMANENT GRASSING DETAIL' SEEDING MIXTURE ME�YY F LGROWTH IS "Or L17M 0 FULLY OTHERR M%W4E_ REFER11LiZE AND MULCH s1- , ,, PATE AbZMMI FALL -WINTER PENSACOLA 151T00RA55 50 A� PERMANENT GRASSING DETAIL B� "am e T MILLET 10 TEMPORARY FALL GRASSING DETAIL SEEDING MIXTURE50 SEEDING MIXTURE 1EEM RATE AbZQgMl SEEDING NOTES RATE (IbIOCT'� 1 TMRW�YEDIOD OF TOD OR ZD0 1. WHERE NEAT APPEARANCE IS DES, OMIT SERICEA. 2. 115E COMMON BERMUDA GRASS ONLY ON ISOLATED STIES WHERE :FrCAIWWWT Rye (grain) 120 RYE (GRAM) 23 COLS A PEST. BERMUDA GRASS MAY BE REPLACED WITH 5 Ib/aa* SEEDING NOTES SEEDING DATES JIO ARf - APRL SEEDING DATES MOUNTAINS - AUG. 15-DEC. 15 IICIST - DECEMNBER COASTAL PLAN and PIEDMONT - AM. 15-DO 30 APRL 1 - JMY 15 SOL AMENDMENTS SOIL AMENDMENTS IDLY LTAE AND FTRIL¢ER ATX:OROINO TO SOL TESTS, OR APPLY 3.000•-S.DOD Ib/ocn SOIL AMENDMENTS O b MICULUMLI��ocm 10-10-10 � THE LOWER RATE ON SANDY SONS) AND APPLY LIME AND FERTILIZER ACCORDING TO SOL TESTS, OR APPLY (2y FOLLOW SOIL 1ES15 OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL / GROUND AGRICULTURE LrESTOME AND SOD b/ocm 10-10-10 FEIMMER. LIMESTONE AND 1,000 LB/ACRE 1D-10-10 FEFTTILMER. MILCH MULCH /PLY 4,00D b/ocm GRAIL STRAW OR EOIINALENT WvER OF ANOTHER sUITABLE MULCH WLCHI 440M STRAW BY TACIONO WITH ASPHALT iiDAI. A OR NEr= OR BY MFI APPLY 4,000 LB/ACRE SrRtW. ANCHOR SWW BY TACLDNG WITH ASPMT, NEnW-, � Wn A MULCH ANCHORIIO TOOL. A DISK WITH aADE5 SET NEARLY STRAIGHT CAN _ OR A MULCH NG TOOL A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE H USED AS A MULCH AK FgR1NG TOOL APPLY 4,ODO b TACKING MWOSPHALT, OF ANOTHER SUITABLE USED AS A MULCH ANCHORING TOOL i WITH A MULOH ANCHORING TOOL A DISK WT114 USED AS A MULCH ANCHORING TOOL 2: MAINTENANCE M#flMNANCE Repair and refertilize damaged arose imm*dlat*Iy Topdrsee with 50 Ib/aero FB1TXIZE ACCORDING TO SOL TESTS OR APPLY 40 �6�[/o�cve� �NRRUGEN IN JANLWM '` U iJ of niUngen in March. N It s ne Remy to extend t*rnporary cover 09 ITORUARY, 40 b IN SEPTEMBER AND 40 b IN NOAIETABE7R. FROM A 12-4-8. MNINTENANCE < June 15. overseed with SO /acre Kobe (Piedmont and Coastal P1a 0- i OR SIMIAR TURF Funta R. AVOID FERILLZQt APPLICATIONS DURING € = or Korean (Mountains) kapedeaa in late February tw eery March. Wft WEATHER, AS THIS: DICREASES STAND LOSSES TO DISEASE. REMM, FESTL�E REFERILIZE THE FOLLOAHING APRL WITH 50 Ib/ INfrR00p1. REPEAT AS GROWTH AD MULCH DALNGED AREAS IMMEDIATELY. MOW TO A HEIGHT OF 2.5-3.5 INCHES REWIRES • 1MY BE MOWED ONLY ONCE A YEAk A NEAT. APPFj1RANCE 1$ _.... _ AS NEEDED. DESIED, OMIT SER CEA AND MOW AS OFTEN AS NEEDED. REVISIONS Date I Description I By U1 U � z o W � E z � o � z A � th Cl)z E A V W T...I O llqdq r �w 01) ZV W O Z04 O �--1 rr�� ,�`cam^^D L0cc cc Lo U z O I I a O O O w ° z O -1--> ,--I r-I O_ w 4w a Z n r ��-•--II �V, O � � a, 4",O DATE 04-04-13 DESIGN PGT DRAWN EJW c2 SHEET 2 OF 2 13004 - - .. I .. - -� -� -- .- i- �---,j! �•r�Try {r-,�r1;-� S l:l 'L '�',',1 -:: � �I 1, �.1� .}"A1T-i3��{�': �1T,F'11�1� REVISIONS Date I Description I By U1 U � z o W � E z � o � z A � th Cl)z E A V W T...I O llqdq r �w 01) ZV W O Z04 O �--1 rr�� ,�`cam^^D L0cc cc Lo U z O I I a O O O w ° z O -1--> ,--I r-I O_ w 4w a Z n r ��-•--II �V, O � � a, 4",O DATE 04-04-13 DESIGN PGT DRAWN EJW c2 SHEET 2 OF 2 13004 - - .. I .. - -� -� -- .- i- �---,j! �•r�Try {r-,�r1;-� S l:l 'L '�',',1 -:: � �I 1, �.1� .}"A1T-i3��{�': �1T,F'11�1� W T...I O llqdq r �w 01) ZV W O Z04 O �--1 rr�� ,�`cam^^D L0cc cc Lo U z O I I a O O O w ° z O -1--> ,--I r-I O_ w 4w a Z n r ��-•--II �V, O � � a, 4",O DATE 04-04-13 DESIGN PGT DRAWN EJW c2 SHEET 2 OF 2 13004 - - .. I .. - -� -� -- .- i- �---,j! �•r�Try {r-,�r1;-� S l:l 'L '�',',1 -:: � �I 1, �.1� .}"A1T-i3��{�': �1T,F'11�1� DATE 04-04-13 DESIGN PGT DRAWN EJW c2 SHEET 2 OF 2 13004 - - .. I .. - -� -� -- .- i- �---,j! �•r�Try {r-,�r1;-� S l:l 'L '�',',1 -:: � �I 1, �.1� .}"A1T-i3��{�': �1T,F'11�1� I STORMWATER DETENTION POND OITCH PROPOSED 6' TOP OF BANK 41.5 49 "0 CHAIN -LINK FENCE CITY FLOOD POOL 40.25 ERMANENT POOL 36.5 BOTTOM 30.5 (1) 4' GATE INV. 335. 65 PROPOSED 5' 1 7" " CHAIN -LINK FENCE 24CONCRETE PIPE (2) 5' GATES -20'EMERCEN Y-- SP IL- WAY ,TE� E GAT 41.0 BCP 0 al. I - OUTLET STRUCTURE; q RCP EXIST. SDMH SEE DETAIL RIM 40.5 INV 36.35 ECR�ATION ;AREA 6f 98, Li NOTE: REAR HALF OF--- 32.0 1 hIBUILDING HEIGHT IS 24�6#o 35.5 (f) EXIST. BUILDING Lo 37.5' 5also ' RIPRAP STABILIZATION; ELEV 15,000 S.F. • F.F.E. 42.5 Y Ln Ln 35.5 40.25 0322 C: LLJ p P e V, V'j ,4_j j , (0 - 18' FES W/ 33.5 Ln I O'x 1 5'x 18" ED U INV 36.5 < �5 CATCH BASIN 1� V�l✓D RIM 42.35 Vf� Z�z N �' W�l r. _P 8" RC 90.00- AZ ne EXIST. - SbMH 1 7 RIM 40.5 P PROPOSED V 36.8 pine F.Fl. -PROPOSED 6' 149 CHAIN-LIMI -FENCE J7 DITCH S SWH IN o. 3 Act 5 RIM �. 0 SITE DATA INV 3-47.0--_, PROPERTY OWNER BISHOP & ZAPPLE LLC 44.72 PROJECT ADDRESS 3529 CAROLINA BEACH RD PIN NUMBER R0651 1 -001 -011 -000 AREA NOT IN A FEMA I 00-YEAR FLOOD ZONE. ZONING DISTRICT CB -COMMUNITY BUSINESS DISTURBED AREA .13 AC (5,650 SF) '1--1 3981 SETBACKS REQUIRED FRONT: 20' REAR: 10' SIDE: 0'/0' N/F CAMERON PROPERTIES PROPOSED SETBACKS FRONT: 247' ZONING: R-15 REAR: 247' USE: VACANT SIDE: 23'/11' TRACT AREA 86,554 SF (1.987 AC) BUILDING USE GYMNASTICS EXISTING BUILDING AREA 15,000 SF PROPOSED BUILDING AREA (GROSS) 2,523 SF BUILDING LOT COVERAGE (2,523/86,554) 3% NUMBER OF BUILDINGS 2 BUILDING HEIGHT 16'/26' NUMBER OF STORIES 1 SF PER FLOOR 15,000 SF & 2,523 SF EXISTING IMPERVIOUS AREAS: EXISTING BUILDING 15,000 SF EXISTING ASPHALT + CURB 18,166 SF EXISTING CONCRETE (SIDEWALK) 1,560 SF EXISTING IMPERVIOUS AREA 34,726 SF (40%) PROPOSED IMPERVIOUS AREAS: (ON -SITE) PROPOSED BUILDING FOOTPRINT 2,523 SF PROPOSED ASPHALT + CURB 0 SF PROPOSED CONCRETE 0 SF PROPOSED IMPERVIOUS AREA 2,523 SF (3%) PROPOSED+ EXISTING IMPERVIOUS AREA 37,249 SF (43%) PARKING REQUIRED: MINIMUM: 1/300 �17,523X.400) 44 SPACES ( MAXIMUM: 1/200 7, 300) 58 SPACES PARKING PROVIDED: 45 SPACES CAMA LAND USE: URBAN PUBLIC WATER AND SEWER BY CFPUA EXISTING WATER FLOW: 1980 GPD EXISTING SEWER FLOW: 1,800 GPD PROPOSED WATER FLOW: (120 GPD/1,000 SF x 17,523 x 110%) 2,313 GPD PROPOSED SEWER FLOW: (120 GPD/1000 SF x 17,523 SF) 2,103 GPD HANDICAP SPOTS REQUIRED PROPOSED � 1-25 SPOTS= 1 HANDICAP SPOT) 5 SPOTS/25=1.8 2 HANIDCAP SPOTS NOTE: 1) WATER AND SEWER SERVICE FROM EXISTING BUILDING 2) BUILDING NOT SPRINKLERED. CONTRACTOR TO LOCATE SDMH No. 6 AT SDMH No.1 RIM 41.75 INV 37.7 SDMH No.2 RIM 42.0 INV 37.5 N/F COTTLE DB 1880 PG 768 ZONING: CB HqF* VACANT EXIST SHRUBS (1 ) EXIST TREE BLDG. ENCROACHMENT '---24" FES INV 37.5 CONTRACTOR TO LINE OPENING TO FES WITH FABRIC AND CLASS B RIPRAP AND MAINTAIN POSITIVE SLOPE N/F BULLOCK DB 721 PG 95 PROPOSED 6' ZONING: CB CHAIN-LlNFENCE C USE: RESIDENTIAL 9 all, Oak (1) 3' GATE Cf) 0 /FORMERLY WE-PLANIV7, Q­.'t (Dq NOTnbisTUR 2 BUFFER LLJ 7 Z47 99C"U M 4MaE 0'l m FT1 < RECRPA70N AREA c) n k l_ Ld k u� N/F CAMERON PROPERTIES Cn ZONING: R-15 USE: VACANT 01TCH,- 12- pire _j MAP OF NEWKIRK M, MAP BOOK 25 PACE 149 < r e_ N/F BULLOCK N/F COTTLE DBll 68 PG11 20 ZONING: CB USE: RESIDENTIAL es POWER POLE," fl-rr-I r, r-r,%/ A rn r% AIPPROXIMNTE LOCATION OF EXISTING 12" WATER APPROXIAATE LOCATION OF EXIS�ING 8" PVC SS , 413,20 5 0931 EXIST. 5' CONC ETE SIDEWALK (j EXIST TREES OF WILMINGTON APRON T TREES (2) EXISI TREES (3) EXIS-n SHRUBS A ------ ------- §26-03'00"E 120.68' I.tII3 ems) 7 la 54 415700 EXISTING S CLEANOUT C. 39.87 TOP lEXIST. 43,36 WATER METER ak EXISTING' WA L R SERVICE TO BE EQUIP'eEp WITH CITY OF WILMINGTON APPROVED ",,gACKFLOj PFREVENTER �4.4083 I SOING 0 CDBUCD ki oCD 42,3448 N/F COTTLE kb 920 DB 1168 PG 1 12 0` ZONING: CB 3,44 USE: COMMERCIAL A- 0 N/F MILLER � DB 1369 PG 1575 I u ZONING: CB 'yY��APPROXIMTE LOCATION USE: COMMERCIAL OF FIRE HYDRANT I LEGEND EXISTING CONTOUR • 31"" EXISTING SPOT ELEVATION W-1- 1,IP PROPOSED SPOT ELEVATION x TEMPORARY SILT FENCE PROPOSED CHAIN LINK FENCE CURB INLET w/INLET PROTECTION STORMWATER RUNOFF DIRECTION CHDLANDSCAPING w/AREA LIMITS OF DISTURBANCE STREETYARD w/AREA EXIST. CONCRETE AREA EXISTING TREE EXISTING TREE TO BE REMOVED DATE PRINTED WETLANDS APR 0 4 2013 _j SITE P BAR SCALE 1 2) =20' t 0' 10 01 20 40 60 VICINITY MAP NTS OWNER: BISHOP & ZAPPLE, LLC. ADDRESS: 2831 CAROLINA BEACH ROAD WILMINGTON, NC 28412 7 REVISIONS Description I By z Z C) 0 1­4 P4 Co Fq Z z C:) L) z F-1 C �D p A W E-4 Z Z 0 E­4 L) Z F-1 0 Cz Z 0 z 0 E-4 0 E--1 CD 00 C\2 z 0 zQ) C::) Q) j..4 �, V-4 C) co 4-) P �0 � 0 Lo u 0 1 1 41 Kc, r- Ld I z� 4--) to b C:) 0 C Ld 40 m (m a- 53 Q) m r, 0 0 E­i *trz \CARO�\\\ � � I I I I I I I / /I ///" -Kl ...... z S E A L 17,374 DATE 04-04-13 DESIGN IPGT DRAWN EJW Cl SHEET 1 OF 2 13004 T 1 41, ti. TOP OF BANK EL. 41.5 NORMAL POOL EL. 36.75 1\ 3 * POND SLOPE TO BE SEEDED IN ACCORDANCE TO SEEDING SPECIFICATIONS * 6:1 VEGETATED SHELF TO BE PLANTED WITH WETLAND SPECIES I.E. COMMON THREE SQUARE, DUCKWEED, PICKEREL WEED, PONDWEED, SEDGES, SMARTWEED,WATERWEED & WILD CELERY Approved Construction Plan Name Date Planning Traffic Fi re 2-1/2 GA. o m EDIATE WIRESI LJ L� STEEL POST WIRE FABRIC FILTER FABRIC I I \- ANCHOR FABRIC SKIRT AS DIRECTED BY ENGINEER u u NOTES: 1. FENCE FABRIC SHALL BE A MIN. OF 32" IN WIDTH AND SHALL HAVE A MIN. OF SIX LINE WIRES WITH 12" STAY SPACING. 2. FABRIC SHALL BE FOR EROSION CONTROL AND MIN. OF 36" IN WIDTH. FABRIC SHALL BE FASTENED ADEQUATELY TO THE WIRE FABRIC AS DIRECTED BY THE ENGINEER. 3. STEEL POST SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER STEEL ANGLE TYPE. TEMPORARY SILT FENCE NTS 3' 6' VEGETATED EMBANKMENT SHELF �1 FOREBAY 3 \1L BOTTOM EL. 33.5 1.5 DETENTION POND & FOREBAY SECTION NTS Date: -- Signed: FLOOD POOL EL. 40.25 NORMAL POOL EL. 36.75 MAIN POOL q 5 I.D. 18"RC STL PIPE A �I I� PLAN GALV. BAR GRATING - 1" x 1/8" BEARING BARS. FASTEN WITH TYPE J CLIPS. ATTACH TO 1-1/4" x 1-1/4* x1 4" RE GALVANIZED ATTACH GALVANIZED WI ANGLE FRAME. MORTOR FRAME TO TOP 0 OU STRUCTURE. CLOTH OVER SMALL DIAMETER TOP OF BANK ORIFICE (8 MESH .020 WIRE) 41.5 3 -11 iLOOD POOL 40.25 18"R1PP NORMAL POOL 36. I.s L 4'-0 I. SECTION A -- A TEMPORARY GRAVEL 3 FILTER 1 BOTTOM 30.5 DETENTION _ P-V OUTLE--. STRUCTURE NTS (:TI'Y OR NOR1•H CQR N GTON Public Services* Engineering Division APPROVED DRAINAGE PLAN -_-___ Permit #--------- _-- BOTTOM EL. 32.0 For each open utility cut of City streets, a $325 permit Shall be required from the City prior to occupancy and/or project acceptance. L Lj J O d 7.5» NCDOT #5 OR #57 WASHED STONE NCDOT #5 OR WASHED STON 1. UNIFORMLY GRACE A SHALLOW DEPRESSION APPROACHMIG THE INLET. 2. DRIVE 5-FOOT STEEL POSTS 2 FM INTO THE GROUND SURROUNDING THE MNL.ET. SPACE POSTS EVENLY AROUND THE PERIMETER OF THE INLET, A "MUM OF 4 FEET APART. s. SURROUND THE POSTS WITH WIRE MESH HARDWARE CLOTH. SECURE THE WIRE MESH TO THE STEEL POSTS AT THE TOP. MIDDLE, AND BOTTOM. PLACINOA 2-FOOT FLAP OF WIRE MESH UNDER THE GRAVEL FOR ANCHORING IS RECOMMENDED. 4. PLACE CLEAN GRAVEL NO" //5 OR 57 STON ON A 21SLOPE WITH A HEIGHT OF 16 INCHES AND E WIRE, AND SMOOTH TO AN EVEN GRADE 5. ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ACCUMULATED SEDIMENT, AND ESTABLISH FINAL GRADING ELEVATIONS. 5. COMPACT THE AREA PROPERLY AND STABRIZED IT WITH GROINNDOOVER. INSPECT INLETS AT LEAST WEEI(LY AND AFTER EACH SIGNIFICANT Q INCH OR GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE GYRE NOT TO DAMAGE OR UNDERCUT THE MARE MESH DURING SEDIMENT REMOVAL REPLACE STONE AS NEEDED. HARDWARE CLOTH AND GRAVEL INLET PROTECTION NTs SEE PLAN FOR PIPE I Y I ORIENTATIO � I � F-+-+-__1 CONC. COLLAR L-----J GONC, BRICK MASO 3000 PSI FINISH AS GRADED El CASTING NOTE: USE DEWEY BROS. CH-BN 3A FOR CATCH FORT YARD DINLLETSBN-47 PLAN AR V 0. ASPHALT PAVEMENT ELEV. VARIES 2' 0" Y N O W - ._ - 4" 4 ao SECTION DROP INLET DETAIL NTS 2'-0" STD. CITY OF WILMINGTON M.H. COVER. SEE DETAIL SHEET SD-14-01 & 14-02 3/4" CEMENT PLASTER MAX. CORBEL 1 " PER COURSE -Opp 4' F9 A A (o SECTION 'A -A" GUIDELINES FOR STORM DRAIN MANHOLE SD 2 -03 NOT TO SCALE HARDWARE CLOTH OPENINGS) SITE AREA STABILIZATION STABILIZATION DESCRIPTION TIMEFRAME TIMEFRAME EXCEPTIIONS PERIMETER DIKES, 7 DAYS NONE SWALES, DITCHES AND SLOPES HIGH QUALITY 7 DAYS NONE WATER (HQW) ZONES SLOPES STEEPER 7 DAYS IF SLOPES ARE 10' OR THAN 3:1 LESS IN LENGTH AND ARE NOT STEEPER THAN 2.1, 14 DAYS ARE ALLOWED. SLOPES 3:1 OR 14 DAYS 7 DAYS FOR SLOPES FLATTER GREATER THAN 50 FEET IN LENGTH ALL OTHER AREAS 14 DAYS NONE (EXCEPT FOR WITH SLOPES PERIMETERS AND FLATTER THAN 4:1 HQW ZONES) DATE PRINTED APR 0 � 2013 NPDES GROUND STABILIZATION CRITERIA NTS LATE WINTER do EARLY SPRING TEMPORARY GRASSING DETAIL SEEDING MIXTURE Rye (grain) 120 Annual leepedeza (Kobe in Piedmont and Coastal Plain, Korean in Mountains) 50 Omit annual lespedeza when duration of temporary cover is not to extend beyond June. SEEDING DATES: Mountains - Above 25M R Feb. 15-iAay f5 Below 2500 ft: Feb. 1-May 1 Piedmont - ,Ian. 1-Moy 1 Coastal Plain - Dec. 1-Apr. 15 SOIL AMENDMENTS Follow recommmdattom of soil testa or a 2,000 lb/acre ground agricul- tural limestone and 750 Lb/acre 10-10-10 fertilizer. MULCH APPLY 4,000 LB ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT. NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHOFa N;' TOOL MAINTENANCE RMertilize It growth is not fully adequate. Reseed, refertilize and mulch im- medately folbwing erosion or other damage. TEMPORARY SUMMER GRASSING DETAIL SEEDING MIXTURE SPEMES RATE (Ib/acre) GOO" MILLET 40 N THE PIEDMONT AND MOUNTANS, A SMALL -STEMMED SUNDANGRA55 MAY BE SUBSTITUTED AT A RATE OF 50 LB/ACRE SEEDING NOTES MOUNTAS - MAY 15-AM 15 PIEDMONT - MAY 1-AUC. 15 COASTAL PUN - APR. 15-AU0. 15 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY ZODD LB/ACRE GROUND AGRICUL- TURAL LIMESTONE AND 75D LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 LB/At�iE STRAW. AN(YIOR STRAW BY TACKING WITH ASPHALT. NETTING OR A MULCH Rk4G TOOL A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE SITE WORK NOTES REVISIONS 1. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIARIZED WITH EXISTING CONDITIONS BOTH ON AND IMMEDIATELY ADJACENT TO THE SITE. Date Description By 2. CLEARING: CONTRACTOR SHALL REMOVE ALL TREES AND VEGETATION WITHIN LIMITS OF CONSTRUCTION UNLESS OTHERWISE DESIGNATED TO REMAIN. 3. GRUBBING AND STRIPPING: CONTRACTOR SHALL RAKE AND REMOVE ROOTS, STUMPS, VEGETATION, DEBRIS, EXISTING STRUCTURES ABOVE AND BELOW GRADE, ORGANIC MATERIAL. OR ANY OTHER UNSUITABLE MATERIAL WITHIN LIMITS OF CONSTRUCTION. 4. MUCKING: CONTRACTOR SHALL COORDINATE WITH OWNER AND THEIR GEOTECHNICAL REPRESENTATIVE TO COORDINATE REMOVAL OF ANY SOFT AREAS. 5. DISPOSAL: CLEARED, GRUBBED, STRIPPED OR OTHER WASTE MATERIAL SHALL BE REMOVED FROM SITE AND DISPOSED OF IN A PROPERLY PERMITTED FACILITY. 6, FILL AND COMPACTION SHOULD COMPLY WITH GEOTECHNICAL REPORT. 7. THE CONTRACTOR SHALL NOTE THAT THE GRADING PLAN MAY NOT REPRESENT A BALANCED EARTHWORK CONDITION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CUT AND FILL QUANTITIES AND COMPLETE INSTALLATION TO SPECIFIED GRADES, 8. THE CONTRACTOR SHALL FURNISH SUITABLE BORROW MATERIAL FROM AN OFF -SITE PROPERLY PERMITTED FACILITY AS REQUIRED, 9. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES DURING CONSTRUCTION. BEFORE COMMENCING ANY EXCAVATIONS IN OR ALONG ROADWAYS OR RIGHT-OF-WAYS, PUBLIC AREAS OR IN PRIVATE EASEMENTS, THE CONTRACTOR SHALL NOTIFY ALL APPROPRIATE PERSONNEL OF THEIR INTENT TO EXCAVATE, IN WRITING, NOT LESS THAN 10 DAYS PRIOR TO EXCAVATING, 10. THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE DISCONNECTION/ RECONNECTION AND/OR THE RELOCATION OF ALL EXISTING UTILITIES WITH APPROPRIATE PERSONNEL. 11, EXISTING SURVEYING PERFORMED TRIPP ENGINEERING, P.C. 12. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AT THE SITE. FURTHERMORE 0 THE CONTRACTOR SHALL REPORT ALL DISCREPANCIES OR QUESTIONS TO THE ENGINEER 13. PRIOR TO INSTALLATION. THE CONTRACTOR SHALL PROVIDE ANY AND ALL LAYOUT REQUIRED TO CONSTRUCT r^ LJ 1 HIS WORK UNLESS OTHERWISE DIRECTED BY OWNER, 14. ALL PVC UTILITY MAINS SHALL BE INSTALLED WITH A MINIMUM OF 36" COVER AT FINAL GRADE. 15. ALL SERVICE CONNECTIONS SHALL BE INSTALLED TO MEET ALL LOCAL AND STATE CODES. .44 METERS, TAPS, MATERIALS, WORKMANSHIP AND ALL FEES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL COMPLY WITH ALL REQUIREMENTS. 16. ALL PAVEMENT, BASE AND SUBGRADE SHALL CONFORM TO NCDOT STANDARDS INCLUDING WORKMANSHIP, MATERIALS AND EQUIPMENT. APPROPRIATE BARRICADES, SIGNS, LIGHTS OR OTHER TRAFFIC CONTROL DEVICES SHALL BE PROVIDED IN ACCORDANCE WITH NCDOT TO MAINTAIN SAFETY AND TWO WAY TRAFFIC. 17, ALL AREAS SHALL BE GRADED FOR POSITIVE DRAINAGE. THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO INSTALLATION. ALL AREAS SHALL BE � SLOPED TO DRAIN AWAY FROM BUILDINGS AT ALL TIMES. >4 1 & CONCRETE STORM DRAINAGE PIPE SHALL BE CLASS III WITH RUBBER GASKETED JOINTS AND INSTALLED IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS. 19. USE WHITE LANE MARKING PAINT FOR ALL PAVEMENT MARKINGS. PAINT SHALL BE A ram, CHLORINATED RUBBER ALKYD, FS TT--P-115, TYPE III, FACTORY MIXED, QUICK DRYING, F�1 NON BLEEDING. REFLECTIVE MATERIAL MAY BE ADDED AT OWNER'S OPTION FOR NIGHT REFLECTING. 20. DUCTILE IRON SHALL BE CLASS 50. 21. CONCRETE FOR WALKS, CURBS AND DRIVES SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI 0 28 DAYS - AIR ENTRAINED, 22. FIELD TESTING SHALL BE DONE BY AN INDEPENDENT TESTING LABORATORY PAID FOR ��1 BY THE OWNER. FURTHER TESTING REQUIRED DUE TO A FAILED TEST WILL BE �L� PAID FOR BY THE CONTRACTOR. 23. SEE GEOTECHNICAL REPORT NO- DATED BY ---------- --------- ----- FOR ADDITIONAL REQUIREMENTS. co CONSTRUCTION SEQUENCE T 1 �••! 1. NO CUT SLOPE OR FILL SLOPE SHALL EXCEED A RISE OR FALL OF ONE FOOT FOR EVERY RUN OF 3 FEET (1 VERTICAL TO 3 HORIZONTAL). M-"I Z 2. NO SEDIMENT WILL BE ALLOWED TO EXIT THE SITE. ALL EROSION SHALL BE CONTROLLED E-4 I. -I INCLUDING SIDE SLOPES DURING AND AFTER CONSTRUCTION. Tn O 3. INSTALL PRIMARY EROSION CONTROL MEASURES BEFORE BEGINNING CONSTRUCTION INCLUDING CO BUT NOT LIMITED TO GRAVELED CONSTRUCTION ENTRANCE, SILT FENCE, CHECK DAMS, ETC. INSTALL ALL SECONDARY EROSION CONTROL MEASURES AS SOON AS POSSIBLE AFTER BEGINNING CONSTRUCTION. Z 4. ALL EROSION CONTROL MEASURES TO BE INSPECTED AFTER EACH RAIN. SILT FENCE AND INLET PROTECTION ARE TO BE CLEANED WHEN 0.5 FEET OF SEDIMENT HAVE ACCUMULATED IN FRONT OF THE DEVICE OR WHEN THEY LEAK OR FAIL. SEDIMENT TRAPS ARE iJ} CLEANED OUT AS STATED OR WHEN HALF FULL. w 5. IF APPLICABLE, CONSTRUCT PROPOSED RETENTION POND TO ACT AS A SEDIMENT BASIN DURING CONSTRUCTION. REMOVE ACCUMULATION OF SILT AS REQUIRED TO ALLOW PROPER FUNCTIONING, RESTORE POND TO DESIGN LEVELS AT THE COMPLETION OF CONSTRUCTION. y�0 6. IF APPLICABLE, INSTALL DROP INLETS WITH INLET PROTECTION TO ACT AS SILT TRAPS MLf z DURING CONSTRUCTION. REMOVE ACCUMULATED SILT AS NEEDED TO PREVENT SILT FROM �1 ENTERING STORM DRAIN PIPING. p �y 7. A 4" LAYER OF TOPSOIL SHALL BE APPLIED TO ALL NEW AREAS TO BE GRASSED. Z z 8. ALL DISTURBED AREAS WILL BE STABILIZED WITHIN 21 CALENDAR DAYS OF CEASE OF ANY PHASE OF 1­4 0 ACTIVITY, THIS INCLUDES SLOPES, SWALES, STOCKPILES AND OTHER UNSTABILIZED AREAS, 9. MAINTAIN ALL EROSION CONTROL MEASURES UNTIL PROJECT IS COMPLETE. a E'I 10. MORE STRINGENT MEASURES MAY BE REQUIRED TO HALT EROSION IF THOSE ON THIS PLAN PROVE TO BE LESS EFFECTIVE. a O 11. REMOVE ALL TEMPORARY EROSION CONTROL MEASURES UPON COMPLETION OF CONSTRUCTION, ALL PERMANENT MEASURES SHALL BE WELL ESTABLISHED PRIOR TO PROJECT COMPLETION. 1 II --I E 4 X MAINTENANCE PLAN 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND W Iy~ OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL, BUT IN NO CASE, LESS THAN Q 1i ONCE EVERY WEEK AND WITHIN 24 HOURS OF EVERY HALF INCH RAINFALL, 2. ALL POINTS OF EGRESS WILL HAVE CONSTRUCTION ENTRANCES THAT WILL BE PERIODICALLY • TOP -DRESSED WITH AN ADDITIONAL 2 INCHES OF #4 STONE TO MAINTAIN PROPER DEPTH. THEY WILL BE MAINTAINED IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING • THE SITE. IMMEDIATELY REMOVE OBJECTIONABLE MATERIAL SPILLED, WASHED OR TRACKED ONTO THE CONSTRUCTION ENTRANCE OR ROADWAYS. r-I 3. SEDIMENT WILL BE REMOVED FROM HARDWARE CLOTH AND GRAVEL INLET PROTECTION, BLOCK O AND GRAVEL INLET, ROCK DOUGHNUT INLET PROTECTION AND ROCK PIPE INLET PROTECTION "ZI4 WHEN THE DESIGNED STORAGE CAPACITY HAS BEEN HALF FILLED WITH SEDIMENT. ROCK WILL .. 00 BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS AS DESIGNED. r h C\2 DEBRIS WILL BE REMOVED FROM THE ROCK AND HARDWARE CLOTH TO ALLOW PROPER �•/ DRAINAGE. SILT SACKS WILL BE EMPTIED ONCE A WEEK AND AFTER EVERY RAIN EVENT. z co SEDIMENT WILL BE REMOVED FROM AROUND BEAVER DAMS, DANDY SACKS AND SOCKS ONCE A WEEK AND AFTER EVERY RAIN EVENT. 1- 4 r 4, DIVERSION DITCHES WILL BE CLEANED OUT IMMEDIATELY TO REMOVE SEDIMENT OR OBSTRUCTIONS r__4 FROM THE FLOW AREA. THE DIVERSION RIDGES WILL ALSO BE REPAIRED, SWALES MUST BE O TEMPORARILY STABILIZED WITHIN 21 CALENDAR DAYS OF CEASE OF ANY PHASE OF W I� ACTIVITY ASSOCIATED WITH A SWALE. 5. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES HALF FILLED. W +� THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. STAKES MUST Q) p z BE STEEL, STAKE SPACING WILL BE 6 FEET MAX, WITH THE USE OF EXTRA STRENGTH O O co FABRIC, WITHOUT WIRE BACKING. STAKE SPACING WILL BE 8 FEET MAX. WHEN STANDARD T-4 STRENGTH FABRIC AND WIRE BACKING ARE USED, IF ROCK FILTERS ARE Lo Lo DESIGNED AT LOW POINTS IN THE IN THE SEDIMENT FENCE THE ROCK WILL BE REPAIRED O I 14 OR REPLACED IF IT BECOMES HALF FULL OF SEDIMENT, NO LONGER DRAINS AS DESIGNED Z Z co co zN OR IS DAMAGED. CD as 6. SEDIMENT WILL BE REMOVED FROM SEDIMENT TRAPS WHEN THE DESIGNED STORAGE CAPACITY HAS W w i BEEN HALF FILLED WITH SEDIMENT, THE ROCK WILL BE CLEANED OR REPLACED WHEN z U r THE SEDIMENT POOL NO LONGER DRAINS OR WHEN THE ROCK IS DISLODGED. BAFFLES O C) C:) 1z 0 WILL BE REPAIRED OR REPLACED IF THEY COLLAPSE. TEAR, DECOMPOSE OR BECOME INEFFECTIVE. THEY WILL BE REPLACED PROMPTLY, SEDIMENT WILL BE REMOVED WHEN Q) Qy aabi DEPOSITS REACH HALF THE HEIGHT OF THE 1ST BAFFLE. FLOATING SKIMMERS WILL 8E ^ ,� z INSPECTED WEEKLY AND WILL BE KEPT CLEAN, - a + J 7. SEDIMENT WILL BE REMOVED FROM THE SEDIMENT BASIN WHEN THE DESIGN STORAGE CAPACITY HAS BEEN HALF FILLED WITH SEDIMENT. ROCK WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT N 0 N O Nz POOL NO LONGER DRAINS OR IF THE ROCK IS DISLODGED. BAFFLES WILL BE REPAIRED OR w REPLACED IF THEY TEAR, DECOMPOSE OR BECOME INEFFECTIVE. THEY WILL BE REPLACED a PROMPTLY. SEDIMENT WILL BE REMOVED FROM BAFFLES WHEN DEPOSITS REACH HALF THE HEIGHT OF THE 1ST BAFFLE. FLOATING SKIMMERS WILL BE INSPECTED WEEKLY AND WILL BE KEPT CLEAN. 8. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. ALL SLOPES WILL BE STABILIZED WITHIN 21 CALENDAR DAYS. ALL OTHER AREAS WILL BE STABILIZED WITHIN 15 WORKING DAYS. 9. FLOCCULATES WILL BE USED TO ADDRESS TURBIDITY ISSUES. THE PUMPS, TANKS, HOSES AND INJECTION SYSTEMS WILL BE CHECKED FOR PROBLEMS OR TURBID DISCHARGES DAILY, USED AS A IA1t1Y1 ANCHORING TOOL �r�nw-wnfEmr`r� GRASSING DETAIL MAINTENANCEPERMANENT SEEDING MIXTURE REFEIMIZE IF GROWTH S NOT FULLY ADEQUATE. RESEED, REFERNUZE AND MULCH IN- MEDIATELY FOLLOMMG EROSION OR OTHER DAMAGE. FALL -WINTER sSPEM RATE fib/acre) PENSACOLA BAHMPASS 50 PERMANENT GRASSING DETAIL COMMON BERMUDA GRASS 10 MLLEr 10 TEMPORARY FALL GRASSING DETAIL SEEDING MIXTURE TALL SG SEEDING MIXTURE .Sa&lEez RATE Ob/acre) SEEDING NOTES SPMESRATE [IbLgIzAl 7A[L FESCUE BLFND OF TWO OR THREE tM VARIETIES) 2DD 1. WHERE A NEAT APPEARANCE IS DESIRED, OMIT 5ERK FA 2. USE COMMON BERMUDA GRASS ONLY ON SOUTED SITES WHERE IT CANNOT Rye (grain) 120 RYE (�H) 23 COMAE A PEST. BERMUDA, GRASS MAY DE REPLACED WITH 5 lb/orre CENTI SEEDING DATES SEEDING NOTES JANIARY - APRIL SEEDING DATES MOUNTAINS - AUG. 15-DEC. 15 AI1CI15T - DECEMBER APRIL 1 - JULY 15 COASTAL PLAN and PIEDMONT - AUG. 15-DEC 30 SOIL AMENDMENTS SOIL AMENDMENTS APPLY LIME AND FERTa m ACCORDING TO SOIL TESTS, OR APPLY 3A00-5,0D0 Ib/acre SOIL AMENDMENTS SY 21 FOLLOW SOIL TESTS OR APPLY 2,DD0 LB/ACRE GROUND AGRICULTURAL G1tWIND KN2ICULTURAL UMTSTDNE THE LOWER RATE ON SANDY SOILS) AND 1,00o Ib/acre 1D-10-1D FERTILIZE GROUND AGRICULTURE LIMESTONE APPLY UWE AM FWLIZER G70 5DD %acre 10-10-10 FFERDR IIUZER. LIMESTONE AND 1,000 LB/ACRE 10-10-1D FERTILIZER. MULCH MULCH APPLY 4,Doo l6/ACRE STRAW. NNCNOR STRAW 8Y TACKING WITH ASPNIALT, NETTING, APPLY 4,000 Ib aero GRAN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. STRAW BY TACKING WITH ASPHALT, RCAING, OR NETTING OR BY CRIMP- ING WITH A MULCH ANCHORING TOOL A DISK WITH BLADES SET CAN MULCH y !® OR A MULCH ANCNORNG TOOL A DISK WITH ELADES SET NEARLY STRAIGHT CAN BE ANCHORING TOOL NEARLY STRAIGHT BE USED AS A MULCH ANCHORING TOOL APPLY 4,ODD lb mm GRAN STRAW EQUN COVER OF ANOTHER SURAi3� USED AS A MULCH MULCH. ANCHOR Bf TACKING WITH ASPHALT. _RaMNO, OR NETTING OR BY CRIMPING WITH A MULCH ANCHORING TOOL A DISK LADESkSP. EARLY;VWAp}�� USED AS A MULCH ANCHDRING TOOL itK MAINTENANCE MAINTENANCEit Repair and refertlize damaged areas immediately. Tapdross with 50 lb/acre in M it to temporary FERTL.TZE ACCORDING TO SOL TESTIS OR APPLY 40 lb/ode NITROGEN IN ,JANUARY FEBRLYAR1f, MAINTENANCE':...: of nitrogen March. to necessary exlxnd cover June 15, overseed with 50 lb/acre Kobe (Piedrnont and Coastal Pr OR 40 b IN SEPTEMBER AND 40 lb IN NOVEMBFR, FROM A 12-4-0. 16-4-B, OR SIMILAR TURF FERTILIZER. AVOID FERTILIZER APPLICATIONS DURING -... --------.... or Korean (Mountains) lospedezo In late February or early March. WART WEATHER, AS THIS INCREASES STAND LOSSES TO DISEASE. RESEED. FERRIZE, ADN 11YYAAGED AREAS IMMEDIATELY. MOM TO A HEIGHT OF 2.5-3 5 INCHES REFER, THE FOLLOWING APRIL WITH 50 ID//acre NITROGEN. REPEAT AS GROWM REFERS. TH LLOWIN HE MOM ONLY ONCE A YEAR. WHERE A NEAT MPEARAS O S DESIRED. OMT SERICFA AND MOW AS OFTEN AS NEEDED. \\\�tislilllrrrr,� S E A L i17374 0REG01\\,1`�. rrl111K4111� DATE 04-04-13 DESIGN PGT DRAWN EJW C2 SHEET 2 OF 2 13004 *JI ,Fir I i TTi (r js