Loading...
HomeMy WebLinkAboutSW8030921_COMPLIANCE_20030924STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW SYD DOC TYPE El CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE PCOMPLIANCE EVALUATION INSPECTION DOC DATE m e YYYYMMDD ,ti�lllllll+rirrr� �H CARP S� ,✓r: S � = 4 � AL = 02 r, .yob C- AL`, qS J V A%� fr�11141ti1�,`` y2�c3 BACKGROUND FOOD LION LLC Food Lion Store P749 Morehead City, Carteret County, NC Stormwater Management Sand Filter Design Criteria (revised 9-18-03) The Food Lion Corporation desires to build a new Food Lion Store in the same location as an exsiting Winn Dixie Store in the Parkway Shopping Center The footprint of the new store is somewhat narrower but longer than the existing structure This causes expansion to the rear of the building and the need for additional drive and loading space The existing asphalt drive will need to be expanded at the rear of the building Currently all stormwtater runoff sheet flows along the access drive into a drainge that eventually empties into Peltier Creek No stormwater structures currently exist behind the shopping center Total runoff from the Food Lion impervious area will be approximately 15 acres Size and volume of the forebay and sandfilter were sized based on criteria as set forth in the design guide Stormwater Best Management Practices In order to contain the entire V of rainfall (within the first few hours of the storm) the structure would have to be much larger The site location, Food Lion design and limited space available were taken into consideration Therefore, the Design Intent is as follows Runoff from adjacent, unimproved areas, pervious and impervious will be allowed to drain, untreated to the Creek by means of existing surface drainage channels as they've always done 2 The area of new asphalt ,concrete and roof will be incorporated into the new stormwater management system 3 Stormwater runoff from impervious surfaces will be collected in a drop inlet catch basins and conveyed to a key manhole structure near the sand filter 4 The KEY manhole will be designed with an overflow pipe, set at a design height which will allow runoff in excess of the first flush (I-inch)to bypass the stormwater filtration system and discharge directly to the creek The stormwater filter shall have (1) a sediment chamber, (2) CMU overflow weir and (3) a surface sand filter with underdram discharge to the drainage The filter design shall be in accordance with NCDENR's Stormwater Best Management Practices Manual, latest edition 6 The Sand Filter System design criteria, attached hereto, identifies State minimum standards and the actual design intent, which equals or exceeds State criteria 1 of 4 SAND FILTER DESIGN CRITERIA A Forebay — Sediment Pool 1 Design Runoff Control Volume 2 Design Tributary Drainage Area 3 Design Rainfall Vol Per Event 4 Basin Volume 4*A*� 5 Side Water Depth 6 Wet Surface Area Allowance 7 Inlet Control 8 Outlet Control B Sand Fitter Basin 1 Design Storm 2 Rainfall Intensity 3 Expected Runoff Flow Rate Based on Q=CiA C=0 90 I= 2 38 in /hr A= 15 ac 4 Wet Storage Volume Allowance 5 Side Water Depth 6 Sand Filter Surface Area 7 Design Filtration Rate 8 Method of Discharge 9 Maximum Discharge Rate 10 Time to Drain 11 Maximum Water Level in Filter 12 Freeboard 13 Interbasm Weir Elevation 14 Key Manhole Control Elevation (18" dia Pipe) 15 Key Manhole Rim Elevation 16 Discharge Inv Elevation @ drainage ditch Required Engineer's Design Design 1-inch of Rainfall 15 acres 40,730 gallons 540 cf/ac 1,225 c f ( 810 cf) Min 18-inches 18-inches 360 sf/ac 1,047 sf (860 sf) - Overflow MH Weir Weir to Sand Filter 10 yr, Tc 10 yr, 1 hour 2 38 -- inch/hr 3 21 cfs (max ) 540 cf/ac 1,225 cf (810 cf) (9,153 gals ) 18-in (Min) 18 inch 360sf (540 s f) 596 s f 0 04 gpm/sf 0 04 gpm/sf Underdrain piped to drainage ditch - 24 gpm - 6 hours - Elev 9 5 fl - 1 0 ft - 93ft Elev 9 5 ft Elev 12 5 ft 50ft 2 of 4 LOADING RATE CALCULATIONS FOR FILTRATION OF UNTREATED STORMWATER Food Lion Morehead City, North Carolina o Desian of Filter Flow -Through Capacity The NCDENR Manual for Stormwater Best Management Practices (SwBMP), dated April 1999, establishes the average recommended filtration rate at 0.04 gal.mm/sf with one (1) foot of head on the sand surface A second requirement is that the first inch of rainfall runoff should pass through the filter within a 24-hour period. Sand from local sources within the Onslow County area are able to meet the following specifications f- Effective grain size T Uniformity Co -Efficient —� Dust Content Permeability 10-20mm < 3 < 10 6 — 20 in/hr rM Design = 4 0 in/hr The Design Specification for sand filter media can be met by local sources of supply However, prior to delivery, the sand shall be tested for compliance with the above standards The following analysis has been prepared for this specific Stormwater Filter application o Design Permeability of Filter Sand 4 0 m/hr o Sand Type Local Supply o Calculations P = 4 0 in/hr , = 4 x 144 = 576 in3/sf/hr 576 x 004329 = 2 5 gph/sf -- 60 = 0.041 GPM/S.F. o Filter Operation ** Filter Area ** Filtration Rate ** Liquid Vol @ Max S WD (2 0') ** Min. Drain Time ** Max Drain Time 596 s f 596 x 041 = 24 gpm 1225 c f /9,160 gals (9160 — 24) = 380 min = 6 3 hrs. 24 hours 3 of 4 Misc. Calculations ',�y►11111111►►►�, N CAROZ Q AL Z, S J, vvgj `; �►�InI�I�+tip „Q� STAGE vs VOLUME POND AREA_(Forebay and Sandfilter each side) ELEV � AREA (sf},"IncFnc VQL(c , ' Total VOL(cf} ;, �k� _ —WDIF In EI 112 area 8 596 91 0 0 (o 5 1 9 887 7415 7415 Onp 101T 05 95 1047 4835 1225 05 10 1207 5635 17885 1 11 1555 1381 31695 A B C D E F G H I J K I L l Ef"71 01190®R,111'iDATE 8 "HE-;0ylll- 08/��103 DESIGN PHASE 2 PRELIM ! X 1 CONSTR ! 1 REVISION ! ! RECORD 1 ! OTHER ! 1 (SPECIFY) 3 PROJECT NAME FOOD LION PROJECT NO 20034032 4 5 LOCATION MOREHEAD BY TW 6 7 CHECKED BY T1N 8 9 n= 0 014 �= 195 h= 22 STORM DRAINAGE SCHEDULE CONTINUE site with building 10 11 12 13 AREAS (INLETS) INLET AREA (AC) INLET Cc RUNOFF COEFF INLET DISCHARGE (CFS) TOTAL AREAS (AC) INLET TIME (MIN} PIPE TIME (MIN) Tc TIME OF CONC (MIN) I INTENSITY (IN/HR) Cc RUNOFF COEFF FROM TO N14 15 i6 17 18 ' 19 ScenanoI 20 CB1 KEYMH Al 150 090 321 150 500 000 6000 238 090 21 KEYMH FES1-PND A2 001 090 002 151 Soo 006 6000 238 090 22 23 24 Scenano 2 25 CB1 KEYMH Al 1150 0 90 321 150 5 00 000 5 00 722 090 25 KEYMH FES2-CRK A2 001 090 002 151 500 006 500 722 0 90 27 28 29 30 NOTE SCENARIO ONE ASSUMES THAT THE STORM IS THE 1 r 1hr 31 32 NOTE SCENARIO TM ASSUMES THAT THE STORM IS THE 1 r 5MIN Tc 33 uyfguNfkyfmyhl[mhy Date 8/13103 Time 4 08 PM Pere I of 12 A B M N O P O R S T U V I W 1 .,,� `s s� r�F,S�� � � �ary�24+o ay �y ff t' •�'v�$ DATE 08/13/03 DESIGN PHASE 2 PRELIM 1 X 1 CONSTR 1 1 REVISION I 1 RECORD / / OTHER I I (SPECIFY) 3 4 PROJECT NAIVE FOOD LION PROJECT NO 20034032 5 LOCATION MOREHEAD BY JTW 6 7 CHECKED BY TW 8 9 10 11 12 13 n= 0 014 g= 195 h= 22 STORM DRAINAGE SCHEDULE - rQNTINUE© Ei DISC #ARUE q SIDE- STREAM (CFS) SLOPE DIA pN) CAPAI(TY {F# MI V FULL (FPS) LENGTH (FT) SEGMENT TIME (MIN) UPPER INV (FT) LOUVER INV (FT) UPSTREAM TOP ELEV (FT) 14 15 FROM TO 16 17 18 19 ScenanoI 20 C131 KEYMH 3 21 0 0100 18 98 55 20 006 860 i 840 1100 21 KEYMH FES1-PND 323 00400 18 195 110 10 002 8 40 800 1250 22 23 24 Scenano 2 25 CB1 KEYMH 975 00100 18 98 55 20 006 860 840 1100 26 KEYMH FES2-CRK 982 0 1167 18 33 3 18 8 30 003 950 6001 1250 27 28 29 30 31 32 33 uyfgufyfkyfmyhfFmhy Date 8113/03 Time 4 08 PM Page 2 of 12 A A B X Y Z AA AB AC AD AE AF AG All 1 sAN'� �.x.l�o rya 2Y" 4 SfWN Qar DATE 08/13/03 DESIGN PHASE 2 PRELIM CONSTR REVISION RECORD OTHER (SPECIFY) 1 X I 1 1 (_ / I 1 3 PROJECT NAME FOOD LION PROJECT NO 20034032 4 5 LOCATION MOREHEAD BY TW 6 7 8 CHECKED BY Tw 9 n= 9= h= 0014 195 22 WoflAULJC GRADE LINE PIPE HYDRAULIC SIDESTREAM AREA RADIUS SUMMATION Hf (FT) (FT) (CFS) 90 DEG=O 7 60 DEG=O 55 HEAD LOSS He He BEND LOSS Hb K'S 30 DEG 28 15 DEG=010 HI BEND LOSS K CONTINUED FRICTION SLOPE (FTIFT) — N FRICTION VELOCITY (FPS) 11 d10 12 13 14 FROM TO 15 16 17 18 19 Scenano 1 20 CBI KEYMH 17671 03750 000 002 001 000 000 003 000 00011 181 21 KEYMH FES1-PND 17671 03750 000 001 001 002 000 004 000 00011 182 22 23 24 Scenano 2 25 CBS KEYMH 17671 03750 000 020 012 0 00 000 032 000 1 00099 549 26 KEYMH FES2-CRK 17671 03750 000 030 012 016 000 058 0 00 00101 553 27 28 29 30 31 32 33 uyfgufyfkyfmyhffmhy Date 8113A3 Time 4 08 PM Page 3 of 12 A B AI AJ AK AL AM AN AO AP AQ AR AS 5 PROJECT NAME FOOD LION DATE 01/00/00 DESIGN PHA PRELIM CONSTR REVISION RECORD OTHER (SPECIFY) 3 PROJECT NO 20034032 4 5 LOCATION MIOREHEAD BY TW 6 7 CHECKED BY TVV 8 9 n= 0014 9= 195 h= 22 HYDRAIUMG D NE- fONIINUED DESIGN CRITERIA 1 10 YR STORM 1 hr DESIGN CRITERIA 1 10 YR STORM 5 mmTc 10 11 12 13 OUTLET W S ELEV (FT) INLET W S ELEV FLOW CONDITION CONTROL 1 COMMENTS 14 FROM TO OUTLET CONTOL (FT) INLET CONTROL (FT) USE (FT) 15 16 17 18 19 Scenano 1 20 CBI KEYMH 960 963 949 963 OUTLET 137 OK 21 KEYMH FES1-PND 920 924 929 929 INLET 321 OK 22 23 24 Scenano 2 25 C131 KEYMH 1158 1190 1066 1190 OUTLET 0 90 OVERFLOW 26 KEYMH FES2-CRK 720 778 1158 1158 INLET 092 OK 27 28 29 30 31 32 33 uyfgul wrnyhlfmhy pate sn W3 Time 4 08 PM Page 4 of 12 ® o'x;'"''� jDATEDESIGN j�( 1kMimlk'i 08/13/03 PHASE PRELIM 1 X 1 PROJECT NAME PROJECT NO CONSTR 1 I FOOD LION 2003403 REVISION 1 I LOCATION BY RECORD 1 1 MOREHEAD TW OTHER 1 1 CHECKED BY (SPECIFY) TW Storm Outlet Structure FES No = ' ' FES 1 Pipe Dia= 18 in Q10 = 3 23 cfs Qfull = 19 51 cfs VfUll = 1102 fps From Fig 8 06 b 1 From Fig 8 06 b 2 Storm Outlet Structure FES No = I FES2 Pipe Dia= 18 in Q 10 = 9 82 cfs Qfull = 33 32 cfs Vfull = 18 83 fps From Fig 8 06 b 1 From Fig 8 06 b 2 Q10/Qfull = 017 V1Vfu 1I = 072 V = 7 9 fps Zone -- 1 D5o - 4 in DMAx = 6 in Riprap Class = A Apron Thickness = 9 in Apron Length = 60 ft Apron Width = 3xDia = 45 ft Q101Qfull = 029 VNfull = 085 V = 16 1 fps Zone = ,1 D50 = 4 in DMAx = 6 in Riprap Class = A Apron Thickness - 9 in Apron Length = 6 ft Apron Width = 3xDia - 45 ft Is 10304100131ADMINIfoodhonstorml0 As LATEST REVISION 8113103 4 19 PM PAGE 1 OF 2