HomeMy WebLinkAboutSW8000521_COMPLIANCE_20100422STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
COMPLIANCE EVALUATION INSPECTION
DOC DATE
-P-
22ZDI' YI_
YYYYMMDD
Compliance Inspection Report
Permit SW8000521 Effective 01/16/01 Expiration
County Brunswick
Region Wilmington
Contact Person Michael A Thomas Title
Directions to Project
Type of Project State Stormwater - HD - Detention Pond
Drain Areas 1 - (Jump and Run Creek) (03-06-17) ( SC,Sw)
On -Site Representative(s)
Related Permits
Inspection Date 04122/2010 Entry Time 02 30 PM
Primary Inspector David W Cox
Secondary Inspector(s)
Reason for Inspection Routine
Permit Inspection Type State Stormwater
Facility Status ❑ Compliant ■ Not Compliant
Question Areas
State Stormwater
(See attachment summary)
Owner Unknown Wiro
Project Comfort Suites Southport NC
Exit Time 03 00 PM
Phone 252-444-1111
Phone 910-796-7215
Inspection Type Compliance Evaluation
Page 1
Permit SW8000621 Owner -Project Unknown Wiro
Inspection Date 04/22/2010 Inspection Type Compliance Evaluation Reason for Visit Routine
Inspection Summary
In oreder to bring this system into compliance you must perform the following
1 Provide a copy of the Engineer's Certificate
2 Direct all runoff to the forebay
3 Make the repairs necessary to the forebay berm
Fite Review
Yes
No NA
NE
Is the permit active?
■
❑ ❑
❑
Signed copy of the Engineer's certification is in the file?
❑
■ ❑
❑
Signed copy of the Operation & Maintenance Agreement is in the file?
■
❑ ❑
❑
Copy of the recorded deed restrictions is in the file?
❑
❑ ■
❑
Comment 1 This office has not received a copy of the engineer's certificate
SW Measures
Yes
No NA
NE
Are the SW measures constructed as per the approved plans?
❑
■ ❑
❑
Are the inlets located per the approved plans?
❑
■ ❑
❑
Are the outlet structures located per the approved plans?
❑
❑ ❑
❑
Comment 1 Not all runoff is directed to the forebay, mainly the west side of the
building's roof drains
Operation and Maintenance Yes No NA NE
Are the SW measures being maihtained and operated as per the permit requirements? ❑ ■ ❑ ❑
Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ ❑ ❑ ❑ ❑
upon request?
Comment The forebay berm is eroded
Page 2
Compliance Inspection Report
Permit SW8000521 Effective 01/16/01 Expiration Owner Unknown Wiro
Project Comfort Suites Southport NC
County Brunswick
Region Wilmington
Contact Person Michael A Thomas Title
Directions to Project
Type of Project State Stormwater- HD -Detention Pond
Drain Areas 1 - (Jump and Run Creek) (03-06-17 ) (SC,Sw)
On -Site Representative(s)
Related Permits
Inspection Date 04/22/2010 Entry Time 02 30 PM
Primary Inspector David W Cox
Secondary Inspector(s)
Reason for Inspection Routine
Permit Inspection Type State Stormwater
Facility Status ❑ Compliant ■ Not Compliant
(question Areas
State Stormwater
(See attachment summary)
Exit Time 03 00 PM
Phone 252-444-1111
Phone 910-796-7215
Inspection Type Compliance Evaluation
Page 1
t
Permit SW8000521 owner -Project Unknown Wiro
Inspection Date 04/22/2010 Inspection Type Compliance Evaluation Reason for Visit Routine
Inspection Summary
In oreder to bring this system into compliance you must perform the following
1 Provide a copy of the Engineer's Certificate
2 Direct all runoff to the forebay
3 Make the repairs necessary to the forebay berm
Fife Review Yes No NA NE
Is the permit active? ■ ❑ ❑ ❑
Signed copy of the Engineer's certification is in the file? ❑ ■ ❑ ❑
Signed copy of the Operation & Maintenance Agreement is in the file? 0 ❑ ❑ ❑
Copy of the recorded deed restrictions is in the file? 0000
Comment 1 This office has not received a copy of the engineer's certificate
SW Measures Yes No NA NE
Are the SW measures constructed as per the approved plans? ❑ ■ ❑ ❑
Are the inlets located per the approved plans? 0000
Are the outlet structures located per the approved plans? ❑ ❑ ❑ ❑
Comment 1 Not all runoff is directed to the forebay, mainly the west side of the
building's roof drains
Operation and Maintenance Yes No NA NE
Are the SW measures being maintained and operated as per the permit requirements? ❑ ■ ❑ ❑
Are the SW BMP inspection and maintenance records complete and available for review or provided to DWO ❑ ❑ ❑ ❑
upon request?
Comment The forebay berm is eroded
Page 2
DETENTION POND ANALYSIS
FILE NAME S IWQSIPOND1000521 WK1
PROJECT # SW8 000521
REVIEWER sav
PROJECT NAME Comfort Suites, Southport, NC DATE 21-Nov-2000
Receiving Stream Jump and Run Creek Class SC SW Chlorides nla
Drainage Basin Cape Fear Index No 18-88-9-3-2
Site Area 1 85 acres
Drainage Area 1 80360 00 Isquare feet needs to be verified
Area in Acres 1 84 acres
IMPERVIOUS AREA
Rational C-list beside
each item below in El to E20
On -Site Buildings
1309200 square feet
On -Site Parking
2719800 square feet
On -Site Sidewalks
93800 square feet
Other On -Site (pool deck)
202600 square feet
square feet
square feet
TOTAL
43254 001
Cc= 009
% IMPERVIOUS 53 83%
Des Depth
30 TSS 90
SURFACE AREA CALCULATION
Rational'
�lf Rational is used put a
SAIDA
6 14%
1" in box E26 If not, leave it blank
Req SA
4931 square feet
Prov SA
5460 ]square feet
[From plan Contours]
VOLUME CALCULATION
Perm Pool Volume= 11418
Req Forebay Volume= 22836
Bottom
32 90 MSL
Provided Volume= 2334
Perm Pool I
35 90 JMSL
Percent= 20%
Design Pool
36 80 MSL
Design SA
7370 square feet
Des Storm , 1 00 inches
Req Volume
3579 cubic feet
Rv= 053442758
Prov Volume
5773 cubic feet
SA @ _
Elevation=
ORIFICE CALCULATION
Avg Head = 0 43 ft
Flow Q2, cfs 0 021 Area, in' 095
Flow Q5, cfs 0 008 Area, in 038
No of Orifices 1 IDiameter, in 1 001 Area = 0 785 in
Q, cfs = 0 017 Drawdown = 2 4 jdays
COMMENTS
Surface Area , Volume and Orifice are within Design Guidelines