Compliance Inspection Report
Permit SW8000219 Effective 03/14/00 Expiration 03/17/10 Owner Parkway Business Park LLC
Project Parkway Corporate Center -Lot 2
County New Hanover
Region Wilmington
Contact Person Tony Caporaletti Title Manager
Directions to Project
Type of Project State Stormwater - HD - Detention Pond
Drain Areas 1 - (Prince George Creek) (03-06-23) ( C,Sw)
On -Site Representative(s)
Related Permits
SW8991001 Parkway Business Park LLC - Parkway Corporate Park
Inspection Date 02/04/2011 Entry Time 12 30 PM Exit Time 01 00 PM
Primary Inspector David W Cox
Secondary Inspector(s)
Reason for Inspection Routine
Permit Inspection Type State Stormwater
Facility Status ❑ Compliant ■ Not Compliant
Question Areas
N State Stormwater
(See attachment summary)
Phone
Phone 910-796-7215
Inspection Type Transfer Renewal
Page 1
Permit SW8000219 Owner - Project Parkway Business Park LLC
Inspection Date 02104/2011 Inspection Type Transfer Renewal Reason for visit Routine
Inspection Summary
In order to bring this stormwater collection system Into compliance, you must perform the following
1 Submit the required Engineer's Certification
2 Perform the maintenance necessary to bring this system into compliance with the Operations and Maintenance
Agreement
File Review
Is the permit active?
Signed copy of the Engineer's certification is in the file'?
Signed copy of the Operation & Maintenance Agreement is in the file?
Copy of the recorded deed restrictions is in the file?
Comment This office does not have a copy of the P E
Operation and Maintenance
Are the SW measures being maintained and operated as per the permit requirements?
Are the SW BMP inspection and maintenance records complete and available for review or provided to DWO
upon request?
Comment Pond has > 50% cattails
Yes No NA NE
Yes No NA NE
❑ ■ ❑ ❑
Page 2
DETENTION POND ANALYSIS
PROJECT # SW8 000219
PROJECT NAME Lot 2 Parkway Business Park
FILENAME S 1WQSIPOND1000219 WK1
REVIEWER arl
DATE 14-Mar-2000
Receiving Stream Prince George�r -ek Class C__Sw Chlorides
Drainage Basin Cape Fear Index No 18-74-53
Site Area 1 28 acres
Drainage Area 55570 00 square feet needs to be verified
Area in Acres 128 acres
IMPERVIOUS AREA
Rational C-list beside
each item below in E15 to E20
Building
1185300
square feet
095
Future Bldg
225600
square feet
095
Parking
1956900
square feet
095
SW
61300
square feet
095
square feet
square feet
TOTAL
34291,00
Cc= 066
% IMPERVIOUS 61 71% Des Depth 50 TSS 90
SURFACE AREA CALCULATION
Rational '?
SAIDA 4 42%
Req SA 2456 square feet
Prov SA 2552 square feet
Bottom 29 20 MSL
Perm Pool 34 20 1 MSL
Design Pool 35 44 MSL
Design SA 3478 square feet
Req Volume 30,59 cubic feet
Prov Volume 3739 Icubic feet
1 00 If Rational is used put a
"1" in box E26 If not, leave it blank
[From plan Contours]
Perm Poof volume= tioUo
Req Forebay Volume= 1301
Provided Volume= 1350
Percent= 21 Ala
Des Storm 1,00 inches
Rv= 06053698
SA @ _
Elevation=
TION
Avg Head = 060 ft
Flow Q2, cfs 0 018 Area, in 068
Flow Q5, cfs 0 007 Area, in 027
No of Orifices 1 Diameter, in 0 75 Area = 0 442 in
Q, cfs = 0 011 Drawdown 3 1 Idays
COMMENTS
Surface Area, Volume and Orifice are within Design Guidelines