HomeMy WebLinkAboutSW7960611_CURRENT PERMIT_20200501STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW 7Q�QO(P�r
DOC TYPE
� CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
DOC DATE
2p'd0 DSOI
YYYYMMDD
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Acting Direcror
Mr. Charles E. Schulz,
MCAS Cherry Point
PSC Box 8006
'40RT.1 CAROLINA
Environmental Quality
May 1, 2020
Deputy Facilities Officer
Cherry Point, NC 28533
Subject: Stormwater Permit No. SW7960611 Renewal
MCAS Cherry Point Runway 5 Storage Area
High Density Project
Craven County
Dear Mr. Schulz:
The Washington Regional Office received a Stormwater Management Permit
Application for renewal of the subject permit on March 27, 2020. Staff review of the
applications have determined that the permit can be reissued. We are forwarding Permit
No. SW7960611 dated May 1, 2020, for the continued operation of the subject project.
This permit, upon its effective date, will replace all previous State Stormwater permits for
this project. This permit shall be effective from September 14, 2020 until September 13,
2028 and shall be subject to the conditions and limitations as specified therein, and does
not supercede any other agency permit that may be required. Please pay special attention
to the Operation and Maintenance requirements in this permit. Failure to establish an
adequate system for operation and maintenance of the stormwater management system
will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you
have the right to request an adjudicatory hearing upon written request within thirty (30)
days following receipt of this permit. This request must be in the form of a written petition,
conforming to Chapter 150B of the North Carolina General Statutes, and filed with the
Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714.
Unless such demands are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please
contact me at (252) 948-3923.
Sincerely,
pc -
Roger K. Thorpe
Environmental Engineer
Nrrt,h taro€ na Depar,menr of Environmental Quality ! Divisien of Energy, Mineral and Land Resources
Q�� 'Nmhington Regional Office i 9-43'Na�hingten Sgaare 41a€1 wa,ringtan. Nurt�h Carolina 27889
:ar:a a
2.946.,,-;,,I
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules and Regulations
PERMISSION IS HEREBY GRANTED TO
US Marine Corps Air Station Cherry Point
Runway 5 Storage Area
Cherry Point, Craven County
FOR THE
construction, operation and maintenance of one wet detention pond in compliance with
the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "storm water rules')
and the approved stormwater management plans and specifications and other
supporting data as attached and on file with and approved by the Division of Energy,
Mineral, and Land Resources (Division) and considered a part of this permit.
This permit snail be effective from September 14, 2020 until September 13, 2028, and
shall be subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
1.- This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.6 of this permit. The stormwater control measure
has been designed to handle the runoff from 3.46 acres of impervious area.
3. The tract will be limited to the amount of built -upon area indicated in Section 1.6
of this permit, and per approved plans.
4. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
5. The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system.
6. The following design criteria have been provided in the wet detention pond and
must be maintained at design condition:
a. Drainage Area, acre:
5.0
b. Total Impervious Surfaces, acre:
3.46
C. Design Storm, inches:
1.0
d. Pond Depth - average, feet:
4.0
f. Permanent Pool Elevation, FMSL:
31.0
g. Permanent Pool Surface Area required,
ft2: 13,068
h. Permanent Pool Surface Area, ft2:
14,810
i. Min. Volume required, ft3:
12,300
j. Permitted Storage Volume, ft3:
13,329
k. Controlling Orifice:
1.5" 0 pipe
I. Receiving Stream/River Basin:
Slocum Creek/Neuse
M. Stream Index Number:
27-112
M. Classification of Water Body:
"C; Sw, NSW"
II. SCHEDULE OF COMPLIANCE
1. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
3. The permittee shall at all time provide the operation and maintenance necessary
to assure the permitted stormwater system functions at optimum efficiency. The
approved Operation and Maintenance Plan must be followed in its entirety and
maintenance must occur at the scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and re -vegetation of slopes and the vegetated filter strip.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of outlet structure, orifice device, level
spreader, filter strip, catch basins and piping.
g. Access to the outlet structure must be available at all times.
4. Records of maintenance activities must be kept for each permitted SCM. The
records will indicate the date, activity, name of person performing the work and
what actions were taken.
5, The permittee shall submit to the Division of Energy, Mineral, and Land
Resources an annual summary report of the maintenance inspection records for
each SCM. The report shall summarize the inspection dates, results of the
inspections, and the maintenance work performed at each inspection.
6. Access to the stormwater facilities shall be maintained via appropriate
easements at all times.
7. The facilities shall be constructed as shown on the approved plans. This permit
shall become void unless the facilities are constructed in accordance with the
conditions of this permit, the approved plans and specifications, and other
supporting data.
8. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A
modification may be required for those deviations.
9. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
10. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project
area. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMA
Major permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
11. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
12. The permittee shall submit final site layout and grading plans for any permitted
future areas shown on the approved plans, prior to construction.
13. A copy of the approved plans and specifications shall be maintained on file by
the Permittee at all times.
Ill. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a completed Name/Ownership Change form, to the Division of Energy,
Mineral, and Land Resources, signed by both parties, and accompanied by
supporting documentation as listed on page 2 of the form. The project must be in
good standing with the Division. The approval of this request will be considered
on its merits and may or may not be approved.
2. The permittee is responsible for compliance with all permit conditions until such
time as the Division approves the transfer request.
3. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division of Energy, Mineral,
and Land Resources, in accordance with North Carolina General Statute 143-
215.6A to 143-215.6C.
4. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
5. In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
6. The permittee grants DEQ Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
7. The permit issued shall continue in force and effect until revoked or terminated.
The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and re -issuance or
termination does not stay any permit condition.
8. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
9. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
10. The issuance of this permit does not prohibit the Director from reopening and
modifying the permit, revoking and reissuing the permit, or terminating the permit
as allowed by the laws, rules and regulations contained in Title 15A NCAC
21-1.1000, and NCGS 143-215.1 et -al.
11. The permittee shall notify the Division of any name, ownership or mailing address
changes at least 30 days prior to making such changes.
12. This permit shall be effective from September 14, 2020 until September 13,
2028. Application for permit renewal shall be submitted 180 days prior to the
expiration date of this permit and must be accompanied by the processing fee.
Permit issued this the 15t day of May 2020
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
For
Brian Wrenn, Acting Director
Division of Energy, Mineral and Land Resources
By Authority of the Environmental Management Commission
Permit Number SW7960611
-- - - - — 'UtML"K'USE UNL'Y -- - - -- - ----- - ... - - --
Date Received Fee Paid Permit Number
NC DEQ Division of Energy, Mineral and Land Resources
STATE STORMWATER:
PERMIT RENEWAL APPLICATION FORM 's1
In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days
prior to its expiration. Renewed permits are valid for a period of 8 years per Session ,Law 2011-398 (SB 781)
Section 60. (c). This application form is for permit renewals only. REr,'EI ED MAR 2 7 2029
A. PROJECT INFORMATION
1. State Stormwater Permit Number: SW7960611
2. Project name: MCAS -Runway 5 Storage Area
3. Project street address: No street address. Project located on an unpaved road off Cunningham Boulevard,
City: Cherry Point County: Craven ZIP:
28533
4. What, if any, changes have been made to the project as permitted? None
If the project has changed from the original approved plans, please complete SWU-101 for a Major
Modification or Minor Modification Application form available at: https:/Idea.nc.govlaboutldivisionslenergy-
mineral-land-resourceslenergy-mineral-land-rulesistormwa_t-er-arog-ramlpost-construction.
B. PERMITTEE INFORMATION
If changes to the permittee or project name have been made, please complete either the Permit Update form
or the Permit Transfer form available at: https://deg.nc.gov/about/divisions/energy-mineral-land-
resourceslenergy-mineral-land-ruleslstormwater-programlpost-construction. State Stormwater Permits do not
automatically transfer with the sale of the property-
1. Current Permit Holder's Company Name/Organization: Marine Corp Air Station Cherry Point
2. Signing Official's Name: Charles E. Schulz
3, Signing Official's Title: Deputy Facilities Director
4. Mailing Address: PSC Box 8006
City: Cherry Point State: NC ZIP 1
28533
5. Street Address: Building 4223 Access Road
City: Cher Point State: NC ZIP
28533
6. Phone: (252) 466-3148 Email: charles.e.schulz(a)usmc.mil
Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018
C. SUBMITTAL REQUIREMENTS
Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR
Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal NQW/ORW). Only applications packages that
include all required items listed below will be accepted and reviewed.
Initial each item below to indicate that the required information is provided in. the application package:
1. A permit application processing fee of $505.00 payable to NCDEQ.
NA
2. One original signed hard copy and one electronic copy of this completed form. The signing official
named on this application to represent the current permittee must meet one of the following:
a. Corporation — a principle executive officer of at least the level of vice-president;
b. Limited Liability Company (LLC) — a manager or company official as those terms are defined
in G.S. 57D "North Carolina Limited Liability Company Act;"
c. Public Entity -- a principal executive officer, ranking official, or other duly authorized employee;
d. Partnership or limited partnership — the general partner;
e. Sole proprietor; or
f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the
signature of another entity.
One hard copy and one electronic copy of recorded documents required by the original permit that have
not yet been received by DEMLR, including: deed restrictions, protective covenants,
condominium/planned community declaration and easements. If the project has been built, include
documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If
the project has not been built, include a signed agreement that the final recorded deed restrictions
and protective covenants will be submitted at a later date.
4.
O&M Agreements, Please select one:
® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to
keep this on file with the permit; or
❑ I do not have a copy of the current recorded 0&M Agreement for all SCMs and am
requesting a copy be sent to me. I agree to keep this on file with the permit.
5. Designer Certifications, Please select one:
® A copy of the certification(s) confirming that the project was built in accordance with the
approved plans have been previously provided to the Division; or
❑ A copy of the certification(s) confirming that the project was built in accordance with the
approved plans are enclosed; or
❑ The project has not yet been built.
6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a
signed, sealed, and dated letter from a licensed professional stating that the SCMs have been
inspected, and that they have been built and maintained in accordance with the permit.
NA 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide
one hard copy and one electronic copy of documentation from the NC Secretary of State, or other
official documentation, which supports the titles and positions held by the persons listed in Section
C.2 per 15A NCAC 2H. 1043(3)(b).
httr)s://www.sosnc.gov/online_ services/search/by title/ Business Registration
Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018
D. PERMITTEE'S CERTIFICATION
W1 '5 FJ. SL IV J 21- _ the person leaally resnonsihle for the hermit. certify that I have
a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am
responsible for the performance of the maintenance procedures, and the site has been and will be maintained
according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs
or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the
project, SCMs, or owners All information provided on this permit renewal application is, to the best of my
knowledge, correct an5o6mpleiiitle.
Signature: Date:
NOT RIZrA` tT�IONN:
I, MVtvvF ` a Notary Public for the State of
Y C ' ' ++, County of , do hereby certify
that Wn[�J 1 2_ personally appeared before me
this the _�/V day of N l _ 20��, and acknowledge the due
execution of the forgoing instrument. Witness my hand and official seal,
(Notary Sea!)
\\11ti111lIIlf!!1!/!
Notary Signature: �P Notary Publlc c!'�
Onslow
County
My commission expires (/v my Comm. Exp-
2 1014-2Q23 Q
Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018
UNITED STATES MARINE CORPS
MARINE CORPS AIR STATION
POSTAL SERVICE CENTER BOX 8003
CHERRY POINT, NORTH CAROLINA 28533-0003
Professional Engineer's Certification
I, Dale A. McFarland, a duly registered Professional Engineer in the State of North Carolina, have
reviewed the approved plans for Stormwater Permit No. SW7960611 and have inspected the existing
conditions at the Runway 5 Storage Area. I have determined to the best of my knowledge and abilities
that:
1. The project's built -upon area and storinwater management features were constructed in accordance
with the approved plans, specifications, and correspondence.
2. The stormwater control measures (SCMs) have been built in compliance with the permit and are
functioning as intended. Operation and maintenance of the SCMs has been completed in substantial
compliance with the permit.
�Jt`I:It"E;,;
Dale A. McFarland
Registration #025438
UNITED STATES MARINE CORPS
MARINE CORPS AIR STATION RECEIVED MAR 2 7 2020
POSTAL SERVICE CENTER BOX 8003
CHERRY POINT, NORTH CAROLINA 28533-0003
i
IN REPLY REFER TO,
5090/29522
LN
March 16, 2020
North Carolina Department of
Environmental Quality
Division of Energy, Mineral, and Land Resources
943 Washington Square Mall
Washington, North Carolina 27889
SUBJECT: STATE STORMWATER PERMIT NO. SW7960611 RENEWAL APPLICATION
Please see enclosed the State Stormwater permit renewal package
for Stormwater Permit SW7960611 which services the Runway 5 Storage
Area at Marine Corps Air Station, Cherry Point. The system consists of
a wet detention pond. The permit is set to expire September 13, 2020.
We thank you for your consideration on this matter. If there are
any further questions or comments, please contact Mr. Nathan Arnett of
the Environmental Affairs Department at 252-466-5271 or
nathan.arnett@usmc.mil.
Sincerel
C. E. SCHULZ
Deputy Facilities Direct
By direction of the
Commanding Officer
Enclosure: Stormwater Permit Renewal Package SW7960611