Loading...
HomeMy WebLinkAboutSW7960611_CURRENT PERMIT_20200501STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW 7Q�QO(P�r DOC TYPE � CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE DOC DATE 2p'd0 DSOI YYYYMMDD ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Direcror Mr. Charles E. Schulz, MCAS Cherry Point PSC Box 8006 '40RT.1 CAROLINA Environmental Quality May 1, 2020 Deputy Facilities Officer Cherry Point, NC 28533 Subject: Stormwater Permit No. SW7960611 Renewal MCAS Cherry Point Runway 5 Storage Area High Density Project Craven County Dear Mr. Schulz: The Washington Regional Office received a Stormwater Management Permit Application for renewal of the subject permit on March 27, 2020. Staff review of the applications have determined that the permit can be reissued. We are forwarding Permit No. SW7960611 dated May 1, 2020, for the continued operation of the subject project. This permit, upon its effective date, will replace all previous State Stormwater permits for this project. This permit shall be effective from September 14, 2020 until September 13, 2028 and shall be subject to the conditions and limitations as specified therein, and does not supercede any other agency permit that may be required. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact me at (252) 948-3923. Sincerely, pc - Roger K. Thorpe Environmental Engineer Nrrt,h taro€ na Depar,menr of Environmental Quality ! Divisien of Energy, Mineral and Land Resources Q�� 'Nmhington Regional Office i 9-43'Na�hingten Sgaare 41a€1 wa,ringtan. Nurt�h Carolina 27889 :ar:a a 2.946.,,-;,,I STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules and Regulations PERMISSION IS HEREBY GRANTED TO US Marine Corps Air Station Cherry Point Runway 5 Storage Area Cherry Point, Craven County FOR THE construction, operation and maintenance of one wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "storm water rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral, and Land Resources (Division) and considered a part of this permit. This permit snail be effective from September 14, 2020 until September 13, 2028, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1.- This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 of this permit. The stormwater control measure has been designed to handle the runoff from 3.46 acres of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in Section 1.6 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acre: 5.0 b. Total Impervious Surfaces, acre: 3.46 C. Design Storm, inches: 1.0 d. Pond Depth - average, feet: 4.0 f. Permanent Pool Elevation, FMSL: 31.0 g. Permanent Pool Surface Area required, ft2: 13,068 h. Permanent Pool Surface Area, ft2: 14,810 i. Min. Volume required, ft3: 12,300 j. Permitted Storage Volume, ft3: 13,329 k. Controlling Orifice: 1.5" 0 pipe I. Receiving Stream/River Basin: Slocum Creek/Neuse M. Stream Index Number: 27-112 M. Classification of Water Body: "C; Sw, NSW" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, level spreader, filter strip, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted SCM. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5, The permittee shall submit to the Division of Energy, Mineral, and Land Resources an annual summary report of the maintenance inspection records for each SCM. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 6. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 7. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 12. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 13. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. Ill. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division of Energy, Mineral, and Land Resources, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Energy, Mineral, and Land Resources, in accordance with North Carolina General Statute 143- 215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DEQ Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Title 15A NCAC 21-1.1000, and NCGS 143-215.1 et -al. 11. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. This permit shall be effective from September 14, 2020 until September 13, 2028. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 15t day of May 2020 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION For Brian Wrenn, Acting Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW7960611 -- - - - — 'UtML"K'USE UNL'Y -- - - -- - ----- - ... - - -- Date Received Fee Paid Permit Number NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM 's1 In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session ,Law 2011-398 (SB 781) Section 60. (c). This application form is for permit renewals only. REr,'EI ED MAR 2 7 2029 A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW7960611 2. Project name: MCAS -Runway 5 Storage Area 3. Project street address: No street address. Project located on an unpaved road off Cunningham Boulevard, City: Cherry Point County: Craven ZIP: 28533 4. What, if any, changes have been made to the project as permitted? None If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at: https:/Idea.nc.govlaboutldivisionslenergy- mineral-land-resourceslenergy-mineral-land-rulesistormwa_t-er-arog-ramlpost-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https://deg.nc.gov/about/divisions/energy-mineral-land- resourceslenergy-mineral-land-ruleslstormwater-programlpost-construction. State Stormwater Permits do not automatically transfer with the sale of the property- 1. Current Permit Holder's Company Name/Organization: Marine Corp Air Station Cherry Point 2. Signing Official's Name: Charles E. Schulz 3, Signing Official's Title: Deputy Facilities Director 4. Mailing Address: PSC Box 8006 City: Cherry Point State: NC ZIP 1 28533 5. Street Address: Building 4223 Access Road City: Cher Point State: NC ZIP 28533 6. Phone: (252) 466-3148 Email: charles.e.schulz(a)usmc.mil Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal NQW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in. the application package: 1. A permit application processing fee of $505.00 payable to NCDEQ. NA 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity -- a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. 4. O&M Agreements, Please select one: ® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded 0&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. Designer Certifications, Please select one: ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. NA 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). httr)s://www.sosnc.gov/online_ services/search/by title/ Business Registration Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION W1 '5 FJ. SL IV J 21- _ the person leaally resnonsihle for the hermit. certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or owners All information provided on this permit renewal application is, to the best of my knowledge, correct an5o6mpleiiitle. Signature: Date: NOT RIZrA` tT�IONN: I, MVtvvF ` a Notary Public for the State of Y C ' ' ++, County of , do hereby certify that Wn[�J 1 2_ personally appeared before me this the _�/V day of N l _ 20��, and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, (Notary Sea!) \\11ti111lIIlf!!1!/! Notary Signature: �P Notary Publlc c!'� Onslow County My commission expires (/v my Comm. Exp- 2 1014-2Q23 Q Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 UNITED STATES MARINE CORPS MARINE CORPS AIR STATION POSTAL SERVICE CENTER BOX 8003 CHERRY POINT, NORTH CAROLINA 28533-0003 Professional Engineer's Certification I, Dale A. McFarland, a duly registered Professional Engineer in the State of North Carolina, have reviewed the approved plans for Stormwater Permit No. SW7960611 and have inspected the existing conditions at the Runway 5 Storage Area. I have determined to the best of my knowledge and abilities that: 1. The project's built -upon area and storinwater management features were constructed in accordance with the approved plans, specifications, and correspondence. 2. The stormwater control measures (SCMs) have been built in compliance with the permit and are functioning as intended. Operation and maintenance of the SCMs has been completed in substantial compliance with the permit. �Jt`I:It"E;,; Dale A. McFarland Registration #025438 UNITED STATES MARINE CORPS MARINE CORPS AIR STATION RECEIVED MAR 2 7 2020 POSTAL SERVICE CENTER BOX 8003 CHERRY POINT, NORTH CAROLINA 28533-0003 i IN REPLY REFER TO, 5090/29522 LN March 16, 2020 North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources 943 Washington Square Mall Washington, North Carolina 27889 SUBJECT: STATE STORMWATER PERMIT NO. SW7960611 RENEWAL APPLICATION Please see enclosed the State Stormwater permit renewal package for Stormwater Permit SW7960611 which services the Runway 5 Storage Area at Marine Corps Air Station, Cherry Point. The system consists of a wet detention pond. The permit is set to expire September 13, 2020. We thank you for your consideration on this matter. If there are any further questions or comments, please contact Mr. Nathan Arnett of the Environmental Affairs Department at 252-466-5271 or nathan.arnett@usmc.mil. Sincerel C. E. SCHULZ Deputy Facilities Direct By direction of the Commanding Officer Enclosure: Stormwater Permit Renewal Package SW7960611