HomeMy WebLinkAboutSW7951211_HISTORICAL FILE_20200129STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW
DOC TYPE
❑CURRENT PERMIT
❑ APPROVED PLANS
HISTORICAL FILE
c.
DOC DATE
WYYMMDD
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
NORTH CAROLINA
Environmental Quality
January 29, 2020
Mr. Charles E. Schulz, Deputy Facilities Officer
MCAS Cherry Point
PSC Box 8006
Cherry Point, NC 28533
Subject: Stormwater Permit Renewal
Stormwater Management Permit SW7951211
MCAS Cherry Point Community Center
Craven County
Dear Mr. Schulz:
t,', �'o
A Division of Energy, Mineral, and Land Resources file review has determined that
Stormwater Permit SV 7951211 for a stormwater treatment system consisting of a wet
detention pond serving a Community Center expires on September 13, 2020. This is a
reminder that permit renewal applications are due 180 days prior to expiration. We do
not have a record of receiving a renewal application.
Please submit a completed permit renewal application along with a $505.00 fee for
permit renewal. Application forms for renewal can be found on our website at:
https://deg.nc.gov/aboujt ddvis_j_+�ns�e orgy-mineral-land-resourceslenergy-mineral-lai>id-
rules'Istormwater-progra .1post-construction. North Carolina General Statutes and the
Coastal Stormwater rules require that this property be covered under a stormwater
permit. Failure to maintain a permit subjects the owner to assessment of civil penalties.
If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to
discuss this by phone or meet with you. If you would like, I can e-mail you a copy of the
application form. You can request a copy by e-mailing me at roger.thorpe@ncdenr. ov.
Sincerely,
/c- ..2
Router K. Thorpe
Environmental Engineer
North Carolina Department of Environmental Quality I division of Energy. Mineral and Land Resources
Washington Regional Office I 941 Washington Square Mall I WAshingtnn, North Carolina 27889
::cn7 i suns un
nT�.rn�m.lul eu,uN 7.5'z �t4 (i.h4 R1
= pM;WA7-,!� r ����yp ru swAcK 6/0-k-0,/06 Michael F. Easley, Governor
William G. Ross, Jr., Secretary
j � JUN 2 7 2006 North Carolina Department of Environment and Natural Resources
� . �-,�.•,!*.,+.emu. �r �
Alan W. Klimek, P.E. Director
D VY}pr Q-WARD Division of Water Quality
SURFACE WATER PROTECTION SECTION
COASTAL STORMWATER PERMIT RENEWAL APPLICATION FORM
I. f CURRENT PERMIT INFORMATION:
1. Stormwater, Management Permit Number: Sc3`7i"5'17A _.
2. Permit Holder's name: P,,o P N%r Ske-\ cc,
-
3. Signing official's name: ea..ge 1,�, (a Title:
(person legally responsible for permit)
4. Mailing address: City. rs
State: NC ZipCode:2�A%-;off'hone: QS2-atO16-"� FAX: 406- 2000
(Area Code and Number) (Area Code and Number)
5. Project
6. Location of Project: (streetaddress)Aga VCY►C� __ _K�'J�
%. Directions t0 Project (from nearest major intersection} i'Ma' i C► 1� �; ,k ��a,�, [� �c�tr, . f2'1V 0
Sl�c►}m, pft� CA e-,A Coy- 4.16 u9�4A. onko N AA ova CcAr "a it-r
03 in\QS a lweti lc4V onkD S\,Wc Loa 'fir cfl�l Au1h lckA flAc7 J F-,i hk,
II. PERMIT INFORMATION p ` 1. Specify the type of stormwater treatment (wet pond, infiltration, etc.): 1J.�"C'-�r�ic1 0Ji
2. List any changes (from pcoject that was originaily approved, attach additional pages if needed) L
3. Do you have a copy of the original Operation and Maintenance Agreement? Yes_XNo
Applicant's C ifica
I, (print certify that the information included on this
permit rei , n, thg t y knowledge, correct and complete.
Signature:
Date:
Submit this c�rmpleted brm a(at'ig with an application fee of $420.00 and a copy of the
designer's certification to the address listed below.
North Carolina Division of Water Quality 943 Washington Square Mall Phone (252) 946-6461 Customer Service 1-877-623-6748 pre
Washington Regional Office Washington, NC 27889 FAX (252) 946-9215 Internet: h2o.enr.state.nc.us NOTE 1C1fo11717a
An Equal Opportunity/Affirmative Action Employer— 50% Reoyded110%o Post Consumer Paper
C.1�t�t?Su•'� 1
Project Name: Community Center, MCAS, Craven County rr2,11EGEM®
Stormwater Permit No. SW795121 1 T%
Owner: Marine Corps,Air Station Cherry Point
,SUN 2 7 2006
Professional Engineer's Certification DWQ-WARD
I, Dale A. McFarland, as a duly Registered Professional Engineer in the State of
North Carolina, have reviewed the design application package for Stormwater Permit No.
7951211 dated 26 JLine 1996 and inspected the Community Center project area. I have
determined and attest to the best of my knowledge and abilities that the project's
stormwater management features were constructed in substantial compliance with the
approved plans, specifications, and correspondence. The project deviates from the
approved plans in that one of two planned parking lots (including two associated catch
basins) was not constructed.
I -
5j
' UNITED STATES GOVERNMENT
DEPARTMENT OF THE NAVY a70sooa11164 Ll
USMC AIRSTATION
�Qd�
- CYNTHIA M. IVES
FOR OFFICIAL USE ONLY.' �- � �
❑S GO ER. MENT TAX EXEMPT
�e ,w,derof �,
<Jtl�` ; NOT TO EXCEED 066,2500.00
1.CITIBANK USA N.A,
PAY(I13
4E.7
HR6
UGH CITIBANK (SOUTH DAKOTA), N.A.
701 e. BQTH6TREET NORTH, S10UX FALLS, SO 61104 605,331-2826
try; Sior.wwk,
A-V.
Ali—
a
UNITED STATES MARINE CORPS
e MARINE CORPS AIR STATION
POSTAL SERViCE CODE BOX 8003
CHERRY POINT, NORTH CAROLINA 28533-0003
5090/29154
LN
June 26, 2006
Mr. Bill Moore
North Carolina Department of
Environment and Natural Resources
943 Washington Square Mall JUN 2 7 2006
Washington,. NC 27889
Dear Mr. Moore:
Marine Corps Air Station Cherry Point (MCAS Cherry Point)
submitted correspondence on March 14, 2006 requesting the
renewal of State Stormwater Management Permits SW7951211,
SW7960410, and SW7960611 for three detention ponds located at
the installation's community center, T-10 test cell, and Runway
5 Storage Area respectively. Conversation between yourself and
Daryle Tripp of the Environmental Affairs Department in April
2006 indicated that due to changes in policy of the North
Carolina Department of Environment and Natural Resources
Washington Regional Office (NCDENR WARD) MCAS Cherry Point would
be required to submit certifications from a Professional
Engineer indicating that the stormwater detention ponds were
built in accordance with the approved plans and specifications
provided with the submitted Stormwater Management Permit
Application. Further communication between yourself and Daryle
Tripp in late May 2006 indicated that a Professional Engineer
Certificate stating that approved plans and specifications have
been reviewed and stormwater best management practices have been
constructed in accordance with the State Stormwater Management
Permit can be provided in lieu of a certificate from the
Professional Engineer that supervised construction of the
project. Attached for review and record are the Professional
Engineer Certificates for State Stormwater Management Permits
SW7951211, SW7960410, and SW7960611. The renewal fee of $420.00
for each project was submitted with initial correspondence for
permit renewal on -March 14, 2006.
Attached as enclosure (1) are the Professional Engineer
Certificates for State Stormwater Management Permits SW7951211,
SW7960410, and SW7960611. The Coastal Stormwater Permit Renewal
Application Forms provided by NCDENR WARO are attached as
enclosure (2) and enclosure (3) is the original Operations
5090/29154
LN
June 26, 2006
and Maintenance Plan that applied to all Stormwater Detention/
Retention Ponds aboard MCAS Cherry Point during construction of
these structures. Enclosure(4) is a permit modification letter
received by NCDENR WARO on April 08, 1996 indicating that the
Northern Parking Lot designed for State Stormwater Management
Permit SW7951211 will not be constructed and may be developed in
future construction. This permit modification has been noted in
the Professional Engineer's Certification for the project. At
this time there are no plans to construct the parking lot.
Thank you for your help in this matter. If you have any
questions or require additional information, please contact Mr.
Daryle Tripp of the Environmental Affairs Department at 252-466-
5747.
Sincerely,
Rfiviro�en al f fa\i.rs Officer
By dir t'on the
Commandincr neral
Enclosures: 1. Professional Engineer Certificates for State
Stormwater Management Permits SW7951211,
SW7960410, and SW7960611.
2. Coastal Stormwater Permit Renewal Application
Forms for State Stormwater Management Permits
SW7951211, SW7960410, and SW7960611.
3. Operations and Maintenance Plan for all
Stormwater Detention/Retention Ponds aboard
MCAS Cherry Point.
4. Permit Modification Letter Dated April 08,
1996 for State Stormwater Management Permit'
SW7951211
'1•K ;�r.� fir, {t4• -,. 7 %� Iv '�r�i:•.Ay•1 ,
'r. '�,- �,,} . b' � '� "iAr .y��j N �f• � tf+' P -, �.1 C" "� � r
,`'1: � fa�.�. � t' '<•'r' W%dry, ��� rr,• - ,its. WS
•�
p r 1 > 1 t 4 'I,s 1' v�v,��`r� �� '�'� r r. W * ✓ � �� r � � +y l 0t ° w •
.`.��.y^.� � L . -_'�- �•�r.�•+ �J �1f�S� ter... }.4....¢'..'' f -. � 1 SI.! ,�+i
��J�a � •.,a f I+�` �"•���*� ��t7,Ij:1��i �%*Y'�7����•v�.� �+�± �ti tilk 1�3
'�ili-t+: ?y*"{
� "+. yt��•, ra- � � ,r„ eY '�-'��� � r s.. '.` " � .r3 ! tom: j
Y �� 5 ��Y9'a4 4 .. f� ti �xr� «k'�!L'!v •lt,.Tw e ! a-..
r } .Mr,k d,,.^r n,/ i, fij• !' i ,r, c S ; �r5tik. Wv rtk tr { ..
�• L�� �! %' lr t�T��r'l Tt Y , ��'�• t - S� � :wl'.s� c -� t
i• � rl 's �4� �' :'i�: �•q�''ryw�,�.:+�j_(l�r i{j•\N.t � Si r^}x�i� /-r} ` tl
� � / � ;c.�Q6'r :}:}!. ems." � a }3 F v. ♦ u,•i `"+ "
`�• � , t �. 1• i��� t � { I f i � f ;�!r i1i,'�(y�y �' •r.,t�!-��iy�}J��u it �t��rt " � :.rai �f �!. �a � r�f�.'rr•"{';r � �"may.•'^'f s'�•�-.'Y'' �y.�"i��T�}f,9'�•i�C4>c+�..hYi_lj►jA�;�y�Yiy,��l�{y�,i1 YL lf,r I:rA � ,( �1
F ,i ! ,%'al fql'-qY—�ywy-•7 �T. ,]^•i \�NFi' 1. •�tl. 7ir•F
ti�"i S'ti ' � b��L_�+-•.{�r?lL.-.i':•-1
•S � v-i>�.- I�3f �t�'��i �. 'i. �tT- •`nti:. {'w ,rt i, `,-�•: '.T
�i' r "�' � /''f�� :r �':'� V^r-. "N.si; f�rt �:��t•� �i� >:��la' E�i7.�.1�1ti� +.'� r 1``' s
z' •l, � ��,�)�a _ ''•r' ''� "Y:X•.'.'�',.•� w�ar.r.sT ��t � •y�d' :�' f�'-� � ':r}.r
a �.5 � t r f,;r�lk• i� r,.�� . j ��!�+�4,.•: 3yi:` t+''ri��_ 1 �y; iR.i l' i
�• _ :a: r � � t ti b'��• •�J ` , ��r4u�� rs°ti �. ` • 1��C , 1��Fy � f. .-�
jN N _;��1,i I sit
�]r?I� r:•�:�/ j„•� z �`
•..f 4 .", r P 4 yw'.,SS+._""1yS1••x F%,✓'� ?'k! �� R y �(-:471 r %�'' Ri
11�u. �fy � 4 F t,+�+1 �YYY�,. y,r 4 , 1. �n, �;�',- �:1',•y �`�i�'�"`' r t' hly ,:�'n yt..r�� `�4 t yl"! t
''l i I sr rr �°•�*'i �1�"� .4,'� T�` r.:>ti' FF.`� },t �,�' ^���r, y� y.' �.,1 1: � w-s�-
I'' 'k7k• �5! � v .) l;J�a "}�"„f la�� �., �yt• tf'.�i1r..,r'�� "• f ��, , ' ` ; � ,. +�� � � +�t4,.
�� J jri,'td�+:•`f. ��;�e �� �1.•+3:ari�iL� �t ,k�'. '���;,� � ' .� e ,rah a.,k� ; t `'�'r�
{ - �! • i, r•+'t�7'w,,�.�,�;. r, `tx•. ♦i•'r rr` 'i Yti..
„� �;ll {i+,%'�iiis'""r�rrr �����'}Tr.� r,':i •f ���:.��il�'', 'i .,�•: ?�� '.
.v � J� J��,r ���},r+j��' fs� ,�N S S .�y �" R. . %. '! • :`'� t �"1`°: j
5�!`Jj',yr�;j�' �•/"-/�JJt�/"l� J�.� K�^' �:`. �iy,, -r'• ae�``
i1'�..���,•j�: A ��'li�Yli;�•�f/t1iL'- J�;�l..l�%�.�i�`f%ies+.:: .` � _�iu'.'• •.t .,_4"�i'�
Stormwater.Detention Pond-
MCAS Cherry Point Community Center (SW7951211)
Aerial Photo 2004
JUN 2 7 2006
MAINTENANCE OF STORM WATER MANAGEMENT
SYSTEMS ABOARD MARINE CORPS AIR STATION
CHERRY POINT, NC 28533-0006
The following maintenance and operation guides for permanent and temporary storm water
management and erosion control practices shall he followed for, all practices constructed
aboard Marine Corps Air Station, Cherry Point and all Out1ying,Auxiliary Landing Fields.
Z-"Az%uv'z (-3)
GUIDE 1.1 - DURING CONSTRUCTION
All temporary and permanent storm water management and erosion control measures shall be
maintained to meet design specifications for the duration of the construction contract, by the
appropriate construction contractor. In order to assure this, contractors shall visually inspect
each permanent and temporary control measure a minimum of once per week or after each rainfall
in excess of 0.5 inches 'within 24 hrs. Prior to acceptance by the government, the contractor shall
perform final maintenance of all permanent practices, (i.e. re-establish grades, remove sediment,
fertilize, mulch and seed denuded areas, etc.). Coupled with final maintenance of permanent
practices, the contractor shall remove all temporary practices that will no longer be required.
Upon project acceptance by the government all responsibility for maintenance and operation of
these structures shall become the responsibility of the Commanding General, Marine Corps Air
Station, Cherry Point, North Carolina.
When projects site(s) exceed the minimum threshold requirements of the North Carolina "General
Permit for Storm Water Discharges Associated with Construction Activities (NCG010000),
(currently 5 acres), 'the contractor shall follow the requirements of said pernut. Specifically, the
contractor shall maintain a written log detailing the required weekly inspections of project
management practices, required inspection of practices within 24 hrs of a rainfall of over 0.5
inches within 24 hrs, notations of any problems observed and corrective actions taken, notations
of any off site sediment migration, presence -of foam, outfall staining, visible'sheens, dry weather
flows and presence of trash or debris. A complete description of corrective actions shall also be
included. This log shall be maintained at the project site by the contractors Quality Control
representative or other representative as determined by the Resident Officer in Charge of
Construction (ROICC). Upon completion of project, the logbook shall be submitted by the
ROICC to the Environmental' -Affairs Department (EAD), Bldg 4223 for central filing. An EAD
representative will be responsible for periodically checking this log. This log is also subject to
inspection by state regulators or designated representatives.
Any off -site impacts of contractor operations shall be corrected at the expense of same.. This shall
include removal of sediment from adjacent property, cleaning of downstream storm drains and
culverts, and removal of sediment from adjacent watercourses and wetland areas. The contractor
shall be responsible for the cost of actual corrective actions as well as any civil or criminal
penalties associated thereto.
1 oC2
GUIDE 2.1 - POST CONSTRUCTION - LONG TERM MAINTENANCE
Upon final acceptance of project by the government, all permanent and temporary practices in
place will become the property and responsibility of the government. Maintenance of these
standard practices will'be followed as detailed below. Prior to acceptance the government shall
perform the following inspections and implement appropriate corrective action for noted
deficiencies.:
DETENTIONIRETENTION/INFILTRATION/SEDIMENT PONDS SHALL BE
INSPECTED ONCE EVERY SIX MONTHS FOR THE FOLLOWING:
- Sediment/debris/trash accumulation
- Inlet and outlet structure condition
- Erosion of pond overbanks and side.slopes
Displacement of artificial grade stabilization materials
Beaver damage
o VEGETATIVE FILTER STRIPS AND CONSTRUCTED WETLANDS SHALL BE
INSPECTED ONCE EVERY SIX MONTHS FOR THE FOLLOWING.
- Sediment/debris/trash accumulation,
- Inlet and outlet conditions,
- Erosion of overbanks and side slopes
- Displacement of artificial grade stabilization materials
Beaver damage
- Density/condition of vegetation
CONICRETE/GRASS/RIPRAP LINED CHANNELS SHALL BE INSPECTED
ONCE EVERY SIX MONTHS FOR:
- Sediment/debris/trash accumulation,
- Scouring at culvert/swale inlets and outlets
- Erosion of channel and side slopes for erosion
- Displacement of any artificial grade stabilization materials
- Choking of flow due to vegetation or beaver damage
Within thirty days of the aforementioned inspections, appropriate corrective actions shall be
programmed for each deficiency noted. Where deficiencies pose an acute hazard to human health
or environment, corrective actions shall'be implemented within 24 hrs.
2 of 2
Mills, Oliver & Webb, Inc.
200 Country Club Drive, Plaza One, Building E, Blacksburg, VA 24060
Tel; t540) 552-2151 FAX: (540) 951-0219
April 1, 1996
North Carolina Dept. Of Environment, Health & Natural Resources
1424 Carolina Ave.
Washington, NC 27889
ATTN: Mr. William Moore
RE: Stormwater Management Application
Community Center, MCAS Cherry Paint
A/E Commission No. 9454
Dear Mr, Moore:
Robert L Mills, AJA.
Robert B. Oliver, P.E
Ambler W. Webb, Jr., P.E
Philip Pappas, A.I.A.
Dan G. Mudy, P.E
w . INGTON OFFICE
APR Q 8 1996
a. E M.
2
As we have discussed in recent telephone conversations, enclosed please find our revised stormwater
management application package for the above referenced project. This package has been revised
in accordance with your review letter dated January 10, 1996.
The stormwater management system has been almost completely redesigned since the last submittal.
Basically, the site is broken into two pieces, one controlled with the use of a wet detention pond and
the other controlled with the use of vegetative swales or filters. For a complete description of the
management scheme, please refer to the attached Stormwater Management Narrative.
Please note that the project as a whole has changed somewhat since the last submittal. The Navy has
decided to construct the lower (southern) parking lot as an add alternate to the base bid. The base
bid provides for the preservation of the lower parking lot in its current state which is a gravel surface
with no concrete walks surrounding it. The 'eadsting lot is also smaller than the proposed new lot.
However, since there is the possibility that the new paved lot will be constructed as an add to this
contract or possibly at some time in the future, the stormwater management measures have been
designed assuming that the lower parking lot will be constructed right away.
ecwnr nnJ uron
North Carolina Dept. Of Environment, Health & Natural Resources
Page 2
April 1, 1996
I trust that this submittal will meet with your approval.. However, if you should have any questions
or require any additional information, please do not hesitate to contact me.
Sincerely,
Todd D. Poi P.E.
Civil / Structural Engineer
Enclosure
cc: Commanding General, Attn: EA Dept, MCAS Cherry Point
Mr. Tim Osborne, LAN'I'DIV
4341)Loo2 wPp
C/O
F w� f�
6
JI
N Sc v Gam' "`
ij r T
nee
j
1-e h ew 6c4,wt— -� ram • 7t
l-�-e n r W,=- /
21/CGS %f e� �O ✓I7�s
�3) `J/-oJec7�s
cJ�LL� Grjc..y� T� O�
UNITED STATES MARINE CORPS
MARINE CORPS AIR STATION
PSC BOX $003
CHERRY POINT, NORTH CAROLINA 28533-0003
5090/29154
LN
March 14, 2006
Mr. Bill Moore
North Carolina Department of
Environment and Natural.Resources
Water Quality Section
943 Washington Square Mall
Washington, NC 27889
Dear Mr. Moore:
As discussed in a phone conversation between yourself and
Daryle Tripp of the Environmental Affairs Department in February
2006, Marine Corps Air Station (MCAS) Cherry Point is in the
process of renewing��tate Stormwater Management Permits
SW7951211, SW7960410'; and SW7960611xfor three detention ponds
located at the installation's community center, T-10 Jet -Test
Cell, and Runway 5 Storage Area respectively_ As indicated by
yourself in this conversation, State Stormwater Management
Permit Applications would not be required for the renewal of the
permit of each detention pond if no additional impervious area
was constructed or no redesign of drainage patterns occurred
which would ultimately result in an increase of stormwater flow
to the designed detention pond. Attached for your review are
aerial photos depicting site conditions in 1997 and 2004.
Comparison of these aerial photos with information collected
from site investigations of each pond verifies that no
construction or modification that resulted in the addition of
impervious area -or increased stormwater runoff occurred from the
date the detention ponds were constructed to present. In
addition, inspection of these detention ponds by the Department
of Environment and Natural Resources Wilmington Regional Office
in September 2005 indicated that there were no maintenance or
construction issues with any of the detention ponds.
Due to the fact.that the designed operation and capacity of
the detention ponds have not been altered State Stormwater
Permit Applications for the renewal of SW7951211, SW7960411, and
SW7960611 will not be necessary. Enclosure (1) is the $1260 fee
for renewing State Stormwater Management Permits SW7951211,
SW7960411, and SW7960611. Enclosure (2) are the 1997 and 2004
aerial photos for the detention pond constructed at the MCAS
5090/29154
LN
March 14, 2006
Cherry Point Community Center. Enclosure (3) are 1997 and 2004
aerial photos for the detention pond constructed at the T-10
Test Cell and (4) are 1997 and 2004 aerial photos for the Runway
5 Storage Area detention pond..
Thank you for your help in this manner and if you have
any questions or require additional information, please contact
Mr. Daryle Tripp of the Environmental Affairs Department at 252-
466--5747.
Sincerely,
� nW. RAD O D
vir m n 1 Affairs Officer
By direction of the
Commanding General
Enclosures: 1. $1260 renewal fee for State Stormwater
Management Permits SW7951211, SW7960410, and
SW7960611
2. 1997 and 2004 Aerial Photographs for MCAS
Community Center, Detention Pond
3. 1997 and 2004 Aerial Photographs for T-10 Test
Cell Detention Pond
4. 1997 and 2004 Aerial Photographs Runway 5
Storage Area Detention Pond
` UNITED STATES MARINE CORPS
MARINE CORPS AIR STATION
POSTAL SERVICE CODE BOX 8003
CHERRY POINT, NORTH CAROLINA 28533-0003
5090/29154
LN
June 26, 2006
Mr. Bill Moore
North Carolina Department of �cE
Environment and Natural Resources.
943 Washington Square Mall JUN 2 7 2006
Washington, NC 27889
Dear Mr. Moore: ®1r'VQ-WARO
Marine Corps Air Station Cherry Point (MCAS Cherry Point)
submitted correspondence on March 14, 2006 requesting the
renewal of State Stormwater Management Permits SW7951211,
SW7960410, and SW7960611 for three detention ponds located at
the installation's community center, T-10 test cell, and Runway
5 Storage Area respectively. Conversation between yourself and
Daryle Tripp of the Environmental Affairs Department in April
2006 indicated that due to changes in policy of the North
Carolina Department of Environment and Natural Resources
Washington Regional Office (NCDENR WARO) MCAS Cherry Point would
be required to submit certifications from a Professional
Engineer indicating that the stormwater detention ponds were
built in accordance with the approved plans and specifications
provided with the submitted Stormwater Management Permit
Application. Further communication between yourself and Daryle
Tripp in late May 2006 indicated that a Professional Engineer
Certificate stating that approved plans and specifications have
been reviewed and stormwater best management practices have been
constructed in accordance with the State Stormwater Management
Permit can be provided in lieu of a certificate from the
Professional Engineer that supervised construction of the
project. Attached for review and record are the Professional
Engineer Certificates for State Stormwater Management Permits
SW7951211, SW7960410, and SW7960611. The renewal fee of $420.00
for each project was submitted with initial correspondence for
permit renewal on March 14, 2006.
Attached as enclosure (1) are the Professional Engineer
Certificates for State Stormwater Management Permits SW7951211,
SW7960410, and SW7960611. The Coastal Stormwater Permit Renewal
Application Forms provided by NCDENR WARO are attached as
enclosure (2) and enclosure (3) is the original Operations
5090/29154
LN
June 26, 2006
and Maintenance Plan that applied to all Stormwater Detention/
Retention Ponds aboard MCAS Cherry Point during construction of
these structures. Enclosure(4) is a permit modification letter
received by.NCDENR WARO on April 08, 1996 indicating that the
Northern Parking Lot designed for State Stormwater Management
Permit SW7951211 will not be constructed and may be developed in
future construction. This permit modification has been noted in
the Professional Engineer's Certification for the project. At
this time there are no plans to construct the parking lot.
Thank you for your help in this matter. If you have any
questions or require additional information, please contact Mr.
Daryle Tripp of the Environmental Affairs Department at 252-466-
5747.
Sincerely,
Rhviro amen al ffaUrs Officer
By dir t'on 9t the
Commanding neral
Enclosures: 1. Professional Engineer Certificates for State
Stormwater Management Permits SW7951211,
SW7960410, and SW7960611.
2. Coastal Stormwater Permit Renewal Application
Forms for State Stormwater Management Permits
SW7951211, SW7960410, and SW7960611.
3. Operations and Maintenance Plan for all
Stormwater Detention/Retention Ponds aboard
MCAS Cherry Point.
4.'Permit Modification Letter Dated April 08,
1996 for State Stormwater Management Permit
SW7951211
--
Mills, Oliver
& Webb? Inc.
a
'
200 Country Club DfiM Plaza One,
Building E� Okitti &4, VA 24060
Tet (703) 552-2151
FAX (703) 951-0219
To:
Nwth Carolina DEHNR
hate: Jvae 26, i 99i6
ATTN: Bill Marie
Fax No.:
(919) 975-3716
Page(s): 3
From:
Todd D. Mo P.E.
Comm. Na: 9454
ID 1Ptojed:
Curry Point Cmnmuaity Cerda
N
m Su"bject_
SWM Revisions
M.
Attached far your approval, are the copies of Sheets C4 and CS we discussed yesterday_ I wW
put the full sine prints in &e =a way.
Ifyou need any additia wl infonnatim please feel free w calL .
0
34
26
22.40
zm
24-M
cm "a
nm:i&n mm GMtAff welmD
Mw aom
-Werr T
lob
tr acm GU=
LMaY
rtliMLr
L J
ftff
mip >
m 2,
D=. It NOUL
7
EM I
WrAtr
U�e
Im
1CM
so reow- to
mr ru
'COVE —1 ,
.yam
zm
mse
24
CAW
&Rcuf
Sir
to
m"Ba aw .—a
sfm;mxft WAYM
nitq
em OD tdtwjkas
0 nm orw7r.
CM."
-tLm --w
IQ �.A UFA= Al OW 10 Map=
hy VIC.25 go
LET rnI4C
Mw" LIM
aicumc
mw
ELEr. .
r
wvfta
Am aFM Fare16 T9P Or am
art
Poe lopriff
Or W144 &7
T2
L
umn or
421ARC Few w"ft
ORWIC SCALE,
0 cur
TUMAM rLIM
W,
IMEMMEEMENE
WEENrow
MEMMMEOMMU-.
-
�_�
�
,��1�'(HIf��■y
t1■!�L'
7�a■■�l�fa
�
■�r■1��IN
■
i��
iR
Sitila'7.^.'■y'�■�■�
l��
OWNF�■■+■LiLy�1ii��wlapp■
�ti+s_fP����■1<ar�
rrrs■ww�■i�a■ram■�■■■■�o.■■■■■■■ss■a■�■■o.■�■�
�•
■�IFr71■■�■®�
�■MR1�
SEC-n THROUGH P
Fjr
�■F�ir"ri����
■s��
Iwo-YJS■fY■r^^T:-r-r•
■■aw■■as��ac■e��■.■a■■■osAa.�—•�■■■�urr■�'
mRn
■!����N��
�!
g■■R■kt-_
ram
s_aau■aim'��i{•�.i■ai■a■:®■■���■r�e■s■u•.�w�
sas�r■asw:■=a■■rr■■av
a■■■■SAIONS
i
,+��awa-
aoss■e=■�rra■
SEEM
all
VERDE-
�
IMMM09SE
�
MEW
Ev
P F!-y-5Ah{FARY SEM F.QRCE MAIN
141E
001�
�
u■EA tl ws+ du
gar a s am
rm a9
Ef0" eewc v
v f 9TIN
wa-a �na�ai
IL V-
rv■, 9/a FPc m 00
Al 1■ Maw Y t
i ?
aM 4 m
Y nt afa
-
Q90 � VLi
M7 '.b11C
1. 1(4ef 9S! .u+e ■ •11� O urac fSw7
■■14■I YIY�! ml� ICF �t/itill Yr11 7�
_.1■■9l M46t GPOW
2 = 6= pw PI 0t ge =Nwiml O ft IP I&V&
h17Y LWIjkftL11■Rl}BOLO
M a'R7ti447■ toc" v ,
M mm
pY M irBQ101>QY
t •lY1� M
man
f. 7 omw o4
1 Swa i0 ow Piz Y �o
n own � 4LW *wmr ar cr OVAL
s. ""M tswx w.
State of North Carolina
�' Department of Environment,
Health and Natural Resources
Washington Regional Office
James B. Hunt, Jr., Governor
Jonathan S. Howes, Secretary
DIVISION OF ENVIRONMENTAL MANAGEMENT
WATER QUALITY SECTION
June 26, 1996
Commanding General
Attn: Environmental Affairs Dept
PSC Box 8006
Cherry Point, NC 28538
Dear Sir:
wR �
Subject: Permit No. SW7951211.
Community Center, MCAS
High Density Stormwater Project
Craven County
The Washington Regional Office received the completed
Stormwater Application for the subject project on June 26, 1996.
Staff review of the plans and specifications has determined that
the project, as proposed, will comply with the Stormwater
Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding
Permit No. SW7951211 dated June 26, 1996 to the Marine Corps Air
Station at Cherry Point, NC.
This permit shall be effective from the date of issuance until
June 26, 2006, and shall be subject to the conditions and
limitations as specified therein. Please pay special attention to
the operation and Maintenance requirements in this permit. Failure
to establish an adequate system for operation and maintenance of
the Stormwater management system will result in future compliance
problems.
If any parts, requirements, or limitations contained in this
permit are, unacceptable, you have the right to request an
adjudicatory hearing upon written request within thirty (30) days
following receipt of this permit. This request must be in the form
of a written petition, conforming to Chapter 150B of the North
Carolina General Statutes, and filed with the Office of
Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611--7447.
Unless such demands are made this permit shall be final and
binding.
1424 Carolina Avenue, Washington, NC 27889 . Telephone (919) 946-6481 FAX (919) 975-3716
An Equal Opportunity Affirmative Action Employer 50% recycled / 10% post -consumer paper
Commanding General
June 26, 1996
Page ,Two
If you have any questions, or need additional information
concerning this matter, please contact Bill Moore at (919) 946-
6481, extension 264.
Sincerely,
4 r
o Per K. Th6rpe
Water Quality Supervisor
Washington Regional Office
cc: Mills, Oliver & Webb, Inc
Craven County Inspections
ti,in'Tashington Regional Office
Central Files
State Stormwater Management Systems
Permit No. SW2951211
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES
DIVISION OF ENVIRONMENTAL MANAGEMENT
STATE'STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143,
General Statutes of North Carolina as amended, and other applicable
Laws, Rules, and Regulations
����J�-���Fzi�►YYal�7��C�7
Marine Corps Air Station, Cherry Point
Craven County
FOR THE
construction, operation and maintenance of stormwater management
systems in compliance with the provisions of 15A NCAC 2H.1000
(hereafter referred to as the "stormwater rules") and the approved
stormwater management plans and specifications and other supporting
data as attached and on file with and approved by the Division of
Environmental Management and considered a part of this permit for
a wet pond system to serve the Community Center, MCAS, Cherry
Point, NC.
This permit shall be effective from the date of issuance until June
26, 2006, and shall be subject to the following specified
conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and
volume of stormwater described in the application and other
supporting data.
2. This stormwater system has been approved for the management of
stormwater runoff as described on pages 4 and 5 of this
permit, the Project Data Sheet(s).
3. Approved plans and specifications for this project are
incorporated by reference and are enforceable parts of the
permit.
3
DIVISION OF ENVIRONMENTAL MANAGEMENT.
PROJECT DATA
Project Name:
Permit Number:
Location:
Applicant:
Mailing Address:
Application Date:
Water Body Receiving
Stormwater Runoff:
Classification of
Water Body:
Pond Depth:
Permanent Pool
Elevation:
Total Impervious
Surfaces Allowed:
Offsite Area
Entering Pond:
4
Community Center
MCAS, Cherry Point
SW7951211
Craven County
MCAS, Cherry Point
Environmental Affairs Dept
PSC Box 8006
Cherry Point, NC 28538
12/22/95, original
6/26/96, completed
Slocum Creek
SC -NSW
3 feet
9.70 MSL
1.49 acres
N/A
Required Surface
Area:
Provided Surface
Area:
Required Storage
volume:
Provided Storage
Volume:
Temporary Storage
Elevation:
Controlling orifice:
4810 square feet
10,312 square feet
11,471 cubic feet
27,969 cubic feet
10.76 MSL
2 inch pipe
4. No homeowner/lot owner/developer shall be allowed to fill in,
alter, or pipe any vegetative practices ( such as swales ) shown
on the approved plans as part of the stormwater management
system without submitting a revision to the permit and
receiving approval from the Division.
5. The following items will require a modification to the permit:
a. Any revision to the approved plans, regardless of size
b. Project name change
c . Transfer of ownership
d. Redesign or addition to the approved amount of built -upon
area
e. Further subdivision of the project area.
In addition, the Director may determine the other revisions to
the project should require a modification to the permit.
6. The Director may notify the permittee when the permitted site
does not meet one or more of the minimum requirements of the
permit. within the time frame specified in the notice, the
permittee shall submit a written time schedule to the Director
for modifying the. site to meet minimum requirements. The
permittee shall provide copies of revised plans and
- certification in writing to the Director that the changes have
been made.
5
II. SCHEDULE OF COMPLIANCE
1. The permittee will comply with the following schedule for
construction and maintenance of the stormwater management
system.
a. The stormwater management system shall be constructed in
its entirety, vegetated and operational for its intended
use prior to the construction of any built -upon surfaces
except roads.
b. During construction, erosion shall be kept to a minimum
and any eroded areas of the system will be repaired
immediately'.
2. The facilities must be properly maintained and operated at all
times. The approved Operation and Maintenance Plan -must be
followed in its entirety and maintenance must occur at the
scheduled intervals.
3. The permittee shall at all times provide the operation and
maintenance necessary to assure the permitted stormwater
system functions at optimum efficiency including, but not
limited to:
a. Semiannual scheduled inspections (every 6 months)
b. Sediment removal
C. Mowing and revegetation of side slopes
d. immediate repair of eroded areas
e. Maintenance of side slopes in accordance with approved
plans and specifications
f. Debris removal and unclogging of outlet structure,
orifice device and catch basins and piping.
4. Records of maintenance activities must be kept and made
available upon request to authorized personnel of DEM. The
records will indicate the date, activity, name of person
performing the work and what actions were taken.
5. This permit shall become voidable unless the facilities are
constructed in accordance with the conditions of this permit,
the approved plans and specifications, and other supporting
data.
6. Upon completion of construction and prior to operation of this
permitted facility, a certification must be received from an
appropriate designed for the system installed certifying that
the permitted facility has been installed in accordance with
this permit, the approved plans and specifications, and other
supporting documentation. Mail the Certification to the
Washington Regional Office, 1424 Carolina Avenue, Washington,
North Carolina, 27889, attention Water Quality Section.
n
7. A copy of the approved plans and specifications shall be
maintained on file by the Permittee for a minimum of five
years from the date of the completion of construction.
III. GENERAL CONDITIONS
1. This permit is not transferable. In the event there is a
desire for the facilities to change ownership, or there is a
name change to the Permittee, a formal permit request must be
submitted to the Division of Environmental Management
accompanied by an application fee, documentation from the
parties involved, and other. supporting materials as may be
appropriate. The approval of this request will be considered
on its merits and may or may not be approved.
2. Failure to abide by the conditions and limitations contained
in this permit may subject the Permittee to enforcement action
by the Division of Environmental Management, in accordance
with North Carolina General Statute 143--215.6(a) to 143-
215.6(c).
3. The issuance of this permit does not preclude the Permittee
from complying with any and all statutes, rules, regulations,
or ordinances which may be' imposed by other government
agencies (local, state, and federal) which have jurisdiction.
4. In the event that the facilities fail to perform
satisfactorily, including the creation of nuisance conditions,
the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as
the construction of additional or replacement stormwater
management systems.
5. The permit may be modified, revoked and reissued or terminated
for cause. The filing of a request for a permit modification,
revocation and reissuance or termination does not stay any
permit condition.
Permit issued this the 26 th day of June, 1996.
NORTH CAROLINA ENVIRONNENTAL MANAGENENT COMMISSION
f-A. Preston Howard, Jr., P.E., Director
Division of Environmental Management
By Authority of the Environmental Management commission
Permit Number SW7951211
7
Community Center
Craven County
Stormwater Permit No. SW7951211
Designer's Certification
I,
, as a duly
registered Professional Engineer in the State of North .Carolina,
having been authorized to observe (periodically/weekly/full time)
the construction of the project,
for
(Project)
(Project Owner)
hereby state that to the best of my abilities, due care and
diligence was used inthe observation of the project construction
such that the construction was observed to be built within
substantial compliance and intent of the approved plans and
specifications.
Signature
Registration Number
Date
N
Inc.Robert L Mills, A.I.A.
Mills, Oliver & Webb, IncRobert B. Oliver, P.E.
Ambler W Webb, Jr., P.E
200 Country Club Drive, Plaza One, Building E, Blacksburg, VA 24060 Philip Pappas, A.I.A.
Tel: (540) 552-2151 FAX: (540) 951-0219 t Dan G. Rhudy, P.E.
t
April 1, 1996
WASHREcEtvm
NG ONOFFICE
APR 0 8 1996
aLIL
North Carolina Dept. Of Environment, Health & Natural Resources - :x
1424 Carolina Ave.
Washington, NC 27889
ATTN: Mr. William Moore
RE: Stormwater Management Application
Community Center, MCAS Cherry Point
A/E Commission No. 9454
Dear Mr. Moore:
As we have discussed in recent telephone conversations, enclosed please find our revised stormwater
management application package for the above referenced project. This package has been revised
in accordance with your review letter dated January 10, 1996.
The stormwater management system has been almost completely redesigned since the last submittal.
Basically, the site is broken into two pieces, one controlled with the use of a wet detention pond and
the other controlled with the use of vegetative swales or filters. For a complete description of the
management scheme, please refer to the attached Stormwater Management Narrative.
Please note that the project as a whole has changed somewhat since the last submittal. The Navy has
decided to construct the lower (southern) parking lot as an add alternate to the base bid. The base
bid provides for the preservation of the lower parking lot in its current state which is a gravel surface
with no concrete walks surrounding it. The existing lot is also smaller than the proposed new lot.
However, since there is the possibility that the new paved lot will be constructed as an add to this
contract or possibly at some time in the future, the stormwater management measures have been
designed assuming that the lower parking lot will be constructed right away.
454OL002,WPO
North Carolina Dept. Of Environment, Health & Natural Resources
Page 2
April 1, 1996
I trust that this submittal will meet with your approval. However, if you should have any questions
or require any additional information, please do not hesitate to contact me.
Sincerely,
Todd D. Poff, P.E.
Civil / Structural Engineer
Enclosure
cc: Commanding General, Attn: EA Dept, MCAS Cherry Point
Mr, Tim Osborne, LANTDIV
454DL00Z WPD
State -of North Carolina
Department of Environment,
Health and Natural Resources
Washington Regional Office
James B. Hunt, Jr., Governor
Jonathan B. Howes, Secretary
..c � :.y'?w}; �,y;s,l; ,ts!t.��.w"'��. • ,V'Y..'.i','_�'s^C+;.x�f"� :��:
DIVISION OF ENVIRONMENTAL MANAGEMENT
WATER QUALITY SECTION
January 10, 1996
Commanding General
Attn: EA Dept (LN)
PSC Box 8006
Marine Corps Air Station
Cherry Point, NC 28533
Dear Sir:
wftrz
Subject: Application No. SW7951211
MCAS - Community Center
Craven County
The Washington Regional Office acknowledges receipt of your
permit application and supporting information on December 22, 1995.
This application has been assigned the number listed above.
A preliminary review of your project has been completed. The
rF' following additional information is needed before a permit can be
issued:
stormwater calculations, including SA/DA calculation
- site plan showing drainage basins
-- details of forebay
specify orifice size and pond depth
The above information must be submitted within 30 days, or
your application will be returned as incomplete. If you have
questions, please feel free to contact Bill Moore at (919) 946-
6481, extension, 264.
Sincerely,
-�7� Roger K . Thorpe
Water Quality Supervisor
Washington Regional Office
cc: Mi ls, Oliver & Webb, Inc.
hington Regional Office
1424 Carolina Avenue, Washington, NC 27889 Telephone (919) 946-6481 FAX (919) 975-3716
An Equal Opportunity Affirmative Action Employer 50% recycled / 10% post -consumer paper
DIVISION OF ENVIRONMENTAL MANAGEMENT
NORTH CAROLINA STORMWATER MANAGEMENT PERMIT APPLICATION
I. GENERAL INFORMATION:
1. Project Name: Community Center, Marine. Corps Air Station at Cherry Point
2. Project Location: (County, State Road, Address)
Vance Road, Cherry Point MCAS
3. Owner's Name: Commandinz General at MCAS Phone: (919) 466--4.674
4. Mailing Address: Environmental Affairs Dept. PSC Box 8006
city Cherry Point State NC Zip- 28538-0006
5. Application Date: 12/15/95 Fee Submitted: $385 V
7. Nearest Receiving Stream: Slocum Creek Class: SC-SWP-NSW
8. Project Description: New Community Center for the MCAS
II. PERMIT INFORMATION 1. Permit No. (will be completed by DEM) : �5-w1 7
2. Permit Type: X New
Modification (existing permit no.)
3. Project Type: Low Density X
Infiltration
4. Other State/Federal Permits/Approvals Required:
(Check appropriate blanks)
X Sediment/Erosion Control CAMA Major
III. PROJECT BUILT UPON AREA
Drainage • Drainage
Basin Basin
Classification SC
Allowable Impervious
Total Project Area
Proposed Impervious
% Impervious Area
4:09 Ac
1.64
40
Renewal
Detention
other
404 Permit
Breakdown of Impervious Areas
Buildings 0.24 Ac
Roads --
Parking 1.40 Ac
Other --
Totals 1.64
' r'
IV. STORMWATER TREATMENT (Describe how runoff will be treated):
Runoff will be collected in storm sewer system and piped..uriderground;:to-a
wet pond for detention and release. See additional information in the
attached narrative.
V. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
Deed restrictions and protective covenants are required for all low density projects and
all subdivisions prior to the sale of any lot. Please see Attachment A for specific
requirements.
By your signature below, you certify that the recorded deed restrictions and
protective covenants for this project shall include all the items required by the
permit, that the covenants will be binding on all parties and persons claiming
under them, that they will run with the land, that the covenant cannot be changed
or deleted without concurrence from the State, and that they will be recorded
prior to the sale of any lot.
OWNER'S CERTIFICATION
I, Robert B. Oliver for Commanding General MCAS certify that the
(Please print name ctearty)
information included on this permit application form is correct, that the project will
be constructed in conformance with the approved plans, that the deed restrictions will
be recorded with all required permit conditions, and that to -the best of my knowledge,
the proposed project complies with the requirements of 15A NCAC 2H.1000.
I authoriz the below named person or firm to submit stormwater plans on my
behalf. D
. / Pry
Owner Authorized aent Sianature and Title Date
AUTHORIZED AGENT
Person or Firm Name: Mills, Oliver & Webb, Inc.
Mailing Address: 200 W. Country Club Drive
City Blacksburg; State VA Zip 24060
Phone: (540) 552-2151
Please submit application, fee and plans to appropriate Regional Office.
(see attached map)
-2-