Loading...
HomeMy WebLinkAboutSW7951008_HISTORICAL FILE_20061128STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE DOC DATE V' YYYYMMDD Quible � ' Quible & Associates, P.C. ENGINEERS • ENVIRONMENTALISTS • SURVEYORS • LANDSCAPE ARCHITECTS • PLANNERS SINCE 1959 November 11, 1995 Mr: Bill Moore North Carolina Department of Environment, Health and Natural Resources Division of -Environmental Management water Quality section 1424 Carolina Ave. Washington, North Carolina 27889-2188 P.O- Drower 670 Kitty Hawk, NC 27949 Phone: 919.261-3300 Fax: 919-261-1260 PRINCIPALS H.W. Bill Gilbert, ill. P.E. Joseph S. LossRer. S.E.S. William C. Owen. R,L.S. F. Richard Quible. P.E.. R.L.S. ASSOCIATES Sean C. Boyhe. P.E. Eduardo J. Valdivieso. P.E. NOV 2 8 2006 Re: stormwater Management Plan for The Inn at Hatteras Village, located in Hatteras Village, Dare County, North Carolina 5LX7 p.57' /d0 8 Dear Mr. Moore: Please find enclosed two copies of revised drawing C8 for the Inn at Hatteras Village. We have revised the overflow structure detail to match the proposed elevations and configuration of the infiltration pond. Please replace the originally submitted sheet C8 with this revised sheet. If you have any questions or require additional information, please don't hesitate to call. sincerely, Quible and Associates, P.C. Sean C. Boyle, P.E. enc: As stated The Villas of Hatteras Landing Subject: The Villas of Hatteras Landing From: "Joe Anlauf, P.E." <jja@quible.com> Date: Fri, 21 Jul 2006 09,04:57 -0400 To: <Della.Robbins@ncmail.net> CC: <tlyons@thrvb.com> Della, I was able to look back into our files and found where I had sent a copy of the original design certification of the stormwater system by Bill Gilbert, P.E., dated 6127/06, to AI Hodge via fax on 3/20/06. We also sent a copy of the certification to Mr. Tom Lyon of Tidewater Hotels & Resorts to be attached with the renewal form. After reviewing the file, my recollection is that Tidewater Hotels & Resorts were to execute the renewal form, pay the fee and attach the original copy of the engineer's certification. I will check into the status of this renewal form and let you know what I find out. Sincerely, Quible & Associates, P.C. Joseph J. Anlauf, P.E. 1 of 1 7/21/2006 11:13 AM Type.... Master Network Summary Page 1.02, Name.... Watershed File.... G:\LNR\406005\LNR\Stormwater\Pond Pack\NEW RUNS\BBH POST 2.ppw MASTER NETWORK SUMMARY SCS Unit Hydrograph Method ('Node=Outfall; +Node=Diversion;) (True= HYG Truncation:.Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return•; ,HYG Vol. Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event ac-ft Trun hrs cfs ft ac-.ft POND 10 OUT POND 2 2.635 R 12.6500 3.24 10.90 1.368 POND 10 OUT POND 5 3-711 R•. ,.,:;12.',4500 5..95 11.22 2.164 POND 10 OUT POND 10 4.466 R 12.4000 7.95 11.44 2.582 POND 10 OUT POND 25 5.533 R 12.3000 11.26 11.74 3.153 POND 10 OUT POND 50 6.375 R 12.2500 13.92 11.97 3.598' POND 10 OUT POND 100 7.211 R 12.2000 16.70 12.19 4.026 SUBAREA 10 AREA 2 2.670 11.9000 47.98 SUBAREA 10 AREA 5 3.749 11.9000 66.50 SUBAREA 10 AREA 10 4.506 11.9000 79.26 SUBAREA 10 AREA 25 5.574 11.9000 96"99 SUBAREA 10 AREA 50 6.417 11.9000 110.82 SUBAREA 10 AREA 100 7.254 11"9000 124.45 SIN: ADYXYWJ3JNBA ARCADIS POndPdck (10.00.016.00) 9:51 AM 5/26/2006 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality March 14, 2006 Tidewater Inn Management ATTN: Dwight Wheless PO Box 718 Virginia Beach, VA 23451 Subject: Stormwater Permit No. SW 7951008 Inn at Hatteras Village Dare Dear Dwight Wheless, The Division of Water Quality issued a Coastal Stormwater Management Permit, Number SW 7951008 to Tidewater Inn Management for Inn at Hatteras Village on 12/11/1995. This permit expires on 12/11/2005. Section .1003(h) of 15 A NCAC 2H .1000 (the stormwater rules) requires that applications for permit renewals shall be submitted 180 days prior to the expiration of a permit and must be accompanied by a processing fee,.which is currently set at $420.00. If this is still an active project please complete and submit the enclosed renewal application in a timely manner. If this project has not been constructed and a permit is no longer needed, please submit a request to have the permit rescinded. If you have sold the project, or are no longer the permittee, please provide the name, mailing address and phone number of the person or entity that is now responsible for this permit. Enclosed is a form for change of ownership, which should be completed and submitted if the property has changed hands. Your permit requires that upon completion of construction and prior to operation of the permitted treatment units a certification of completion be submitted to the Division from an appropriate designer for the system installed. This is to certify that the permitted facility has been installed in accordance with the permit, the approved plans, specifications and supporting documentation. Please include a copy of the certification with your permit renewal request and processing fee. Enclosed is a copy of a sample certification. You should be aware that failure to provide the Designer's Certification and the operation of a stormwater treatment facility without a valid permit, are violations of NC General Statute 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $10,000 per day. If you have any questions, please feel free to contact me or a member of the coastal stormwater staff with DWQ at 252-946-6481. Sciere y, i AI Hodge, eglonal Supervisor Surface Water Protection Section Washington Regional Office Enclosures cc: Quible & Associates Washington Regional Office North Carolina Division of Water Quality Internet. www.ncwaterquahi y.org �7One g N 943 Washington Square Mall Phone (252) 946-6481 OCarolina Washington, NC 27889 Fax (252) 946-9215 turall J An Equal OpportunitylA(f rmative Action Employer -- 50°% Recycled110% Post Consumer Paper ' OB-;445-2006 08:25am From-OIIIKRASSOCIATFS 2522611260 ~ DWQjWAP0 Fax=252-946-9215 _ Aug24 " S�OF wAr�9 - .... ---- _ �/�Il0 :� UGC � Q RECEMED �� O G r`a North Carolina Department of Envltx Q SEP 2 9 2006 1_ 2 3 4 SURFACE WATER PROTECTION SECTION STAL. STORMWATER PERMIT RENEWAL APPLICATR CURRENT PERMIT INFORMATION: Storrnwater Management Permit Number. SW7951008 Permit Holder's tiame: Tidewater Inn management for Inn Signing official's name: Thomas J. Lyons, Jr. Title:Maria (person IeQaiiy responsime for permit) Mailing address: P.O. Box 718 City:_ State: VA ZipCode: 23451 Phone: 757-425-5422FAX: 757- LArea Code an0 Number) (Arco Code and Number) Project Name: Inn at, Hatteras Village Location of Project: (StrPet address) NC 12 in Hatteras Village Dare County, North Carolina (Address not assigned.) 7. Directions to Project (tram nearest major intersection) It. PERMIT INFORMATION 1. Specify the type of stormwater treatment (wvt pond• inrllrtation. Inc.) 2. Llsi any Changes mm pmlact trial was origlnaay approwad, 091ACh odditionol p30en if 3. Do you have a copy of the original Operation and Maintenance Applicant's Certification: I, (P,;n,) 'Thomas J. Lyons, Jr. certify that the permit renewal applie , is to the best of my knowledge, correct Signature: Da' Submit this compiei Q fo along with an application lea a[ designer's certification to the address listed below. Nortfi Carotins oiyiLbn of Water auaiiiy 343 WOSNtlgEon Square Nall Phoro (252) W&6481 C, wa �t n Fta rmy offm wrrehWWJ"n. We 7MN FAX L2521946-9213 m All Fqual OppoAwrhy/ANirmntiw Amon 6mpw&r- 50% RncyclodllO% post Con va*t Raper T-840 P 002/004 P-159 ' 17 ; 00 P. 03 chae1 F.`Easley, Goiierror )m G. Ross. Jr,, Secretary sot and Natural Resouroes n W. nrnek, P.F,. Director Division of Water Quality Hatteras Village of Harborside, L.G. Va. Beach, VA 23451 6885 Infiltration system YesX No )rmation included on this complete. 9/5/2006 dD snd a copy of the Strobe r-MJL21W49 n2o.em.cmn&.nc.u% lei �iQ/ll/lila Received 08-24-2000 DA :13pm From-252 949 9215 To-01118LUAS5 CJATES Page 003 08-25-2006 OB:25am From-QUIBLl&ASSOCIATES 2522611260 T-840 P 003/004 F-158 DEil4/lrlAPO ! ax :252-9u6-9215 _- Aug_ 24 'CC 17 : p0 P. 02 O�oF W A rFRQ R IF, C"' E.t CI E� MiGhac7 F. Fawley. Gavcrnar Wiuism G. Pass In. Scercwy N0M Carolina DeparTrrlC T orEnvimwr z and Nawnl itr uma ;; p 2 9 2006 a T Alar+ W. Klimek, P.E. D6100 r Divi,ion v� WaseX QtisaliTY SURFACE WATER PROTECTION SECTION COASTAL STORMWATER PERMIT NAME/OWNERSHIP CH NGE FORM I, CURRENT PERMIT INFORMATION: SW7951008 1. Stormwater Management Permit Number, 2. Permit Holder, r, name: Tidewater Inn Mang ement for Inn 4 Hatteras Village 3. Signing official's name: Thomas J. Lyons, Jr. Title: ger of Harbor side, L.C. 4. (parson lege11y m%ponaihle Mr perm@) Mailing address: P O, Box 718 City: Va. Beach State: VA ZipCode: 23451 Phone: 757-425-5422 FAX: 75 -428-6885 (Aron Cade and Number) (/fir a Cade qna Mhiner) 11, NEW OWNER 1 PROJECT 1 ADDRESS INFORMATION 1. This request is for: (please cheok all that apply) X_a_ Change in ownership of the prop ertylcompany ( lease complete 1'tem,54 : ' #3, and #4 below) X b. Name change of project (Please complete Item 5 below) x C. Mailing address change. (Please complete Item below) d. Other (please explain): 2. 3. 4 New owner's name to be put on permit_ Villas of Hatteras New owners signing officlal's name and title: Cheri. A. Pa? President New Mailing Address. 1,410 S. Dare Trail (TsW) City.. K State: NC ZipCode: 27948 Phone; 252-480-2700 FA; (Area Coca and Number) New Project Name to be placed on permit: Villas , of Hat Page 1 of 2 North Carol:.. Oiv:uan o! W.rer Q"Iwy Ifnternd: YYara-0r. +mUgL4LR 943 WmhingTon Squarc Mall Phone (252) 946-6481 NVAMWQton, NC 27989 Fen C252) 94"215 An Equal dpftmlylAlrlmigbe Acdon Employer- 50% Racya;411o% Pool, Concu nsr vapor Received Ilia-2d-2006 aA.13pm Frum-252 Q46 9215 To-pl1IBL Owners Assoc.,Inc. Devil Hills 252-480-2042 Code and Numbc4 Landing as NaCamlina turally ATES page 002 Oa-25-206B 06:25am Froin-QUIBLELASSOCIATES 7522611260 T-040 P 004/004 F-159 Fax:252-946-9215 17.00 P.04 C THIS APPLICATION PACKAGE WILL NOT BE ACCEPTED BY TH DIVISION OF WATER QUALITY UNLESS ALL OF THE APPLICABLE ITEMS LISTED 113 LOW ARE INCLUDED WITH THE SUBMITTAL,. REQUIRED ITEMS: 1. This completed form. 2. Legal documentation of the transfer of ownership. 3. A copy cf the recorded deed restrictions, if required by the per it. 4. The designer's certification, if required by the permit. S. A signed Operation and Maintenance plan, if a system that r quires maintenance will change ownership. b. Maintenance records. CERTIFICATION'MUST BE COMPLETED AND SIGNED BY BOTH THE CURRENT PERMIT HOLDER AND TAE NEW APPLICANT IN THE CASE OF A CH� AeiGt OF OWNERSHIP. FOR NAME CHANGES, COMPLETE AND SIGN ONLY THE CL RRENT PERMITTEE'S CERTIFICATION. Current Permittee's Certification. 1, Thomas J. Lyons, Jr, attest that this a plicatio for a name/ownership change has Geen reviewed and is accurate and complete to the b st of my Knowledge. I understand that if all required parts of this application are not compiet d and that if all required supporting information and attachments are not included, this appi cation package will be returned as incomplete. Signatl.Irt' 'z Date: 9/5/2006 New Applicant's Certification; (Masi be Compleled for all tran6rBr5 ofownershipy 1, Cheri A. Pain attest that this appli change has been reviewed and is accurate and complete to the understand that if all required parts of this application are not comple supporting information and attachments are not included, this alp returned as incomplete. Signature: ,1� �� _ _ Date:_ THE COMPLETED APPLICATION PACKAGE, INCLUDING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE F'OI North Carolina Department of Environment and Natural R Division of Water Quality. SWP 943 Washinton Square Mall Washington, NC 27889 rage 2 of 2 rn for an ownership t of my knowledge_ I and that if all required ?Rion package will be 9/2-6 /o.c ALL SUPPORTING ]WING ADDRESS- rces Roca ived 09--U-2006 ad:13am Fralrr-262 646 0215 Te-i UIRLEZASSOCI�TEs Rage 004 From: The Villas of Hatteras Landing To: NCDENR 163 Check Date Check Amount Check Number 9/26/06 420.00 001230 Batch Date invoice Number Reference Gross Discount Net 266 9/26/06 STORMWTR PERK Stormwater Permit 420.00 .00 420.00 SER 2 9 2006 D- -WARO The•Viit" of -Hatteras Landing wachovia Bank -00r4 n9 1410 S Virginia Dare Trail Kill Devil Hift, NC -27948 i iii Devil Hills NC'27948 66-1521531 Pay Exactly FOUR HUNDRED TWENTY AND 001100 DOLLARS' ........................ ....... .r _'Date: 09126/06 Y To The > Oider.Of: NCDENR 943 Washington Sq. Mall ';':: : V. �slgna .Washington, NC 27889 R _ - nutsohz%e'sfyrtatur Quible 9ulble & Assoclotes, P.C. FNGNFEn5 • FNVIROMAENTALL51S - 5LIRVEYOnS • lPN[}5C/%PE APCHIt[Cf5 - PLANNERS SINCE 1959 June 27, 1996 Mr. Hill Moore North Calrolinn Dcpnrtmenl of Environment, Health anti IVnturni Resources Division of-Environlneittal Management Water Quality Section 1424 Carolina Ave. Washington, North Carolina 27889-2188 1-11 F= SEPI 2 9 2006 DWI)-WARD Re: Storm%vater Management Plan Ccrtification for The Inn @ Hatteras V North Carolina Dear Mr. Moore: This letter is to serve as die Engineers Certification dial the stormwater infiltra appurtenances were constructed in substantial conformance to the approved So and that the system will function as intended. It is reconuncnded that the Owner follow all operation and maitltctiance proced approved SLonnvater Management Plan, If you linve any questions, or need any further ui lforrnation, please contact me a Sincerely, 'Quffible and Associates, P.C. �l , � H. W. Gilbert, III, P.E. cc: Torn Lyons, Tidewater Inn Management Tim Midgeu r 14892 P.O. Drawer 676 KJ" Ilowk. NC 27949 Phone. 919-201,3300 F(= 919-261-1260 F. Richard Oulble. P.E., R.L.S. H.W. 6m GUbOR, 11, 13 t. Joseph S lmtuar C E.P 1Mluom C. Owen. R.L.S. Soon C. Boylo. P, E- Hatteras, Darc County, basin and associated eater Management Plan that arc outlined in the 919-261-3300. e Filed Book: 1565 Pi 05/21/2004 01:52PM Doc Code: DECL BARBARA M GRAY, REGIS Prepared by and Return to: W. Jay Wheless Wheless R Wheless, PLLC P. O. Box 500 Manteo, NC 27954 NORTH CAROLINA DARE COUNTY DECLARATION OF THE VILLAS OF HATTEI CONDOMrgUM SEP 2 9 2006 DWQ-WARD 499 Doc Id: 6134863 Receipt #: 112894 OF DEEDS DARE CO, NC I IIIII fff IIIII 1111 IN 6134853 4 01 :52P LANDING DECLARANT: Harborside Investment Associates, LLC, a North Carolina limited liability company (hereinafter "Declarant") CONSENTERS: See. Exhibits "E-1" and "E-2" attached hereto and incorporated herein by reference. DATE: May 21, 2004 RECITALS: 1. Harborside Investment Associates, LLC is the o ' er in fee simple of a certain tract of land and all improvements thereon. Said lands are situated in the Village of Hatteras, Dare County, North Carolina, and adjoin the development commonly referred to as Hatteras Landing. On this property, Declarant has previously constructed various improvements and, for years, has managed the improvements as a hotel; 2. Harborside Investment Associates, LLC shall con' ert two of the three former hotel buildings and the surrounding lands into a Condominium purluant to and in accordance with f fllff f llffl fill Ifllfflf lffll Ill( f lfllf Chapter 47C of the North Carolina General Statutes. Harbor construction project or development is known as "THE VILL Said development may consist of residential units, walkways, and permitted to be constructed by Harborside Investment Asso building has not been submitted to the Act and will remain in or at all, Declarant submits it to the Act in accordance with the described herein, fflf fIlf 3 2 Page: aee2 of 73 eSl2112004 01:52P Investment Associates, LLC's Or HATTERAS LANDING". .)r recreational areas as planned �s, LLC. The commercial hotel :ion as a hotel until such time, if or the .Declarant Rights further 3. At the time of filing this Declaration, the residential units (and the commercial hotel rooms), recreational areas and walkways are encumbered by a De elopment Agreement recorded in Book 1024, Page 142, Dare County Registry. 4. The lands are further described in Exhibit "A" ttached hereto and incorporated herein by reference. By this Declaration, Declarant submits the land and all improvements (except the building on the Plat still shown as hotel -use or "Possible future Phase — Need Not be Added"), easements,. appurtenances, riparian and other incideI tal rights attaching thereto (all known as "Submitted Property") and further described in Exhibit hibit "A" to the provisions of Chapter 47C of the General Statutes of North Carolina and amendments thereto. A copy of said Chapter 47C can be obtained as further described on Exhibit "C'J and attached hereto. 5. The Consenters have heretofore purchased or otherwise acquired land or interests in lands Eying within the original outer boundaries of the Submitted Property or have a lien or other interest that requires consent to this Declaration. 6. Chapter 47C is generally known as the North { this Declaration the Declarant creates a Condominium ("Ci Submitted Property. A maximum of fifty-three (53) Condomir that is hereinafter referred to as the Submitted Property (as here to the North Carolina Condominium Act by this Declaration, or Condominium Units. Said Units may be built and certif development or two phases. 7. The Villas of Hatteras Landing, A Condominiu Property as defined below, and shall be governed by the Vi Association, Inc., or VHLOA, which shall be created as the Condominium pursuant to the requirements of the Act. Each Ui VHLOA that shall have the duty to ensure and maintain the ove and to own, improve, maintain, repair and replace the walkw constituting the Common Elements of the Condominium. NOW, THEREFORE, Declarant hereby makes this Dec] to all the terms and provisions hereinafter set forth and Consent( rolina Condominium Act and by lomuuum") with respect to the m Units may be built on the land after defined), which is submitted already built may be converted to as complete in one phase of i, shall consist of the Submitted as of Hatteras Landing Owners nit Owners' Association for this t Owner shall be a member of the ill integrity of the Condominium, � s, pool, amenities and facilities ition for the purposes and subject consent to this Declaration. 2 Google Maps http://maps.google.com/maps?q=Frisco,+NC&ie=UTF8&z=15&11=3 5 Address Frisco, NC 27936 4r�aps Fw: The Villas of Hatteras Landing Subject: Fw: The Villas of Hatteras Landing From: "Joe Anlauf, P.E." <jja@quible.com> Date: Tue, 1 Aug 2006 11:36:35 -0400 To: <Della.Robbins@ncmai].net> Della, I sent this email out at the beginning of last week and have learned that Tom Lyons is out of the country. I will continue to pursue getting this permit renewal resolved. Sincerely, Quible & Associates, P.C. Joseph J. Anlauf, P.E. ----- Original Message ----- From: Joe Anlauf, P.E. To: tlyons@thrvb.com Cc: Tim Midgett Sent: Monday, July 24, 2006 11:59 AM Subject: The Villas of Hatteras Landing Gentlemen, I received a phone call from Della Robbins of the NCDE&NR, DWQ, regarding the renewal of the Stormwater Permit for the Villas of Hatteras Landing, In March of 2006, we faxed a copy of the original engineer's certification by Bill Gilbert, Iil, P.E., to Al Hodge of the DWQ and to Tom Lyon. The original certification must be attached to the permit renewal application. It was our understanding that the renewal application would be executed by Tom's staff, the renewal fee paid by the owners and the renewal application would be sent to the DWQ, directly from TWH&R. DWQ has not received the renewal application. If we can be of any assistance in the preparation of this renewal application, please let us know. Sincerely, Quible & Associates, P.C. Joseph J. Anlauf, P.E. 1 of 1 8/25/2006 12:55 PM Hatteras Holiday Inn Express - The Villas of Hatteras Landing Subject: Hatteras Holiday Inn Express - The Villas of Hatteras Landing From: "Joe Anlauf, P.E." <jja@quible.com> Date: Fri, 25 Aug 2006 08:43:04 -0400 To: <Della.Robbins@ncmail.net> CC: <tlyons@thrvb.com> Delia, Thank you for sending out new copies of the permit renewal forms. I have forwarded those forms via fax to Tom Lyons of Tidewater Hotels & Resorts, for execution and fee payment. Sincerely, Quible & Associates, P.C. Joseph J. Anlauf, P.E. 1 of 1 8/25/2006 12:55 PM The Villas of Hatteras Landing Subject: The Villas of Hatteras Landing From: "Joe Anlauf, P.E." <Ja@quible.com> Date: Fri, 21 Jul 2006 09:04:57 -0400 To: <Della.Robbins@ncmail.net> CC: <tlyons@thrvb.com> Della, I was able to look back into our files and found where I had sent a copy of the original design certification of the stormwater system by Bill Gilbert, P.E., dated 6/27/06, to A! Hodge via fax on 3/20/06. We also sent a copy of the certification to Mr. Tom Lyon of Tidewater Hotels & Resorts to be attached with the renewal form. After reviewing the file, my recollection is that Tidewater Hotels & Resorts were to execute the renewal form, pay the fee and attach the original copy of the engineer's certification. I will check into the status of this renewal form and let you know what I find out. Sincerely, Quible & Associates, P.C. Joseph J. Anlauf, P.E. 1 of 1 7/21/2006 11:44 AM l., Type.... Tc Calcs Page 2.0101 Name.... SUBAREA 10 File.... G:\LNR\406005\LNR\Stormwater\Pond Pack\NEW RUNS\BBH POST 2.ppw TIME OF CONCENTRATION CALCULATOR Segment#1: Tc: User.Defined. ' Segment 01 Time: 0a33'h,r5, -------------------------------------------------------------------------- .° ------------------------- Total Tc: .0833 hr.s S/N: ADYXYWJ3JNBA Pori dpack:(10.00.016.00) 9:51 AM ARCADIS 5/26/2006 State of North Carolina Department of Environment, Health and Natural Resources Washington Regional Office James B. Hunt, Jr., Governor Jonathan B. Homes, Secretary DIVISION OF ENVIRONMENTAL MANAGEMENT WATER QUALITY SECTION December 11, 1995 Tidewater Inn Management Attn: Mr. Thomas J. Lyons, Jr. P.O. Box 718 Virginia Beach, Virginia 23451 Subject: Permit No. SW7951008 The Inn at Hatteras Village High Density Stormwater Project Dare County Dear Mr. Lyons: The Washington Regional Office received the completed Stormwater Application for the subject project on December 6, 1995. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7951008 dated December 11, 1995 to Tidewater Inn Management. This permit shall be effective from the date of issuance until December 11, 2005, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements. in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, permit arel unacceptable, you h adjudicatory hearing upon written following receipt of this permit. of a written petition, conformin Carolina General Statutes, and Administrative Hearings, P.O. Draw Unless such demands are made t binding. g or limitations contained in this ave the right to request an request within thirty (30) days This request must be in the form to Chapter 150B of the North filed with the Office of er 27447, Raleigh, NC 27611-7447. his permit shall be final and Telephone (919) 946-6481 FAX (919) 975-3716 50% recycled / 10% post -consumer paper 1424 Carolina Avenue, Washington, NC 27889 . An Equal Opportunity Affirmative Action Employer Tidewater Inn Management December 11, 1995 Page Two �._ -If you have any questions, or need additional information concerning this matter, please contact Bill Moore at (919) 946- 6481, extension 264. Sincerely, oR ger K Thorpe Water Quality Supervisor Washington Regional Office cc: Quible & Associates D e County Inspections ashington Regional Office Central Files State Stormwater Management Systems Permit No. SW7951008 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL MANAGEMENT - STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Tidewater Inn Management Dare County FOR THE construction, operation and maintenance "of stormwater management systems in compliance with the provisions of 15A NCAC 2H.1000 (hereafter referred to as the "stormwater rules") and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Environmental Management and considered a part of this permit for The Inn at Hatteras Village, Hatteras, N.C. This permit shall be effective from the date of issuance until December 11, 2005, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on pages 4 and 5 of this permit, the Project Data Sheet(s). 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 3 DIVISION OF ENVIRONMENTAL MANAGEMENT PROJECT DATA Project Name: The Inn at Hatteras Village Permit Number: SW7951008 Location: Dare County Applicant: Tidewater Inn Management Mailing Address: P.O Box 718 Virginia Beach Virginia 23451 Application Date: 10/26/95 original 12/6/95 completed Water Body Receiving Stormwater Runoff: Pamlico Sound Classification of Water Body: SA Pond Depth: 1.75 feet Permanent Pool Elevation: N/A Total Impervious Surfaces Allowed: 75,851 square feet Offsite Area Entering Pond: N/A Required Storage Volume: 9,481 cubic feet 4 Provided Storage Volume: 17,521 cubic feet Controlling Orifice: 6.75 overflow elev. 4. No homeowner/lot owner/developer shall be allowed to fill in, alter, or pipe any vegetative practices (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 5. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size b. Project name change C. Transfer of ownership d. Redesign or addition to the approved amount of built -upon area e. Further subdivision of the project area. In addition, the Director may determine the other revisions to the project should require a modification to the permit. 6. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. II. SCHEDULE OF COMPLIANCE 1. The permittee will comply with the following schedule for construction and maintenance of the stormwater management system. a. The stormwater management system shall be constructed in its entirety,. vegetated and operational for its intended use prior to the construction of any built -upon surfaces except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The facilities must be properly maintained and operated at all times. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals. 6i 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency including, but not limited to: a. Semiannual scheduled inspections (every 6 months) b. Sediment removal C. Mowing and revegetation of side slopes d. Immediate repair of eroded areas e. Maintenance of side slopes in accordance with approved plans and specifications f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DEM. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from an appropriate designed for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Mail the Certification to the Washington Regional Office, 1424 Carolina Avenue, Washington, North Carolina, 27689, attention Water Quality Section. 7. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of five years from the date of the completion of construction.' III. GENERAL CONDITIONS 1. • This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change to the Permittee, a formal permit request must be submitted to the Division of Environmental Management accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Environmental Management, in accordance with North Carolina General Statute 143-215.6(a) to 143- 215.6(c). 6 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Permit issued this the llth day of December, 1995. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION A. Preston howara, Jr., P.E., Ulrector Division of Environmental Management By Authority of the Environmental Management Commission Permit Number SW7951008 7 ' The Inn at Hatteras Village Dare County Stormwater Permit No. SW7951008 Designer's Certification --' I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration Number Date 8 Quible Quible & Associates, P.C. ENGINEERS • ENVIRONMENTALISTS • SURVEYORS • LANDSCAPE ARCHITECTS • PLANNERS SINCE 1959 November 2, 1995 Mr. Bill Moore North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management Water Quality Section 1424 Carolina Ave. Washington, North Carolina 27889-2188 RECEIVED ='f�L lir�wTOl�! OFFICE i I [r!0 hT 0 1095 viS?:a I P.C. Drawor 870 Kitty Hawk, NC 27949 Phone: 919-261-3300 Fax: Q19.26i-1260 PRINCIPALS H.W. Bill Gllbert. III. P.E. Joseph S, Lassiter, S,E.S. Williom C. Owen, R.L.S. F. Richard 9uible, P.E., R.L.S. ASSOCIATES Sean C. Boyle, P.E. EduardoJ, VOIdIVIeSa, P.E. Re: Stormwater Management Plan for The Inn at Hatteras Village, located in Hatteras Village, Dare county, North Carolina Dear Mr. Moore: Please find enclosed two copies of Drawings 1 (Cover Sheet), 2 (Site Plan), 3 (Grading and Drainage Plan) and 8 (Stormwater Drainage Details) that detail the stormwater management plan for the project. Also enclosed is a North Carolina stormwater Management Permit Application and an application fee check for $385.00. The Inn at Hatteras Landing will consist of a 72 room hotel with a 2 bedroom employee apartment. A total of 112 parking spaces are proposed to service the facility. storm flows from the parking and landscaped areas will be directed, via surface flows, to the retention pond. Storm flows from the roof areas of the hotel and the pool decks will be collected in storm drainage pipes and piped to the retention pond. site coverage calculations, as shown on the Grading and Drainage Plan, are summarized below: Description Existing Proposed Total Impervious Impervious (SF) Surface (SF) Surface (SF) 1. Parking/Drive 0 51,313 51,313 (Includes conc. walks, decks, & flumes) 2. Buildings 0 24,538 24,538 (Includes covered decks) Total Impervious Coverage (-75,851 SF Total Site Area 141,042.23 SF % of Impervious Coverage 39.70% The retention pond was sized to hold, at a minimum, the first 1 1/2" of rain. Total retention requirements for a 1 1/2" rainfall is calculated as follows: A x D = V where A = area of impervious surface in square feet D = depth of 1 1/2" in feet (.1251) V = required storage in cubic feet A x D = V 75,851 SF x 0.125=(9,481 CF The retention pond's storage capacity at the permanent pool elevation (6.00) is calculated by computing the average area between the 5' and 61, then multiplying by the pond depth of 1.00 feet. The storage volume (V) at the permanent pool elevation is computed by the following: V = (Area (at 5' contour) + Area (at 6' contour))/2 x depth V = (8,900 + 10,149/2) x 1 V = 9,524 CF Total storage required "=-_9481 CF Total storage provided (at permanent pool elev.) �524 CF The invert on the pond overflow structure, as indicated on the drawings, is set at elevation 6.75. This will allow for a total pond -storage capacity of -177521 CF. The total pond storage capacity is calculated as follows: V = (Area (at 5' contour) + Area (at 6.75' contour))/2 x depth V = (8,900 + 11,124/2) x 1.75 � 1�7, 521 CF Total pond storage capacity (17,521 CF) minus required storage capacity (9,524 CF) equals 7,997 CF of excess storage capacity. This equates to an additional ri—.26" of rainfall on the impervious surfaces that will be retained on -site. Due to this extra storage volume (total storage is approximately twice the required volume) and the high infiltration rate and hydraulic conductivity of the soils, we are not proposing a "bypass" system for the runoff above the first 1 1/2" of rainfall. Once the stormwater exits the pond, the stormwater will surface flow along a 30, vegetated buffer before reaching the adjacent wetlands. Also enclosed with this application is copy of the text portion of a Hydraulic Soil Report done by Soil & Environmental Consultants, Inc. dated March 1, 1991, revised October 4, 1995. This report addresses the soil characteristics and water table depth. A memorandum from Joe Lassiter of our firm is also included which addresses his findings of water table depth. If you have any questions or require additional information, please don't hesitate to call. Sincerely, Quible and A ssoc iates, P.C. Sean C. Boyle- , P.E. enc: As stated cc: Tidewater Inn Management Soil & Environmental ConsItauntsr Inc. 244 west Miiibtook Road a Raleigh, north Carolina 27609 ■ (919) 846-5900 E Fax (919) 846,9467 HYDRAULIC CHARACTERISTICS OF THE SOILS AND SHALLOW AQUIFER AT THE PROPOSED HATTERAS LANDING PROJECT DARE COUNTY, NORTH CAROLINA March 1,1991 Revised October 4,1995 On November 15,16,17 and 18, 1990, Mr. Kevin Martin (Certified Professional Soil Scientist) and James Beeson evaluated the hydraulic characteristics of the soils and shallow unconfined aquifer on the property. The property is located adjacent to the Hatteras Ferry and NC Hwy. 12. The purpose of this evaluation was to determine the hydraulic conductivity of the saturated zone and transmissivity of the shallow unconfined aquifer so that this data could be used to determine potential mounding beneath an on -site subsurface wastewater treatment system. The system is expected to receive 21,700 gallons per day of sewage effluent. The following is a brief report of the methods utilized in this evaluation and the results obtained. There will actually be two different systems serving two different facilities, but due to their proximity we have treated them as one system for the purpose of this report Soil Descriptions Soil auger borings were made to identify soil textures and to determine if restrictive horizons occur on the site. Borings were performed at the locations shown on the attached blue prints, Descriptions are attached in Appendix 1 of this report for each boring site in the form of hard -written logs. Soils in the areas examined have sandy bextures. Such soils can be permitted for conventional septic systems by the county with a loading rate of .8 to 1.2 gpd/ ft2 on a trench bottom area basis or for a Low Pressure Pipe system with a loading rate of .4 to .6 gpd/ft2 on an area basis. These loading rates are taken from 10 NCAC 10A.1900 (Laws and Rules for Sanitary Sewage Collection, Treatment and Disposal). This system will employ Low Pressure distribution. The area of the proposed system is shown on blue prints provided to you by Quible & Associates. The potentially "restrictive" layer found on -site by Dr. Uebler was not found in any other location on -site, this is discussed in more detail later in this report Soil suitability evaluations as per current DEH Soil/Site Evaluation ■ Mapping and Physical Analysis ■ Wetlands Mapping and Mitigation ■ Environmeptal Audits On -Site Waste Treatment Systems, Evaluation and Design 7n 7nHA L9069vesls TZMT QRFUNA/AT regulations were performed on -site previously by the county health department and later by Dr. Uebler. Transmissivity .; Transmissivity of the saturated zone was determined using a multiple well drawdown test. One pumping well and six observation wells were used (see blueprints for well locations). The methods used in these measurements were similar to those described in Theory of Aquifer Tests, U.S. Geological Survey Water -Supply Paper 1536-E: pp. 91-100. Based on our previous experience on predicting mounding, we located the most restrictive area from a soils and hydraulic standpoint and performed an 8 hour drawdown test with a constant discharge rate of 4gpm. Measurements were made as shown in the attached field log (see Appendix 2). The pumping test was performed in the area where Dr. Uebler and others had found what might be a restrictive horizon. This horizon was at 5 to 6 feet below land surface and was made up of a darkly stained sand. It did not appear to be a "marsh mat" like those commonly found on the Outer Banks beneath'old fill areas or naturally deposited dunes. Such layers are sometimes present due to the islands migration toward the mainland during which it migrates over the sound side marshes containing organic surfaces. The "organic" layers are usually level bedded (at the same elevation) and act as aquitards. We actually attempted to use the very same auger hole that Dr. Uebler made at this site for our pumping well but could not "force" the well down. However, we then moved over several feet and easily installed a pumping well and four observation wells 'a little over 6' below land surface (see blueprints for locations). The potential restrictive'layer was not observed in any of these wells in this area or in any of the other well borings on the site (for locations see blueprints). This suggests that the layer encountered was isolated to that one hole and could have been a partially decomposed log, stump, etc. The actual measurements, graphs, curve matches and calculations for the pump test are attached in Appendix 3 of this report. I should that note even though the aquifer thickness may be as much as 60' to 80' or more we chose to evaluate the upper. 5 or 6 feet since only the shallow part of the aquifer will respond to the additions of wastewater even though no restrictive layer is present The effective transmissivity for the upper 5 feet of the aquifer was determined to be about 500ft2/d,(see data curves and calculations in Appendix 3 of this report). This meansthatthe.hydraulic conductivity is about 100ft/day. These numbers are in the range of{those;normally found in similar areas. If one used the entire - thickness of the aquifer (about 60') at of 6000ft2/day would result. The lower T value presented is probably a more appropriate number considering the purpose of this report because we are dealing with the reaction of the upper part of the aquifer. This lower value was used in predicting the mounding for the drainfields. Boulton type curves were matched with plots of drawdown (ft) versus t/r2 for two observation wells (TW2 and TW4) which were approximately 5' and 10' from the pumping well (see blueprints). This was necessary since the test initially "behaved" as a confined aquifer, passed through a "delayed yield" phase, and then began to behave.as a unconfined aquifer near the end. Therefore, this type curve matches are inappropriate. This "switching" in the "behavior" of the aquifer is commonly observed in barrier island pump tests. Also attached in Appendix 4 is a Jacob "distance drawdown" graph for data from the same two wells (TW2 and TW4) and associated calculations which also resulted in a transmissivity of about 500ft2/d. Using both methods of analysis of drawdown data serves as a check (i.e. if the two show drastically different results something is wrong with the analysis or collection of data). Seasonal High Water Table Two methods were used to determine the seasonal high position of the water table. The first employed the use of the "Fetter Water Table Equation" for predicting water table heights beneath Oceanic islands (reference Applied Hydrogeology by C.W. Fetter, Jr.,1980, .pages 144-146). The second involved the installation and monitoring of two monitoring well networks which transected the island (see blueprints). The calculations in Appendix 5 for the Fetter Equation show that the predicted average position of the water table in the center of the island would be about 1.06 feet above the level in the sound. This predicted average position is lower than the actual water level observations made on -site, which suggests that our measurements were made during a period of above normal water table levels. Because the measurements are not drastically higher than predicted average position of the water table, this supports the other evidence that there is not a restrictive horizon beneath the proposed drainfiield area. Water level observations and. fluctuation are shown in tabular form in Appendix 6 of this report and graphically on the attached blueprints. Also attached are readings on 'the tide gauges which reflect tidal fluctuations and cwn be compared to water levels in the monitoring wells with respect to time. In general, the water levels in the wells did not respond to fluctuations in tidal levels during a 36 hour observation period with the exception of well #8 which was installed in the edge of a tidally flooded marsh. In fact, while the tide constantly rose due to a 20 to 30 mph constant wind from the northeast, many of the wells dropped slightly over time. This along with the data collected from the wells on 11/30/90 by Quible & Associates (see Appendix 6 and blueprints) tends to indicate that little tidal effect exists beneath the proposed drainfiield. It is interesting to note that when the 11/30/90 Quible data is plotted graphically verses our data from 11/15/90 a distinct pattern appears (see blueprints). Our data shows a constant water level slope from the primary dunes toward the sound while the Quible data indicates the expected normal shape of the water table beneath the island (i.e. higher in the center and sloping both toward the sound and the ocean). This suggests that our readings were made shortly after a significant rainfall event since the levels are highest in elevation beneath the areas with the thickest unsaturated zone (i.e. the dunes). A copy of the Hatteras rainfall records indicates that a 24 hour rainfall event of 3" occurred a week before our work on November 9 and 10,1990 (see Appendix 7). It should be noted that due to the nature of the uncoated sands in these areas the seasonal high position of the water table cannot be determined by the evaluation of soil color. It must be examined during expected high positions. The'water levels observed on -site should be assumed'to be seasonal high positions since these measurements were taken in early winter when evapotranspiration is low, one week after a 3" rainfall event and before, during and after a 20-30 mph strong northeast wind which caused the water level in the sound to stand constantly at a level of 1 to 1.5' above normal for 24 to 36 hours. Due to the close proximity of the site to the sound and recent weather conditions in the area prior to and during our measurements, we believe they are a good approximation of the seasonal high stand of the water table. However, to again be conservative, in our recommendations based on our mounding model, we allow for .2' rise above and the levels observed and the mounding predicted when determining minimum elevation required to maintain minimum separation between trench bottoms and the water table. Mounding Using the measured values described above and using the inputs shown on Table 1, various approaches were made to predict the mound which would develop under the system(s). The systems were assumed to be rectangular for the purposes of the model, but total square footage of drainfield is approximately equal to that proposed. Several different scenarios were examined, but only the most realistic will be discussed in this report In all cases it was assumed that only the upper 5 to 6 feet of the aquifer responded and that the water table remained at its seasonal high position year round. t' r! t 4tR�;!!!'�y.�F�ix�!��:y.;�r..,,�:,•..�..,t.��:�-:•:-.r.�..�<•5•.�i .-r,:f1��."7�%^.. __: >.^'2',':"?J,!��ar,.n- .. ._._.._. The computer model used for predicting mounding beneath a rectangular basin with a constant recharge rate was version 3.0 of the Colorado State University Program CSUPAW Well and Pit This program was developed by D. Moulden, D. Sunada and J. Warner. A journal article describing the program was published in Groundwater Vol. 22, Number 1, Jan -Feb 1984. The microcomputer uses Glover's Solution with consideration for Hantush's better means of evaluating this solution by integration by parts. The Division of Environmental Management, Groundwater Section often uses this model to predict mounding beneath large on -site wastewater systems and for stormwater infiltration basins. The proposed layout of active and repair areas shown on the blue prints submitted by Quible Associates dated 9/21/95, shows an alternation of system and repair areas. This will tend to minimize mounding as compared to concentrating all of the system in one area, so this approach is recommended. However for the'sake of modelling mounding beneath the systems we chose to use a scenario where Field 2A, Repair 2A, Field 2B and Repair 2B were treated as one active drainfield. The mounding predicted by such treatment will be somewhat worse than that which will actually occur utilizing the alternating system and repair design proposed. Therefore, like all other assumptions in this report, this is a conservative approach Repair Area 1D, Field 1D, Repair Area 1C and Field 1C is also modelled, but is treated as an independent system due to its distance from Field 2A and 2B. We believe this approach best reflects the proposed wastewater application methodology on -site... Figure 1. shows the resultant mound developed beneath Field 2A, Repair 2A, Field 2B and Repair 2B and at steady state after 3 years of daily application of .5gpd/ft2 (13,020gpd over 26,040ft2). This graph shows that a mound would develop 1.0' above the existing water table. The mounding beneath Repair 1D, Field 1D, Repair 1C and Field 1C is shown in Figure 2. Figure 2 assumes a .5gpd/ft2 loading rate (8,903gpd over 17,805ft2) and indicates that a mound would develop to a maximum height 1.3' above the existing water table. Conclusions and Recommendations Based on the findings stated above the following treatment for the drainfields is suggested: A. The state requires a separation of 2' between the trench bottom and the predicted mound height for all drainfields. Assuming a trench depth of 12" (6" cover and 6" gravel), the proposed drainfields in Active Areas 2A, 2B, 2C and 2D should be brought up to a uniform elevation of at least 7.0'. To round these numbers off and allow for an on "safety Iactor" it would be simpler to bring the land surfice elevations up to 7.51. Similarly Field 1A, 1B, 1C and 1D should be brought up to a uniform landsurface elevation of at least 7.3. These final elevations were determined using our predicted "high" water table elevation of 2.8' above MSL, adding the 0.2' "safety factor" for natural water rise, adding the predicted mound height adding the 2' separation from the trench bottom and adding 1' to allow for installation of an LPP trench. B. The original elevations across the proposed system areas varied and contained areas well above' 8' MSL, so it was possible to "even" the proposed drainfield areas out to the recommended elevations. Attempting to install a system in the original topography would be difficult and would likely result in ("seepage") effluent surfacing in the lower areas. If done carefully the "leveling" of the drainfields should not affect the hydraulic characteristics of the soil or shallow aquifer. This is mainly due to the fact that a "Pile of wind blown sand" such as that present at this site is structure - less and moving it around, whether by wind naturally or by equipment has little or no effect on its physical or chemical nature. `6 f fo v IL j. TABLE 1. INPUT DATA FOR MOUNDING UNDER WASTEWATER SYSTEM Field 2A, Repair 2A, Field 2B, Repair 2B Repair 1D, Field 1D, Repair 1C, field 1C 1. Recharge Rate ft day)__*0.067 2 Transmissivi s ft da 500 same 3. Specific Yield . - - .20 same 4. Beginning Time (days) Final.Time (days)....,.. : Time Increment (days) 30 1080------' 30 same same same 5. End of Recharge Period (days) 1090 same 6. Beginning Distance (ft) Final Distance (ft) Distance Increment ft 0 250 25 same 350 same 7. Depth to Water ft **5 **same 8. Angle from X - Axis de 0 same 9. Distance to Stream fk 250 350 10. Calculate Mound Profile yes yes ' 11. Calculate Discharge to Stream no no 12. Basin Width(ft.) 186 160 13. Basin Len ft 140 111 *At .5 gpd/ ft.2 Loading Rate, Recharge Rate .067 ft/day;. "This not actual depth; it is -assumed. If water table reaches surface in model it . shuts down, 'so a deep depth is assumed.and..the resultant mound height is _ added to the estimated seasonal high-water table elevation in order to determine _ final trench bottom elevations required. 3 •y{{'t `.� % `�a .� i XM1 %Il t7ikF i�i}. rbsyRS•�_�' �� 1 I is 1 L s i k i kK J_�r'� �F' f , i p yy , { i, . �s^ [n.C.S wu. 4� �, tie 5 k:! r Y 4 i- r a }•r r ! i s r j ? .: 1 13.: tr; LY �§�t„i�� �„� •��•'.ti '! �(:1 � x' n' sl:., � i�l:, ':r ``S��i >���' !. •,: 1 •if Y�+' r ��,. t i � ;ir L y1G •..or µ; il, F • I,tf 'r � sk / y'Lj 7r•�w, p j � F vt ~�+'��'�?y'�'t��TW 1. �i •Yfr-.�r y.:� IS � ��t A){ -I'. �IY I. �4'u :t aYl.�r �f'k 7' �� 5.��{i -:,}I ' ..r�, .F L,s � 1.7. lrc! , � .♦L`* a. ii '� 4 +r - rFp 4 - - r ` c 1 { } :bra �tirr tieti':'tS L`� �L�"R. - �; �f�` s �• � � .r. a ..fin r'; ]. ,�- tI -1 r s � 3. � i+ 1 �•"�`S:'ii"ii.< i.1` I+•: L;a��t igi' ^,�""+[Lr� r � r���� �i'f'�r �,�^ k Fy. r'yat q tr • ,r`.Y[� �F7 �� Fyr •t f' �i . - �k�_:. h{� �. •. , >: j fi g , 3t� 0`IFq �`s"1 f i`t�#, �iig i.,+ L1 ;�., :; .�_ x'+•�F'�S " rl: ci a't,.� �:���t?�sC1�Ta Cfit Si'��1'k'!TC►�!�"f+,�:�iiy�t�/+ . J �t�`^ � `_ a k. Soil & E en1 Consul tan#s Inc. 244 west Millbrook Road n Raleigh, North Carolina 27609 ■ (919) 846-5900 ■ Pax (919) 846-9467 HYDRAULIC CHARACTERISTICS OF THE SOILS AND SHALLOW AQUIFER AT THE PROPOSED HATTERAS LANDING PROJECT DARE COUNTY, NORTH CAROLINA March 111991 Revised October 4,1995 On November 15,16,17 and 18, 1990, Mr. Kevin Martin (Certified Professional Soil Scientist) and James Beeson evaluated the hydraulic characteristics of the soils and shallow unconfined aquifer on the property. The property is located adjacent to the Hatteras Ferry and NC Hwy. 12. The purpose of this evaluation was to determine the hydraulic conductivity of the saturated zone and transmissivity of the shallow unconfined aquifer so that this data could be used to determine potential mounding beneath an on site subsurface wastewater treatment system. The system is expected to receive 21,700 gallons per day of sewage effluent. The following is a brief report of the methods utilized in this evaluation and the results obtained. There will actually be two different systems serving two different facilities, but due to their proximity we have treated them as one system for the purpose of this report Soil Descriptions Soil auger borings were made to identify soil textures and to determine if restrictive horizons occur on the site. Borings were performed at the locations shown on the attached blue prints, Descriptions are attached in Appendix 1 of this report for each boring site in the form of hand-written logs. Soils in the areas examined have sandy textures. Such sails can be permitted for conventional septic systems by the county with a loading rate of .8 to 1.2 gpd/ft2 on a trench bottom area basis or for a Low Pressure Pipe system with a loading rate of .4 to .6 gpd/ftZ on an area basis. These loading rates are taken from 10 NCAC 10A.1900 (Laws and Rules for Sanitary Sewage Collection, Treatment and Disposal). This system will employ Low Pressure distribution. The area of the proposed system is shown on blue prints provided to you by Quible & Associates. The potentially "restrictive" layer found on -site by Dr. Uebler was not found in any other locabion on -site, this is discussed in more detail later in this report Soil suitability evaluations as per current DEH Soil/Site Evaluation ■ Mapping and Physical Analysis ■ Wetland~ Mapping and Mitigation ■ Environmotal Audits On -Site Waste Treatment Systems, Evaluation and Design Z0 39bd L906908616 iZ:01 9661/90/01 regulations were performed on -site previously by the county health department and later by Dr. Uebler. Transmissivi Transmissivity of the saturated zone was determined using a multiple well drawdown test One pumping well and six observation wells were used (see blueprints for well locations). The methods used in these measurements were similar to those described in Theory of Aquifer Tests, U.S. Geological Survey Water -Supply Paper 1536-E: pp. 91-100. Based on our previous experience on predicting mounding, we located the most restrictive area from a soils and hydraulic standpoint and performed an 8 hour drawdown best with a constant discharge rate of 4gpm. Measurements were made as shown in the attached field log (see Appendix 2). The pumping best was performed in the area where Dr. Uebler and others had found what might be a restrictive horizon. This horizon was at 5 to 6 feet below land surface and was made up of a darkly stained sand. It did not appear to be a "marsh mat" like those commonly found on the Outer Banks beneath'old fill areas or naturally deposited dunes. Such layers are sometimes present due to the islands migration toward the mainland during which it migrates over the sound side marshes containing organic surfaces. The "organic" layers are usually level bedded (at the same elevation) and act as aquitards. We actually attempted to use the very same auger hole that Dr. Uebler made at this site for our pumping well but could not "force" the well down However, we then moved over several feet and easily installed a pumping well and four observation wells a little over 6' below land surface (see blueprints for locations). The potential restrictive layer was not observed in any of these wells in this area or in any of the other well borings on the site (for locations see blueprints). This suggests that the layer encountered was isolated to that one hole and could have been a partially decomposed log, stump, etc. The actual measurements, graphs, curve matches and calculations for the pump test are attached in Appendix 3 of this report. I should that note even though the aquifer thickness may be as much as 60' to 80' or more we chose to evaluate the upper 5 or 6 feet since only the shallow part of the aquifer will respond to the additions of wastewater even though no restrictive layer is present The effective transmissivity for the upper 5 feet of the aquifer was determined to be about 500ft2/d (see data curves and calculations in Appendix 3 of this report). This means that the _hydraulic conductivity is about 100ft/day. These numbers are in the range of those'normally found in similar areas. If one used the entire thickness of the a uifer. about 60' a T of 6000ft2 day would result The lower T q ( } / Y 2 . ' �} yf � •,t � ��tyjµ 'ice I.� Y��� �y}��^ •1 R value presented is probably a more appropriate number considering the purpose of this report because we are dealing with the reaction of the upper part of the aquifer. This lower value was used in predicting the mounding for the drainfields. Boulton type curves were matched with plots of drawdown (ft) versus t/rz for two observation wells (TW2 and TW4) which were approximately 5' and 10' from the pumping well (see blueprints). This was necessary since the test initially "behaved" as a confined aquifer, passed through a "delayed yield" phase, and then began to behave as a unconfined aquifer near the end. Therefore, this type curve matches are inappropriate.- This "switching" in the "behavior" of the aquifer is commonly observed in barrier island pump tests. Also attached in Appendix 4 is a Jacob "distance drawdown" graph for data from the same two wells (TW2 and TW4) and associated calculations which also resulted in a transmissivity of about 500ft2/d. Using both methods of analysis of drawdown data serves as a check (i.e. if the two show drastically different results something is wrong with the analysis or collection of data). Seasonal High Water Table Two methods were used to determine the seasonal high position of the water table. The first employed the use of the "Fetter Water Table Equation" for predicting water table heights beneath Oceanic islands (reference Applied Hydrogeology by C.W. Fetter, Jr.,1980, -pages 144-146). The second involved the installation and monitoring of two monitoring well networks which transected the island (see blueprints). The calculations in Appendix 5 for the Fetter Equation show that the predicted average position of the water table in the center of the island would be about 1.06 feet above the level in the sound. This predicted average position is lower than the actual water level observations made on -site, which suggests that our measurements were made during a period of above normal water table levels. Because the measurements are not drastically higher than predicted average position of the water table, this supports the other evidence that there is not a restrictive horizon beneath the proposed drainfield area. Water level observations and fluctuation are shown in tabular form in Appendix 6 of this report and graphically on the attached blueprints. Also attached are readings on the tide gauges which reflect tidal fluctuations and can be compared to water levels in the monitoring wells with respect to time. In general, the water levels in the wells did not respond to fluctuations in tidal levels during a 36 hour observation period with the exception of well #8 which was installed in the edge of a tidally flooded marsh. In fact, while the tide constantly rose due to a 20 to 30 mph constant wind from the northeast, many of the wells dropped slightly over time. This along with the data collected from the wells on 11/30/90 by Quible & Associates (see Appendix.6 and blueprints) tends to indicate that little tidal effect exists beneath the proposed drainfield. It is interesting to note that when the 11/30/90 Quible data is plotted graphically verses our data from 11/15/90 a distinct pattern appears (see blueprints). Our data shows a constant water level slope from the primary dunes toward the sound while the Quible data indicates the expected normal shape of the water table beneath the island (Le. higher in the center and sloping both toward the sound and the ocean). This suggests that our readings were made shortly after a significant rainfall event since the levels are highest in elevation beneath the areas with the thickest unsaturated zone (i.e. the dunes). A copy of the Hatteras rainfall records indicates that a 24 hour rainfall event of 3" occurred a week before our work on November 9 and 10, 1990 (see Appendix 7). It should be noted that due to the nature of the uncoated sands in these areas the seasonal high position of the water table cannot be determined by the evaluation of soil color. It must be examined during expected high positions. The water levels observed on -site should be assumed'to be seasonal high positions since these measurements were taken in early winter when evapotranspiration is low, one week after a 3" rainfall event and before, during and after a 20-30 mph strong northeast wind which caused the water level in the sound to stand constantly at a level of 1 to 1.5' above normal for 24 to 36 hours. Due to the close proximity of the site to the sound and recent weather conditions in the area prior to and during our measurements, we believe they are a good approximation of the seasonal high stand of the water table. However, to again be conservative, in our recommendations based on our mounding model, we allow for .2' rise above and the levels observed and the mounding predicted when determining minimum elevation required to maintain minimum separation between trench bottoms and the water table. Mounding Using the measured values described above and using the inputs shown on Table 1, various approaches were made to predict the mound which would develop under the system(s). The systems were assumed to be rectangular for the purposes of the model, but total square footage of drainfiield is approximately equal to that proposed. Several different scenarios were examined, but only the most realistic will be discussed in this report. In all cases it was assumed that only the upper 5 to 6 feet of the aquifer responded and that the water table remained at its seasonal high position year round. 4' The computer model used for predicting mounding beneath a rectangular basin with a constant recharge rate was version 3.0 of the Colorado State University Program CSUPAW Well and Pit. This program was developed by D. Moulden, D. Sunada and J. Warner. A journal article describing the program was published in Groundwater Vol. 22, Number 1, Jan -Feb 1984. The microcomputer uses Glover's Solution with consideration for Hantush's better means of evaluating this solution by integration by parts. The Division of Environmental Management, Groundwater Section often uses this model to predict mounding beneath large on -site wastewater systems and for stormwater infiltration basins. The proposed layout of active and repair areas shown on the blue prints submitted by Quible Associates dated 9/21/95, shows an alternation of system and repair areas. This will tend to minimize mounding as compared to concentrating all of the system in one area, so this approach is recommended. However for the sake of modelling mounding beneath the systems we chose to use a scenario where Field 2A, Repair 2A, Field 2B and Repair 2B were treated as one active drainfield. The mounding predicted by such treatment will be somewhat worse than that which will actually occur utilizing the alternating system and repair design proposed. Therefore, like all other assumptions in this report; this is a conservative approach. Repair Area 1D, Field 1D, Repair Area 1C and Field 1C is also modelled, but is treated as an independent system due to its distance from Field 2A and 2B. We believe this approach best reflects the proposed wastewater application methodology on -site... Figure 1. shows the resultant mound developed beneath Field 2A, Repair 2A, Field 2B and Repair 2B and at steady state after 3 years of daily application of .5gpd/ft2 (13,020gpd over 26,040ft2). This'graph shows that a mound would develop 1.0' above the existing water table. The mounding beneath Repair 1D, Field 1D, Repair 1C and Field 1C is shown in Figure 2. Figure 2 assumes a .5gpd/ft2loading rate (8,903gpd over 17,805ft2) and indicates that a mound would develop to a maximum height 1.3' above the existing water table. Conclusions and Recommendations Based on the findings stated above the following treatment for the drainfiields is suggested: A. The state requires a separation of 2' between the trench bottom and the predicted mound height for all drainfields. Assuming a trench depth of 171 (6" cover and 6" gravel), the proposed drainfields in Active Areas 2A, 2B, 2C and 2D should be brought up to a uniform elevation 'of at least 7.0'. To round these numbers off and allow for 5 . sl an additional "safety -factor" it would be simpler to bring the land surface elevations up to 7.5. Similarly Field 1A,1B,1C and 1D should be brought up to a uniform landsurface elevation of at least 7.3. These final elevations were determined using our predicted "high" water table elevation of 2.8' above MSL, adding the OZ "safety facto{' for natural water rise, adding the predicted mound height, adding the Z separation from the trench bottom and adding 1' to allow for installation of an LPP trench B. The original elevations across the proposed system areas varied and contained areas well above 8' MSL, so it was possible to "even" the proposed drainfield areas out to the recommended elevations. Attempting to install a system in the original topography would be difficult and would likely result in ("seepage") effluent surfacing in the lower areas. If done carefully the "leveling" of the drainfields should not affect the hydraulic characteristics of the soil or shallow aquifer. This is mainly due to the fact that a "pile of wind blown sand" such as that present at this site is structure - less and moving it around, whether by wind naturally or by equipment has little or no effect on its physical or chemical nature. - 55:�4� :. w.nra�� [. y..r.�s' - •. � .... �.�.r.�;rfw{F w— 1.... �. i 3 6 ��� .. ..: 1.,.:'J�.'��ti •.. -. -ra.�. �R'- rf •v _ .. ...«"'wq►��rs �M.-!L':_ • - . .'N "NY. i-Gs:i-.'�. w... �...�.. TABLE 1. INPUT DATA FOR MOUNDING UNDER WASTEWATER SYSTEM Field 2A, Repair 2A, Field 2B, EfEair 2B Repair ID, Field 1D, Repair 1C, field 1C I. E2tEZ Rate _(ftj clay) *0.067 2. Transmissivi ft day) 500 same 3. S ' 'c Yield .20 same 4. Beginning Time (days) Final.Time (days) ' .. Time Increment (dMs) 30 1080 ....-.. 30 same same same 5. End of Recharge Period(clays) 1080 same 6. Beginning Distance (ft) Final Distance (ft.) Distance Increment ft 0 250 25 same 350 same 7. Depth to Water fk **5 **same 8. Angle from X - Axis d 0 same 9. Distance to Stream ft 250 350 10. Calculate Mound Profile yes Yes 11. Calculate Discharge to Stream no no 12. Basin Width ft 186 160 13. Basin Len ft 140 111 *At .5 gpd/ft.2Loading Rabe, Recharge Rate = .067 ft/day; 'This not actual depth; it is assumed.. If water table reaches surface in model it shuts down, so a deep depth is assumed and .the resultant mound height is , added to the estimated seasonal high water table elevation in order to determine final trench bottom elevations required. rt r ; r ' r • ���K" �� sus fJimh�am!i^s,sd 4 1 r 7 s � Quible Quibie & Associates, P.C. ENGINEERS • ENVIRONMENTALISTS • SURVEYORS • LANDSCAPE ARCHITECTS • PLANNERS SINCE 1959 November 2, 1995 MEMORANDUM To: Sean Boyle From: Joe Lassiter Re: Seasonal -High- ater Table - Inn at Hatteras Village P.O. 111 870 Kitty Hawk, NC 27949 Phoney 919-261.3300 Fax:919-261-1260 PRINCIPALS H.W. Bill Gilbert. III, P.E. Joseph S. Lassiter, S.E.S. William C. Owen, U.S. F. Richard Oulble, P.E., R.L.S. ASSOCIATES Soon C. Boyle, P.E. Eduardo J. Voldivieso, P.E. The purpose of this memorandum is to provide you with my determination of seasonal high water table at the proposed location at the Inn at Hatteras Village. The subject property is located adjacent to the Hatteras Landing Planned Unit Development and Teach's Lair Marina in Hatteras Village, Dare County, North Carolina. I have done extensive soil borings on the subject property in conjunction with the delineation of Section 404 wetlands and have determined that the seasonal high water table on the property, based on hydrology indicators in the soil profile, is at an elevation of approximately 3.0' relative to Mean Sea Level (MSL) as established on the site by field survey. Thank you for your attention to this information. If you need further clarification for your stormwater submittal to Bill Moore please let me know. Quible 9uible & Associates, P.C. ENGINEERS • ENVIRONMENTALISTS • SURVEYORS • LANDSCAPE ARCHITECTS • PLANNERS SINCE 1959 November 2, 1995 MEMORANDUM To: Sean Boyle From: Joe Laser Re: Seasonal ' ater Table - Inn at Hatteras Village P.O. Drawer 870 Kitty Hawk, NC 27949 Phone: 919-261-3300 Fax: 919-261.1260 PRINCIPALS H.W. Bill Gilbert, III. P.E. Joseph S. Lowder, S.E.S. Wllllam C. Owen, R.L.S. F. Richard Quible, P.E,. R.L.S. ASSOCIATES Sean C. Boyle, P.E. Eduardo J. Valdlvieso. P.E. The purpose of this memorandum is to provide you with my determination of seasonal high water table at the proposed location at the Inn at Hatteras Village. The subject property is located adjacent to the Hatteras Landing Planned Unit Development and Teach's Lair Marina in Hatteras Village, Dare County, North Carolina I have done extensive soil borings on the subject property in conjunction with the delineation of Section 404 wetlands and have determined that the seasonal high water table on the property, based on hydrology indicators in the soil profile, is at an elevation of approximately 3.0' relative to Mean Sea Level (MSL) as established on the site by field survey. Thank you for your attention to this information. If you need further clarification for your stormwater submittal to Bill Moore please let me know. DIVISION OF ENVIRONMENTAL MANAGEMENT. NORTH CAROLINA STORMWATER MANAGEMENT PERMIT APPLICATION I. GENERAL INFORMATION: 1. Project Name: _ The inn at Hatteras Village 2. Project Location: (County, State Road, Address)NC 12 in Hatteras Village, Dare County NC (address not assigned) 3. owner's Name: Tidewater Inn Management Phone:(804) 425-5422 4. Mailing Address: 3600 Pacific Ave. (Po Box 718)--. City Virginia State VA Zip23451 5. Application Date: 10/26/95 Fee Submitted: $ 385.00 7. Nearest Receiving Stream: Austin Creek Class: SA 8. Project Description: 72 room hotel with 2 bedroom employee apartment II. PERMIT INFORMATION 1. Permit No. (will be completed by DEM) : 2. Permit Type: X New Renewal N/A Modification (existing permit no.) N/A 3. Project Type: Low Density X Detention Infiltration Other 4, other State/Federal Permits/Approvals Required: (Check appropriate blanks) X Sediment/Erosion Control CAMA Major 404 Permit III. PROJECT BUILT UPON AREA Drainage Drainage Basin Basin Classification Allowable Impervious Total Project Area Proposed Impervious % Impervious Area Breakdown of Im ervious'Areas Buildings 24,538 SF Roads N/A Parking/Drive, Con.walk and decks 51,313 SF Other Totals 75,851 SF (39.70%lof lot) 1 IV. STORMWATER TREATMENT (Describe how runoff wild be treated): Parking and grassed areas to flow to detention pond. Runoff from roof areas and pool deck to be piped to detention pond. Overflow from pond area to surface flow through 30' vegetated buffer before reaching wetland areas. V. DEED RESTRICTIONS AND PROTECTIVE COVENANTS NSA Deed restrictions and protective covenants are required for all low density projects and all subdivisions prior to the sale of any lot. Please see Attachment A for specific requirements. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the items required by the permit, that the covenants will be binding on all parties and persons claiming under. them, that they will run with the land, that the covenant cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. OWNER'S CERTIFICATION I, Thomas J. Lyons, Jr. certify that the (Please print name clearly) information included on this permit application form is correct, that the project will be constructed in conformance with'theapproved plans, that the deed restrictions will be recorded with all required permit conditions, and that to the best of my knowledge, the proposed project campl'es with the requirements of 15A NCAC 2H.1000. I auth e e ow named_ person or firm to submit stormwater plans on my' behalf. Manager, Harborside- L-C. f9 Owner Au rized gent Signature and Title D to AUTHORIZED AGENT Person or Firm Name: Bill Gilbert c/o Quible and Associates, R.C. Mailing Address: Post Office: Drawer 870 City Kitty Hawk stit-- NC Zir 27949 Phone: (919) 261-3300 Please submit application, fee and plans to appropriate Regional Office. (see attached map) -2- Quible Quible & Associates, P.C. ENGINEERS • ENVIRONMENTALISTS • SURVEYORS • LANDSCAPE ARCHITECTS • PLANNERS SINCE 1959 November-11, 1995 Mr. Bill Moore North Carolina Department of Environment, Health and Natural Resources Division of -Environmental Management Water Quality Section' 1424 Carolina Ave. Washington, North Carolina 27889-2188 P.O. Drower 870 KIhv Hawk, NC 27949 Phone: 919-261-3300 1 919261-1260 RECEIVED WASHINGTON OFFICE PRINCIPALS i Bill Gilbert, Ill, P,E. Joseph S. Lossi}er, S.E S. v NOV 15 1995 icrn Owen, F. Ric alrld QuiblC. e. E , P.L. S. S ASSOCIATES 4 Sean C. Boyle, P.E. Eduardo J. Valdivleso, P.E. Re: stormwater Management Plan for The Inn at Hatteras Village, located in Hatteras village, Dare county, North Carolina Dear Mr. Moore: Please find enclosed two copies of revised drawing C8 for the Inn at Hatteras village. We have revised the overflow structure detail to match the proposed elevations and configuration of the infiltration pond. Please replace the originally submitted sheet C8 with this revised sheet. If you have any questions or require additional information, please don,t hesitate to call. Sincerely, Quible and Associates, P.C. Sean C. Boyle, P.E. enc: As stated O C.-06'95(WE➢) 16;59 �l1BLE&ASSOCIATES TEL:9192611260 p.001 QUIBLE AND A ED h ASSOCIATES, B.C. Engineers — Environmeut&Hvt.5 — Surveyors — Planners — Landscape Architecture FACSIMILE TRANSMITTAL TO: FROM: DATE: G : TOTAL NUMBER OF PAGES; including this page) ✓ AS REQUESTED FOR YOUR INFORMATION ----FOR REVIEW AND COMMENT FOR CONSIDERATION AND APPROVAL COMMENTS: NEED RESPONSE A.S.A,P, ____LEASE PHONE TO DISCUSS -----PLEASE SIGN AND RETURN _:PLEASE REPLY VIA FAX PLEASE REPLY VIA MAIL ****** ** *`**�***********-t****************T****** NOTICE of CONFIDENTIALIT The information contained in this facsimife fransmittal is privileged and confidential, and is intended for the addressee only. If you are neither the intended recipient nor the employee or agent responsible for delivering this message to the intended recipient. any disclosure of this information is strictly prohibited. If you have rece;ved this trans— mittal in error, please notify the person transmitting the information immediately and return the transmission to the firm set out above immediately. 8 Juniper Trail Post Office Drawer 870 Kltty Hawk, North Carolina - 279d9-0870 Phone. (019 )261-3300 Fax: I� C.-06'95(VEQ) 16:59 4L1BLUASSOCIATES TEL.9192611260 12/06/08 17:31 V804 428 8885 TARTR INN NGr P. 002 (�QQZ dEG. -�i�75 (916lli 16 ,15 QrI)�LE�lSSOCIIT�S TEL:9[9�b11�60 Jim L C�il�AL L FROM d hm<e! �ttaas V 2 Qqmtm'�4derakrs 3cm Ma MM Pkd& A�c V� ,VA L Ph= mmm Puw jhr the hn 0 Rath me C'L M C& A a fted Oa, 3% M wi* htftt rtw6ion dzke of Naumubar I IW Qml& ad AmmaxtwL pp- mod apvnved iw the iTo" 9edam [1 pis_ 4��1• till k•1c:r�':ati _ 1[�i: _a_�Llll: Dzy dobmdm .made hwe m h roquh nmak dqpmmftg as the szbmt m VM& sthtma me& ara modsw ed &ft the &dp sLag-- The awamq mod above, ahaa ba raqmmdMz fhr bdh r'mcdna emd rma-totie w taste. V xepAr mmk4mmm =d #mipe7faoa are rat umkrukak tbe% pond, will soot adzime im htm&d papaw. Me lme of a dry ceded dd=dd= pod mdftmmus pmgmm are deeeflied belaw- hSA Zee >ddd-�ge� � m!d iv+8 �e ce a eby pQad � be �o+oad st OEM a =ZA to gaga woody pmwh *pd 0=" . ad& l m'e 60went mmMria� �mcm= 7= mm of ar m I" ate vatw4gm=* and dwrwtag am mucsomaded Spa at ldmd. sw rqx=mVObe spedFs ad 2vH&VWw rates. dwid be kwAyAd m1 an aaamsi beds to mom that tin OW40um apmmtm bz a :h s— lea peas+ laepeeldoda dlazfl& he aoit4mAed dudng weir weaffier to dere if fha pem,d is ftuqpb3d&kuukuQAm= Ea pwftaar ttb-, auerfin.2&nd=e a tudd he ram karmo dhr eddeam af or shot cam . Ot#�r p mthms whmh be d wftd far imdaa}ciMAMOMM ermine, madymg or trees guvth cm the ambotwiag wad= wou d the ie cd wA � th,a adognV of slim; emim cf t * Dmirs W mibmkq wed= of tl= d v vet to *i a pmd a ita thatzW P. 002 1 EC. -06' 95(WED) 17:00 QUIBLUASSOCIATES 12/00/98 17:31 Mod 428 eggs TEL:9192611260 TDvn INN XGT P. 003 Z 003 DEC. -NA VED) I6 , l 5 Qli I B LUBSOC IVES im new and fit&v emk aqw*a Wa,mavWJ= aftwft= ,tea be rmnm.a no Md *%Aape% tmd and s no v=r tithe wa tee a as- en.ramasaftd=nwbe-mdPaAto tba ripov am tbc t4 wd oU91A des MW WdOMM11raM&tn hft'zffi aftoft o- ROM ina�aa�ae r"S for Oar. =DNqr meads admar am eD O=d pemved to be problem Jm AWpmidk, Man aft mevW ism a c came$ a 4 that ed MdnIODEM are ad bftVaTRM2Md (P46 dQbdg me a . D 6. 1995 P- 005 • m. THE INN @ HAT3`ERAS VILLAGE �, N v. Wzy A 4.3N AC. PARML fl? LAND HA7TR,RAB LANDIliiI� � d m -- HATTARAS T*WfMW DARK COUNYY NGRM IwA KNAIU r o -a c t� ALL. DI"BEO ARMS SH#N.Li. BE: SFEEiIEp AND MUL.001 N o ACCORDING TO THE FOL.LOWNa SPEMOATIM;PEWAWMT `r 4 rye. p/ MUMM SE ONG DATEM APRIL I•— SM 34 SI"�I� oaTM OCT. I - 6+wItCF1 39 a 8iild as teen a1E ewtM 1]�i k.Bla. w '� JUMUZER a m amm LCUOT is c, W-14-18 0 mw LaJww nod eao UvAoftc Anor 4. JUnal Ic UK %ED M1c16� 1► IWtCHBs .� —� r. 0 �FAW mwd b Jut ONEWL rKboAn4tr" ICY M;a ANQU i OF IIMMADW C04 WIT WE CIMUSIM WALSfaSU Romm 49L FgrMH% � >GI�IF�A�OH Mltl lON 04YRRfl1fA11nE� w f�►IPLiiE �yp�, tl�l RI � A]g1�6 (� 6 _y_�1lDt n.� r Wu� car J4SAki SO f�iQIA drlsau'sse�BIIRFJN;2- A eraotir°t cs�► o��4C� rn c4 SPD� �11R La��S��cO FP 1�Y �PF1tiOB��1Ei� � � OWl1ES dL1�iCP THO" IllliY BB FKI� l E- o v AHR }i� A� SOIR� f� P19 CI�LNS 1!i!F @T !q WITiL .RFH�iF'K FtJ!/i8HrOID MA106LgiF1V7E�ANCE REQLJIREwIENTS E}iTEi�D BEYOIVQ THE SEEDING PHASE. • ' oft ao mar sE rt1eEA, �Upttn. + AE%�Ear�n Pleauw�Y �s RnsS. R� ra�r ee Adam ru,a1taW c Ln ci Qulble and Associates, P.C. ig - ) Q ACJrD filfigllYi£�lD.O�a A[$ pYiv2P fwF w (4110 nf�uw PAN ()IIJ mi-12alCAM 19