Loading...
HomeMy WebLinkAboutSW7120906_HISTORICAL FILE_20200417STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW 71� DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS 1pISTORICAL FILE DOC DATE��lZ _ YYYYM M D D walt° ROY COOPER Governor MICHAEL S. REGAIN Secretary BRIAN WRENN Acting Du ecror NORTH CAROLINA Environmental Quality April 17, 2020 Chowan University Attention: Danny R. Davis, VP for Business Affairs One University Place Murfreesboro, NC 27855 Subject: Stormwater Permit No. SW7120906 Renewal Chowan University Athletic Facilities — Phase I High Density Stormwater Project Hertford County Dear Mr. Davis: A Division of Energy, Mineral, and Land Resources file review has determined that Stormwater Permit SW7120906 for a stormwater treatment system consisting of a wet detention pond to serve Chowan University Athletic Facilities — Phase I located on Union Street in Murfreesboro, NC expires on October 26, 2020. This is a reminder that permit renewal applications are due 180 days prior to expiration. We do not have a record of receiving a renewal application. To keep this permit active please submit a completed permit renewal application along with a $505.00 fee for permit renewal. Permit application forms for renewal can be found on our website at: tiups:/deq..nc.gov/about idivis.ions lenergy-mineral-I a nd-resources /energy-mineral-land- ruds/stormwater-nrograrn/post-co-astruction. North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit. If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to discuss this by phone or meet with you. If you would like, I can e-mail you a copy of the application forms. You can request a copy by e-mailing me at roger.thorpe@ncdenr.6o. Sincerely, Roger K. Thorpe Environmental Engineer North C:a3 oGna Department ol'Environwental Quality I DiOsiorl of Energy. Mineral and Land Resources Washington Regionai Office i 943'Washingron Square Maii j Washington, North Carolina 27889 n: r•w r,a:n :na �' aewnr�riorE­­woU,.� /"� 52-946-6481 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P.E. Dee Freeman Governor Director Secretary October 26, 2012 Mr. M. Christopher White, President Chowan University One University Place Murfreesboro, NC 27855 Subject: Stormwater Permit No. SW7120906 Chowan University Athletic Facilities — Phase 1 High Density Commercial Wet Pond Project Hertford County Dear Mr. White: The Washington Regional Office received a complete Stormwater Management Permit Application for Chowan University Athletic Facilities — Phase 1 project on September 21, 2012. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations -set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7120906 dated October 26, 2012, for the construction of the subject project. This permit shall be effective from the date of issuance until October 26, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Samir Dumpor at (252) 946-6481. Sincerely, 0,t4� aCl� .Charles Wakild, P.E., Director Division of Water Quality AA/ sd: K:1WQSISTORMWATERISD1SW7120906 cc: David Gastel, PE, LandDesign, Inc. (19 W. Hargett Street, Raleigh, NC 27601) Oertford County Building Inspections ,/Washington Regional Office North Carolina Division of Water Quality Intemet www-ncwaterg uality o g 943 Washington Square Mall Phone: 252-946-6481 One Washington, NC 27899 FAX 252-946-9215 NOI ChCarofina An Equal OppMunitylAHirmative Action Employer - 50% Recycled110% Post Consumer Paper Natm,"WI& State Stormwater Management Systems Permit No. SW7120906 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations 'PERMISSION IS HEREBY GRANTED TO Chowan University Chowan University Athletic Facilities — Phase 1 Hertford County FOR THE construction, operation and maintenance of one wet detention pond in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until October 26,-2020, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The stormwater control has been designed to handle the runoff from a total of 281,816 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in Section I. of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The built -upon areas associated with this project shall be located at least 50 feet landward of all perennial and intermittent surface waters. 7. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: Page 2 of 7 State Stormwater Management Systems Permit No. SW7120906 a b C. d. e. f. h. i. 1. k. 1. n. o. P. q• Drainage Area, ft2: Total Impervious Surfaces, ft2 Design Storm, inches: Pond Depth - average, feet: TSS removal efficiency: Permanent Pool Elevation, FMSL Perm. Pool Surface Area required Permanent Pool Surface Area, ft Min. Volume required, ft Permitted Storage Volume, ft3: Temporary Storage Elevation, FM Controlling Orifice: Permitted Forebay Volume, ft3: Maximum Fountain Horsepower: Receiving Stream/River Basin: Stream Index Number: Classification of Water Body: II. SCHEDULE OF COMPLIANCE 352,270 281,816 (143558 ft —current proposal) (138:258 ft2 —future expansion) 1.5 4.5 85% 56.50 ft2: 16,557 18,331 33,906 50,023 SL: 58.75 2.50" O pipe 16,733 113 HP Hares Branch/Chowan River Basin 25-4-6 "C; NSW' 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, level spreader, filter strip, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted BMP. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 6. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 7. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Page 3 of 7 State Stormwater Management Systems Permit No. SW7120906 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director , that the changes have been made. 12. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 13. Decorative spray fountains will be allowed in the stormwater treatment systems, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. C. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. The maximum pump power for a fountain is 113HP. 14. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. Ill. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division of Water Page 4 of 7 State Stormwater Management Systems Permit No. SW7120906 Quality, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may . subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008- 211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. This permit shall be effective from the date of issuance until October 26, 2020. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 26th day of October, 2012. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Division of Water Quality By Authority of the Environmental Management Commission Stormwater Permit No. SW7120906 Page 5 of 7 State Stormwater Management Systems Permit No. SW7120906 Chowan University Athletic Facilities — Phase 1 Stormwater Permit No. SW7120906 Hertford _County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW7120906 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built-upon.area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Washington Regional Office Hertford County Building Inspections Page 7 of 7 10/18/2011 16:14 3587910 REGISTER OF DEEDS PAGE 02 REQEIVED ATA7K OR NORYM CAROLINA n•�a. ••TnTx I,}I•• cxcr•t T.aJ[ 1 10.00 NORTr•r i✓Ag01.rNA w awl. c•YA1"t /'r�T- R%91•ti TRx !;I 0.00 ram• .... � .. STATw OF ; NORTH CArROLINA - CAL t•TAT • �.,:. c:ci•,. TA• ^ R 10.00 eTAY6 OF NORTH CAROLINA 4 neat s•T.T• i :-•� ••C,•t TAR • �., f3lO.00 i I STATE_ Or ' NORTH CAROLIHA ><Swi IC•TwTt • J KxG1gc Tax i O 10.00 JLy . .. ( ETATL Vr NOnTii CA,.ol.1NA ' 1 ff f,.� - [Itcl�c tux 1o.oa �4 f � ,' -r.y;, or �f NORTH C.\ctoLINA J,�a NorrTH CAgOLINA ,f: � n.:nt e,r�Tc ^ T 0.00 ` } 7 r a M1C NORT:7 10 co wi mi sa 27 We de th So it th mi Pa fo is 30 Eu En mi Ea fe En mi 45 de So So No L. de th to biu aEL di th ad to an 4S th We la in 21 co wi th Ni o f71P.01D I. V SEP 2 1 2012 ®W Q-WAR4 337 FA_U215 itinutes West 477.4 feet to a concrete marktnr. nor for this at line of C. k: Revelle, Sr.; thence h the said Revelle line South 28 dogeee.s 10 �1tes East Z80 feet to a stake; thence still with d Rcyelle line South 36 degrees 30 minutes Wese feet to a stake. South 60 degrees 10'minutes t 695 feet to stake, corner; thence North 63 revs 10 min. West 235 feet to a stake, corner; Tice still with line of C, L. Ravelle, Sr. th 36 degrees 40 minutes West 1344 keet to an n stake. corner for this at the Powell land; nce with the'poweil lands South 8S degrees lU utes East 323,5 feat to a concrete post at the ker landi thence with the said Parker land the lowing courses and distances, South 87 degrees minutes East 666 feet to a gulp, North 85 degrees minutes East 73 feet South 86 degrees 30 minutes t 104 feet to a gum South 72 degreez 30 minutes t 73 feet to a sycamore South 73 degrees 30 ures Beast 86.S feet to a bay, South 66 degreo9 t S7 fact to an elm. South 0 degrees East. 100 t to a hay, South 73 degrees 45 minutes t 62 fa at to a b. Qum, North 85 dogmas l5 vitas East 64 fact to a b, gum, South 71 dagrwes minutes East III feet to a b. gum South 75 Tees 30 minutos East 129 feet to a b. gum, th 84 degrees 15 minutes East 100 feet to a b. gum. th 84 degrees 1S 6inutes Easst. 109 feet to a b. gum, th 84 degrees 30 minutes East 121 feet to..an s. gum, th 8g degrees 30.minutes East 172 feet to a b. gum, th 74 degrees East 45 feet to corner at line of 1.. Parker. thence with said Parker line North Z roes 15 minutes West Z37.S feet to an iron stake; s►ca North 75 degrees 15 minutes East 200 feat' an iron pipe at the Western edge of the freesboro-Union public road, which iron pipe located-30 feet from the canter lino of d road; thence across said road in a•Southcastcrly ectiorc to an iron stake at the Esytarn edge of aforesaid road corner for the lands herein conveyed other lands of Jossie S, Bryant st the Eastern e of the aforesaid road (said irop stake being ated 30 fret from the center line of said rowel} running thence a new line South 85 degrees minutes East 424 feet Co an iron stake, corner; nce still a new line South 04 degrees 15 minutes t 358 feat to an iron stakes corner for other ds of Jessie S. Sryant and the Underwood lands a line of the Inds herein Gornvoyad, thence South degrees East 371 feet to the Mill fond run -nor for this and, the Underwood lino; thence h the Mill Fond run as a dividing line between s and the Underwood land the courses and distances -on as a more general direction us follows: ,th L67 degrcas East 75 feet North 61 degrees East i fe.et. South 84 degroas East 183feet North 82 ;Twos East 173 feet. North 6Z dagr=es East 100 10I1812©11 1b:14a5B7914 F � . sr�ra�o� - trOnTY. ct.rr.t_ C.TAt_ fFJ _ .71 C.Ca ' NOMTH CA rP1.1NA a' 1 r' n1, r. �Tnrc 'il ` I. ^.TA-V C_ f . i ^ i'- r,cn� revnTr 'Ax " ..r. C.C' f _ 1 s RE',USTER OF DEEDS e= 337 rAcEZ .6 feat rtii 47 degrees East 13S feet North,40-degrees East 82 feet Worth 10 dagreea East 176 feet North 42 de Tees West 304 feet North 12 degrees East X80 feet orth 13 degrees East l20 feat'North 42 degrees Past 90 feet Korth 82 degrees Raftt 101 feet North 65 de reo3 Eaat 22S feet,South 81 degrees East 77 feet North 87 degrees 30 minutes East 180 feet North 45 de reel bast 142 feet. to the Mhll Pond; thence with hc- said Mill Pond North 25 degrees West 273 feet to a occh, corner at line of lands of Chowan College: Noyth SS degrees 30 minutes went 1950 feet to the Eastc n edge of the Murfreesboro -Union road, thenc across said road North85.degrees 30 minutes West 0 feet to the point o£ beginning- -YCONTA KING 126.84 acres-, according to Map prepared May 7 1960. by M. M. Revello, SUrveyor, which Said map i made from maps of adjoining property bearing dates of 1944. 19S2, 1949 and 1959. RESER ING AND EXCEPTING gram this conveyance the folio ing described lot of land containing 3.01 scrag, said ands excepted being described by metes and bound as Follows: That crtain tract or parcel of land lying and being in Mu ireesboro Township, Hortf"ord CouT%t$r, North Carol na, lying an the East side of Union Road from Muvfr esboro to Ahoskie, and which said tract is boun d on the North.by.landa of Jessie S. Bryant, boun d on the East by lands of Jessie S', Bryant, boun d an the South 6y lands of .Bessie S. Bryant, and unded on the Nest by the eastern edge of the afor .aid Union Road from Murfreesboro to Ahoskie. and ich Said tract or parcel. o6 land is mole part cularly described as follows: 88GI NING at d concrete post in the eastern edge of the iforosaid road, which said post is a corner for this tract and other lands of JeAsio S. Bryant, and which said post is 40 foot South. of an iron stake, which said stake is also in the 8asterA edge of the aforesaid road and is a Corner for property of Jessie S. 8 yant and Chowan College; running thence with the Eastern edger of the aforesaid road South 14 degrees 30 m nutea West 66 feet;. -thence still along -the eastern edge of the aforesaid road South 11 degrees O,minutes West 76 foot; thence still along the eastern edge of the forosaid highway South 7 degrees S minutes West 98.5i feet,, thence still along the eastern edge of the aforesaid road South 05 degrees 1S minutes West 201.70 feet to a concrete post, Corner for this trwo. and other lands of Jessie S. Bryant: thence turA ng and running along the line of other land* of Joss a S. Bryant South 84 degrees 4S minutes East 300 eat to a concrete post-, eornor for this tract and othe lands of Jessie-S. Bryant; thence turning and rune ng along other lands of'Jessie S. Bryant North OS greos IS minutes East 444.35 feet to a concrete PA5E a3 a I 10/18/2011 1S.i4 3587911 REGISTER_ OF DEEDS PAGE 04 337 fAa2V pa t, which said post is dO f" et South of the herein me ktioned chowan Callege property, and is also a corner- fo this tract and other lards of Jessie S. Bryant; th nee turningg and running along the Iine of other lands of Jessie S. ftryant North 85 degrees 30 minutes wc3t'z79.8 fe t to the point and place of beginning - CONTAINING 3.01 ACRES, more or less. Th above conveyance is made subject to the easements art right-of-ways granted to the North Carolina St to Highway Commission for the construction And ma ntenance of State Road A1179 and the "new Murfreesboro- Ah ski& htghway'l.which highways cross a portion of said pr mises. Po session of the dwelling house (the current residence of Jessie S. Bryant) together with the yard and out- bu idings used in connection with the residence are he Eby retained by %no parties of the first part un it July 1, 1969. The parties of the first part he eby reserve the right and privilege to remove from th above promises eight (8) dwarf fruit trees Located ad %Cent to the r&sidence of Jessie S. Bryant on or be ore December 31, 1969. Th s conveyance includes all crop allotmonts on the pr mises above deacrlbed and said cro allotments ar heroby conveyed to the party Of the second part. Th party of the second part agrees to assume and pn any and all County property taxes which may be 1e i.ed on said premises for the year 1969. TO.HAVE AND TO HOLD the aforesaid 'tract or parcel of land, together vlt al; privileges and appurtenances thereto belonging. to the said howan College', and its successors and &$Aigns, to its only use and bahoof forever. Bryant, for hereby Coven and assigns, a right to c clear from a highway righ defend the s i the said Jessie S_ Bryant and husband, Richard E. themselves and their heirs■ executors and administrators. ant to and with the said Chowan College, and its successor% that they are seised of said premise9 in fee and have 3,nvcy the same in fee si.mpl'C; that the same are free and zy and all encumbrances. except utility easements and t-of-ways, and that they do hereby waALant and will forever 2id title to the same against she lawful Claims of all 10/13/2011 16:10 35R7914 REGISTER OF DEEDS PAGE 05 persons whomso iN 1{ Richard H. Bry and year first ea;;u 337 ra2� v'er. . TNESS WHEREOF, the said Jessie S. Bryant and husband, nt. havv hereunto set their hands and seals, the day above written_ (SEAL) (SEAL) NORTH CAROLINA HERTFORD COUNT I, , a Notary Public, In and for .the, County and State aforesaid. do hereby certify that Jessie S. Bryant and hus arid, Richard E. Bryant, personally appeared before me this day and a knowledged the due execution of the annexed Dood of Conveyance, %!'J5.;;'ET�;� Wi tnt ss my hand end Notaxial,Seal, this kb.e day of r: F r, ` - h r a f- otary 1_tj0Lt.3.c �i' My, .Cat~l.�a ion xpires 01t_Tll CA OLIVA H1iRTFORD COUNT The oregoing certificate of Notary Public s certified to be correct. This instrumens was presented For eg3strati.on and recorded in this office at Book Page. This any of. 194,1 as c1oGk=M_ T_ 'V, NORTHIC01-f Register of Deeds ay og. ter a ae s S I ' i Chowan University Athletic Facilities — Phase 1 State Stormwater Review Proiect Narrative: Chowan University has proposed a +/- 8.087 acre site for a maintenance facility and tennis -courts. The site includes one maintenarc-e building, eight tennis courts, two paring lots, and a proposed driveway. The project is located in Murfreesboro, NC on the east side of Union Street (SR 1179) and 1000 ft south of Hassell Drive. The 1.5" storm water runoff volume will be treated to 85% TSS removal via a wet pond which will also provide detention for the 1-yr 24-hr storm. The storm water will be discharged into the Hares Branch waterway which is part of the Chowan River Basin. This waterway is classified as a NSW/C and has no additional requirements for treatment onsite. We are submitting for a State Storm Water Permit and a Land Quality Erosion and Sediment Control Permit. The existing site is a grassed with a tree area in the southeast section of the site. The site is slope so that the Stormwater runoff is to the southeast. Future site discharges into the Hares Branch waterway. All storm water will be collected through drainage structures and transported via a piping system to the proposed wet pond. The wet pond is sized for a portion of the master plan build out provide in the calculations manual. It will be constructed to handle 8.087 acres of land with an impervious area of 80%. The current site to be constructed is only 41% impervious. The remaining 39% of impervious area will be constructed within the next year for future parking area. RECEIVED SEP 2 1 2012 DWQ-WARO E • � � 1 � � �r, �...+-. - '� �� ! �r � � %i" � �s` J� F �w � `^tip i qy ate: -�., �* ��� 4 _ •,� �� i # � � ��� nJ !`f,� `..� /'�� �� �, _ } ', { • �� ss ...,,.:;-�_ �} ��``:,. :.� `:ram `*� ♦ r � _. 1 �-•.� � ^ +� „"" ,.,.«+r, 4,� � �;li ` +,,,��.r��O J - i f'� sF � `y �� 1 E f NO ell F � rs61 r f ; � J.6.r% f�,.,..r ��i F f 1 � �� � f• } r•" �.. g fi i f d r � � �F r ` : �� .} try �, � � •.�"'� 1 '"� {f � . '•�, ` .. _..�- � .. -. , ,Jj)i� Jff�ft } r � {�%� ��f! µ `'4,r}_�`,.' - A" `� � frt 1 it r1 - N �-�,� x•" N}�rUSGSV NED Excerpt 11" p SEP-D\N2�1Z ar ARO North Carolina Secretary of State Page I of I North Carolina Elaine F Marshall DEPARTMENT QI=-I-I-IE Secretary SECRETARY OF STATE Date: 10/19/2011 PO Box 29622 Raleigh, NC 27626-0622 t919►807-2000 Click here to: View Document Filings i Sign Up for E-Notifications i PC, PLLC, LP and Non -Profit entities are not required to file annual reports. Corporation Names Name Name Type NC CHOWAN LEGAL UNIVERSITY NC CHOWAN COLLEGE PREV LEGAL NC CHOWAN BAPTIST PREV LEGAL FEMALE INSTITUTE Non -Profit Corporation Information SOSID: 0027709 Status: Current -Active Effective Date: 2/28/1905 Dissolution Date: Annual Report Due Date: Citizenship: DOMESTIC State of Inc.: NC Duration: PERPETUAL Registered Agent Agent Name: WHITE, M. CHRISTOPHER Office Address: ONE UNIVERSITY PLACE MURFREESBORO NC 27855 Mailing Address: ONE UNIVERSITY PLACE MURFREESBORO NC 27855 Principal Office Office Address: ONE UNIVERSITY PLACE MURFREESBORO NC 27855 Mailing Address: ONE UNIVERSITY PLACE MURFREESBORO NC 27855 RECEIVED S E P 2 1 2012 DWQ-WARD Officers This website is provided to the public as a part of the Secretary of State Knowledge Base (SOSKB) system. Version: 1282 http://w�N,w.secretary.state.nc.us/corporations/Corp.asps?Pitein I d=4815196 10/ 19/201 1 WET DETENTION POND ANALYSIS - ALL RULES FILE NAME: S:IWQSISTORMWATERIEXCELSPREADSHEETSIPOND1120906 PROJECT#: SW7 120906 REVIEWER: Samir Initial Run Date PROJECT NAME: Chowan University Athletic Facilities Ph 1 Last modified 23-Oct-12 Receiving Stream: Hares Branch Class: Drainage Basin: Chowan -NSW Within 112 mile Y or N SIN Index No, 15.00 Site Area ODrainage Area 8.09 acres square feet DA Area 8.09 acres 352270.00 Rules- "2008" or "Ph2" 2008 IMPERVIOUS AREAS - BUA Runoff C Buildings 281816,00 square feet i user input rec Street square feet 0.98 formula SW square feet 0.95 Future square feet Offsite square feet 77. Other square feet )BUA at dill. DSQ TOTAL square feet 281816.00 square feet SURFACE AREA CALCULATION (with added DA and BUA at different design storm) Overall % Impervious 80.00% SAIDA Ratio 4.70% Average Design Depth 4.5 feet Req. SA 16557 sf TSS, 85 or 90: 85 % Prov. SA 18331 sf TEMPORARY POOL AND FOREBAY VOLUME CALCULATIONS New BUA Old BUA Drainage Area® 352270.00 sf BUA 281816.00 0.00 sf Post development Rv= 0.770 #DIV/01 unitless Old BUA Design Storm inches Old BUA Design Volume 0 1.5" New BUA Design Storm Volume 33906 t yr. 24 hour precipitation depth (inches) 2.90 from NOAA chart Predevelopment Rv value 0.05 Use 0.05 if no existing BUA 1 yr. 24 hr. Pre -development volume 4257 cubic feet 1 yr_ 24 hr. Post -development volume 65552 cubic feet 2008 Design Volume 33906 cubic feet Phase 2 Design Volume 33906 cubic feet Required Volume Top of Sediment Bottom of Shelf Permanent Pool Top of Shelf Temporary Pool Volume met at elev Vol. Prov. at TP 33906 49.00 56.00 56.50 57.00 58.75 58.41 49853.50 ct msl ........ msl......... msl...... ... msl......... msl......... msi cf Area, sf Inc. volume Acc, volume 5812.00 0.00 0.00 15915.00 76044.50 76044.50 18331,00 8561.50 84606.00 21000,00 9832.75 94438.75 24738.00 40020.75 134459.50 FOREBAY Perm. Pool Volume= Req. Forebay Volume= Provided Volume= Percent-- IMax Pumt, HP 84606 16921 16733.00 19.8% Calculated Average Depth. feet 15.25 F 113 ORIFICE CALCULATION Average Head Flow Q2, cfs Flow Q5, cfs No. of Orifices Diameter, inches Drawdown = i yr 24 hr intensity, in/hr Runoff Coefficient 1 yr 24 hr peak Q Orifice Bow<1yr24hr ? feet cfs cis or weir H x W days NOAA chart @t unitless cfs Q2 Area = 6.94 Q5 Area 2.78 Orifice Area = 4.91 Av . Flow Q= 0.139 in x '# of end contractions, N = discharge coefficient, C = Effective weir length, L = sq. inches sq. inches sq. inches cis in 3.33 0.00 0.72 0.196 0.078 1 2.50 2.8 0.12 0.85 0.82 YES -OK Page 1 of 2 LandDesign Transmittal ID: 00005 Date Sent: 9/20/2012 Project: 7512013 CHOWAN UNIVERSITY MAINTENANCE FACILITY Number: 7512013 To: Division of Water Quality - Surface Water Protection 943 Washington Square Mall Washington, NC 27889 From: Steven Keidel LandDesign Subject: Chowan University Athletic Facilities - Phase 1 State Stormwater Review via: Overnight Purpose: For your review and comment Remarks: Attached for submittal: Check Original & copy of application and all associated forms. 2 sets of plans 2 & set of Engineering Calculations. Please let me know if you have any questions. Thanks, Steven Keidel LandDesign CC: Description of Contents Quantity Dated Description 1 9/18/2012 C-0.0.pdf 1 9/18/2012 C-1.0.pdf 1 9/18/2012 C-1.1.pdf 1 9/18/2012 i C-10.0,pdf 1 9/18/2012 C-2.0.pdf 1 9/18/2012 C-2.1.pdf 1 9/18/2012 C-2.2.pdf 1 9/18/2012 C-2.3.pdf 1 9/18/2012 C-2.4.pdf 1 9/18/2012 C-3.0.pdf 1 9/18/2012 C-3.1.pdf 1 9/18/2012 C-3.2.pdf 1 9/18/2012 3 C-3.3.pdf aboutNank 9/20/2012 Page 2 of 2 1 9/18/2012 C-3.4.pdf 1 9/18/2012 C-3.5.pdf 1 9/18/2012 C-4.0.pdf 1 9/18/2012 C-4.1.pdf 1 9/18/2012 C-5.0.pdf 1 9/18/2012 C-5.1.pdf 1 9/18/2012 C-5.2.pdf 1 9/18/2012 C-6.0.pdf 1 9/18/2012 C-6.1.pdf 1 9/18/2012 C-6.2.pdf 1 9/18/2012 C-7.0.pdf 1 9/18/2012 C-7.1.pdf 1 9/18/2012 C-7.2.pdf 1 9/18/2012 C-7.3.pdf 1 9/18/2012 C-7.4.pdf 1 9/18/2012 C-7.5.pdf 1 9/18/2012 C-9.0.pdf 1 9/17/2012 CALL BOOK.pdf 1 9/17/2012 SSW-SWU-101.pdf about:blank 9/20/2012 G r--lC, 04L we r<—C) DWQUSE ONLY Date Received Fee Paid Permit Number a s I— Applicable Rul s: (select all that apply) ❑ Coastal SW - 1995 ❑ Coastal SW - 2008 ❑ Ph 11 - Post Construction ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Managem t Plan ElOther WQ Mgmt Plan: SO State of North Carolina �� � � ��� D Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORIIJPP 2 1 2012 This forty may be photocopied for use as an original 1. GENERAL INFORMATION DWQ—WA RO 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Chowan University Athletic Facilities - Phase 1 2. Location of Project (street address)_ Union Street 1000 ft south of Hassell Drive City: Murfreesboro County: Hertford Zip:27855 3. Directions to project (from nearest major intersection): Turn north from US 158 onto Union Street (SR 1179) Site is approximately .6 miles on the right. 4. Latitude:36° 25' 45.30" N Longitude:-77°_05' 48.79" W_ of the main entrance to the project. H. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑ Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density (—]Drains to an Offsite Stormwater System ❑Other If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ®Sedimentation/Erosion Control: 7.9$ ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b. If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: Form SWU-101 Version 07Jun2010 Page I of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the roiect): Applicant/Organization:M. Christopher White/Chowan University Signing Official & Title:President of Chowan University b.Contact information for person listed in item la above: Street Address:One University Place City: Murfreesboro State:NC Zip:27855 Mailing Address (if applicable). -One University Place City: Murfreesboro State: NC Zi p:27855 Phone: (252 } 398-6250 Fax: Email: Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organizatio Signing Official & Title: b.Contact information for person listed in item 2a above! Street Address: City: Mailing Address (if applicable): Citv: Phone: ( } Email: Sta State: Zip: Fax: f 1 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b.Contact information for person listed in item 3a above: Mailing Address: City: State: Phone: ( } Fax: ( } Email: 4. Local jurisdiction for building permits: Hertford Count Point of Contact:William Earl Phone #: (252 ): 358-7801 Form SWU-101 Version 07Jun2010 Page 2 of G IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. All stormwater runoff on -site will be gathered via drainage structures and directed into a piping system. The System will convey the stormwater to the site BMP (wetpond) and be treated before beingdischargedto the Hares Branch Waterwa . 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.lf claiming vested rights, identifv the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Chowan River basin. 4, Total Property Area: 8.087 ✓ acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:8.087 acres * Total project area shall be calculated to exclude the fo11o7Vh1g fire lronnal pool of impounded structures, the area between. the barks of streams and rivers, the area below the Norrrral High Water (NHVO lice or Mean High Water (MHW) line, and coastal wellmrds landward from the NHW (or MHA line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal zuetlands landward of the NHW (or MHM fine may be included in the total project area. 8. Project percent of impervious area: (Total impervious Area / Total Project Area) X 100 = 80 ✓ % 9• How many drainage areas does the project have?7 (For high density, count I for eaclr proposed engineered stormwater BMP. For low density and other projects, rrse I for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1. Drainage Area _ Drain age Area Drama e Area Receiving Stream Name HARES BRANCH ✓ Stream Class C-NSW V , Stream Index Number * 25-4-6 Total Drainage Area (so 352,270 ✓ 6,()$ymc On -site Drainage Area (sf) 352,270 Off -site Drainage Area (so - - - Proposed Impervious Area s 281,816 ✓ - - Impervious Area** total 80 Irn ervious** Surface Area Drainage Area 1. Draina e Area Drainage Area ° Draina e Area _ On -site Buildings/Lots (so 12,263 On -site Streets (sf) 48,254 On -site Parkin (sf) 16,675 On -site Sidewalks (so 2,232 Other on -site (sf) 64,134 Future (sf) 138,258 Off -site (SO 0 Existing BUA*** (so 0 Total (so) 281,816 Stream Class and Index Nuurber can be determined at. http://dot tal.nr:r�ertr�or� r eb/tu �slcsrr/clrrssi i{:rrt inns Form SWU-101 Version 07Jun2010 Page 3 of 6 * Impervious area is defined as fire built upon area including, bill not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 'Report only that amount of existing BUA that Will remain after developruerrt. Do not report rrtty existing BUA that is to be removed and Which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Proiects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http:/ /12ortal.ncdenr.org/ web/wq/ws/su/bnip-rtiatival. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://12ortal.ncLieiii,.org[,A,eb/%vq/ws/su/stateswZfoi-i-tis does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http//portal.ncdenr.org/web/w(f/tvs/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in bIue ink. Download the latest versions for each submitted application package from liLtLi://12ortil.ncdenr.org/web/ivq/w.s/su/­`statesw/forms does. / Initials V 1. Original and one copy of the Stormwater Management Permit Application Form. �dC. FIA- 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants (if required as per Part VIl below) V1Form. 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M � agreement(s) for each BMP. '/ V 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to httR://www.envhelp.org/pa,ges/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for /additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for V"6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the - receiving stream drains to class SA waters within'/z mile of the site boundary, include the'/z / mile radius on the map. ram' /7. Sealed, signed and dated calculations. .` v 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: ti/a. Development/Project name. ✓b. Engineer and firm. ✓c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. impounded r/ • Delineate the vegetated buffer landward from the normal pool elevation of structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. i/ j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. I. Details of roads, drainage features, collection systems, and stormwater control measures. ✓ m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. Form SWU-101 Version 07]un2010 Pate 4 of 6 Drainage areas delineated (included in the main set of plans, not as a separate document). Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x1l" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to vernfij the SHWF prior to submittal, (9I0) 796-7378.) 10. A copy of the most current property deed. Deed book: 337 Page No: 214 V 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. htt�:/ www,secretar ..state.nc.us/Corporations/CSearch.asl2x VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from htlp://portal.ncdenr.orgZweb/wg1ws/su/statesw/forms_docs. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:David Gastel _ Consulting Firm: LandDesign, Inc. Mailing Address:19 W. Hargett Street _ City:Raleigh State:NC Zip:27601 Phone: (919 ) 838-9331 Fax: i919 L 800-3583 Email:dgastel@tanddesign.com IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, itenn 2 has been filled out, complete this sections) 1, (print or type name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, itent 1a) with (print or type nnanne of organization listed in Contact Information, item It?) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 07Jun2010 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: a Notary Public for the State of do hereby certify that before me this _ day of Date: County of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seat, SEAL My commission expires. X. APPLICANT'S CERTIFICATION 1, (print or type nante of person listed in Contact Mfonnation, item la) M. Christopher VAite certify that the information included on this permit appli tion form is, to the best of my knowledge, correct and that the project will be constructed in conformance with lie approved plans, that the required deed restrictions and protective covenants will be recorded, and that t oposed project complies with the requirements of the applicable storm wa t /r�rules un r S NCAC�2H .1 SL 2006-246 {Ph. I I - Post Constr%�ion} or SL 210_Q8-1�1. r Signature: A I/ f _. �� V l Da 0 11:�t. a Notary JPiblic ford the County of VA 244A do hereby certify that L.AR tA�yV ft—L.TQ-, personally appeared before m is b may of ticia andnowledge the due exe on of the application fora stormwater permit. Witness my hand and ol seat SEAL My commission expires J-o 1 5- Form SWU-101 Version 07Jun2010 Page 6 of 6