HomeMy WebLinkAboutSW7061119_CURRENT PERMIT_20150615STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW
DOC TYPE
� CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
DOC DATE
ei(Jl S/�G l5
YYYYMMDD
AT�®��
�CDEN�
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
June 15, 2015
Mr. James A Mason, Owner
790 Pitts Chapel Road
Elizabeth City, NC 27909
Subject: Stormwater Permit No. SW7061119 -
- Plan Revision & Ownership Change
790 Pitts Chapel Road
High Density Project
Pasquotank County
Dear Mr. Mason:
Don Van der Vaart
Secretary
The Washington Regional Office received a complete Stormwater Management Permit
Plan Revision and ownership/name change Application for the 790 Pitts Chapel Road
(former Lot 1, Spruill Industrial Park) project on May 14, 2015. Staff review of the plans
and specifications has determined that the project, as proposed, will comply with the
Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit
No. SW7061119 dated June 15, 2015, for the construction of the subject project.
This permit shall be effective from the date of issuance until December 15, 2020, shall void
permit SW7061119 issued on December 15, 2006 and shall be subject to the conditions
and limitations as specified therein. Please pay special attention to the Operation and
Maintenance requirements in this permit. Failure to establish an adequate system for
operation and maintenance of the stormwater management system will result in future
compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you
have the right to request an adjudicatory hearing upon written request within thirty (30)
days following receipt of this permit. This request must be in the form of a written petition,
conforming to Chapter 150B of the North Carolina General Statutes, and filed with the
Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714.
Unless such demands are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please
meat (252) 946-6481.
Sincerely,
Samir Dumpor, PE
Environmental Engineer
PHMISD: G:1LR1SWPISDIPermits-wet pond 1SW7061119
Division of Energy, Mineral, and Land Resources . Land Quality Section
Washington Regional Office
943 Washington Square Mall, Washington, North Carolina 27889 • Phone: 252-946-64811 FAX: 252-975-3716
Internet: http://2ogal.ncdenrorg/web/Ir/land-quality_
An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper
cc: Michael Morway, PE, Albemarle & Associates, Ltd.
Elizabeth City Building Inspections
Washington Regional Office
Henry Revelle, Revelle Development, Inc. (PO Box 357, Murfreesboro, NC
27855)
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
James A. Mason
790 Pitts Chapel Road
Pasquotank County
FOR THE
construction, operation and maintenance of a wet detention pond in compliance with the
provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules") and
the approved stormwater management plans and specifications and other supporting
data as attached and on file with and approved by the Division of Energy, Mineral, and
Land Resources (Division) and considered a part of this permit.
This permit shall be effective from the date of issuance until December 15, 2020, and
shall be subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.5 on page 3 of this permit. The stormwater
control has been designed to handle the runoff from 87,224 square feet of
impervious area.
3. The tract will be limited to the amount of built -upon area indicated on page 3 of
this permit, and per approved plans.
4. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
5. The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system per
approved plans.
Page 2 of 7
6. The following design criteria have been provided in the wet detention pond and
must be maintained at design condition:
a. Drainage Area, acres:
b. Total Impervious Surfaces, ft2:
proposed: 86,030
future: 1,194
C. Design Storm, inches:
d. Pond Depth, feet:
e. TSS removal efficiency:
f. Permanent Pool Elevation, FMSL:
g. Permanent Pool Surface Area, ft2:
h. Permanent Storage Volume, ft3:
i. Permitted Forebay Volume, ft3:
Temporary Storage Elevation, FMSL
k. Temporary Storage Volume, ft3:
I. Controlling Orifice:
M. Receiving Stream/River Basin:
n. Stream Index Number:
o. Classification of Water Body:
11. SCHEDULE OF COMPLIANCE
4.99
87,224
1.0
7.00
90%
5.00
18,329
67,278
15,943
5.40
7,619
1.50" � pipe
Pasquotank River/ Pasquotank
30-3-(12)
a
1. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance
necessary to assure the permitted stormwater system functions at optimum
efficiency. The approved Operation and Maintenance Plan must be followed in its
entirety and maintenance must occur at the scheduled intervals including, but not
limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of outlet structure, orifice device, flow
spreader, catch basins and piping.
g. Access to the outlet structure must be available at all times.
Page 3 of 7
4. Records of maintenance activities must be kept and made available upon
request to authorized personnel of the Division of Energy, Mineral, and Land
Resources. The records will indicate the date, activity, name of person
performing the work and what actions were taken.
5. The facilities shall be constructed as shown on the approved plans. This permit
shall become voidable unless the facilities are constructed in accordance with the
conditions of this permit, the approved plans and specifications, and other
supporting data.
6. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A
modification may be required for those deviations.
7. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
8. Access to the stormwater facilities shall be maintained via appropriate
easements at all times.
9. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project
area. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMA
Major permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
10. The permittee shall submit final site layout and grading plans for any permitted
future areas shown on the approved plans, prior to construction.
11. A copy of the approved plans and specifications shall be maintained on file by
the Permittee for a minimum of ten years from the date of the completion of
construction.
12. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
13. This permit shall be effective from the date of issuance until December 15, 2020.
Application for permit renewal shall be submitted 180 days prior to the expiration
date of this permit and must be accompanied by the processing fee.
Page 4 of 7
III. GENERAL. CONDITIONS
This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a formal permit transfer request to the Division, accompanied by a
completed name/ownership change form, documentation from the parties
involved, and other supporting materials as may be appropriate. The approval of
this request will be considered on its merits and may or may not be approved.
The permittee is responsible for compliance with all permit conditions until such
time as the Division approves the transfer request.
2. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division, in accordance with
North Carolina General Statute 143-215.6A to 143-215.6C.
3. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal) having jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation of .
nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
5. The permittee grants DENR Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted.
stormwater management facility.
6. The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and reissuance or
termination does not stay any permit condition.
7. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
8. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
9. The permittee shall notify the Division of any name, ownership or mailing
address changes within 30 days.
Permit issued this the 15th day of June, 2015.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
/
for
Tracy E. Davis, PE, CPM
Division of Energy, Mineral, and Land Resources
By Authority of the Environmental Management Commission
Permit Number SW7061119
Page 5 of 7
790 Pitts Chapel Road
Stormwater Permit No. SW7061119
Pasquotank County
Designer's Certification
I, , as a duly registered
in the State of North Carolina, having been authorized to observe (periodically/ weekly/
full time)'the construction of the project,
(Project)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL
Page 6 of 7
Certification Requirements:
1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
5. The outlet/bypass structure elevations are per the approved plan.
6. The outlet structure is located per the approved plans.
7. Trash rack is provided on the outlet/bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
12. Required drawdown devices are correctly sized per the approved plans.
13. All required design depths are provided.
14. All required parts of the system are provided, such as a vegetated shelf,
and a forebay.
15. The required system dimensions are provided per the approved plans.
cc: NCDENR-DEMLR Regional Office
Elizabeth City Building Inspections
Page 7 of 7
State of North Carolina •• '--
Department of Environment and Natural Resources
Division of Water Quality M AY 14 2015
STATE STORMWATER PERMIT NAME/OWNERSHIP CHANGE FORM
I. CURRENT PERMIT INFORMATION''
1. Stormwater Management Permit Number: s117061119
2. Project Name: Lot 1, Spruill Industrial Park Y
3. Current Permit Holder's Company Name/Organization: Revelle Development, Inc.
4. Signing Official's Name: Mr. Henry Revelle ✓ Title: President
5. Mailing'Address: Po Box 357
City: Murfreesboro State: NC Zip: 27855
6. Phone: z( 52 ` 398-4116 Fax:
11. PROPOSED PERMITTEE / OWNER I PROJECT 1 ADDRESS INFORMATION
This request is for: (please check all that apply)
0 Name change of the owner (Please complete Items 1, 2 and 3 below)
❑ Name change of project (Please complete Item 5 below)
❑ Change in ownership of the property/company (Please complete Items 1, 2, 3, and 4 below)
❑ Mailing address / phone number change. (Please complete Item 4 below)
❑ Other (please explain): ��»'►
1. Proposed permittee's company name/organization:_ _ �a�w.es A. N1a.son
2. Proposed permittee's signing official's name:
3. Proposed permittee's title:
4. Mailing Address: 790 Pitts Chapel Rd.
City: Elizabeth City State: NC ___Zip: 27909
Phone: 2( 52 338-3916 fax:-(
5. New Project Name to be placed on permit: 19 o P;4+s C-],npal (ZdP— {
Please check the appropriate box. The propes ed perm Mee listed above is:
❑ HOA or POA (Attach documentation showing that t e 6A or POA owns, controls, or has a
recorded easement for all areas that contain stormwater system features. Print name of HOA or
POA in #1 above and provide name of HOAPOA's authorized representative in #2 above)
71 The property owner
❑ Lessee (Attach a copy of the lease agreement and complete Property Owner Information on
page 4)
❑ Purchaser (Attach a copy of the pending sales agreement. Final approval of this transfer will be
granted upon receipt of a copy of the recorded deed)
❑ Developer (Complete Property Owner Information on page 4)
SSW N/O Change Rev24Sept2012 Page 1 of 4
f. '
III. REQUIRED ITEMS
A request to transfer a permit will not be approved by the Division of Water Quality (DWQ) unless all
of the applicable required items listed below are included with the submittal. Failure to provide the
listed items may result in processing delays or denial of the transfer.
1. This completed and signed form_�This certification mustrvbe completetl~aoid`signecf` byboth'`fh`e
current permit holderand th nnew applicant if,this' iis achange_of. _ownership!
2. Legal 4documentation ofLLthe proYperty transfer to a new owner.
3. A copy of any recorded deed restrictions, covenants, or easements, if required by the permit.
4. The designer's certification (DWQ Engineer and Designer Certification Forms are available from
each DWQ Regional office), if required by the permit and if not already submitted to DWQ.
6. If the proposed permittee is a firm, partnership, association, institution, corporation, limited liability
company, or other corporate entity, provide documentation showing the authority of the named
representative to act on behalf of the proposed permittee.
6. The $40.00 processing fee. If this is an initial transfer from the original permittee the processing
fee is not required. Subsequent ownership transfers will require the $40.00 processing fee.
IV. CURRENT PERMITTEE'S CERTIFICATION
Please check one of the following statements and fill out the certification below that statement.
[] Check here if the current per m. ittee is only changing his/he�iits name, the project f lame, or mailing -
address, but will retain the permit. I, , the current
permittee, hereby notify the DWQ that I am changing my name and/or I am changing my mailing
address and/or I am changing the name of the permitted project. I further attest that this application
for a name/ownership change is accurate and complete to the best of my knowledge. 1 understand
that if all required parts of this application are not completed or if all required supporting information
and attachments listed above are not included, this application package will be returned as
incomplete.
0 Check here if current permittee is transferring the property to a new owner and will not retain
ownership of the permit.
I, the current permittee, am submitting this application
for a transfer of ownership for permit # mm( i179 I hereby notify DWQ of the sale or
other legal transfer of the stormwater system associated with this permit. I have provided a copy of
the most recent permit, the designer's certification for each BMP, any recorded deed restrictions,
covenants, or easements, the DWQ approved plans and/or approved as -built plans, the approved
operation and maintenance agreement, past maintenance records, and the most recent DWQ
stormwater inspection report to the proposed permittee named in Sections II and V of this form.
further attest that this application for a name/ownership change is accurate and complete to the best
of my knowledge. I understand that if all required parts of this application are not completed or if all
required supporting information and attachments listed above are not included, this application
package will be returned as incomplete. I assign all rights and obligations as permittee to the
proposed permittee named in Sections II and V of this form. I understand that this transfer of
ownership cannot be approved by the DWQ unless and until the facility is in compliance with the
permit.
Signature::�z Wt/v ?rtr' ,(�,��' Date:
I, a Notary Public for the State of
rr4h L' na County of (aD r tdo hereby certify that
personally appeared before me this the
15} day of , 20 1 S , and acknowledge the due execution of the
forgoing instrument. Witn ss my kand and official seal, ��� pal)
Not ry Signature a ya:
O
ME
SSW N/O Change Rev24Sept2012 Page 2 of 4
Cou �,��,''�� 1, +`��
V. PROPOSED PERMITTEE CERTIFICATION: (This section must be completed by the
Proposed Permittee for all transfers of ownership)
Imo. a. , hereby notify the DWQ that I have acquired
thr gh sale, lease or legal transfer, the responsibility for operating and maintaining the permitted
sto water management system, and, if applicable, constructing the permitted system. I
acknowledge and attest that I have received a copy of: (check all that apply to this permit)
the most recent permit
the designer's certification for each BMP
❑ any recorded deed restrictions, covenants, or easements
® the DWQ approved plans and/or approved as -built plans
0 the approved operation and maintenance agreement
epast maintenance records from the previous permittee (where required)
DWQ stormwater inspection report showing compliance within 90 days prior to this transfer
have reviewed the permit, approved plans and other documents listed above, and I will comply with
the terms and conditions of the permit and approved plans:I acknowledge and agree that I will
operate and maintain the system pursuant to the requirements listed in the permit and in the
operation and maintenance agreement. I further attest that this application for a name/ownership
change is accurate and complete to the best of my knowledge. I understand that if all required parts
of this application are not completed or if all required supporting information and attachments listed
above are included, this application package will be returned as incomplete.
Signature: Cr• nlA_0_ � Date: S 141115
)�, arc-., Bc te_ , a Notary Public for the State of
C sr b l , County of IP o4$I u...o t a.%k , do hereby certify that
YY1 ar s . personally appeared before me this the
`i day of +M y , 20 157, and acknowledge the due execution of the
forgoing instrument. Witness my hand and official seal,
'h Vi '�� Notar �¢� K. BitITE
Notary Signature Notary Pub7i. North Carolina
►Y 9 Camden county
My Commission Expires
Max 06, 2018
Additional copies of the original permit and the approved Operation and Maintenance agreement can
be obtained from the appropriate Regional Office of the Division of Water Quality.
This completed form, including all supporting documents and processing fee (if required), should be
sent to the appropriate Regional Office of the North Carolina Department of Environment and Natural
Resources, Division of Water Quality, as shown on the attached map.
Please note that if the Proposed Permittee listed above is not the property owner, the property owner
must complete and sign page 4 of this document. Both the lessee / developer and the property
owner will appear on the permit as permittees.
SSW N/4 Change Rev24Sept2012 Page 3 of 4
s
1 .h .'j .... __ _ ..fil
• � i !
• y _.�
Z
' 1
' � �! •�I '•Pi.4
.r .. � a tie aw a..
VI. PROPERTY OWNER CONTACT INFORMATION AND CERTIFICATION
If the Proposed Permittee listed in Sections II and V of this form is not the Property Owner, the
Property Owner must provide his/her Contact Information below and sign this form:
Printed Name:
Organization:
Title within the Organization:
Street Address:
City:
Mailing Address:
City:
Phone:
Email:
State:
(if different from street address)
State:
Fax:
Zip:
LM
certify that I own the property identified in this permit transfer document and have given permission
to the Proposed Permittee listed in Sections II and V to develop and/or, lease the property. A copy
of the lease agreement or other contract, which indicates the party responsible for the construction
and/or operation and maintenance of the stormwater system, has been provided with the submittal.
As the legal property owner I acknowledge, understand, and agree by my signature below, that I will
appear as a permittee along with the lessee/developer and i will therefore share responsibility for
compliance with the DWQ Stormwater permit. As the property owner, it is my responsibility to notify
DWQ by submitting a completed Name/Ownership Change Form within 30 days of procuring a
developer, lessee or purchaser for the property. I understand that failure to operate and maintain the
stormwater treatment facility in accordance with the permit is a violation of NC General Statute
(NCGS) 143-215.1, and may result in appropriate enforcement action including the assessment of
civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6.
Signature of the property owner
M
Date:
a Notary Public for the State of
County of , do hereby certify that
personally appeared before me this the
day of , 20�, and acknowledge the due execution of the
forgoing instrument. Witness my hand and official seal,
(Notary Seal)
Notary Signature
SSW N/O Change Rev24Sept2012 Page 4 of 4