Loading...
HomeMy WebLinkAboutSW7061003_CURRENT PERMIT_20200608STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE DOC DATE YYYYMMDD ROY COOPER Governor MICHAEL S. REGAN Secrerary BRIAN WRENN Director NORTH CAROLINA Environmental Quality June 8, 2020 Albemarle Electric Membership Corporation Attention: Mr. Gary Ray, Executive VP/General Manager P.O. Box 69 Hertford, NC 27944-0069 Subject: Stormwater Permit No. SW7061003 Renewal Morgans Corner Substation High Density Project Pasquotank County Dear Mr. Ray: The Washington Regional Office received a complete Stormwater Management Permit Application for renewal for the Morgans Corner Substation located on Firetower Road near Elizabeth City, NC on May 11, 2020. Staff review of the application and supporting document has determined that the permit can be renewed. We are forwarding Permit No. SW7061003 dated June 8, 2020, for the construction and continued operation of the subject project. This permit shall be effective from October 31, 2020 until October 30, 2028 and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within sixty (60) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact me at (252) 948-3923. Sincerely, Roger K. Thorpe Environmental Engineer Washington Regional Office North Carolina Department of EnvWonmental Quality I Division of Energy. Mineral and Land Resources Wayhingtan Regional Offire 1 943 Washington Square Niall ? Washingron. North Carolina 27889 oawrtmmrot [mvmnw,utown� 7g�q,l h.p•l$I STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Albemarle Electric Membership Corporation Morgans Corner Substation Located on Firetower Road, Elizabeth City, NC Pasquotank County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral, and Land Resources (Division) and considered a part of this permit. This permit shall be effective from October 31, 2020 until October 30, 2028, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The stormwater control has been designed to handle the runoff from 1.08 acres of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in Section 1.7 of this permit, and per approved plans. r 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system per approved plans. 6. Final plans including site layout and drainage for the "Future" area shall be submitted and approved by the Division prior to the construction of any of the future impervious area. 7. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: 2.30 b. - Total Impervious Surfaces, acres: 1.08 C. Design Storm, inches: 1.0 d. Pond Depth, feet: 3.00 e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMSL: 6.00 g. Permanent Pool Surface Area, ft2: 6,000 h. Permanent Storage Volume, ft3: 13,356 i. Permitted Forebay Volume, ft3: 2,744 j. Temporary Storage Elevation, FMSL: 7.00 k. Temporary Storage Volume, ft3: 7,890 I. Controlling Orifice: 1.50" � pipe M. Receiving Stream / River Basin: Newland Drainage Canal 1 Pasquotank n. Stream Index Number: 30-3-1.5 o. Classification of Water Body: "C; Sw" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 13. This permit shall be effective from October 31, 2020 until October 30, 2028. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and ail statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DEQ Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. Permit issued this the 8 th day of June 2020. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Brian Wrenn, Director Division of Energy, Mineral, and Land Resources By Authority of the Environmental Management Commission Stormwater Permit No. SW7061003 f 1v F*-.r A Date Received Fee Paid Permit Number S 1i 1 1 !7-0- s, o s,v 7 0 a J o o, -� J� NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3) the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION RECEIVED MAY 1 POTO 1, State Stormwater Permit Number: SW7061003 2. Project name: Morgans Corner Subtation - 3. Project street address: Firetower Road City: Elizabeth City County: Pasquotank ZIP: 27909 4. What, if any, changes have been made to the project as permitted? No changes If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at: https://deg.nc.gov/about/divisions/energv- mineral-land-resources/energy- min era l-land-rules/stormwater-program/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at.- https://deg.nc.gov/about/divisions/energy-mineral-land- resources/energy- min era l-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: Albemarle Electric Membership Corporation 2. Signing Official's Name: Gary Ray 3. Signing Official's Title: Executive Vice President/General Manager 4. Mailing Address: PO Box 69 City: Hertford State: NC ZIP: 27944-0069 5. Street Address: 125 Cooperative Way City: Hertford State: NC ZIP : 27944 6. Phone: J 426-5735 Email: Gary.Ray(Maemc.com Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW%ORM. Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: 1. A permit application processing fee of $505.00 payable to NCDEQ. 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following. a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BLIA per lot or maximum total BllA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. 4. O&M Agreements, Please select one: ® 1 have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. Designer Certifications, Please select one: ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc.gov/online services/search/by_title/ Business_ Registration Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION I, GCknJ W , �\( , the person legally responsible for the permit, certify that I have a copy of thb Permit and C&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my knowledge, co ct and c plete. Signature: Date: S S tiOUO NOTARIZATION: I, Evt 2 oaa_� �K , f�\On5 , a Notary Public for the State of iyC -a r,6_, ncr , County of CV\nI&\ t!, , do hereby certify that personally appeared before me this the 15 *- -\ day of DOCK4 _ 20`;tC), and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, (Notary Seal) Notary Signature: My commission expires -�O%q Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 Albemarle EMC Date : 10/19/2006 Morgan's Corner 115 kV to 15 x 20 kV Substation Run By : BDM Erosion and Sediment Control & Stormwater Management Plan Page : 1 of 1 ,,,�u Wet Detention Basin Calculation ,`, . �I,A J11� Drainage Area (DA) : 1.64 Acres Impervious Area (IA) : 1.08 A s i Percent Impervious, (1) = 66 % n� 762 •�- :� ItNGINEE�;,.• Pond Design Criteria: "RlS I,�I�TI A I/llmsti iii Permanent Pool Elevation : 6 Ft. Design Storm (DS) : 1 In. t'a Permanent Pool Length (L) : 150 Ft. Total Suspended Solids (TSS) : 90 % Permanent Pool Width (W) : 40 Ft. Note : if TSS = 90%, No VegffEMY � Permanent Pool Depth (D) : 3 Ft. 11r) MinimumRequired Surface Area At Permanent Pool: (Refer to Surface Area to Drainage Area Ratio Table 3.3-3) Surface Area to Drainage Area Ratio: SA/DA = 7.70 %PROD # Required Permanent Pool Surface Area (RPPSA) : SA/DA x DA = 5501 Sq. Ft. Actual Permanent Pool Surface Area (PPSA) : 6000 Sq. Ft, Actual Permanent Pool Volume (PPV) : 13356 Cu. Ft. OCT 2 0.2006 DWQ (PPSA > RPPSA) Minimum Required Tempora►y.Pool Area & Volume (Simple Method by Tom Schuler) . Runoff Coefficient (Rv) : 0.05 f 0,009 x I = 0.64 Required Temporary Pool Volume (RTPV) : DS x Rv x DA = 3826 Cu. Ft. Minimum Depth of Temporary Pool : 0.64 Ft. Actual Depth of Temporary Pool : 1.0 Ft. Temporary Pool Elevation : 7.0 Actual Temporary Pool Surface Area (TPSA) : 9780 Sq. Ft. Actual Temporary Pool Volume (TPV) : 7890 Cu. Ft. (TPV > RTPV) Minimum Required ForebaV Area & Volume: Required Forebay Volume (RFV) : 20% x PPV = 2671 Cu. Ft. Acutal Forebay Length : 34.00 Ft. Actual Forebay Surface Area (FSA) : 1360 Cu. Ft. Actual Forebay Volume (FV) : 2744 Cu. Ft. (FV > RFV) Orifice Sizing : Required Flowrate for a 2 Day Drawdown (RF2) : TPV 1 172800 seconds = 0.05 Cfs Required Flowrate for a 5 Day Drawdown (RF5) : TPV 1432000 seconds = 0.02 Cfs Orifice Diameter: 1.5 In. Average Head (h) = 0.47 Ft. Actual Flowrate (AF) : Cp*A*SQRT[2*g*hl = 0.04 Cfs (RF2 < AF < RF5) Copyright 2006 Booth & Associates, Inc.