Loading...
HomeMy WebLinkAboutSW7060904_CURRENT PERMIT_20061122STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW 7G�(1Q0� ❑OC TYPE � CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE DOC DATE ZBDIo/lsi'oi YYYYMMDD Michael F. Easley, Governor .= o�o� W a rE,�QG Mr. Kenneth I. Peregoy, Carolina Creek, LLC 119 Middle Street New Bern, NC 28560 Dear Mr. Peregoy: William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality November 22, 2006 Member/Manager Subject: Stormwater Permit No. SW7060904 Carolina Colours — Amenity Campus High Density Subdivision Project Craven County The Washington Regional Office received a complete Stormwater Management Permit Application for Carolina Colours — Amenity Campus on November 20, 2006. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7060904, dated November 22, 2006, for the construction of the subject project. This permit shall be effective from the date of issuance until November 22, 2016, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Scott Vinson, or me at (252) 946-6481. Pincerely, Al Hodge Regional Supervisor Surface Water Protection Section AHlsav: C:ISTORMWATERIPERMIT1SW7060904 cc: Richard Collier, PE Craven County Building Inspections ✓111lashin ton Regional Office Central Tiles N�On,�` Carolina Naturally North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6481 FAX (252) 946-9215 Customer Service Internet: www ncwaterguality.org 943 Washington Square Mall, Washington, NC 27889 1-877-623-6748 An Equal OpportunitylAffirmatve Action Employer — 50% Recycled110% Post Consumer Paper State Stormwater Management Systems Permit No. SW7060904 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Carolina Creek, LLC Carolina Colours — Amenity Campus Craven County FOR THE construction, operation and maintenance of two wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until November 22, 2016 and shall be subject to the following specified conditions and limitations: 1. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater controls have been designed to handle the runoff from 4.88 acres of impervious area to Pond #1 and 1.79 acres of impervious area to Pond #2. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. The runoff from all built -upon area within the permitted drainage. areas of this projectmust be directed into the permitted stormwater control system. 4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 2 of 7 State Stormwater Management Systems Permit No. SW7060904 6. The following design elements have been permitted for these wet detention pond stormwater facilities, and must be provided in the system at all times. Drainage Areas: POND #1 POND #2 a. Drainage Area, acres: 12.37 3.68 b. Total Impervious Surfaces, ft2: 212,480 77,945 c. Pond Depth, feet: 6.00 4.00 d. TSS removal efficiency: 90% 90% e. Design'Storm: f. Permanent Pool Elevation, FMSL: 18.00 22.00 g.. Permitted Surface Area @PP, ft2' 41,962 13,421 h. Storage Elevation, FMSL: 19.00 22.50 i. Permitted Storage Volume, ft3: 44,912 7,293 j. Controlling Orifice: 3.00" 1.75" O pipe k. Receiving Stream / River Basin: LIT to Lees Branch 1 Neuse I. Stream Index Number: 27-101-40-4 m. Classification of Water Body: "C; Sw, NSW" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 3 of 7 State Stormwater Management Systems Permit No. SW7060904 5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance ccrdance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and -Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 13. This permit shall be effective from the date of issuance until November 22, 2016. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. 14. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. Page 4 of 7 State Stormwater Management Systems Permit No. SW7060904 ' III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of.a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 9. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. Permit issued this the 22"d day of November, 2006 NORTH CA LINA ENVIRONMENTAL MANAGEMENT COMMISSION �--� for Alan W. Klimek, P.., Director Division of Water Quality By Authority of the Environmental Management Commission Permit No. SW7060904 Page 5 of 7 State Stormwater Management Systems Permit No. SW7060904 Carolina Colours — Amenity Campus Stormwater Permit No. SW7060904 Craven County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW7060904 Certification Requirements: .1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built - upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are 'no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. M. NCDENR-DWQ Regional Office Craven County Building Inspections Page 7 of 7 OFFICE USE ONLY Date Received Fee Paid Pernntt Number ac(d i+`� r State of North Carolina Department of Environment and Natural Resou'wxs Division of Water Quality -"zC 'V4 STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form maybe photocopied for use as an original OCT 17 2006 Dpr � L GENERAL INFORMATION PRod 1. Applicants name (specify the. name of the corporation, individual, etc. -who owns the project): Carolina Creek, LLC 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Kenneth I. Pere2ov 3: Mailing Address -for person listed.in item 2 above: 119 Middle Street City: New Bern State: NC Zip: 28560 Telephone Number: 252 ) 636-3700 - 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name_ on plans, specifications, letters. operation and maintenance agreements, etc.): Carolina Colours Amenity Campus 5. Location of Project (street address): Intersection of Waterscape Way and Wilcox Road City: New Bern County: Craven 6. Directions to project (from nearest major intersection): From the intersection of Thurman Road West and Hwy 70 make immediate left at split onto Waterscape way. Approximately 1 mile south, located at prior intersection with Wilcox Road. 7. Latitude; N 35° _1'. 12"_ Longitude: W 770 0' 46" of project 8. Contact person who can answer questions about the project: Name: Frir. Frank Telephone Number: ( 252 ) 633-5899 I1. PERMIT INFORMATION: 1. Specify whether project is (check one): _XNew Renewal Modification Form S\VU-101 Version 3.99 Page 1 of 4 2; If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit nu"mbcr N/A and its issue date (if known) N/A 3. Specify the type of project (check one): Low Density X High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable. blanks): _CAMA Major X Sedimentation /ErosiomControl X 404/401 Permit _NPDES Storrnwater Information on required state permits can be'obtained by contacting the Customer Service Center at 1-877-623 f748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative. (one to two pages) describing stormwater management for the project. Stormwater shall be collected in 2 wet detention ponds and treated through settling, and nutrient uptake. Goals are 85% TSS removal and 35% TN removal. 2. Stormwater runoff from this project drains to the. Muse 3. Total Project Area: 19.0 acres 5: How many drainage areas does the project, have? 4 River basin. 4, Project built Upon Area: 35.9 9'0 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach.an additional sheet with the information for each area provided in the same fori-nat as below. W101MIN Wr[6l:fu'1WON I Basin Information Drainage Area 1, Drairage Area 2 Receiving Streatn,Name Receiving Stream Class Drainage Area Existing Impervious* Area Proposed [mpe1_vi0us*Area % Impervious* Area (total) Impervious* Surface Area. Drainage Area.] Drainage Area 2 On -site Buildings On -site Streets On -site Parking On -site Sidewalks Other on -site Off -site Total: Total': * Impervious area is rlelyned as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks,.gravel areas, etc. Form SVWU-101 Version 3.99 Page 2 of 4 Basin Information Drainage Area I Drainage Area 2 Entire Project Area Receiving Stream Name Lee's Branch Lee's Branch Lee's Branch Receiving Stream Class C,SW,NSW C,SW,NSW C,SW,NSW Drainage Area 539,010 sf 160,299 sf 827,640 s Existing Impervious Area 0 sf 0 sf 0 s Proposed Impervious Area 212,480 sf 77,945 sf 296,801 s % Impervious Area 39,42% 48.62% 35.86% Impervious Surface Area Drainage Area 1 - Drainage Area 2 Entire Project Area On site Buildings 34,625 sf 6,464 sf 41,089 s On Site Streets 32,019 sf 0 sf 38,395 s On Site Parking 104,814 sf 0 sf 104,814 s On Site Sidewalks 35,344 sf 6,296 sf 41,640 s On Site Other 5,678 sf 65,185 sf 70,863 s Off Site 0 sf 0 sf 0 s Total Impervious 212,480 sf 77,945 s 296,801 s 7 Flow was the off -site impervious area listed above derived? NIA IV. DEED RESTRICTIONS AND PROTECTIVE. COVENANTS NIA The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of "later Quality: These covenants may not be changed or deleted without the consent of the. State. No more than square feet of any. lotshall be covered by structures or impervious materials. Impervious materials; include.asphalt, gravel, concrete, brick, stone; slate or similar material but do "not include wood decking or the'water surface ofswin)thing pools. 3. Swales shall not. be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5.. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control_systein shall be performed in a manner that.maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and' protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, 'that the required covenants cannot be changed -or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENTFORMS The applicable state stormwater management permd'supplernent form(s) listed below must be submitted for each BIVIP specified for this project. Contact.the Stormwater and General Permits Unit at (919) 73.3-5083 for the status and -availability of these forms. Form SWU-102 Wet0etention-Basin Supplement Forth SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlef.Systern Supplement Form SWU-IOG Off -Site Systern.Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative. Best Management Practice Supplement Form SWU=101 Version 3.99 Page 3 of . V.I. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. 1. Please indicate that you have provided the following required information by initialing in thespace provided next to each item. Initials Original and one copy, of the Stormwater Managernent Permit Application Form • One copy,of the applicable Supplement Form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) •. Detailed narrative description of storrrrwater treatment/management :• Two copies of plans and specifications,.including: - Development/Project napie - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed cont.burs, spot elevations, finished floor elevations - Details of roads, drainage features, collection'systems, and stormwater control measures - Wetlands delineated, or, a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe si-/.es, runoff calculations Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual dr firm so that they may provide information on your behalf, please. com�lete.this section. Designated agent (individual or firm): Eric Frank, PE McKim and Creed, PA Mailing Address:. 2807 Neuse Boulevard, Building 5 City.-----N,-W-Bem, State: Zip: 29562 Phone: ( 252 ) 633-5899 Fax: ( 252 ) 633-6551 VIII. APPLICANT'S CERTIFICATION 1, (print or type nine of person listed in, General Information, iteln 2) Kenneth I. Peregoy certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000. / A Signature: Date: Form SWU-101 Version 399 Page 4 of 4 ' Permit No. S W 7 o ( ,950Y (to he provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form inay be photocopied for use as an original DWQ Stormwater Management Plan Review: 0 A complete stormwater management plan submittal includes a wet detention basin supplement for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. I. PROJECT INFORMATION (please complete the following information): Project Name: Carolina Colours Amenity C Contact Person: Kenneth 1. Peregoy Phone Number: 252-636-3700 For project with multiple basins, specify which basin this worksheet applies to: Pond #1 Elevations Basin Bottom Elevation 12.00 ft. (floor of the basin) Permanent Pool Elevation 18.00 ft. (elevation of the orifice) Temporary Pool Elevation 19.00 ft. (elevation of the discharge structure overflow) Area Permanent Pool Surface Area 41,962 sq. ft. (water surface area at the orifice elevation) Drainage Area 12.37 ac. (on -site and off -site drainage to the basin) Impervious Area 4.88 ac. (on -site and off -site drainage to the basin) Volumes Permanent Pool Volume 114,471 cu. ft. (combined volume of main basin and foreba)) Temporary Pool Volume 44,912 cu. ft. (volaune detained above the permanent pool) Forebay Volume 22,266 cu. ft. (approximately 20% of total voluine) Other parameters SA/DA' 2.05 (surface area to drainage area ratio from DWQ table) Diameter of Orifice 3 in. (2 to 5 day temporary pool draw-doivn required) Design Rainfall 1 in. Design TSS Removal 2 90 % (ntinitnum 85% required) Form: SWU-102 Rev. 3.99 Page 1 of 4 " FootYtotes: t When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. The requirement for a vegetative filter may be waived if the wet detention basin is designed to meet 90% TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. if a requirement has not been met, attach justification. Applicants Initials f;' a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). f 'q b. The forebay volume is approximately equal to 20% of the basin volume. q17 c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow NON: t—!94 21 t { c calculations) ZL'`�- f. The basin length to width ratio is greater than 3:1. g. The basin side slopes above the permanent pool are no steeper than 3:1. h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. J. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest .e �t right-of-way. 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use a wet detention basin. m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) (EJ) does (®) does not incorporate a vegetated filter at the outlet. This system (check one) (Q) does (®) does not incorporate pretreatment other than a forebay. Form: SWU-102 Rev. 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately; re -seed as necessary to maintain good vegetative cover, now vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 13 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 13 feet in the fore bay, the sediment shall be removed. BASIN DIAGRAM (fill rn Me blanks) Permanent Pool Elevation 18 Sediment Remova�li - -13 �5/ Sediment Removal Elevation 13 5 Bottom Elevation\ 12 FOREBAY Bottom Elevation 12 MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and fore bay berm. G. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet detention basin system shall be maintained in good working order. Form: SWU-102 Rev. 3.99 Page 3 of I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Kenneth I. Peregoy, Carolina Creek, LLC Title: M Address: 119 Middle Street, New Bern, NC 28560 Phone: Signatu Date: /D-47-6 G Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, Joseph T. Chance , a Notary Public for the State of North Carolina , County of Craven, do hereby certify that Kenneth 1. Peregoy personally appeared before me this 13th day of October, 2006, and acknowledge the due execution of the foregoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires SL << U f 700 Form: S WU-102 Rev. 3.99 Page 4 o f 4 Permit No. �:5 w 7 o f Orj 0 y (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin supplement for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. I. PROJECT INFORMATION (please complete the following information): Project Name: Carolina Colours Amenity Campus Contact Person: Kenneth I. Pere oy Phone Number: 252-636-3700 For project with multiple basins, specify which basin this worksheet applies to: 2 Elevations Basin Bottom Elevation 18.00 ft. (floor of the basin) Permanent Pool Elevation 22.00 ft. (elevation of the orifice) Temporary Pool Elevation 22.50 ft. (elevation of the discharge structure overflow) Area Permanent Pool Surface Area Drainage Area Impervious Area Volumes Permanent Pool Volume Temporary Pool Volume Forebay Volume Other parameters SA/DAI Diameter of Orifice Design Rainfall Design TSS Removal 2 13,421 sq. ft. (water surface area at the orifice elevation) 3.68 ac. (on -site and off -site drainage to the basin) 1.79 ac. (on -site and off -site drainage to the basin) 34038 cu. ft. (combined volume of main basin and forebay) 7293 cu. ft. (volione detained above the permanent pool) 8613 cu. ft. (approximately 20% of total volume) 4.22 (Surface area to drainage area ratio frown DWQ table) 1.75 in. (2 to 5 day temporary pool draw -down required) 1 in. 90 % (mininnan 85516 required) Form: SWU-102 Rev. 3.99 Page I of 4 Footnotes: I When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 The requirement for a vegetative filter may be waived if the wet detention basin is designed to meet 90% TSS removal. I1. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials 7- 4,.T' e `re A C ;7 a. The permanent pool depth is between 3 and G feet (required minimum of 3 feet). b. The forebay volume is approximately equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) f. The basin length to width ratio is greater than 3:1. g. The basin side slopes above the permanent pool are no steeper than 3:1. h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest e right-of-way. 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use a wet detention basin. m. A mechanism is specified which will drain the basin for maintenance or an emergency. II1. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) (❑) does (®) does not incorporate a vegetated filter at the outlet. This system (check one) (❑) does (®) does not incorporate pretreatment other than a forebay. Form: SWU-102 Rev. 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately; re -seed as necessary to maintain good vegetative cover, now vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 19 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 19 feet in the fore bay, the sediment shall be removed. Sediment RemovAEL 19 1 3 BASIN DIAGRAM Till in lire blanks) Permanent Pool Elevation 22 Sediment Removal Elevation 19 3 Bottom Elevation 18 1 Bottom Elevation 18 1 FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and fore bay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet detention basin system shall be maintained in good working order. Form: SWU-102 Rev. 3.99 Page 3 of I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Kenneth 1. Peregoy, Carolina Creek LLC Title Address: 119 Middle Street, New Bern, NC 28560 Phone: Signatu Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, Joseph T. Chance , a Notary Public for the State of North Carolina , County of Craven, do hereby certify that Kenneth I. Peregoy personally appeared before me this 13th day of October, 2006, and acknowledge the due execution of the foregoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires �C-rP - 0�d Form: SWU-102 Rev. 3.99 Page 4 of