Loading...
HomeMy WebLinkAboutWQ0042009_Application (FTSE)_20201013Central Files: APS _ SWP 10/1/2020 Permit Number W00042009 Permit Tracking Slip Program Category Status Project Type Non -discharge In review New Project Permit Type Version Permit Classification Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions A Individual Primary Reviewer Permit Contact Affiliation dean.hunkele Coastal SWRule Permitted Flow Facility Facility Name Major/Minor Region 9550 Ploof Rd Commercial Private Pump Station Minor Wilmington Location Address County Brunswick Facility Contact Affiliation Owner Owner Name Owner Type Maat Holdings Ploof Road LLC Non -Government Owner Affiliation Eric R. Davis Dates/Events Scheduled Orig Issue App Received Draft Initiated Issuance 9/28/2020 Regulated Activities 3116 Waddington Rd Matthews NC 28105 Public Notice Issue Effective Expiration Requested /Received Events Additional information requested Additional information received Outfall _ .. Waterbody Nz OTLYNN engineering pllc September 23, 2020 Division of Water Resources RECEIVED North Carolina Department of Environmental Quality RE: 9550 Ploof Road Development— Sewer Main Extension SEP 2 8 2020 9650 Ploof Road, Leland, N.C. 28451 NCDEQ WILMINGTON RO A set of existing restrooms service the entire property and wastewater is currently treated by a septic tank and leech field. The existing restrooms will be demolished, and the septic system will be decommissioned per state standards. The proposed sewer main extension will provide service to a new restroom facility being constructed to replace the existing restrooms on the above referenced site. The proposed project includes the installation of a sewer lift station and approximately 330 Linear Feet of 1-1/2" HDPE SDR9 Force Main. The proposed force main will be connected to an existing 6" Force Main on the southeast side of Ploof Road. Reported head at connection point is 48 feet per H2Go (WWTP Facility Operator). Submittal Contents: • Application Form FTA 04-16 • Power Reliability Letter • LISGS Site Map • Street Level Map • LLC Documentation • Flow Tracking Form FTSE 10-18 • Construction Documents with engineering calculations Please let me know if you need any additional information or have any questions. Sincerely, Brandon G. O'Flynn North Carolina PE #45932 1200 Fourth Street #575 • Key West, Florida 33040 • Firm License 0-1801 brandon@oflynneng.com • (910) 304-5566 State of North Carolina DWR Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Dlvlslon of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: 0606 qQ1,00 I (to becompleted byDwR) All items must be completed or the application will be returned 1. APPLICANT INFORMATION: 1. Applicant's name: MAat Holdings - Ploof Road, LLC (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ❑ Municipal ❑ Other 3. Signature authority's name: Eric Davis per 15A NCAC 02T .0106(b) Title: Member 4. Applicant's mailing address: 341116 Weddington Road, STE 900 City: Matthews State: NC Zip: 28105- 5. Applicant's contact information: Phone number: 910)142-2232 Email Address: eric@poconsulting.com 11. PROJECT INFORMATION: I. Project name: 9550 Ploof Road Development 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: W000 and issued date: If new construction but part of a master plan, provide the existing permit number: W000 3. County where project is located: Brunswick 4. Approximate Coordinates (Decimal Degrees): Latitude: 34.2167' Longitude:-78.0132' 5. Parcel ID (if applicable): 04800013 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Brandon OTlynn License Number: 45932 Firm: O'FI non Engineering PLLC Mailing address: 1200 4" Street #575 City: Key West State: FL Zip: 33040- Phone number: (910) 304-5566 Email Address: brandon@oflynneng.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Belville W WTP Permit Number: NCO075540 Owner Name: Brunswick Regional Water & Sewer: H2GO V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): W00015172(M) Downstream (Receiving) Sewer Size: 6 inch System Wide Collection System Permit Number(s) (if applicable): WQCS00202 Owner Name(s): Brunswick Regional Water & Sewer: H2GO FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS I. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No NN/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No NN/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No NN/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash N Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 0 % Domestic/Commercial 100 % Commercial 0 % Industrial (See 15A NCAC 02T .0103(20)) "Is there a Pretreatment Program in effect? ❑ Yes N No 6. Hasa flow reduction been approved under 15A NCAC 02T .01 MID? ❑ Yes N No ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0I 14(f)1 Daily Design Flow e,b No. of Units Flow General Business 25 gal/day/employee/shift 18 450 GPD Storage I gal/unit 64 64 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 514 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 514 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC Vlll. PUMP STATION DESIGN CRITERIA (If Applicable)-02T.0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: LS-1 2. Approximate Coordinates (Decimal Degrees): Latitude: 34.2169' Longitude:-78.0129° 3. Design flow of the pump station: 0.000514 millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): 12.6 gallons per minute at 56.1 feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 1.5 330 HDPE SDR9 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(13)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ® Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS—(02B.0200 & 15A NCAC 02T.0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g) ® Yes ❑ No ➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains (horizontal) 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-1 waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HOW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top sloe of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade vertical 36 inches ➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage ➢ If noncompliance with 021'.0305(t) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No ® N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .02009 ❑ Yes ❑ No ® N/A ➢ This would include Trout Buffered Streams per 15A NCAC 213.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ❑ Yes ® No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Aunroval of the request is reauired prior to submittal of the Fast Track Aorlication and sunnorting documents. 2. Professional Engineer's Certification: I Brandon O'Flynn attest that this application for (Professional Engineer's name from Application Item III.1.) has been reviewed by me and is accurate, complete and consistent with the infornhation supplied in die plans, specifications, engineering calculations, and all other supporting documentation to die best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. • • . North Carolina Professional Engineer's seal, signature, and date: N GARO4 , OQ�.FE•SS1 Z:0 a SEAL = 45932 _ 9-IS-20 ' 2 3. Applicant's Certification per 15A NCAC 02T .0106(b): I, Eric Davis, Member attest that this application for (Signature Authority's name & title from Application Item I.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215 6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. t r Signature:` A _` Date:!57c) � cvk) FORM: FTA 04-I6 Page 5 of 5 RECEIVED O C 1 01 2020 State of North CqC9JjW DWR Department of Enviromnet"Qvaft RO Division of Water Resources Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: MAAT Holdings - Ploof Road, LLC Project Name for which flow is being requested: 9550 Ploof Road Development More that one FTSE may be required for a single project if the owner of the WJJITP is nol responsible for all pttntp stations along tine roate of the proposed rwaslervaterflov. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: BellevilieWWTP b. W WTP Facility Permit #: NC0075540 All flows fire In MCD c. W WTP facility's permitted flow .400 d. Estimated obligated flow not yet tributary to the W WTP .653 e. W WTP facility's actual avg. flow .400547 f. Total flow for this specific request .000514 g. Total actual and obligated flows to the facility 1.05 h. Percent of permitted flow used 165 11. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the W WTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MOD Flow, MOD MOD Flow Capacity*** NA * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the W WTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Belville W TP Downstream Permit Number: W 67 e¢ qf Page 1 of 6 FTSE 10-18 111, Certification Statement: 1 Bob Walker certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and 11 plus all attached planning assessment addendums for which I am the responsible party. Signature ofthis form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signalui a Date Page 2 of G FTSE 10-18 Maat Holdings— Ploof Road, LLC 3116 Weddington Road, Suite 900 Matthews, NC 28105-9406 (910) 742-2232 September 18, 2020 State of North Carolina Department of Environmental Quality Division of Water Resources RE: 9550 Ploof Road Development 9550 Ploof Road, Leland, NC 28451 The portable power generation unit or portable, independently -powered pumping units, associated appurtenances and personnel are available for distribution and operation of this pump station. Regards, Eric R. Davis Managing Member 9550 Ploof Road Development w r v U SITE �E ear O� c- u �'mlvrn no��„ s JcflgnuopU In li��l.l Il,rinn pr r`rY`" LIMITED LIABILITY COMPANY ANNUAL REPORT ■ , 012017 NAME OF LIMITED LIABILITY COMPANY: MAAt Holdings - PIOof Road, LLC SECRETARY OF STATE ID NUMBER: 1018068 REPORT FOR THE CALENDAR YEAR: 2020 SECTION A: 1. NAME OF REGISTERED AGENT: Davis, Eric R. 2. SIGNATURE OF THE NEW REGISTERED AGENT: STATE OF FORMATION: NC Filing Office Use Only E - Filed Annual Report 1018068 CA202009810008 47/2020 04:46 Changes SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT 3. REGISTERED AGENT OFFICE STREET ADDRESS & COUNTY 4. REGISTERED AGENT OFFICE MAILING ADDRESS 3116 Weddington Rd, Ste 900 3116 Weddington Rd, Ste 900 Matthews, NC 28105-9407 Mecklenburg County Matthews, NC 28105-9407 SECTION B: 1. DESCRIPTION OF NATURE OF BUSINESS: Commerical Real Estate Rental 2. PRINCIPAL OFFICE PHONE NUMBER: (704) 641-7575 3. PRINCIPAL OFFICE EMAIL: Privacy Redaction 4. PRINCIPAL OFFICE STREET ADDRESS 3116 Weddington Rd, Ste 900-171 Matthews, NC 28105-9406 5. PRINCIPAL OFFICE MAILING ADDRESS 3116 Weddington Rd, Ste 900-171 Matthews, NC 28105-9406 6. Select one of the following if applicable. (Optional see instructions) ❑ The company is a veteran -owned small business ❑ The company is a service -disabled veteran -owned small business SECTION C: COMPANY OFFICIALS (Enter additional company officials in Section E.) NAME: Eric R Davis NAME: TITLE: Managing Member TITLE: ADDRESS: 3116 Weddington Rd Ste 900 Matthews, NC 28105 ADDRESS: NAME: TITLE: ADDRESS: SECTION D: CERTIFICATION OF ANNUAL REPORT. Section D must be completed in its entirety by a person/business entity. Eric R Davis SIGNATURE Form must be signed by a Company Official listed under Section C of This form. Eric R Davis Print or Type Name of Company Official 4/7/2020 DATE Managing Member Print or Type Title of Company Official This Annual Report has been filed electronically. MAIL TO: Secretary of State, Business Registration Division, Post Office Box 29525, Raleigh, NC 27626-0525 Hunkele, Dean From: Brandon O'Flynn <brandon@oflynneng.com> Sent: Monday, October 12, 2020 3:25 PM To: Hunkele, Dean; eric@goconsulting.com Subject: [External] RE: 9550 Ploof Road Commercial pump station sewer app - pending permit WQ0042009 Good Afternoon Dean, My client decided to shift over to fast track, which included a re -design of the system to meet the requirements of the fast track process. The system is now duplex, the flow tracking form has been updated, and some other miscellaneous changes we implemented due to comments and redesign of system. There is only one building that will have bathroom facilities. The 64 gpd in question was from NC code for storage units which is 1gal/unit/day and was applied for 64 units. If you require any other documentation or have any questions, please do not hesitate to contact me. Thanks, Brandon G. O'Flynn, PE, PSM c)'I Ll'Nti O'Flynn Engineering, LLC 910.304.5566 brandon(@oflynneng.com From: Hunkele, Dean <dean.hunkele@ncdenr.gov> Sent: Monday, October 12, 2020 12:44 PM To: Brandon O'Flynn <brandon@oflynneng.com>; eric@goconsulting.com Subject: RE: 9550 Ploof Road Commercial pump station sewer app - pending permit WQ0042009 Importance: High Brandon, I have never back from you per the request below. The application is currently within the Fast Track program for issuance by our office. Dean Hunkele Environmental Program Consultant Water Quality Regional Operations Section Division of Water Resources Department of Environmental Quality 910.796.7215 Reception Desk 910.796.7380 Direct 910.350.2018 Fax Dean. Hunkele@ncdenr.go Wilmington Regional Office 127 Cardinal Drive Ext Wilmington, NC 28405 http://deci.nc.goy/contact/regional-offices/wilmington Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties The goal of the Fast Track sewer permit program is to issue a permit in no more than 30 business days from receipt of a complete application and if no additional information has to be requested upon full review. Please use the Department's Permit Application Tracker to determine the official application receipt date to allow you to estimate a date for issuance and find the reviewer's name. Once issued, the record stays on the site for 30 days. For previously issued sewer permit info or to check on sewer certification receipt status, please use the Division's Sewer Extension Permit Tracker. Using the Issue Date on top of the Engineer Certification Form is best way to ensure getting what you want especially for multi -version permits; using today's date only gives Info on the latest permit version. Confirmation using this method will replace letters and emails: it is recommended that confirmation be printed and/or saved. Links to both trackers can be found on the sewer permitting site here: https://deg.nc.gov/about/divisions/water-resources/water-resources- pe rm its/pe res/col I ectio n-syste m s-perm its Subscribe to Collection System Updates listserve to receive automatic alerts for changes to applications, policies, regulations, etc. From: Hunkele, Dean Sent: Wednesday, September 16, 2020 3:57 PM To: brandon@oflynneng.com; eric@goconsulting.com Cc: Fertenbaugh, Christyn L <christvn.fertenbaugh ncdenr.gov> Subject: 9550 Ploof Road Commercial pump station sewer app Importance: High Hi Brandon, First of all, the application (SSEA 04-16) submitted to our office was not the Fast Track application (FTA 04-16) which is the correct one to use for permitting through the regional offices and covers a majority of permitting requests statewide if the design & request meets all our sewer Minimum Design Criteria and the 2T regs. I can use the one submitted if the project is approvable as presented. To that end, it appears that you would like to use a simplex or single pump setup tying into a force main. Our rules and/or design criteria do not allow simplex for non- residential without a variance being granted and permitting through our Central Office in Raleigh where the application I have normally goes. If this is your intention, then I can forward the materials submitted up. They would need your full design and modeling information; I can forward whatever I have. Christyn heads up the permitting group in Raleigh. Also, the requested flow in the application package shows at least 3 different flows being requested —439 gpd in Item VI.7, 514 gpd in Item VI. 8, and 625 gpd on the FTSE form. This value will need to be reconciled to match throughout the request and design. Additionally, it appears on the drawings provided that there are multiple buildings on the site either existing and/or proposed. The narrative indicates this will only serve a new common restroom facility which is assumed to be the only wastewater flow entering the station, correct? I am kind of unclear as to what this site is or does and the storage flow of 64 gpd in Item VI. 8 is not well explained as to what it is for.